Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2005-289
r =. AIA Document A121TW - 2003 f Amendment No . ;' 2 qg - AMENDMENT N0. Y 2 &eo*� TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Section 2 . 2 of the Agreement, dated April 19 , 2005 between Indian River County Board of County Commissioners, Local Government (Owner) and Turner Construction Company, (the Construction Manager), for New County Administration Building (the Project), the Owner and Construction Manager establish a Guaranteed ADDITIONS AND DELETIONS : Maximum Price and Contract Time for the Work as set forth below. The author of this document has added information needed for its ARTICLE IGUARANTEED MAXIMUM PRICE completion . The author may also have revised the text of the Amendment 1 for an Initial Guaranteed Maximum Price was approved on June 7 , 2005 in original AIA standard form . An the amount of $3,978 ,824, is incorporated into and replaced by Amendment No . 2 . Additions and Deletions Reportthat notes added information as Owner hereby authorizes CM to perform the Work described in this Amendment 2 for the well as revisions to the standard form text is available from the complete project, dated August 16, 2005 (Exhibits A through F) , attached hereto and author and should be reviewed . incorporated herein by reference, at the Guaranteed Maximum Price indicated below. The A vertical line in the left margin of Work authorized shall proceed in accordance with the overall project schedule attached as this document indicates where Exhibit D and shall be substantially completed as of January 16 , 2007 as indicated in the the author has added necessary schedule contained within Exhibit D . information and where the author has added to or deleted from the The Construction Manager' s Guaranteed Maximum Price for the Work, including the original AIA text. estimated Cost of the Work as defined in Article 6 and the Construction Manager' s Fee as defined in Article 5 , is Thirty Three Million Eighty Six Thousand Four Hundred Forty This document has important Two Dollars ( $33,086,442 ) . This Guaranteed Maximum Price includes the Initial legal consequences . Consultation with an attorney Guaranteed Maximum Price and is for the performance of the Work in accordance with is encouraged with respect to the Contract Documents`listed and attached to this Amendment and marked Exhibits A its completion or modification . through F, as follows : Exhibit A Drawings, Specifications, addenda and General, Supplementary and other Conditions of the Contract on which the Guaranteed Maximum Price is based, pages 30 through 45 , dated August 16, 2005 . Exhibit B Allowance items, page 2, dated August 16, 2005 . Exhibit C Assumptions and Clarifications made in preparing the Guaranteed Maximum Price, pages 3 through 19 , dated August 16 , 2005 . Exhibit D Completion Schedule , pages 22 through 25 , dated August 16 , 2005 . Exhibit E Prompt Payment Act, F. S . Section 218 . 70 et sq . Exhibit F Final GMP Summary, page 1 , dated August 16, 2005 1 ` AIA Document A121 TmCMc — 2003 Amendment No./. Copyright © 1991 , 1998 and 2003 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING : This document is protected by U.S. Copyright Law and International Treaties. 1 Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14 :47:34 on 08/19/2005 under Order No . 1000192296_1 which expires on 8/8/2006 , and is not for resale . User Notes : (2331262534) ARTICLE II CONTRACT TIME The Substantial Completion shall occur no later than January 16, 2007 , in accordance with the Notice to Proceed issued by the Owner on August 17 , 2005 . ARTICLE III PAYMENT The parties acknowledge and agree that the 2004 version of the Florida Prompt Payment Act, F. S. Section 218 .70 et sq. governs this Agreement and is attached to this Amendment as Exhibit E . (Paragraphs deleted) OWNER CONSTRU ION M AGER BOARD OF COUNTY COMMISSIONERS TURNER C STRUC ION COMPANY INDIAN RIVER COUNTY, FLORIDA Th m~a , irk;Lowther, Chairman Scott Skidelsky, Vice esident jfiO RiV49'tt Board of County Commissioners Turner Construction C mpany • � : e Approv6d,bit , 01'Au9USt 23 , 2005 Witnessed by: 3 � ATTEST: �a ~ 3 . JefftreyJ(. $arton; eow�w Q- Cte`Ir t bf Circuit Court <' ~ , (Signature) f % w 4 Deputy Clerk 71APON A S So LA IL (Printed name) proved: J�n 4�4nik A - &2 j seph A. B ird, County Administrator App ved a Form and Legal Sufficiency: am G . Collins 1 , ounty Ai6m6ef Indian River Co . Approved Date Administration Legal Budget Department Risk Mgt, AIA Document A121 TmCMc — 2003 Amendment No. . Copyright © 19913 1998 and 2003 by The American Institute of Architects and The Associated General Contractors of America. All rights reserved. WARNING : This document is protected by U .S. Copyright Law and International Treaties. 2 Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14 :47:34 on 08/19/2005 under Order No. 1000192296_1 which expires on 8/8/2006 , and is not for resale. User Notes: (2331262534) /h 1 WWI Isil lu ;gwnooci dv o F 7 aauan ,,�� 1 d liqi 4X3 • ■ SHEET • INDEX OF DRAWINGS & GENERAL INFORMATION s pp 1TREE SURVEY AND RELOCATION PLAN MASTER LANDSCAPE PLAN Orem RTIAL LANDSCAPE PLAN PARTIAL LANDSCAPE PLAN- : PARTIAL LANDSCAPE PLAN : PARTIAL LANDSCAPE PLAN ' LANDSCAPE NOTES , PLANTING DETAILS & SPECIFICATIONS ,'�i ;. I � '� .A '1YT4 d ' ♦ ® ; t- 3 W+ 5= s i; ro k` 4mY k: 5 �. �� tc.E'" S'T�.�"'wa�- , � �'� . : w{. HcxT" k T k`aY' ,^�' k�srCr �5� � �b"9 F+.