HomeMy WebLinkAbout2007-263C avv7 - � (o � D O N A D I O & Associates, Architects, P.A. TO: LOU FIORE TURNER CONSTRUCTION STEVE BLUM INDIAN RIVER COUNTY LYNN WILLIAMS INDIAN RIVER COUNTY TOM FRAME INDIAN RIVER COUNTY JIM LEVERONI DONADIO AND ASSOCIATES FROM : ANTHONY J. DONADIO, AIA, NCARB DONADIO & ASSOCIATES, ARCHITECTS, P.A. DATE: FRIDAY - APRIL 6, 2007 ISSUE DATE: APRIL 16, 2007 PROJECT NO. 2102.18 REGARDING: INDIAN RIVER COUNTY ADMINISTRATIVE COMPLEX BUILDING 1 - 2ND FLOOR - EAST END PUNCHLIST TIME: 1 :30 P.M. WEATHER: SUNNYICLEAR CLERK OF THE COURTS: Door 1.2 201A 1 . Door has no glass in it. 2. Door frame needs to be repainted inside and out. Also, no threshold at the expansion joint installed at this time. Corridor 1.2-201 1 . Numerous ceiling tiles missing in this area. 2 . To the left of Door 201A, vinyl base is not adhered to the drywall. 3 . Fire Alarm Pull Station needs to be cleaned of paint and caulked where it abut the drywall . Open Office Area 1.2-202 1 . East wall between the Fire Extinguishers Cabinet and Door 230B, the Training Room and Door 230B, the Training Room about the middle of the wall has a tear in the drywall right at the vinyl base. 2. Edge of drywall soffit board above Door 230B is raveled needs to be sanded and repainted. 3 . Vinyl base is installed probably 35% of this area. 4. Vinyl base outside comer to the right of Door 230B is not adhered properly. 5 . To the right of 230B above the vinyl base screw head showing. 60917 1h Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 Email daa@donadio-arch.com License No. AA0002238 Indian River County Administration Complex ' Bldg. 1 — 2nd Floor East End Punchlist — Friday 04/06/07 April 16, 2007 Page 2 Open Office Area 1.2-202 (continued) 6. Right outside corner of Door 230B alcove corner bead is damaged. Also on the left hand side same thing, scratch in the drywall . 7 . Right side of doorjamb 230B drywall is very irregular, needs to be sanded and repainted. That is true of the left side of the vinyl base location and the right corner. 8 . Vinyl base not installed on the west wall of Storage Room 229 from door 230B towards the Men' s & Women ' s Restroom. 9. Same wall gauges in the drywall have been painted, the vinyl base area needs to be patched and repaired. 10. North wall opposite the drinking fountains, pencil marks on the wall need to be repainted. Also, the west comer of this north wall is damaged, needs to be patched and repaired. 11 . Work still going on in this area. . Carpet boxes all over the floor and also, news print paper on the carpet for protection. 12. South face of the wall directly opposite the drinking fountains needs to be patched and repaired. Paints not matching where it has been touched up. 13 . North drywall wall of open Office area, the wall conjunction with File Room 207, right end paint on top of the vinyl base needs to be removed. Also, on this same wall pencil marks on the wall need to be cleaned and repainted. 14. Drywall to the right of Door 204A at Vestibule Room, this needs to be repainted where it abuts the metal door frame. 15 . West wall of open Office area 202, the wall adjacent to Conference Room 203 , just to the left of Door 204 a lot of nicks in the drywall, carpet glue, etc . Needs to be cleaned, patched and repainted. 16. Column in the center area of open Office 202 needs to be repainted with a second coat of paint. Corridor 202 1 . Open Office Area 202, item west wall ceiling tile along the wall approximately 2 ceiling tiles to the left of the hom strobe is chipped. 2 . Ceiling tile in front of the free standing column, the 3 full ceiling tiles there is a chip in the tile. 3 . Ceiling grid in front of 230B is damaged. 4. Ceiling tile in front of Copy/Coffee Area 212 in between that area and Door 210 approximately 4 ceiling tiles off that wall, tile is chipped. 5. Open area in front of Office 214 and mailroom 213, west wall data outlet to the left, left side of west wall needs being patched and repaired at this time. 6. Vinyl base has been installed in this area. 7 . Vinyl base to the left of Door 214A joints cut too short. Also, drywall to the left of Door 214A, drywall needs to be sanded and repainted on the bottom left and also electrical outlet box needs cover plate . Conference Room 203 1 . Door 203A outside right edge of the metal door frame is dented, needs to be patched and repaired. That is also true of the bottom portions of the jamb, right and left side needs to be patched and repaired. 2. Lights are not operating in Conference Room 203 . 3 . No doors installed at this time. 4. No vinyl base installed in Room 203. 5 . 90% of the ceiling tile is not in place at this time. 6. Carpet joints where the Teal Carpet meets the Pattern Carpet, very irregular, needs to flattened out or cut in re-secure to the adhesive. 7 . Drop drywall soffit at the Conference Room area needs to be repainted at the Sprinkler Heads, fingerprints. 8 . Outside corners of the drop soffit are rough and irregular, these need to be sanded and repainted. That is also true of the inside comers . 9. East wall of Conference Room, electrical outlet to the left of Door 203A , drywall around that outlet needs to be sanded and repainted. That is typical of both outlets on this wall . D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 3 Conference Room 203 (continued) 10. West wall between the boxed out steel column and the wall adjacent to Corridor 201 , the South wall, the drywall around that electrical outlet needs to be sanded and repainted. Vestibule 204 1 . No vinyl base installed at this time . 2. Door 204A, strike side of hollow metal door at the bottom has a dent in it. Also, the bottom right and left side needs to be painted at least 2ft up off the floor on the hollow metal frame. 3 . Door 205A Vestibule side facing door has paint on it at the bottom edge. Needs to be cleaned and removed. 4. Metal door frame where it abuts the carpet on both sides needs to be patched and repaired. 5 . Fire Alarm Horn Strobe needs to be caulked where it abuts the paint. 6. Drywall to the right of Door 205A screw head exposed, needs to be patched and repaired. Also, at the vinyl base area to the right of this door, drywall is irregular, this needs to be sanded and repaired. 7 . To the right of Door 204A from the Vestibule side, drywall needs to be sanded and repainted, torn away from the frame. Also, door heads in the Vestibule where they abut the drywall numerous areas where paint needs to be repainted and the door heads of the metal frame needs to be repainted. 8 . Electrical outlet, pint sanding at the drywall around the electrical outlets. Office 1.2-205 1 . Light switch to the left of Door 205 from within the Office area the drywall needs to be sanded and repainted. 2. East wall North end electrical outlet the drywall needs to be sanded, patched and repaired. Also, below this same area drywall is irregular needs to be sanded and repaired. 3 . No vinyl base installed in Office 205. 4. Ceiling tile about 5 % complete in this room. 5 . No window sill installed. 