2006-112
U-4-- a6 til A, � ='W�AIA Document G701TM- 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 006 New County Administration Building DATE: April 4, 2006 Lying Adjacent to 27th Street, Vero Beach, F1 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 Turner Construction Company CONTRACT DATE: (Amendment #2) August 23, 2005 800 N. Magnolia Avenue - CONTRACT FOR: Guaranteed Maximum Price - Orlando, Florida 32803 Construction Management at Risk OWNER: EJ ARCHITECT: CONTRACTOR: ®✓ FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, inhere applicable, an}' undisputed amount attributable to previously cvecured Constuction Change Directives) Reference Description Amount COR -030 Provide an extension of time (5 calendar days) to the contract for substantial completion Completion Date due to delays (10/21/05 to 10/26/05) resulting from Hurricane Wilma. the new Substantial Completion date is January 21, 2007 $0 COR -031 Provide additional electrical service distribution conduit for Buildings I and 2 as well as the Health Department building and data conduit/raceway for data distribution, as required by revisions indicated on Drawing 0-E1.0P. Includes revised irrigation pump feed to location indicated on Irrigation Drawings and includes partial rework of installed 4" underground data conduit in Building 2. $75,821 COR -033 Provide additional LT type decorative light fixtures for both Buildings I and 2 that were not included in the GMP. this item sis for material only. The labor is added as a result of this work is to be funded from Turner's Construction Contingency within the GMP. $67,664 The payment of these Change Items will not change the GMP but will decrease the Owner's Contingency by $143,485 The original Guaranteed Maximum Price was $ 33,086,442 The net change by previously authorized Change Orders $ (3,844,244) The Guaranteed Maximum Price prior to this Change Order was $ 29,242,198 The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ (0) The new Guaranteed Maximum Price including this Change Order will be $ 29,242,198 The Contract Time will be increased by Five ( 5 ) days. The dam of Substantial Completion as of the date of this Change Order therefore is January 21, 2007 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BYTHE ARCHITECT, CONTRACTORAND OWNER ARCHITECT: CONTRACTOR: OWNER: Donadio & Associates, Architects, P.A. Turner Construction Company Indian River Count Board of Count 609 17th Street 800 N. Magnolia Avenue Commissioners Y Y Vero Beach, Florida 32960 Orlando, Florida 32803 1840 25th Street /� Vero Beach, Florida A onadi tLouisr tsepthCounty Administrator Date at AIA Document G7ZIrd - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WA AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum exten Is under the document was produced by AIA software at 16:21:40 on 03/28/2006 under Order No. 1000192296_1 which expires f /8/2006, Intl is not for User Notes: and Reco ndef for Approval: �-c__, 44F/b6 �, , ,J u). This nv