�Sr �:. IRRIGATION ■ ♦ • ■ IRRIGATION ■ ♦ • ■ IRRIGATION ■ ♦ • ■ ' IRRIGATION ■ ♦ • ■ I ' IRRIGATION ■ ■ ♦ • PLAN IIIIIIIIIIIIIII1116IFS] , IRRIGATION DETAILS & SPECIFICATIONS � TITLE PAGE BOUNDARY / TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY , BOUNDARY / TOPOGRAPHIC SURVEY , BOUNDARY / TOPOGRAPHIC SURVEY , BOUNDARY / TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY UNDARY /- TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY BOUNDARY / TOPOGRAPHIC SURVEY CONSTRUCTION NOTES , • , • •SITE � • PREPARATION PLAN 111311SITE • . • : • . . • • . • : • ' SITE PREPARA-TION PLAN " Dlf MEMO* . • PREPARATIONPLAN • . • : • . iSITE • . • .SITE PLAN � . • : • 111311 • . • : • �® SITE PLAN " C " • . • ISITE PLAN I ' D " PAVING AND GRADING PLAN "All PAVING AND • . • GRADING PLAN 11131PAVING AND GRADING PLAN licil • . • : • • . • PAVING AND GRADING PLAN " D1 • . • CROSS SECTIONS • • � • . • : • WATER AND SEWER PLAN • . • DETAILS PLAN • . • : • 1 - L " Cover Sheet • • ARCHITECTURAL . ■ • • • ISK• . • : • GENERAL LIFE SAFETY NOTES , AND CODE ANALYSIS A01PARTITION TYPES AND UL DESIGN DESCRIPTIONS BUILDING ' • • ' OVERALL SAFETY PLAN • • • • i -SECONDFLOOR OVERALL LIFE SAFETY ■ ♦ !More • • BUILDING FLOOR OVERALL LIFE SAFETY PLAN • • • • i • FLOOR OVERALL LIFE SAFETY PLAN • • • • BU IL I DING I - FIRST FLOOR PARTIAL LIFE SAFETY PLAN orl"ej BUILDING - FIRST • • ' PARTIAL SAFETY PLAN • • • • 10011114911 14 • • • ' ' . ■ • • • • 0.111 13 11153 04 • A Ism • • ' ' • ■ . . ■ . • • • • i ' • • ' ' . ■ . . ■ • • • • • AaBAR Indian River County Turner 3 Administration Complex t� Final GMP Summary Document List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 2- LS1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL LIFE SAFETY PLAN 06/ 29 /05 2- LS1 . 2 . 1 BUILDING 2-SECOND FLOOR PARTIAL LIFE SAFETY PLAN 06 / 29 /05 2- LS1 . 2 . 2 BUILDING 2-SECOND FLOOR PARTIAL LIFE SAFETY PLAN 06/ 29 /05 1 - A1 . 1 BUILDING 1 - FIRST FLOOR OVERALL FLOOR PLAN 06 /08 /05 1 - A1 . 2 BUILDING 1 -SECOND FLOOR OVERALL FLOOR PLAN 06 /08/ 05 1 -A1 . 3 SITE ENCLOSURE PLANS & ELEVATIONS 06 / 29 / 05 1 -A1 . 4 UTILITIES DRIVE-THRU 06/ 29 /05 2-A1 . 1 BUILDING 2- FIRST FLOOR OVERALL FLOOR PLAN 06 / 08/05 2-A1 . 2 BUILDING 2-SECOND FLOOR OVERALL FLOOR PLAN 06 /08/05 1 -A1 . 1 . 1 BUILDING 1 - FIRST FLOOR PARTIAL FLOOR PLAN 06 /08/05 1 -A1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL FLOOR PLAN 06 / 08/05 1 -A1 . 2 . 1 BUILDING 1 -SECOND FLOOR PARTIAL FLOOR PLAN 06 / 08/ 05 1 -A1 . 2 . 2 BUILDING 1 -SECOND FLOOR PARTIAL FLOOR PLAN 06 / 08/ 05 2- A1 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL FLOOR PLAN 06 / 08/ 05 2- A1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL FLOOR PLAN 06 / 08/ 05 2-A1 . 2 . 1 BUILDING 2-SECOND FLOOR PARTIAL FLOOR PLAN 06 / 08/ 05 2- A1 . 2 . 2 BUILDING 2-SECOND FLOOR PARTIAL FLOOR PLAN 06 / 08/05 0- A2 , D . 1 TYPICAL ROOF DETAILS 06 / 08/ 05 0-A2 . D . 2 TYPICAL ROOF DETAILS 06 / 08/ 05 0- A2 . D . 3 TYPICAL ROOF DETAILS 06 / 08/ 05 1 -A2 . 1 BUILDING 1 -OVERALL ROOF PLAN 06 / 08 /05 2-A2 . 1 BUILDING 2-OVERALL ROOF PLAN 06 / 08 /05 1 -A2 . 1 . 1 BUILDING 1 - PARTIAL ROOF PLAN 06 / 08 /05 1 -A2 . 1 . 2 BUILDING 1 - PARTIAL ROOF PLAN 06 / 08/ 05 2-A2 . 1 . 1 BUILDING 2- PARTIAL ROOF PLAN 06 /08/05 2-A2 . 1 . 2 BUILDING 2- PARTIAL ROOF PLAN 06 /08 / 05 1 -A3 . 1 BUILDING 1 - FIRST FLOOR OVERALL REFLECTED CEILING PLAN 06 / 29 / 05 1 -A3 . 2 BUILDING 1 -SECOND FLOOR OVERALL REFLECTED CEILING PLAN 06 / 29 / 05 2-A3 . 1 BUILDING 2- FIRST FLOOR OVERALL REFLECTED CEILING PLAN 06 / 29 /05 2-A3 . 2 BUILDING 2-SECOND FLOOR OVERALL REFLECTED CEILING PLAN 06 / 29 /05 1 - A3 . 1 . 1 BUILDING 1 - FIRST FLOOR PARTIAL REFLECTED CEILING PLAN . 06 / 29 /05 1 - A3 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 1 - A3 . 2 . 1 BUILDING 1 -SECOND FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 / 05 - 1 -A3 . 2 . 2 BUILDING 1 -SECOND FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 2-A3 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 Page 32 A� RtveR Indian River County Turner Administration Complex Final GMP Summary Document List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 2-A3 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 2- A3 . 2 . 1 BUILDING 2-SECOND FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 2- A3 . 2 . 2 BUILDING 2-SECOND FLOOR PARTIAL REFLECTED CEILING PLAN 06 / 29 /05 0-A4 , D . 1 EXTERIOR ELEVATION DETAILS 06 / 08/05 1 -A4 . 0 BUILDING 1 -OVERALL EXTERIOR ELEVATIONS 06 / 08 /05 2- A4 . 0 BUILDING 2- OVERALL EXTERIOR ELEVATIONS 06 / 29 /05 0-A5 . D . 1 TYPICAL WALL SECTIONS 06 /08/05 0-A5 . D . 2 TYPICAL WALL SECTIONS 06 / 08 /05 0-A5 . D . 3 TYPICAL WALL SECTIONS 06 /08 /05 0-A5 . D . 4 TYPICAL WALL SECTIONS 06 / 08/05 0- A5 . D . 5 TYPICAL WALL SECTIONS 06 / 08/05 1 - A5 . 0 BUILDING 1 -OVERALL BUILDING SECTIONS 06 / 08/05 1 - A5 . 1 BUILDING 1 - OVERALL BUILDING SECTIONS 06 /08/05 2-A5 . 0 BUILDING 2- OVERALL BUILDING SECTIONS 06 /08/05 0-A6 . D . 1 ENLARGED FLOOR PLAN NOTES AND LEGENDS 06 /08 /05 1 - A6 . 1 . 1 BUILDING 1 - FIRST FLOOR ENLARGED FLOOR PLANS 06 / 29 /05 1 -A6 . 1 . 2 BUILDING 1 -SECOND FLOOR ENLARGED FLOOR PLANS 06 / 29 /05 1 - A6 . 1 . 4 NOT USED 06 / 29 /05 1 -A6 . 1 . 5 BUILDING 1 - FIRST FLOOR CAFE ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS 06 / 29 /05 1 - A6 . 2 . 1 BUILDING 1 -SECOND FLOOR ENLARGED FLOOR PLANS 06 / 29 /05 1 - A6 . 2 . 4 BUILDING 1 - CHAMBER REFL , CLG . PLAN AND INTERIOR ELEVATIONS 06 / 29 /05 2- A6 . 1 . 1 BUILDING 2- FIRST FLOOR ENLARGED FLOOR PLANS 06 / 29 /05 2- A6 . 2 . 1 BUILDING 2-SECOND FLOOR ENLARGED FLOOR PLANS 06 / 29 / 05 0-A7 . D . 1 TYPICAL STAIR DETAILS 06 /08/05 1 -A7 . 1 . 1 BUILDING 1 -TYPICAL STAIR PLANS AND SECTION 06 /08/05 1 - A7 . 1 . 2 BUILDING 1 -STAIR 1 PLANS AND SECTION 06 / 29 /05 2-A7 . 1 . 1 BUILDING 2-TYPICAL STAIR PLANS AND SECTION 06 /08/05 2-A7 . 1 . 2 BUILDING 2-STAIR 4 PLANS AND SECTION 06 / 08/05 1 -A7 . 1 . 3 BUILDING 2-STAIR 1 PLANS AND SECTIONS 06/ 29 / 05 2-A7 . 1 . 3 BUILDING 2- ELEVATOR PLANS AND SECTIONS 06 /08/05 2-A7 . 1 . 4 BUILDING 2- ELEVATOR PLANS AND SECTIONS 06 /08/05 0- A8 , D . 1 TYPICAL DOOR & BORROWED LIGHT TYPES AND DETAILS 06 / 29 /05 0- A8 . D . 2 TYPICAL DOOR DETAILS 06 /08/05 0- A8 . D . 3 TYPICAL DOOR & BORROWED LIGHT DETAILS 06 /08/05 1 -A8 . 0 . 1 BUILDING 1 - DOOR SCHEDULES 06 / 29 /05 2- A8 . 0 . 