6. Right jamb of exterior window, drywall edge needs to be sanded and repainted. Also, directly below this window, the right side of the window about a foot off the floor there is a budge in the drywall, this needs to be repaired. 7. Electrical outlet to the bottom left of exterior window, needs to be set flush to the drywall. 8. Electrical outlet on the West wall, just to the left of data outlet, the drywall is irregular, needs to be sanded and repainted. Office Area 1.2-206 1 . Left of Door 206A, drywall needs to be sanded and repainted at the light switch. It is irregular. 2. On this same wall carpet adhesive needs to be removed about 6" off the carpet at the middle of the wall . 3 . No vinyl base installed in this room. 4. Window sill needs to be installed on exterior window. 5 . Top left and right inside corner needs to be sanded, drywall is irregular. 6. Electrical outlet to the bottom left of the exterior window, paint tape needs to be removed. Also, below the electrical outlet is a gouge in the drywall that needs to be patched and repaired. 7 . Center of the room ceiling tiles that is the 2nd and 3`d ceiling off the exterior wall, dents in the ceiling tile and also looks like paint on the edge adjacent to the grid . File Room 207 1 . Bottom left below the strike door needs to be cleaned of drywall dust, etc. 2. Top left corner of the Door 207A needs to be sanded and repainted where the drywall meets the door. 3 . Bottom left inside corner drywall very irregular and rough, this needs to be redone. Sanded and painted smooth to receive vinyl base. That is also true of the right inside corner to the right and left of Door 207A. 4. Electrical outlet to the right of Door 207A, drywall needs to be sanded and repainted. Also, in this same area adhesive from carpet and a gouge in the drywall needs to be taken care of. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. I - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 4 File Room 207 (continued) 5. East wall needs to be cleaned of carpet adhesive. 6. North wall to the right third of the wall irregularities in the drywall approximately 24" or 36" off the floor and also in that right corner where the East and the North wall meet, this needs to be repaired. Corridor 208 1 . Drywall at the vinyl base location between Doors 214A & 215A is very irregular, needs to be sanded and repainted . 2. Drywall between Doors 215A and 216A closer to 216A, drywall is irregular, needs to be sanded and repainted. Also, to the left of Door 216A. 3 . West outside corner on the wall adjacent to Mailroom 213, vinyl base edge of drywall is chipped, needs to be repainted and the corner bead needs to be secured where the vinyl base is. Also, in this same location electrical outlet drywall needs to be patched and repaired . Opening cut too large. Also to the right of that electrical outlet irregularities in the drywall, needs to be sanded and repainted. 4. Above the vinyl base locations between the fire alarm pull station and the electrical outlet about middle of the wall the drywall needs to be patched and repaired. 5 . Ceiling in corridor in 208 is incomplete . Women 's 209 & Men's Restroom 210 1. Areas still being worked on, not in a condition to be punched at this time. Janitor's Closet 211 1 . Door frame needs to be cleaned of paint and adhesive throughout. 2. No vinyl base installed or ceiling tile at this time. 3 . Floor needs to be cleaned of dirt and debris and sealed. 4. Drywall to the left side of door at the hinged side needs to be sanded and repainted. 5 . Conduit penetrating the concrete floor needs to be sealed off at the floor and also cut and sealed where it penetrates the ceiling tile. 6. Acoustical ceiling grid in place, carpet adhesive on the grid opposite the Janitors sink, needs cleaned. 7 . Drywall around the escutcheon plates of the Janitor' s sink/faucet needs to be sanded and repainted and painters tape needs to be removed. That is also true of the drywall around the GFI electrical outlet. Cony Room 212 1 . Plastic laminate countertops need to be cleaned of dust, dirt and debris. 2 . Drywall at the light switch needs to be touched up with paint, fingerprints throughout on that wall. 3 . Accent wall center of the wall has fingerprints and chip in the paint needs to be patched and repaired. 4. Same accent wall, bottom left of thermostat there is chip in the drywall needs to be sanded and repainted . 5 . East wall some gouges in the drywall needs to sanded and painted. That is also true just to the right of the cabinet base where it abuts this wall. 6. Drywall between base cabinets and the backsplash needs to be sanded and repainted numerous area chipped on the drywall around the electrical outlet, etc. inside corner. 7. Top right above the upper cabinets, drywall needs to be repainted. 8. To the left of the upper cabinets about the middle the door drywall is chipped, needs to be sanded and repainted . 9. Countertop just to the right of the sink, a black mark in the mica, does not appear to be able to be removed, this needs to be taken care of. 10. Fifth cabinet door from the left inside face needs to be cleaned of adhesive . D O N A D I O & Associates, Architects, P.A . Indian River County Administration Complex Bldg. 1 - 2"d Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 5 Mail Room 213 1 . Hollow metal door frame to Door 213A needs to be cleaned of adhesive . Also, same side below the middle hinge, scratch and also edges are chipped needs to be repainted. Left outside drywall where it abuts the door frame on the strike side needs to be repainted where it has be caulked. Very irregular at the drywall needs to be sanded and repainted. 2. Vinyl base installed in this room. 3 . Vinyl base to the left of the door at the hinge side needs to he reinstalled or caulked where it abuts the hollow metal door frame . 4. Drywall to the left of the hollow metal door frame and top right, drywall is irregular, needs to be sanded and repainted. 5 . Drywall between hollow metal door frame strike side and light switch needs to be sanded and repainted. 6. All electrical outlets in this room the drywall needs to be sanded and repainted where it is irregular or openings are cut too large. 7 . Corners of vinyl base at the inside corners vinyl base is not set tight into the corner, there is a void behind it. 8 . Cleanout on the South wall needs to be escutcheon cover plate. 9 . Ceiling tile to the right of the Return Air Grille has a chip in it, needs to be patched or repaired. Office 214 1 . Door 214A, the hollow metal frame needs to be cleaned of adhesive and repainted where the frame has been chipped in numerous locations on the strike side. 2. Bottom right on the outside of the Door 214A below the bottom hinge is chipped. Chip in the wood door. 3. Left of Door 214, drywall is irregular to the left of the bottom hinge, needs to be sanded and repainted. 4. Right of Door 214A, adhesive on the wall needs to be repaired. 