HomeMy WebLinkAbout2006-081 v aO / A �l Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 005 OWNER: New County Administration Building DATE: March 6, 2006 ARCHITECT: Lying Adjacent to 27th Street, Vero Beach, Fl CONTRACTOR: TO CONTRACTOR (Name and addre.v.c): ARCHITECTS PROJECT NUMBER: 2102 FIELD: ❑ Turner Construction Company CONTRACT DATE: (Amendment 102) August 23, 2005 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - OTHER: ❑ Orlando, Florida 32803 Construction Management at Risk THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Reference Description Amount COR-009 Use A grade venner at doors in lieu of AA Grade. ($ 10,441 ) Use plain sliced oak veneer in lieu of rotary cut at doors. ($ 3,286) Delete bituminous coating on Hollow Metal frames in drywall partitions and ($ 6,837) Hollow Metal frames in masonry shall retain bituminous coating. Provide fully faced welded Hollow Metal frames in lieu of full throat welded frames. ($ 2,862) COR-032 Revise CT-6 pattern at restrooms - change CT-6 from random block to 3"x 3 " on mesh backing in all locations where specified, excluding the rooms 2.2-328 and 2.2-329. ($31 , 196) Use Johnsonite Ambassador (4" high) base & standard rubber cove per Song's proposed alternate. ($78,631 ) Use standard Manningum Commercial VCT in lieu of specified ($ 10,748) The payment of these Change Items will not change the GMP but will increase the Owner's Contingency by $ 144 001 The original Guaranteed Maximum Price was $ 33,086,442 The net change by previously authorized Change Orders $ (3,844,244) The Guaranteed Maximum Price prior to this Change Order was $ 29,242, 198 The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ (0) The new Guaranteed Maximum Price including this Change Order will be $ 29,242, 198 The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is January 16, 2007 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County Commissioners ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 609 17th S t, Vero Beach, Florida 800 N. Magnolia Avenue 1840 25th Street, Vero Beach,Florida 3296 Orlando, Florida 32803 32960 RE ADDRESS RESS et e) BY (Signature) (Signal re) Anthony Donadio Louis Fiore seph A. Baird, County Administrator (Typed name) (Typed name) (Typed came) 3 / 061067 / hV le& DATE DATE DATE �J��� AIA Document G701TM - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this KlAa Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum e t possible under w. This document was produced by AIA software at 11 :20:19 on 03/06/2006 under Order No. 1000192296_7 which expir on 8 /2006, and is no r sale. User Notes: 594839) Review d Recommended for Approval: J Steve Blum. Proiect Manager Thomas W. Frame, eral Services Director ] n Brown. Budget Director