1 BUILDING 2- DOOR SCHEDULES 06 / 29 /05 Page 33 DESCRIPTION AM TYPICAL INTERIOR DETAILS • • • . • • • • • . • • • • . • BUILDING 2-SIGNAGE SCHEDULE • • • • . • •VLA • • . • a warm 111.04 14141 VAN I Lei I 110 • . • iBUILDING I - FIRST FLOOR - LOBBY ATRIUM RECEPTION COUNTER DETAILS BUILDING 1 - FIRST FLOOR-COMMUNITY DEVELOPMENT RECEPTION COUNTER DETAILS ' BUILDING I - INTERIOR ELEVATIONS ATRIUM • • 1-INTERIOR ELEVATIONS CORRIDOR • .BUILDING 2-CASEMENT • ELEVATIONS • . • • � . • . ELEVATIONS BUILDING • . • � . • . • • . • TYPICAL EXTERIOR WINDOW TYPES AND DETAILS • • � • .111111103 BUILDING 1 -2ND • FLOORLo 410!1031 An' I will I I 113 11 Lem PARTIAL INTERIOR FINISHES PLANVA I NI BUILDING 2- • . • FIRST • • ' PARTIAL FL • • ' FINISHES PLAN • . FoZil01111111 FLOORBUILDING 2- FIRST PARTIAL INTERIORFINISHES PLAN =lrelFhpz0*w AV Ere Wml m _ Q0 Ajq Fi rU . • '^. :ax ate ?.''r'"E- sv N t rt 4, o ti ' e � �y Ye: �.''' c,63 aA�� ,�)z. �ir�. tx xrT�` �.�v' F Y,� �, fi- r«�' }, �a �,l t ,q'�v tr..• AP �:� ,n )t s'. �b s, . .r. � . u „ .> ,r : x a •' _+ >3�. [e r `�b:; , 3ya' t: STRUCTURAL NOTES AND TYPICAL DETAILS BUILDING I -WIND DIAGRAM BUILDING 2-STRUCTURAL NOTES AND TYPICAL DETAILS BUILDING 2-WIND DIAGRAM BUILDING I -OVERALL FOUNDATION PLAN B ILDING I - PARTIAL FOUNDATION PLAN BUILDING 1 - PARTIAL FOUNDATION PLAN • • • • . • • ■ • • . • • • 1 � DES APTION � • ENCLOSUREiING 2- PARTIAL FOUNDATION PLAN BUILDING 2- PARTIAL FOUNDATION PLAN , BUILDING I - PARTIAL FRAMING PLAN • • • iBUILDING I - OVERALL FRAMING PLAN. • . • : • ®■ BUILDINGBUILDING • . • : • • • • • : • • • • : • " BUILDING 2- PARTIAL . . ■ . ■ . • • • : • BUILDING 1 -OVERALL ROOF FRAMING PLAN BUILDING I - PARTIAL ROOF FRAMING PLAN 0 0 BUILDING I - PARTIAL ROOF FRAMING PLAN Poll BUILDING 2-OVERALL ROOF FRAMING PLAN LWIIIIIIIIIIIII RUN= BUILDING 2- PARTIAL ROOF FRAMING PLAN MlYoffiffloeflf 6W llp3oqoupzp=' BU ILD ING 2- PARTIAL ROOF FRAMING PLAN % IFOOTING , COLUMN AND BEAM SCHEDULES BEAM SCHEDULE • . • : • BUILDING • • • • 60 • REM BUILDING 2- BEAM, SCHEDULE • • • : • , BUILDING I -SECTIONS IBUILDING I -SECTIONS • • • : e : 2-SECTIONS • • • : • ONROOM* • bN` . 3 �. .. . a'^tis✓ * 154'Kn' :>wP>' , MECHANICAL LEGEND , NOTES AND ABBREVIATIONS • MECHANZfAL SITE PLAN • • • : • • MECHANICAL CHILLER PLANT AND GENERATOR BUILDING • e • • : • e : MECHANICAL SCHEDULES • • • : • ENLARGED MECHANICAL ROOM PLANS 0 100 1 1ENLARGED MECHANICAL ROOM PLANS 00 e e . e : e • e . e : e p` RrvE � Indian River County Turner Jill Administration Complex Final GMP Summary Document List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 1 - M1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL MECHANICAL PLAN 06/ 08 /05 1 - M1 . 2 . 1 BUILDING 1 -2ND FLOOR PARTIAL MECHANICAL PLAN 06 / 29 / 05 1 - M1 . 2 . 2 BUILDING 1 -2ND FLOOR PARTIAL MECHANICAL PLAN 06 / 08 /05 2- M1 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL MECHANICAL PLAN 06 /08 /05 2- M1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL MECHANICAL PLAN 06 / 29 /05 2- M1 . 2 . 1 BUILDING 2-2ND FLOOR PARTIAL MECHANICAL PLAN 06 / 08 /05 2- M1 . 2 . 2 BUILDING 2-2ND FLOOR PARTIAL MECHANICAL PLAN 06 / 08 /05 PLU}MEIN .. . 1 � 0- P0 . 0 PLUMBING LEGEND , NOTES AND ABBREVIATIONS 06 / 08/05 0- P0 . 1 PLUMBING SITE PLAN 06 /08/05 1 - P1 . 1 . 1 BUILDING 1 - FIRST FLOOR PARTIAL PLUMBING PLAN 06 / 08/05 1 - P1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL PLUMBING PLAN 06 / 08 /05 1 - P1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL PLUMBING PLAN 06 / 08 /05 1 - P1 . 2 . 1 BUILDING 1 -2ND FLOOR PARTIAL PLUMBING PLAN 06 / 08 /05 1 - P1 . 2 . 2 BUILDING 1 -2ND FLOOR PARTIAL PLUMBING PLAN 06 / 08/ 05 2- P1 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL PLUMBING PLAN 06 / 08/05 2- P1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL PLUMBING PLAN 06 / 08/05 2- P1 . 2 , 1 BUILDING 2-2ND FLOOR PARTIAL PLUMBING PLAN 06/ 08/05 2- P1 . 2 . 2 BUILDING 2-2ND FLOOR PARTIAL PLUMBING PLAN 06 / 08/ 05 1 - P4 . 1 . 1 PLUMBING SANITARY RISER 06 / 08/ 05 2- P4 . 2 . 2 PLUMBING SANITARY RISER 06 / 08/05 1 - P5 . 1 . 1 PLUMBING STORM WATER RISER 06 / 08/05 2- P5 . 2 . 2 PLUMBING STORM WATER RISER 06 / 08/05 0- P6 . 1 . 0 PLUMBING DETAILS 06 / 08 /05 FS MS3KR 4 0- FP0 . 0 FIRE PROTECTION NOTES AND DETAILS 06 / 29 /05 P. 0- FP0- 1 OVERALL FIRE PROTECTION SITE PLAN 06 /08/05 1 - FP1 . 1 . 1 BUILDING 1 - FIRST FLOOR PARTIAL FIRE PROTECTION PLAN 06 /08 /05 1 - FP1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL FIRE PROTECTION PLAN 06 / 08 /05 1 - FP 1 . 2 . 1 BUILDING 1 -2ND FLOOR PARTIAL FIRE PROTECTION PLAN 06 / 29 /05 1 - FP 1 . 2 . 2 BUILDING 1 - 2ND FLOOR PARTIAL FIRE PROTECTION PLAN 06 / 29 /05 l 2- FP1 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL FIRE PROTECTION PLAN 06 /08/05 2- FP1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL FIRE PROTECTION PLAN 06 /08/05 2- FP 1 . 2 . 1 BUILDING 2-2ND FLOOR PARTIAL FIRE PROTECTION PLAN 06 / 08 /05 Page 36 �� Indian River County Turner Administration Complex � Rl Final GMP Summary Document List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 2- FP1 . 2 . 2 BUILDING 2-2ND FLOOR PARTIAL FIRE PROTECTION PLAN 06/08/05 e t y. r YE x: ' ✓ ti .yak 'S.:.z M $' -"iti�x'" asp- ' Y ' F .. :s ' •�'., '- k ` t. ,� a 8 '& � w. , ,y; r� ,;, +' �„�&fi". x�^C � ELECTRICAL; h � E 0- E0 . 0 ELECTRICAL SYMBOLS , NOTES & ABBREVIATIONS 06 / 08 /05 0- E1 . 0 ELECTRICAL SITE PLAN 06 / 29 /05 0- E1 . 1 ELECTRICAL SITE SURVEILLANCE PLAN 06 / 08/05 0- E1 . 2 ELECTRICAL CHILLER PLANT 06 / 29 /05 1 - E1 . 0 . 1 BUILDING 1 - FIRST FLOOR OVERALL POWER PLAN 06 / 29 /05 1 - E1 . 0 . 1 ABUILDING 1 - FIRST FLOOR CHAMBER POWER PLAN 06 /08/05 1 - E1 . 0 . 2 BUILDING 1 -2ND FLOOR OVERALL POWER PLAN 06 / 29 /05 l - El . l . l BUILDING 1 - FIRST FLOOR PARTIAL POWER PLAN 06/ 29 / 05 1 - E1 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL POWER PLAN 06 / 29 /05 2- E1 . 0 . 1 BUILDING 2- FIRST FLOOR OVERALL POWER PLAN 06 / 29 /05 2- E1 . 0 . 2 BUILDING 2-2ND FLOOR OVERALL POWER PLAN 06 / 29 /05 2- E1 . 1 . 1 BUILDING 2- FIRST FLOOR OVERALL POWER PLAN 06 / 29 /05 2- E1 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL POWER PLAN 06 / 29 /05 1 - E1 . 2 . 1 BUILDING 1 -2ND FLOOR PARTIAL POWER PLAN 06 / 29 /05 1 - E1 . 2 . 2 BUILDING 1 - 2ND FLOOR PARTIAL POWER PLAN 06 / 29 /05 2- E1 . 2 . 1 BUILDING 2-2ND FLOOR PARTIAL POWER PLAN 06 / 29 / 05 2- E1 . 2 . 2 BUILDING 2-2ND FLOOR PARTIAL POWER PLAN 06 / 29 /05 1 - E2 . 0 . 1 BUILDING 1 - FIRST FLOOR OVERALL LIGHTING PLAN 06 / 29 /05 1 - E2 . 0 . 1A BUILDING 1 - FIRST FLOOR COMMISSION CHAMBER LIGHTING PLAN 06 /08 /05 1 - E2 . 