5 . Drywall at the floor level where the vinyl base is to be installed numerous areas inside comer missing drywall, irregularities all need to be sanded smooth to receive to the vinyl base. 6. West wall, electrical quad outlet, drywall needs to be sanded and repainted where it abuts the electrical outlet. Also, on this wall about the middle of the wall there are gouges and material on paint on the drywall needs to be sanded and repainted. 7. North wall, East end electrical outlet needs to be cleaned of paint. 8. South wall, second electrical outlet to the West, drywall needs to be sanded and repainted around the outlet. Office 215 1 . No door installed at this time. 2. Bottom outside face of stop on the hinged side needs to be repainted. 3 . Carpet at this area on the outside face of the right side of the door frame is cut too short from the door frame. 4. Left side bottom left inside of Office 215, drywall is irregular, needs to be sanded and repainted. 5 . Light switch, drywall needs to be sanded and repainted and switch needs to be set plumb . 6. Ceiling tile at the sprinkler heads needs to be replaced. Red mark on the tile. Office 216 1 . Upright metal door frame chip in the paint that has been painted over needs to be sanded and repainted. 2. Hollow metal door frame, bottom right chips in the paint, needs to be repainted. 3 . To the left of Door 216A, inside the office fingerprints on the wall need to be cleaned. Also to the right drywall is irregular, needs to be sanded and repainted and also needs to be painted where it abuts the hollow metal door frame. 4 . To the left of Door 216A, center of the wall to the left of electrical outlet needs to be sanded and repainted. Also, to the bottom left and right of this same area there are imperfections in the drywall, needs to sanded and repainted. 5 . On the South wall between the light switch and electrical outlet to the left of Door 216, approximately 30" off the floor, there is a horizontally irregularity in the drywall, this needs to be taken care of. D O N A D I O & Associates, Architects , P.A. Indian River County Administration Complex Bldg. 1 - 2"d Floor East End Punchlist — Friday 04/06/07 April 16, 2007 Page 6 Office 216 (continued) 6. East wall , top left near the Return Air Grille, marks on the drywall, fingerprints also in the center of this same wall needs to be repainted. Office 217 1 . Bottom right inside face of door needs to be cleaned carpet adhesive. 2. Door frame for 217A, top right inside corner at the stops need to be filled in and repainted. 3. Top left of Door 217 is a crack in the drywall up to the ceiling, this needs to be patched and repainted . 4. Door frame 217 needs to be cleaned of carpet glue and repainted wherever there is any mix, etc. 5 . Inside to the left of door frame 217 , drywall needs to be sanded, caulked and repainted. The complete length of the door. 6. Top right edge of door frame inside is dented needs to be patched and repaired. Also, drywall needs to be sanded at the door head and repainted. 7. Electrical outlet to the left of Door 217, drywall needs to be sanded and repainted where there is irregularity. 8. Any areas in this room where drywall has carpet adhesive on it needs to be removed prior to painting. 9. Right side of Door 217 drywall is very irregular from the carpet up, needs to be sanded and repainted. Office 218 1 . Door frame needs to be cleaned of carpet adhesive. 2. Bottom left and right sides are chipped and also middle of the frame on the left is chipped needs to be repainted on the outside face. 3. Bottom left of door 218 drywall is irregular needs to be sanded and repainted. That is also true of the right side on the top edge. 4. Acoustical grid just above Door 218 needs to be cleaned of paint. 5 . Electrical outlets to the left of Door 218 the drywall is irregular needs to be sanded and repainted. 6. Ceiling tile at the sprinkler heads, fingerprints need to be cleaned or replaced. Conference 219A 1 . Right side of Door 219A on the outside face, door frame is dented. Also, adhesive on the door and numerous areas of the door paint has been chipped. 2. Inside face of door frame bottom left and bottom right doorjamb is dented. 3 . Left of Door 219A, drywall needs to be patched and repaired to left of electrical outlet. Also, a hole adjacent to the fire alarm horn strobe, needs to be patched and repaired. 4. Adhesive on wall, fingerprints, etc. , needs to be patched and repaired. On the South and the East walls . 5 . Exterior wall the accent wall, drywall around the electrical outlet needs to he sanded and repainted. Drywall is irregular. 6. Left inside comer at the exterior wall where the field color and the accent color have been cut in is irregular, this needs to be cut in clean. 7 . West wall to the right of Door 219A paint on the wall needs to be removed and repainted . 8 . Bottom right where the vinyl base is, drywall is very irregular. Needs to be patched, sanded smooth and repainted. 9. Chip in the ceiling grid the 2"0 main runner off the exterior wall and to the left of the exterior window and the 2 x 2 light fixture, chip in the finish. Open Office Area 220 1 . To the right of Door 217A needs to be sanded and repainted at the door jamb. 2. To the right of Door 218A between 218A door frame and the electrical outlet irregularity in the drywall needs to be sanded and repainted D O N A D I O & Associates , Architects, P.A . Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Ponchlist - Friday 04/06/07 April 16, 2007 Page 7 Open Office Area 220 (continued) 3 . Drywall between Doors 232A and 233A irregularities in the drywall above the vinyl base, needs to be patched and repaired. Also to the left of 232A, drywall is irregular where it abuts the hollow metal door frame on the left and the right sides need to be sanded and repainted. 4. Drywall to bottom left of Door 219A needs to be sanded and repainted, Drywall is irregular. Also, on the middle of this wall between 219A and 233A wall needs to be patched. 5 . Drywall at fire alarm horn strobe to the left of 219A needs to be patched and repaired. 6. Drywall to the right of Door 219A approximately 3 feet up the wall needs to be sanded and repainted. Irregular. 7 . Drywall to the bottom left of Door 222A needs to be sanded and repainted and needs to be cleaned of adhesive . 8 . Drywall around Data Outlet 19D & 20D on the South wall of Open Office Area 220, irregularity in the drywall between the Data Outlet and the Quad Outlet, needs to be sanded and repainted . 9 . Drywall to top right of Data Outlets 15D & 16D, irregularities, need to be sanded and repainted. 10. Drywall between Data Outlet 15D, 16D & 13D & 14D, fingerprints on the wall, good portion of this wall between these two Data Outlets needs to be repainted. 11 . Quad outlet to the right of Data Outlet I ID & 12D, bottom drywall paper is tom, needs to be patched, repaired and repainted. 12. Bottom right at Door 221A drywall is very irregular, needs to be repainted. Also, at this same location the door frame is dented above the bottom hinge and Door 220A, IA is missing a hinge . 