Change Order
PROJECT (Name and address): CHANGE ORDER NUMBER: 020 OWNER:
New County Administration Building DATE: December 19, 2006 ARCHITECT:
Lying Between the Main Relief Canal to
the North, the Lateral D Canal on the CONTRACTOR:
Sounth and East and 20th Avenue to the
West FIELD: ❑
TO CONTRACTOR (Name and addresy: ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑
Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005
800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price -
Orlando, Florida 32803 Construction Manager at Risk
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amoun( attributable to previously executed Construction Change Directives)
Reference Description Amount
COR 071 Revisions required by Plans Examiner for Fire Marshall for 2-hour partitions
for Cafe and Public Works Muster room. S 7,700.00
COR 072 Provide air cove through atrium ceilings in Buildings l and 2. $ 18,503.00
COR 074 Hotwater for restrooms per RFI ( Request for Information) $ 9.720.00
COR078 Revise ductwork for Chamber Ceiling : and in Building 1 , the 2ntl floor atrium remm-air
to avoid conflict with Structure (ten day time extension) $ 15,743.00
COR 079 Provide condensate drains for Air Handing Units and Fan Coil Units $ 15.937 .00
Total $ 67,603.00
The acceptance of this change item will not change the GMP, but will decrease the Owners Contingency by $67,60300.
The original Guaranteed Maximum Price was
$ 33,086,442.00
The net change by previously authorized Change Orders $ (6,028,590.00)
The Guaranteed Maximum Price prior to this Change Order was $ 27,057,852.00
The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0.00
The new Guaranteed Maximum Price including this Change Order will be $ 27,057.852.00
The Contract Time will be .increased by Ten ( 10 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is January 31 , 2007.
NOTE : This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. , a A I r;
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. • '>
Donadio & Associates. Architects, P.A. Turner Construction Company Indian Rivii C56'UnV Board of Coi
Commissichers .y..,
ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm yainel
y
609 17th et, Vera Beach, Florida 184025th Street;aero Besach,FIvi
3296 32960 ') - . ' )
A #onyyDonadio
ADDRESS ADD S _ '-• 7 d1
Z 90
lift
B (Signantre) BY (Sign tre)
A Louis Fiore Gary C. Wheeler, Chairman
(T}'ped name) (T}'ped name) ('1 iped name)
DATE DATE DATE
AIA Document G701 T" - 2001 . Copyright C 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reasoned. WARNING: This Ale
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" D current, or any
portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent p 'ble under the la This document
was produced by All software at 20:35:28 on 12/11 %2006 under Order No. 1000250302_1 which expires on 7,!250,20
5 20 an not for resale.
User Notes:
Reviewe ornmendedfor Approval :
s99ea7)
Steve Blum, Project Manager Thomas W. Frame. Genera ervices Director son C, own. Budaet Director