0 . 2 BUILDING 1 -2ND FLOOR OVERALL LIGHTING PLAN 06 / 29 /05 1 - E2 . 1 . 1 BUILDING 1 - FIRST FLOOR PARTIAL LIGHTING PLAN 06 / 29 / 05 1 - E2 . 1 . 2 BUILDING 1 - FIRST FLOOR PARTIAL LIGHTING PLAN 06 / 29 / 05 1 - E3 . 0 . 1 BUILDING 1 - FIRST FLOOR OVERALL SYSTEMS PLAN 06 / 08/05 1 - E3 . 0 . 2 BUILDING 1 -2ND FLOOR OVERALL SYSTEMS PLAN 06 /08/05 1 - E3 . 0 . 3 BUILDING 1 - FIRST FLOOR OVERALL SECURITY PLAN 06 /08 / 05 1 - E3 . 0 . 4 BUILDING 1 -2ND FLOOR OVERALL SECURITY PLAN 06 / 08/05 2- E2 . 0 . 1 BUILDING 2- FIRST FLOOR OVERALL LIGHTING PLAN 06 / 29 /05 2- E2 . 0 . 2 BUILDING 2-2ND FLOOR OVERALL LIGHTING PLAN 06 / 29 / 05 2- E2 . 1 . 1 BUILDING 2- FIRST FLOOR PARTIAL LIGHTING PLAN 06 / 29 /05 2- E2 . 1 . 2 BUILDING 2- FIRST FLOOR PARTIAL LIGHTING PLAN 06 / 29 / 05 1 - E2 . 2 . 1 BUILDING 1 -2ND FLOOR PARTIAL LIGHTING PLAN 06 / 29 /05 1 - E2 . 2 . 2 BUILDING 1 -2ND FLOOR PARTIAL LIGHTING PLAN 06 / 29 /05 2- E2 . 2 . 1 BUILDING 2-2ND FLOOR PARTIAL LIGHTING PLAN 06 / 29 /05 Page 37 �1►� j FU DESCRIPTION � ♦ FLOOR01111111 = BUILDING 2-2ND PARTIAL LIGHTING PLAN � . BUILDING 2- FIRST FLOOR OVERALL SECURITY PLAN BUILDING 2-2ND FLOOR OVERALL SECURITY PLAN • • DETAILS � . � . 11137gll= :: DETAILSELECTRICAL RISER DIAGRAM ELECTRICAL RISER DIAGRAM • iSCHEDULES . • . • : • �■' SCHEDULES SCHEDULES � . • : • • . � : � . iSCHEDULES re • . • : • iSCHEDULES , . • : • e � . � : • � . • : • • . • : • SCHEDULES � . • } r { y rda gc ,ybs . ww ♦ � ., � ,, .td r • • � ♦ ♦ . • LEGEND ♦ SHEET INDEX • • � • , VOICE/ DATA SITE • • • , BUILDING 1 - FIRST FLOOR PARTIAL VOICE/ DATA PLAN , BUILDING 2- FIRST FLOOR OV ERT�LLVO ICE / DATA PLAN BUILDING 2- FIRST FLOOR PARTIAL VOICE / DATA PLAN ' BUILDING 2- FIRST FLOOR PARTIAI�VOICE / DATA PLAN • a I bm • • s • • Fil 4 1 wel eymm uAl • • � . � Indian River County Turner Administration Complex �Rta` Final GMP Summary Document List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 2-T4 . 1 . 1 BUILDING 2- ENLARGED PLANS VOICE / DATA 06 / 08 /05 2-T4 . 1 . 2 BUILDING 2- ENLARGED PLANS VOICE/ DATA 06 / 08 /05 0-T5 . 1 VOICE/ DATA RACK ELEVATIONS 06 /08/05 1 -T6 . 1 BUILDING 1 RISER DIAGRAMS VOICE / DATA 06 / 08 /05 2-T6 . 1 BUILDING 2 RISER DIAGRAMS VOICE/ DATA 06 /08 /05 0-T7 . 1 VOICE / DATA DETAILS 06 / 08/05 0-T7 . 2 VOICE/ DATA DETAILS 06 / 08/05 0-T7 . 3 VOICE/ DATA DETAILS 06 /08/05 0-T7 . 4 VOICE/DATA DETAILS 06 / 08 /05 Page 39 0 a� R�v Indian River County Turner Administration Complex Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE T e �'b. 9`' � xX DIVISION I GENE AC REQUIREMENTS Y 01010 SUMMARY OF WORK Bid Set 01027 APPLICATION FOR PAYMENT Bid Set 01028 MODIFICATION REQUIREMENTS Bid Set 01039 COORDINATION AND MEETINGS Bid Set 01045 CUTTING AND PATCHING Bid Set 01060 REGULATORY REQUIREMENTS Bid Set 01 120 ALTERATION PROJECT PROCEDURES Bid Set 01300 SUBMITTALS Bid Set 01311 NETWORK ANALYSIS SCHEDULES Bid Set 01400 QUALITY CONTROL Bid Set 01410 TESTING LABORATORY SERV ICES Bid Set 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS Bid Set X1540 SECURITY Bid Set ( 560 TEMPORARY CONTROLS Bid Set 01600 MATERIAL EQUIPMENT AND APPOROVED EQUALS Bid Set 01650 STARTING OF SYSTEMS Bid Set 01700 CONCRACT CLOSEOUT Bid Set 01730 OPERATION AND MAINTENANCE DATA Bid Set 01740 WARRANTIES Bid Set A Iii ii i e , iii: t gil m v ... ., - - _ , . .. sit .� 02280 SOIL TREATMENT FOR TERMITE CONTROL Bid Set 02800 SITE IMPROVEMENTS AND AMENITIES Bid Set 02831 CHAIN LINK FENCING Bid Set 02874 BICYCLE RACK Bid Set DUISION�3- COCRETWIN so 03300 CAST- IN - PLACE CONCRETE Bid Set 03410 STRUCTURAL PRECAST CONCRETE - PLANT CAST Bid Set D iS `ON BASOtY __ INN 04810 JUNIT MASONRY ASSEMBLIES Bid Set "120 EfAkE "Set ' 'STRUCTURAL STEEL Page 40 Indian River County Turner Administration Complex Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 05210 STEEL JOISTS Bid Set 05310 STEEL DECK Bid Set 05400 COLD- FORMED METAL FRAMING Bid Set 05520 HANDRAILS AND RAILINGS Bid Set 05710 MONUMENTAL STAIRS & RAILINGS addendum # 1 05800 EXPANSION CONTROL Bid Set 05805 EXPANSION JOIST ASSEMBLIES Bid Set xw i m ws s a $u" a.. r•. Kt m'rsr'W. a + e y xi ° dnyFa S �`^S • Di'�/ IS ON 6 - WOOD AND PLASTICS 4�� ; „ �. ` �=� a_w �IU10 06100 ROUGH CARPENTRY Bid Set 06410 CUSTOM CASEWORK Bid Set 06650 POLYSTONE COMPOSITE COLUMNS addendum # 1 zru. y .e' x s ` n .n+ 'x .yyG...ya. 4 ix R w 4 r i b • %k ' fr Y' w3sq.. f - Y } w �7� IL S101THERMp ANDMOISTUREP�ROTECTiON ; ,. � � a - dJ�' , 120 IFLUID APPLIED WATERPROOFING Bid Set 07191 VAPOR RETARDANTS Bid Set 07213 BATT INSULATION Bid Set 07214 FOAMED - IN - PLACE INSULATION Bid Set 07270 FIRE STOPPING Bid Set 07310 MISSION "S " TILE ROOFING SYSTEM Bid Set 07536 MODIFIED BITUMEN ROOFING SYSTEM Bid Set 07610 STANDING SEAM METAL ROOFING SYSTEM Bid Set 07620 SHEET METAL FLASHING AND TRIM Bid Set 07724 ROOF HATCHES Bid Set 07900 JOINT SEALANTS Bid Set D1 ' S1ON DOOR AND W N S .:.. 4.*#w .>- .. . eb5�a . - ,�#...+�. ,i�=s:ax6�dsse QW _ . . ...-..�.. . . ..... - N . ,.... d e. 08050 DOOR SCHEDULE NOTES AND LEGENDS addendum # 1 08110 HOLLOW METAL DOORS AND FRAMES addendum # 1 08210 SOLID CORE WOOD DOORS Bid Set 08305 ACCESS DOORS / HATCHES Bid Set 08333 ROLLING COUNTER DOORS addendum # 1 08331 ROLLING SERVICE DOORS Bid Set ( ' 410 ALUMINUM ENTRANCES AND STOREFRONT Bid Set \ ' u8460 AUTOMATIC ENTRANCE DOORS Bid Set 08580 JALUMINUM INTERIOR SLIDING SERVICE WINDOWS addendum # 1 Page 41 �/ Indian River County Turner Administration Complex Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 08710 FINISH HARDWARE Bid Set 08800 GLASS AND GLAZING addendum # 1 ,ryc.,.;n+x i aY . TM, n. m :' rs t Yy` • � ib�, 'a R r� "` r -e _ �A M . -Ay D1VIS',,1 FINISHES . yam' s y . , N _ 4 { a � ,, $ � g . . .; o . _Y:a:irJa. . . . .s . + . a .+� $r. Yet '.� e .. . 'fir ,-. 8t . . u. .. id ;II. :. Y.:... .e «. s .. qty\ n . > . ._ . . .:.. 09111 METAL STUD FRAMING SYSTEM Bid Set 09206 METAL FURRING AND LATHING Bid Set 09220 PORTLAND CEMENT PLASTER Bid Set 09250 GYPSUM BOARD SYSTEMS Bid Set 09311 CERAMIC TILE Bid Set 09380 MARBLE WINDOW STOOLS Bid Set 09511 SUSPENDED ACOUSTICAL CEILING SYSTEM Bid Set 09520 ACOUSTICAL WALL PANELS Bid Set 09650 RESILIENT FLOORING Bid Set X9682 CARPET- MODULAR Bid Set 688 CARPET Bid Set 09900 PAINTING Bid Set � � IS� O 0 SPEC �.T1ES : ,. 