13 . Ceiling grid just to the right of Door 218A approximately 4 ceiling tiles off the North wall is cut too short. Also, in this same area, ceiling around the Return Air Grille needs to be replaced, fingerprints throughout. 14. In front of Door 232A to the right, 3 ceiling tiles off the North wall , right edge is chipped. 15 . Ceiling tile to the left of Door 219A , lir` ceiling tile off the wall, right edge is chipped. Office 222 1 . Bottom right outside edge of glass and frame glazing adhesive is on the glass, needs to be cleaned up. 2. Door frame 222A needs to be cleaned of adhesive. 3 . Bottom left and right door frame needs to be touched up with paint. 4. Right side comer just to the right of Door 222 and Secretarial 223 corner bead is damaged. 5 . East wall to the right of Door 222A, irregularities in the drywall below the electrical outlet and about the middle and right end of the wall needs to be sanded and repainted. Also, true of the North wall at the inside corner. 6. East wall about the middle of the wall, paint on the wall needs to be removed. 7 . South wall middle of wall above the vinyl base nick in the drywall has been painted over, needs to be patched and repaired. 8 . Top right of Door 222, drywall needs to be sanded and repainted at the right side of the jamb. Secretarial 223 1 . There is an open office area to the right of Door 222, drywall from the carpet up approximately 30" needs to be sanded and repainted. Pin holes in the drywall mud. 2 . To the top right of the wall adjacent to Office 222 ceiling grid is broken, not connected at the access panel to the above ceiling equipment. Office 224 1 . Bottom right of Door 224 outside face needs to be cleaned of carpet adhesive. Also on the inside face . 2. Door frame needs to be cleaned of carpet adhesive. 3 . Light switch to right of Door 224 irregularity in the drywall top edge and the light switch in the bottom edge, needs to be sanded and repainted. D O N A D I O & Associates, Architects, P.A . Indian River County Administration Complex Bldg. 1 - 2vd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 8 Office 224 (continued) 4. North wall, water stains, some type of liquid stain on the drywall needs to be repainted . Also, to the bottom of the electrical outlet in this same location there is an irregularity in the drywall . Needs to be sanded and repainted. 5 . Bottom left jamb of the window opening needs to be sanded and repainted. Outside edge is very irregular. 6. In front of Door 224 approximately 6 to 7 feet, dark area in the carpet. Not sure if this is part of the carpet or something got on the carpet. Where carpet was installed, carpet tiles were installed incorrectly. Oven Office Area 225 1 . North wall the wall adjacent to Office 224 to the bottom left of the electrical outlet is irregularity in the drywall needs to be patched and repaired. 2. Drywall around electrical outlet needs to be sanded and repainted. 3. East wall, drywall below Data Outlet 29D & 30D needs to be patched and repaired, nick in the drywall. Also, drywall around the Quad Outlet in this same location needs to be sanded and repainted. 4. Quad Outlets to the right and left of Data Outlet 35D, 36D, 37D & 38D needs to be cleaned of paint. 5. South wall the wall adjacent to Office 203 irregularities in the drywall about center portion and also and carpet adhesive on the drywall . 6. West wall at the Computer Room 226, hollow metal paint on the drywall needs to be removed and drywall needs to be repainted . 7. Top right and left of the hollow metal widow frame, the window head complete length drywall needs to be sanded and repainted. 8. West wall opposite Office 224, fingerprints and carpet glue on the wall, needs to be repainted. 9. About a dozen ceiling tiles are missing in Room 225A Open Office area. . 10. Ceiling to the top right corner of Office 224, approximately 2°d full file off that outside comer is chipped. 11 . Ceiling grid between Office Area 224 and Supply Grille along central file room wall, grid is dirty. 12 . Ceiling tile off the exterior window, the 2°d window from Office 224, 4ih tile off the wall is chipped. Computer Room 226 1 . Computer Room 226 is not complete and will punched out at later date. Production Room 227 1 . Door 227A inside face has been sanded, needs to be finished completely. Also, bottom middle of the door has a scratch in it. 2 . Hollow metal door frame needs to be touched up with paint on the bottom right and left approximately 16" up from the floor. 3 . Drywall to the left of Door 227A needs to be sanded and repainted just above the bottom hinge, irregular. Also, in this same area there appears to be a bulge in the drywall. 4. Bottom left where Data Outlet 13D & 14D, marks on the drywall need to be cleaned and painted. 5 . Top right of Data Outlet I ID & 12D mark on the drywall needs to be cleaned. 6. Southwest inside comer needs to be sanded to receive vinyl base. 7. South wall above the Easternmost duplex outlet, drywall needs to be sanded and repainted and also, marks on the drywall needs to be cleaned and repainted. 8. Door 228A inside face at door frame of Production 227 , left side, the bottom left is damaged, dented, and also door frame needs to be touched-up with paint on the bottom right and left sides. 9. Ceiling grid to the top left of Door 228A and Room 227 is damaged. Finish is chipped. That is also true of the ceiling grid adjacent to Supply Air Grille and 1 ceiling tile off the heat detector and sprinkler head. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 9 Lab 228 1 . To the left of 228A the drywall on the inside corner needs to be repainted completely . 2. To the right of Door 228A light switch needs to set plumb. Also top head of the drywall frame needs to be sanded and repainted, carpet adhesive, etc, on the wall . 3 . Top right of duplex outlet just to the left of Door 228B , mark on the drywall needs to be cleaned and repainted. 4. Door 228B inside face right side drywall has been sanded and re-caulked, this needs to be repainted . Also, the head at the drywall needs to be sanded and repainted. 5 . Ceiling grid that is front of Door 228D finish is chipped. 6. South wall to the left of the upper cabinets, drywall is full of black paint. This needs to be sanded and repainted. Also, to the left, this same wall on the left side of the base and upper cabinets there are a lot of chips in the paint, finish needs to be sanded and repainted completely . 7. Drywall completely under all the upper cabinets, need to he sanded where it has been chipped adjacent to the bottom side of the upper cabinetry . 8. All cabinetry needs to be caulked where it abuts the drywall . 9. North wall to the right of the base cabinet pencil marks on drywall need to be sanded and repainted. Also, to the right of the upper cabinets there is a definite irregularity in the drywall that needs to be sanded and repainted, so it is flush. Also, above that same area at the ceiling grid chip in the drywall . 