10171 TOILET COMPARTMENTS , URINAL SCREENS Bid Set 10211 FIXED METAL WALL LOUVERS Bid Set 10350 FLAGPOLES Bid Set 10420 PLAQUE Bid Set 10441 IDENTIFYING DEVICES Bid Set 10520 FIRE EXTINGUISHERS AND FIRE BLANKETS Bid Set 18675 METAL SHELVING NOT INCLUDED 10800 TOILET AND BATH ACCESSORIES Bid Set I131'O ] y P Elow i i 181 PRQ iECTIGN 99REENS NOT INCLUDED 11 160 LOADING DOCK EQUIPMENT Bid Set oGc1nr- K1T1 A i A DDI i A rskIQE_ NOT INCLUDED 1145 � 0 SNOSHVG. ,D / 5a1 ( 2480 FLOOR MATS Bid Set 12510 WINDOW VERTICAL BLINDS Bid Set 12610 AUDITORIUM SEATING Bid Set Page 42 Indian River County Turner Administration Complex Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 12692 FLOOR GRID ( ENTRANCE DOOR SAND TRAP ) addendum # 1 a _ • p ro 'vS � .. vtT { x ..e �"..»'4gfcr`t-s r r F. K .L .'ar d9 t', } r :,gni t DIUON13FIREPROTECTION .fir ISIx 13915 JFIRE SUPPRESSION PIPING Bid Set DIVISION�14tO �VVEXINGSYSTEMS _ F fi �� a r ..#. t �, srr aI e6 14246 HYDRAULIC ELEVATOR Bid Set INTERIORFINISf� SPECIFICAIONS � �, g' , FLOOR FINISHES SCHEDULE addendum # 1 BASE , CHAIR RAIL AND COLUMN SCHEDULE addendum # 1 WALL FINISHES SCHEDULE addendum # 1 MILLWORK/ BUILT- IN FINISHES SCHEDULE addendum # 1 DECORATIVE LIGHTING SCHEDULE addendum # 1 pIWISIOrI �I MEC; ii?► 1VlCAa} F , w . . . .. x .. , , 0I r. . � z t 1 ... _.: '� .. . ... ..b. 15010 BASIC MECHANICAL REQUIREMENTS Bid Set 15030 ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPEMENT Bid Set 15035 VARIABLE FREQENCY DRIVES Bid Set 15050 BASIC MECHANICAL MATERIALS AND METHODS Bid Set 15060 PIPE AND FITTINGS Bid Set 15100 VALVES Bid Set 15120 PIPING SPECIALTIES Bid Set 15160 PUMPS Bid Set 15240 VIBRATION ISOLATION Bid Set 15250 THERMAL INSULATION Bid Set 15300 FIRE PROTECTION Bid Set 15410 PLUMBING PIPING SYSTEM Bid Set 15440 PLUMBING FIXTURES Bid Set 15450 PLUMBING EQUIPMENT Bid Set 15510 HYDRONIC PIPING SYSTEM Bid Set 15530 REFRIGERATION PIPING SYSTEM Bid Set 15680 WATER CHILLER Bid Set 3690 DUCT MOUNTED HEATER Bid Set 15740 CONDENSER Bid Set 15760 SPLIT PACKAGE AIR CONDITIONING EQUIPMENT Bid Set Page 43 �/ Indian River County Turner Administration Complex Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 15800 AIR HANDLING UNIT Bid Set 15860 FANS Bid Set 15870 AIR INTAKE AND RELIEF VENT Bid Set 15880 AIR DISTRIBUTION Bid Set 15890 DUCTWORK Bid Set 15910 DUCTWORK SPECIALTIES Bid Set 15930 TERMINAL UNIT Bid Set 15940 SEQUENCE OF OPERATION Bid Set 15950 BUILDING CONTROL SYSTEM addendum # 1 15990 PERFORMANCE VERIFICATION Bid Set DI�/ ISION 16ELECTRICAL 8WWW" ,nJ4 r . ..>. . x � '�ino+ •, .y>krf a s> 16010 GENERAL PROVISIONS Bid Set 6011 ELECTRICAL SCOPE Bid Set , 100 BASIC MATERIALS AND METHODS Bid Set 16102 BASIC DEVICES Bid Set 16110 RACEWAYS - METAL Bid Set 161 1 1 RACEWAYS- NON METALLIC Bid Set 16112 CABLE TRAYS Bid Set 16120 CONDUCTORS Bid Set 16130 OUTLET BOXES , JUNCTION BOXES AND GUTTERS ( WIREWAYS ) Bid Set 16171 SAFETY SWITCHES Bid Set 16425 DISTRIBUTION SWITCHBOARDS Bid Set 16450 GROUNDING Bid Set 16471 PANELBOARDS Bid Set 16481 MOTOR CONTROLLERS Bid Set 16490 AUTOMATIC TRANSFER SWITCH Bid Set 16501 LIGHTING MATERIALS AND METHODS Bid Set 16610 LIGHTING PROTECTION SYSTEM Bid Set 16615 UNINTERRUPTIBLE POWER SYSTEM Bid Set 16650 ENGINE GENERATORS Bid Set 16720 ADDRESSABLE FIRE ALARM SYSTEM Bid Set 16727 SPECIAL SYSTEMS Bid Set IVIS1017_ SNTRUC tjRED7CAkIN 17010 DIVISION 17 SYSTEMS GENERAL PROVISIONS Bid Set Page 44 ro a= Rt, �R Indian River County Turner Administration Complex '` tM Final GMP Summary Specification List Report Date August 16 , 2005 NUMBER DESCRIPTION DATE 17110 PATHWAYS AND SPACES FOR STRUCTURED CABLING SYSTEM Bid Set 17120 CABLE PLANT- STRUCTURED CABLING SYSTEM Bid Set 17130 COMBINED LOW VOLTAGE / POWER FLOOR BOXES Bid Set 17450 GROUNDING AND BONDING FOR TELECOMMUNICATIONS SYSTEMS Bid Set WON 'w1m,', .., r' r , s t;-c' ,F• s �✓. n_ a5 � � ,. - ADDENDUM # 1 06 /29 /05 l Page 45 (Q Exhibit BTurner -c i - R1 ' Allowances l Ica, _ _ r r Indian River County 00D., Turn r Administration Complex Final GMP Summary Allowances Report Date August 16 , 2005 The following sums are included as allowances in our GMP . The allowances include labor , material , unloading and taxes . In the event the actual cost of these items of work exceeds or is less than the individual allowance amount indicated , the GMP shall be increased or decreased by the difference between the actual cost and allowances , per terms of the Contract . Bid Package Description Amount 2 Water line extension $ 26 , 240 2a Brick Pavers $217 , 810 6 Millwork items that are not elevated in drawings $ 1827975 9d Painted Mural $ 10 , 000 9d Painted Wallcovering Mural $ 10 , 000 12 Floor Mats $ 10 , 000 14 Elevator cab finish allowances $ 22 , 500 15a Kitchen plumbing and ventilation rough - in and final connections to $357000 equipment ( provided by Owner) . 17 Audio Visual Systems at the Commission Chambers Sound System $65 , 000 Multi - Media System $200 , 000 TV Lighting System $ 50 , 000 17a Security System $250 , 000 Shell the space for the Emergency Operations Center ( includes decrease ( $ 524 , 000) in the scope of the mechanical and electrical work) � Y Page 2 Exhibit C Turner Qualifications & Assumptions Indian River County Turner Administration Complex lex p Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 The GMP for the Indian River County Administration Complex is based on the Documents as listed herein and as modified / clarified through the following Qualifications and Assumptions . In the event of any conflicts between these Qualifications and Assumptions and any other Contract Documents , these Qualifications and Assumptions shall govern . I . GENERAL 1 We have assumed that the Cost of the following items are to be paid by the Owner and are not included in our GMP . Impact fees , special assessment fees Threshold Inspector Cost of Building Permits , Plan Review Fees , and related expenses Material Testing and Inspection Unforeseen Subsurface Conditions Utility Company charges and/or fees except for standard monthly power or water bills . Design or consulting costs Survey of existing project site Kitchen Equipment Lockers Artwork Furnishings 2 The GMP is based on standard manufacturer' s warranties as available in the industry at the time of purchase . 3 The GMP is based on having 30 days from receipt of a Notice to Proceed to mobilization . The GMP is based on a sixteen ( 16 . 0) month construction schedule from the day of mobilization to Substantial Completion , plus 2 months of close -out . 4 Turner assumes that the Owner will secure any air rights from adjacent property Owners and permits with regard to the concrete pumps , cranes , and crane booms . 5 The GMP is based on drawings provided by Donadio and Associates which we assume have been designed in accordance with the current Florida Building Code . Any cost resulting from changes in Building Codes may result in a change to the GMP . 6 The GMP includes Subcontractor Default Insurance at 1 . 3 % of the direct cost of the work , in lieu of bonds furnished from subcontractors . Typical subcontractor bonding rates are between 1 . 5% to 2% , The use of Subcontractor Default Insurance results in savings to the Project . 7 The following GMP costs will be billed in full in our first application for payment . The value of these items is based on the GMP amount . a . General Liability & Worker' s Compensation Insurance b . Subcontractor Default Insurance c . Performance and Payment Bonds Page 3 ao "'V" Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 d . Builder' s Risk Insurance 9 Taxes , Insurance , Fringes and Benefits on Turner personnel are a fixed rate of 56 . 00 % of raw payroll , exclusive of Worker' s Compensation Insurance . 10 All costs for Owner furnished and/or Owner installed items are not included in our GMP and will be by Owner . Owner shall provide delivery , distribution , uncrating and disposal costs . These items shall be furnished and installed in accordance with the construction schedule and as coordinated by Turner so as not to adversely affect the Contractor' s approved construction schedule . These items may require out of sequence installation . 11 No retainage will be held on Owner Purchase Orders . 12 All changes to the plans and specifications must have "detailed , specific clouding " . Turner will not be responsible for changes appearing on plans without this annotation . Structural plans will have precedence over all other plans in case of conflicts . 13 The As- built drawings will consist of marked up construction drawings submitted to the Architect at the end of the project for final incorporation into the project record documents by the Architect and paid for by the Owner . 14 Revisions to contract scope will not be annotated on shop drawings or submittals . 15 We have not included any requirements for propriety specification requirements , unless otherwise indicated in this document . 16 The Architect is to provide electronic construction documents to Turner for preparation of coordination documents . 17 We have not included a separate jobsite trailer for the Architects use . We have included a trailer for the Owner' s use . 18 Sales tax for all material is included in the GMP . All sales tax savings accrued through the use of the Owner direct purchase program shall be used to fund the Owner' s contingency within the GMP . 19 The CM and trade contractors , in conjunction with the Owner , Architect and Engineers will identify, price and achieve acceptance of cost reduction items for the work included in the GMP . The A/ E will revise the plans and specifications to incorporate the accepted cost reduction items . The savings achieved from these cost reduction items will be used to fund the Owner' s contingency . 20 The Builder' s Risk deductible is assumed to be paid by the Owner and is not included in the GMP . 21 The start of the warranty is from the date of substantial completion and is for a period of one year . 22 The following positions are to be reimbursable a . On Site Personal ; Project Manager , Project Engineers , Field Secretary , Project Superintendent , Assistant Superintendents , Field Engineers , Site Safety Engineer . b . Off Site Personal in support of the Project : Principal - in -charge , Operations Manager, Project Executive , Purchasing Personnel , Community Relations Manager , Project Accountant , Administrative Assistants . Page 4 �/ Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 23 Living and travel for the following positions are to be reimbursable Project Manager , Project Engineers , Project Superintendent , Site Safety Engineer . 24 The GMP amount does not include the preconstruction phase services cost . 25 The Construction Manager will engage Turner Logistics LLC for technical supply chain management services to competitively bid , purchase , expedite , and manage the delivery of major equipment and material . By doing so , multiple mark- ups from subcontractors and distributors ( historically averaging 20 to 25%) will be avoided . Turner Logistics Cost of Services ( COS) shall be reimbursed at the rate of 10 % for all such equipment and material purchased through this additional service . Historically this results in net savings to the Owner of 10 % to 15 % . Turner Logistics compensation [including all equipment , material , applicable taxes and Logistics ' COS] shall be based on the approved GMP value submitted . The cost of services along with applicable taxes shall be included in the GMP proposal . This equipment will also be part of the Owner Direct Purchase Program , providing further savings to the Owner . Bid Package 2 Sitework Specifications : 1 Civil specification sections were not provided . Notes on the drawings are acknowledged as specifications . Drawings : 1 Vertical header curbs are included around landscape islands and not included at ends of parking spaces with wheel stops . 