10. Ceiling tile above Door 228A to the left of the Return Air Grille is scratch in the ceiling tile. 11 . Paneling in front of the access panel for above ceiling equipment, fingerprints on the ceiling tile. Also to the right towards Door 228B above the Fire Alarm Horn Strobe, the grid against the wall is bent and also, there are fingerprints on the access panel for the above ceiling equipment. 12 . Ceiling grid above the length of the West wall, the ceiling tile does not set flush in the grid, needs to be corrected. Storage 229 1 . Drywall above door head on the door frame needs to be sanded and repainted. 2. Only the perimeter ceiling tile has been installed at this time and location at the sprinkler heads. 3 . Ceiling grid in the far Southwest comer is chipped . Training Room 230 1. Door 230A inside face of door needs to be cleaned of drywall mud, etc . 2. Door frame 230A, left side needs to be patched and repaired, drywall pulling away from door frame. 3 . Outside comers of alcove to Door 230 need to be repainted . 4. Bottom right Door frame 230Apaint is chipped at the bottom right hinge. Also, drywall to the right of Door frame 230A needs to be caulked and repainted where it abuts the door frame and also at the vinyl base area drywall is very irregular needs to be sanded and repainted. Both left and right sides . 5 . Left side of Door frame 230A, drywall is irregular at the bottom left and upper left of the middle hinge needs to be sanded and repainted. 6. To the right of Door frame 230A, drywall where it abuts door frame needs to be sanded, caulked and repainted. Also, to the right of this area, right outside corner needs to be cleaned of dirt, sanded and repainted. 7 . South wall middle, West end electrical outlet drywall needs to be sanded and repainted, pin holes in the drywall and irregularities. Also, on this same wall on the far end paint needs to be removed. 8 . Accent wall West wall, drywall around the duplex electrical outlet needs to be sanded and repainted, very irregular and chips in the paint. 9. AV work is going on in this area. 10. Base cabinet on West wall, left or South end of the cabinet, no end panel installed. 11 . Cabinet on the West wall needs to be cleaned of dirt and debris on doors, countertops and backsplashes. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 10 Training Room 230 (continued) 12. Bottom right edge of kick on the countertop shim is showing at this area, not acceptable. 13 . Door frame 230C - Door Frame 230C needs to be completely repainted . 14 . North wall between Eastern 2 duplex outlets, marks on the drywall, needs to be repainted . That is also to the right of the Easternmost duplex outlet, carpet glue. 15. Door 230B - Door 203B left side drywall needs to be caulked and repainted. 16. Right side bottom right at the vinyl base location drywall mud has just been packed in , very irregular, unacceptable, this needs to be patched and repaired properly to receive vinyl base. 17 . Door Frame 230B - Needs to be repainted. Also left side strike side of the door frame has been dented. 18 . Free standing column needs to be repainted completely. Insufficient coats of paint. Also, some areas of imperfections in the drywall need to be patched, repaired, sanded and repainted. 19 . Ceiling tile off of the south wall approximately 4 ceiling tiles and off the East wall where the free standing column 3 full ceiling tiles have chip in the ceiling tile. 20. Ceiling grid approximately two locations in about the center of the room, carpet adhesive on the grid. 21 . Ceiling tiles have been removed around the electrical projection screen. 22 . Ceiling tile 3 full ceiling tiles off the West wall approximately about the center of the room chip in the ceiling tile. Corridor 231 1 . Top of Door frame 231 , drywall needs to be sanded, re-caulked and repainted. 2. to the right of Door frame 231 drywall needs to be repainted where it abuts the door frame and back to the inside corner, it is true of both left and right sides of Door frame 231 . 3 . South wall approximately 6 feet off of Door frame 231 , large irregularities in the drywall, these need to be repaired so the drywall sets flush. That is also true on this same wall 12 feet off to Door 231 or to the left of Door 401 A. 4. Alcove at Door 401A right and left side outside corner needs to be repainted . Also, the left comer has been damaged and bent. 5 . Bottom left of Door 401 A drywall is irregular needs to be sanded and repainted. 6. Drywall to the right of the duplex outlet to the right of Door 401 A and the first duplex outlet, overspray on wall needs to be repainted. 7 . Door frame 231A, door frame needs to be completely repainted. No threshold installed . Doors need to be cleaned of dirt and debris. 8 . Door frame and left hand door no door light or glass installed. The right hand door glass and door light has been installed. 9. No ceiling tile in this Corridor 231 . 10. Fire Extinguisher Cabinet needs to be caulked where it abuts the drywall and cleaned of the protective film. Office 232 1 . No door installed in Door frame 232A. 2 . Door frame 232A left and right needs to be cleaned of chips in the paint and small dent on the bottom left below the bottom hinge, door frame is dented . 3 . Inside face the strike at the head of hollow metal frame there are some spots on the left side of the strike, need to be touched up with paint. 4. Drywall needs to be repainted where it abuts the hollow metal door frame on the strike side, not a sufficient amount of paint on the drywall on the floor up to the top of the door. Also, to the right and left of the door frame at the vinyl base area needs to be sanded and repainted. Drywall is very irregular. 5 . East wall to the right of quad outlet the drywall is chipped needs to be patched and repaired. 6. General irregularities in the drywall in the location of the vinyl base needs to be corrected. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 — 2nd Floor East End Punchlist — Friday 04/06/07 April 16, 2007 Page 11 Office 232 (continued) 7 . North wall opposite Door 232A, drywall around the electrical outlet is irregular, needs to be sanded and repainted and also to the bottom and bottom left of this same area drywall texture is very rough needs to be sanded. 8 . To the left inside NW corner in Room 232A needs to be sanded and repainted, very irregular. 9. West wall North end just above vinyl base location drywall is irregular needs to be sanded and repainted. 10. Ceiling grid to the left A/C Diffuser, chip in it. That is also true to the one to the East, and at the location of the fire sprinkler head. Corridor that runs East & West from Door 301A down to the end of Mechanical Room 103A which abuts Corridor 232. 1 . Drywall at the bottom left comer of the fire extinguisher cabinet needs to be sanded and repainted and fire extinguisher cabinet needs to be caulked where it abuts the drywall . 2. Drywall above the vinyl base approximately 16' to the left of Door 305A, gouge in the drywall has been painted over needs to be patched and repaired. 3 . to the right of Door 305A drywall at the vinyl base location needs to be sanded and repainted so that the vinyl base sets flush to the drywall. 4. Left and right edges of the alcove going into Door 305A needs to be repainted. 5. Drywall to the bottom left and right of Door 305A needs to be sanded and repainted, drywall very irregular. 6. Drywall to the right and left of Door 228B outside comers need to be sanded and repainted where the paint has been chipped. Also, bottom right of Door 228B drywall is very irregular needs to be sanded and repainted. 7. Drywall to the right of Door 305A approximately 2 feet and 8 feet off of that to the right of Door 305A or to the West, irregularities in drywall need to be sanded and repainted. Corridor 232 1 . Stair 1 .0.002 and Electrical Room 1 .2 . 104 will not be punched out at this time . Done at a later date. 2. No ceiling tile installed Corridor 232. Also, right and left bottom edges of the door frame need to be sanded and repainted. 3 . Drywall to the right of Door 405A approximately 2 feet to the right of door there is a irregular in the drywall and a couple areas here need to be sanded and repainted to set flush to be a flush condition in the drywall . 4. Mechanical Room 1.2.103 is not finished. We will not punch out at this time. 5 . Alcove at Door 231B, off of Corridor 232, doors not installed at this time. 6. Left and right outside corners of this same area drywall is chipped and needs to be repainted. Also, left and right sides of the door frame is chipped needs to be repainted. 7. Left and right of the door frame on the Corridor 232 side needs to be repainted where it has been caulked and top edge of the drywall where it abuts the hollow metal frame needs to be sanded and repainted 8. Top left outside corner of alcove leading to Door 232 needs to be repainted. 9. Ceiling file above Door 232B has water spot on it needs to be replaced. 10. Door frame 232B needs to be sanded and repainted where it has been chipped and also overspray of stain and dirt. Also, to the left of door frame 232B , dirt marks and water spots this whole area needs to be repainted. 11 . Drywall between Door 229A and Door 231B finish is very irregular where it has been patched. Needs to be repainted completely . 12 . Drywall to the top left Door 229A needs to be re-sanded and repainted, irregular. Also, to the right to the right of Door 229A spots on the drywall above the floor need to be repainted. 13 . Drywall around drinking fountains opposite the copy Room Entry Opening 212 needs to be repainted where there is fingerprints and pencil marks on the drywall . 14 . Bottom left of Door 209A leading into Women ' s Restroom needs to be sanded and repainted. That is also true of bottom right of Door 211A Janitor' s Closet, drywall is very irregular. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 12 Corridor 232 (continued) 15 . To the right of the hinged side of Door 209A, drywall is irregular between the first and second hinge. Also, door frame needs to be repainted on the outside edges left and right sides and also on the inside where it has been chipped. Also, top left door has been dented the door frame into Women' s 209 . 16. Janitors Room 211 door frame needs to be repainted, chip, carpet glue, etc. That is also true of Men' s Restroom. Office 233 1 . No door installed in Office 233 . 2. Bottom right and left sides of hollow metal door needs to be cleaned of adhesive and where it has been chipped. 3 . Outside face top left corner, chips have been painted in the hollow metal frame, needs to be sanded and repainted. 4. Inside face of hollow metal frame below the top hinge on the right side chip in the paint, needs to be repainted on the door frame . 5 . Drywall to the right of Door 233 is irregular, needs to be sanded and repainted the complete length. 6. To the right of hom strobes the drywall needs to be sanded and painted. Irregularities in the drywall . 7 . East wall, drywall around quad outlets needs to be sanded, irregularities and the drywall sanded and repainted. Also, on this same wall the ceiling grid has paint on it needs to be cleaned . 8 . Northeast corner of Office 233 needs to be sanded where the drywall is irregular at the vinyl base location . 9. Bottom left and right jambs need to be repainted of the exterior window. Insufficient paint. 10. East wall ceiling grid the main grid along the wall at the North end cut too short. 11 . East wall to the front of Door 233 irregularities in the drywall, need to patch, repair and re-sanded. 12. Drywall above light switch needs to be sanded, patched and repainted. Corridor 301 1 . Bottom left of door on the outside face needs to be cleaned of carpet adhesive. 2. Inside face bottom right door is scratched. 3 . Door frame 301A needs to be repainted on the lower portion and also carpet adhesive removed. 4. Inside and above Corridor 301 , drywall needs to be cleaned of fingerprints and repainted. 5. Right side of Door 301 drywall is very irregular, needs to be sanded and repainted approximately 2 feet up the wall . 6. Hollow metal window frames for Office 303 on Corridor 301 , bottom left drywall needs to be sanded and repainted. Very irregular. Also, to the left of Door 303A the top inside corner of the window sill needs to be sanded and repainted. 7 . Drywall above Door 303A and Corridor 301 side needs to be sanded and repainted where it abuts the door head. 8 . Bottom right of the hollow metal window on Computer Room 302, drywall is irregular needs to be sanded and repainted, that is also true of the top right. 9 . Drywall to the left of door frame 202, drywall needs to be sanded and repainted. 10. Top edge of drywall above the hollow metal door and window opening for Computer Room 302 needs to be sanded and repainted. Computer Room 302 1 . Computer Room 302 is not complete. Needs to be Punched out at a later date. Office 303 1 . Door 303 does not close, hits the doorjamb on the top edge. 2. Door frame 303 needs carpet adhesive removed. 3 . Carpet in this are on the right side hinge side is not cut tight to the door frame. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2°d Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 13 Office 303 (continued) 4. Drywall to the bottom right of Door 303 and on the far right below the window, hollow metal frame needs to be sanded and repainted. 5 . North wall quad outlet needs electrical outlet cover installed. 6. Drywall around Data Outlets 23D & 24D, irregularities, need to be sanded and repainted. 7 . Ceiling tiles missing. 8 . South wall drywall below quad electrical outlet water stained, needs to be taken care of, cleaned. 9. Drywall below light switch, chip in the drywall that has been painted over needs to be patched and repaired . Open Office Area 304 1 . Inside window head of the exterior window on the East wall is irregular needs to be sanded and repainted . 2. AV work is being done in this area. Needs to be cleaned, patched & repaired once it is completed. 3 . On the North wall, carpet needs to be cleaned and area needs to be repainted. 4. Drywall around the electrical outlet to the left of Data 3D & 4D needs to be sanded and repainted. 5 . The bottom left of Data 5D & 6D is irregular, needs to be sanded and repainted. 