2 The temporary parking lot scope of work is included as follows : a . Remove curb in two locations for entrance and exit to the lot as indicated on the drawing . b . Provide new radius header curbs to establish entrances and exits to the lot as indicated on the drawing . c . Excavate and provide stone base and asphalt at the first 24' from the streets at the entrances and exits to the lot as indicated on the drawing . d . Spray the entire temporary parking area of lot with Round - up or similar all purpose herbicide to eliminate all grass and weeds from the area of the lot . e . The Owner will deliver mulch to the area of the iot and Turner shall distribute and evenly spread the mulch over the surface of the lot . f . Provide parking I}locks as indicated on the drawing . Each parking block to be secured in place with 2 each 24" long #4 rebar . g . Provide stop signs at each exit of the lot . h . Remove all wheel stops and mulch , sod with bahia sod and restore lot to its original condition when directed by Owner . Page 5 /�o / C*U0R1ft1'C04 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date: August 16, 2005 3 The scope of work includes installation of water meters . Water meters are to be furnished by the Owner . 4 The GMP is based upon the 15 " , 18 " , 24" and 30 " storm drainage piping being HDPE piping in lieu of CAP piping for these diameters only . 5 An allowance of $26 , 240 is included in the GMP for the water line extension that may be required to replace the 6" PVC water line indicated as existing on sheet 32 of 33 of the Civil Drawings . Bid Package 2a Demolition Specifications : 1 Demolition specification sections were not provided . Notes on the drawings are acknowledged as specifications . Drawings : 1 The fuel tank indicated on the drawings as existing , is understood to have been previously removed by the Owner and any cost associated with this tank is not included in the GMP . 2 The removal and remediation of any contaminated soil is excluded from the GMP . 3 Hazardous material survey and asbestos abatement is excluded from the GMP . 4 No cost is included for the removal of the power lines . It is assumed that this work will be performed by the Utility Company . 5 The cost for the removal or relocation of the underground fiber optic cables is not included in the GMP . 6 The GMP is based on the assumption that the retainage for the demolition subcontractor will be released after all their work is completed . Bid Package 2b Tree Relocation Specifications . 1 Tree Relocation specification sections were not provided . Notes on the drawings are acknowledged as specifications . Drawings : 1 The GMP includes relocation of twenty trees as indicated on the tree relocation plan dated 5/27/05 . The Owner will coordinate with Turner for the specific location of the tress to be relocated . 2 There is no warranty for the relocated trees . Trees are not guaranteed against tropical storm winds above 40 miles per hour , salt , cold temperatures , lethal yellowing , etc . 3 Any maintenance for the relocated trees is assumed to be by the Owner . The GMP includes the initial fertilization and tree staking . 4 The GMP is based on the assumption that the retainage for the tree relocation subcontractor will be released after all their work is completed . Page 6 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date: August 16, 2005 Bid Package 2c Temporary Fence Specifications : 1 Temporary Fence specification sections were not provided . Drawings : 1 No screening is included with the temporary fence . 2 The temporary fence is included as 6 ' 0 " chain link without a top rail . Bid Package 2e Landscaping Specifications . 1 Landscaping specification section was not provided . Landscaping notes on the drawings are acknowledged as specifications . Drawings : 1 The plant quantities included in the GMP are as shown in the plant list . The landscape drawings show the same symbols for different plants . 2 L2 . 1 - Upon substantial completion , maintenance of landscaping is by the Owner . 3 L 2 . 1 - A one year warranty is included where the material supplier provides for it , all other material supplier standard warranties shall govern . 4 The well is included to a depth of 150 ' (one hundred and fifty feet) , any additional footages will be at an allowance of $ 14 . 50 per ft . 5 The well casing is included to a depth of 100 ' (one hundred feet) , any additional footages will be at an allowance of $ 14 . 50 per ft . 6 No import or export of topsoil is included . Existing soils are utilitized for planting . The existing soil may be adjusted for PH as required . Bid Package 2f Site Furnishings Specifications : 1 02874 - Two bicycle racks are included in the GMP per specifications . Drawings : 1 Location of bicycle racks are not shown on drawings . It is assumed that the eventual location will not require additional sitework or concrete . Page 7 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 2g Hardscape Specifications : 1 Hardscape specification section was not provided . 2 Hardscape details were not provided . Drawings : 1 Brick pavers are included in the GMP where indicated on site plan drawings as a $ 10 . 00/sf allowance for furnishing and installation . This allowance includes any subbase or setting bed . Bid Package 3a Concrete Specifications : no clarification Drawings : no clarification Bid Package 4 Masonry Specifications : 1 All block and mortar to be standard gray color . Drawings . 1 High strength block (2800 psi ) is included in the GMP . Bid Package 5 Structural Steel & Miscellaneous Metals Specifications : 1 The finish for the railings are standard powder coat for the monumental stairs and mill finish aluminum at the council chambers . 2 The monumental atrium stairs are concrete construction in accordance with the structural drawings and not steel per section 05710 . 3 The handrails at the monumental stairs and the atrium are included as detailed on the drawings . The railing at the commission chambers is include as a glass rail . Page 8 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date: August 16, 2005 Drawings : 1 Any special loading for joists marked SP are excluded from the GMP . No loads were given . 2 Molded cover top as shown for the atrium balcony railings is not included . The atrium rail has a radiused top , square posts and infill panel . 