6. Top right of electrical outlets to the right of Data 5D & 6D, drywall is irregular, chip in it needs to be sanded and repainted. 7 . Drywall to the bottom left of Data 7D & 8D is irregular, needs to be sanded and repainted. 8 . Drywall around the duplex electrical outlet to the right of 13D & 14D, data outlet needs to be sanded. 9 . South wall, West end, AV work is being done in this area, needs to be patched and painted. 10. Hollow metal window facing part of the Computer Room 302, right jamb is dented, needs to be repaired. Also, top right and left comers of the drywall are irregular needs to be sanded and repainted. 11 . Carpet adhesive on the hollow metal window frame Computer 302 on Office area 304 side. 12. Bottom left at the hollow metal window on the North wall of the Computer Room - Office Area 304 at the bottom right of the hollow metal frame needs to be sanded and repainted. Also, in this same area AV work has been going on. 13 . Some question of finish of the walls in this area, needs to be looked at. As the natural light comes in and hits the drywall a lot of irregularities. Corridor 305 1 . Bottom right of the outside corner at Door 302, corner bead is chipped, needs to be patched and repaired. Also, to the right of door 302, fingerprints on the door frame and door on the right side Corridor 305 side needs to be cleaned and repainted. 2. Drywall to the left of Door frame 302 to the right of the outlet, opening needs to be sanded and repainted. 3 . Drywall above Door 305A needs to be cleaned of fingerprints and repainted. Also, drywall to the bottom left of Door 305 and right. Drywall is irregular needs to be sanded and repainted. 4. Door frame 305 needs to be cleaned of carpet adhesive and there is also chips in the door frame, needs to be repainted. 5 . Bottom right face of the door above the hinge, chip in the door. 6. Bottom right outside of Door frame 305 needs to be cleaned of carpet adhesive. Work Room 306 1 . Hollow metal Door frame 306A, bottom right and left needs to be touched up with paint and cleaned of adhesive. Also, to the right of the strike needs to be cleaned of fingerprints on the outside facing Corridor 305 . 2. Door frame above the center hinge needs to be sanded and repainted. 3 . Drywall to the right of Door frame 306 needs to be sanded and repainted between the light switch and the door frame and down by the vinyl base location . 4. Drywall around the control box to the left of the light switch needs to be sanded and repainted, irregular. 5 . Drywall around the horn strobe needs to be cleaned of pencil marks and repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2"d Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 14 Work Room 306 (continued) 6. Boxed-out column area on the North wall right side edge up approximately 30" is chipped, needs to be repainted. Also, above the ceiling grid in this same area, it has drywall mud on it, needs to be cleaned. 7 . North wall, the Northwest inside corner, large area of drywall is missing, this needs to be patched and repaired in order to properly receive the vinyl base. 8 . To the right of Door 306, electrical outlet drywall has been patched, needs to be sanded and repainted. Also, to the right, the inside corner needs to be sanded and repainted, irregularity in the drywall, that is also true in this same area above the vinyl base. About half a dozen ceiling tiles are missing in this area. 9. Ceiling rile the 5`s full ceiling tile off the East wall at Door 306, the 4a full ceiling tile off the South wall . Tile is chipped at the corner. Reception Area 401 1 . Door 401A — Door frame needs to be repainted and cleaned of adhesive and scratch marks on the door frame. 2. Hinge side of door frame adjacent to the bottom hinge is dented. Also, door is chipped on the inside face by the lock set location above it and to the left of outside edge. 3 . Vinyl base is installed in this area. Outside corners are pulling off the wall especially to right of Door 401A. 4. Bottom right of Door 401A where drywall abuts the metal door frame needs to be sanded, caulked and repainted. 5 . Accent wall east wall, chips in the paint need to be repainted. Also, there is some drywall patching that appears to have been done, this needs to be redone, patched repaired and repainted. Down to the right of Data I ID & 12D is a scuff mark on the accent color that needs to be repainted . 6. Drywall to the right of Door 402A, top right needs to be sanded and repainted. Paint is chipping. Also, vinyl base to the right is cut too short and the outside corner is not adhered. 7 . Top right of door 403A finish in metal frame is irregular needs to be sanded and repainted. That also is true of the drywall where it abuts the head of this door frame. 8 . Door frame 402A needs to be completely repainted on the bottom area left and right hand side. The hollow metal door the paint has been chipped. 9. To the right of Door frame 404A fingerprints on the drywall about mid door and also outside corner of the drywall needs to be repainted. Office 402 1 . Inside bottom left of the door, chip in the door itself. 2 . Door frame needs to be cleaned of carpet adhesive and scratches in the paint. 3. Right side of door inside Office 402 drywall needs to be sanded, caulked and repainted. That is also true on the left side irregularities in the drywall. 4. Left side of Door 402, East wall appears to be overspray on the wall, this needs to be corrected. Also, on this same wall to the left of electrical outlet drywall needs to be sanded and repainted. Irregular. Also, about the middle of this same wall above the vinyl base irregularity in the drywall. 5 . North wall opposite Door 402A, drywall around electrical outlet needs to be sanded and repainted. Also , towards the West end of the wall above the vinyl base irregularities in drywall need to be patched, sanded and repainted. 6. West wall, right inside corner irregularities in drywall needed to be sanded and repainted . 7. South end of West wall above the vinyl base irregularities in the drywall needs to be sanded and repainted . Carpet adhesive needs to be removed and drywall around duplex electrical outlet needs to be sanded and repainted. S . Drywall around light switch cover very irregular needs to be sanded and repainted so the cover sets flush. 9. Vinyl base installed in this room. D O N A D I O & Associates. Architects, P.A. Indian River County Administration Complex Bldg. I — 2 nd Floor East End Punchlist — Friday 04/06/07 April 16, 2007 Page 15 Production 403 1 . Outside of Door 403A finish needs to be cleaned of adhesive. 2. Right side hinge side of 403A scratch in the wood door. Also, hollow metal door frame needs to be touched up with paint and cleaned of carpet adhesive . 3 . Vinyl base installed in this room. 4. Right of door 403A vinyl base does not set flush to the wall at the door frame and also at the cabinetry to the right. There is only small portion of vinyl base on one section installed and the remainder of the room does not have vinyl base installed . 5. Two ceiling tiles missing in this room. 6. Cabinet wall, upper cabinets to the top right of the upper cabinets ceiling grid and tile has paint on it. 7. VCT needs to be cleaned where it abuts the carpet of carpet adhesive. 8. Backsplash needs to be cleaned of paint on the North wall left side. Office 404 1 . Door frame 404 needs to be repainted on the outside and inside. Also to the left bottom right on the inside of the Office 404 there is a scratch on the door. 2. To the right of Door 404, adhesive on the drywall needs to be cleaned and repainted. Also, paint from the metal window lite frame needs to be removed from the door. 3. Drywall on light switch to left of Door 404 needs to be sanded and repainted. Opening cut too large and fingerprints need to be cleaned . 4. Inside corners of vinyl base are not adhering properly. No vinyl base is installed in this area. 5 . West wall duplex outlet drywall needs to be sanded and repainted where it abuts the outlet. 6. South inside comer to the left of quad outlet needs to be repainted. 7. Vinyl base in this room does not set flush to the carpet in numerous areas. Unacceptable . 8. Five ceiling tiles not in place at this time. 9. Ceiling grid to the right of the exterior window, 2 tiles off of that exterior wall appears to have fire caulking on it needs to be cleaned. 10. West wall, middle of the wall, I " grid off the wall is damaged and bent. Open Office Area 405 1 . Vinyl base installed in this area. 2 . Inside comers of the vinyl base have been cut, they do not fit tight. Needs to be looked at. 3. Exterior wall, South wall, drywall above Data Outlet 5D & 6D is not even, needs to be sanded and repainted to set to have a flush condition, very visible. 4. Data Outlets 7D, 8D, 9D & 10D need to be cleaned of paint. 5 . Quad outlet to the left of Data Outlet 9D & l OD on the South wall needs to be cleaned of paint, drywall needs to sanded and repainted on the bottom edge, irregular. 6. East wall, carpet adhesive needs to be removed from the wall and any scratches and dents in the drywall above the vinyl base needs to be patched and repaired. 7 . Door 405A — Door frame needs to be cleaned of carpet adhesive and repainted where the paint finish has been scratch. 8. Right side of Door 405A the drywall has been caulked, needs to be repainted. Also to left of 405A needs to be sanded and repainted . A semi —gloss has been put onto the drywall. This needs to be sanded, caulked and repainted. 9. North wall adjacent to Storage Room 406 needs to be touched up with paint where it has been scratched in numerous locations above the vinyl base on the East end and about the middle of the wall. D O N A D I O & Associates, Architects, P.A . Indian River County Administration Complex Bldg. I - 2°d Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 16 Storage Room 406 1 . Door 406A - Left side of Door 406A, drywall at the outside corner there is a dent in the drywall, needs to be sanded and repainted. Also, on the left side vinyl base cut too short. 2. Both right and left sides of the door accent color needs to be cut in and repaired where the door same paint color has got on to the accent color. 3 . Door frame 406A needs to be repainted where paint has been chipped and scuffed, especially on the bottom right and left hand sides . 4, to the left of Door 406A, drywall around duplex outlet cut too large, needs to be patched and repaired and repainted. Also, drywall around light switch needs to be sanded and repainted so the color sets flush. 5 . Vinyl base has been installed in this room 6. Vinyl base around the boxed out column on the West wall is not adhered to the drywall . 7. East wall, VCT flooring has been cut too short and pieces of the VCT tile is put in especially on the South end of the East wall, Unacceptable. Also, vinyl base does not set flush to the VCT on the East and South walls in the corner areas. 8 . Three ceiling tiles not in place at this time. 9. To the right of Door 406A joint in the ceiling grid the wall channel does not set flush, is tight. 10. Ceiling tile just to the right of Door 406A, the half tile there is a scratch in the tile. See General Notes on next page: D O N A D I O & Associates, Architects, P.A. Indian River County Administration Complex Bldg. 1 - 2nd Floor East End Punchlist - Friday 04/06/07 April 16, 2007 Page 17 General Notes: 1 . No hardware has been installed at this time. 2 . All metal door light frames, numerous areas have overspray of paint, needs to be sanded and repainted where this occurs and also paint on the glass to the view lights. 3 . All light fixtures have plastic covering on them at this time. 4. All fire extinguisher cabinets need to be caulked where they abut the drywall . And all protective wrap needs to be removed. 5. At all interior doors where the carpet joints are and where the carpets cut at the door jambs, right and left side need to be secured properly to the floor. Numerous area of the carpet does not have sufficient adhesive or is not cut tight to the door frame. 6. Drywall around electrical outlets needs to be sanded and repainted. That is typical of all electrical outlets in the Conference Room 203. 7 . All wood doors need to be cleaned of dirt and debris on the face. 8 . All drywall at hollow metal door frames at the door heads where the drywall abuts the metal frame head needs to be sanded and repainted, numerous areas are rough and irregular and have not been painted thoroughly. 9. All Fire Alarm Horn Strobes needs to be caulked and set plumb and level in the drywall where ever they occur. 10. No silencers installed in all hollow metal door frames. 11 . Unless otherwise noted no vinyl base has been installed in the Offices of this Building 2, Second Floor East. 12 . All water coolers, drinking fountains , need to be caulked where they abut the drywall . 13 . All hollow metal frames need to be caulked where they abut the vinyl tile . 14. All electrical outlet covers , data covers, fire alarm pull stations , etc . need to set plumb and level in the wall . 15 . All windows on the interior face need to be cleaned of paint overspray on the frame and on the glass. 16. With the plastic wrap on all the ceiling light fixtures unable to do al Punchlist on the lights . This will have to done on a later date. 17. All light switches need to be cleaned of paint. 18. All drywall corners to the jamb side of doors need to be sanded and repainted where the drywall patch compound or tape compound has been put in place. Very rough and irregular. 19. All cabinet doors and drawers need to be adjusted so that they set plumb and level when closed properly. 20. Need to look at all main ceiling grid runners and the joints of those runners to make sure that they set flush and tight. This Punch List is not a Final Punch List, it is a Preliminary Punch List for the efforts of documenting the condition of the space prior to furniture being installed in the East end of Building 2, Second Floor. END OF PRELIMINARY PUNCHLIST BUILDING 2 - 2"n FLOOR - EAST END. D O N A D I O & Associates, Architects, P.A.