3 The handrails at the exit stairs are included in the GMP as 6 " line standard painted steel . Bid Package 6 Millwork Specifications : no clarifications Drawings : 1 All the following millwork , which is shown in elevation on the drawings , is included in the GMP : Rooms 1 . 1 - 101 a , 1 . 1 - 108 , 1 . 1 - 109 , 1 . 1 - 2155 1 . 1 -2173 1 . 1 - 2189 1 . 1 -4015 1 . 1 - 404 , 1 , 1 - 4065 1 . 1 -4207 1 . 1 - 4283 1 , 1 -50211 , 1 -5059 1 , 2 -21211 . 2 - 228 , 1 . 2 -40311 , 2- 5143 1 . 2 -603 , 2 . 1 - 226 , and 2 . 2-324 . 2 All the following millwork items are included as an allowance in the GMP ; Rooms 1 . 1 - 101 , 1 . 1 - 102 , 1 . 1 - 116 , 1 . 1 -205 , 1 . 1 - 303 , 1 . 1 -408 , 1 . 1 - 411 , 1 . 1 -501 , 1 . 2- 511 , 1 . 2 - 512 , 1 . 2- 613 , 1 . 2-704 , 1 . 2 - 7053 1 . 2-8015 1 . 2- 803 , 2 . 1 -2029 2 . 1 -3035 2 . 1 -4021 2 . 1 - 604 , 2 . 1 - 622 , and 2 . 2- 302 . 3 All the following millwork items are excluded from the GMP ; Rooms 1 . 1 -201 , 1 . 1 -2029 1 . 1 - 203 , 1 . 1 -302 , 1 , 1 -40511 , 1 - 407 , 1 . 1 -4083 1 . 2- 106 , 2 . 1 -2015 2 . 1 -2185 2 . 1 -4015 2 . 1 -409 , 2 . 1 - 5019 2 . 1 - 5035 2 . 1 - 601 , 2 . 1 -6039 2 . 1 -624 , 2 . 1 - 627 , and 2 . 2-315 . 4 All wood base WB- 1 , crown molding , wood paneling , wood trim , and restroom countertops are included in the GMP . Bid Package 6a Cast Stone Columns Specifications : 1 Manufacturer' s standard finishes and colors are included in the GMP . 2 Manufacturer' s standard warranty is included in the GMP . 3 If a mock up is required , it shall serve as part of the final installation if approved . Drawings : 1 Manufacturer' s existing mold , which may differ slightly in dimensions but fully incorporates design intent , may be used as contractor' s option . Page 9 d ° 3 `'' Indian River County Turner � Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 7 Waterproofing Specifications : no clarification Drawings • no clarification Bid Package 7a Roofing Specifications : 1 We have included a standard 20 year warranty on the Standing Seam Metal Roof . This Warranty does not include field inspections on an annual or bi -annual basis as requested in the Specifications . 2 We have included the light gauge metal roof trusses as follows : Building Code FBC2001 Top Chord Live Load 20psf Top Chord Dead Load 30psf Bottom Chord Dead Load 10psf Wind Load 140mph Importance Factor Bldg #2 at 1 . 15 , all other bldgs will be 1 . 0 Exposure C Opening Condition Enclosed 3 We may include a 30#/90# roofing felt system as recommended by the roofing manufacturer in lieu of the ice and water shield/peel and stick under the Spanish " S " roof tiles . 4 We have included using polyfoam to secure the Spanish " S " roof tiles in lieu of mechanically fastened as shown on the drawings . Drawings • no clarifications Bid Package 7b Foamed in place Insulation Specifications : 1 Thermco foam in place is included in the GMP . Drawings : no clarifications Page 10 Keo Indian River County Turner Administration Complex Rt Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 8 Doors , Frames , & Hardware Specifications : 1 If a conflict exists between the plans and the schedule , the doors are included as specified on the door schedule . 2 It is assumed that Steelcraft is an acceptable manufacture for the hollow metal doors and frames . 3 Due to manufacturing limitations , the light size for door types FG/ M and FG with 90 minute and 45 minute fire ratings will be reduced . 4 STC door ratings are unavailable at door types FG/M and FG . 5 The GMP includes standard sound rated doors . Standard flush wood door carries a STC rating of 30 ( in lieu of 35 ) and a steel stiffened hollow metal door carries an approximate STC rating of 39 ( in lieu of 43 ) . 6 All wood doors are included in the GMP as red oak since the color of oak was not defined ( in Section 08210 . White oak can be provided at an additional cost . 7 The GMP includes modifications required for the hardware on the doors that are indicated on the electrical drawings to have a card reader . Drawings : 1 Pocket doors include hardware from the manufacturer in lieu of hardware grouping 13 . 2 Door closers , which are required by code at fire rated openings , have been added to hardware grouping 11 and are included at doors 1 . 1 -325a , 1 . 1 - 325b , and 1 . 1 -504a . 3 Hardware grouping 3 will be used at door 1 . 0 -002a in lieu of group 31 which does not exist . 4 The following doors will receive hardware group 7 in lieu of specified group ; 1 . 1 - 104 , 1 . 2 - 103 , 1 . 2- 113 , 1 . 2 - 115a , and 1 . 2 - 115b . 5 The following doors will receive hardware group 3 in lieu of specified group ; 1 . 0- 002a , 1 . 0 - 003c , and 2 . 2 - 401 . 6 Door 1 . 2- 105a will receive hardware group 13 in lieu of specified group . 7 Door 1 . 2- 104 will receive hardware group 9 in lieu of specified group . 8 In order to match the window elevations and details , windows at doors 1 . 1 -302- BL1 and 1 . 2- 106 - BL1 are included as aluminum framed in lieu of hollow metal . 9 Door 1 . 2-303 - BL1 is not shown on the floor plan and is excluded from the GMP . 10 Doors 1 . 2-233a and 1 . 2 - 233b are not indicated on the drawings and are excluded from the GMP . Page 11 R"'ERS Indian River County Turner z Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 8a Overhead Doors Specifications : 1 Cornell Iron Works is assumed to be an acceptable manufacturer for the overhead doors in the GMP . 2 Manufacturer' s factory standard finish and color for overhead doors is included in the GMP . Drawings • 1 Door 2 . 1 -313a must be face of wall mount as shown on 0 -A8 . D . 2 in order to meet windload requirements . Bid Package 8b Glass and Glazing Specifications : 1 The finish on all storefront and curtainwalls will be bronze anodized . Drawings • no clarification Bid Package 9 Drywall , Stucco Specifications : no clarification Drawings • no clarification Bid Package 9a Tile Specifications : 1 2% maintenance stock of each tile type , with the exception of the logo tile , is included in the GMP . 2 Mud set is included for tile at the Cafe area . Drawings • ( 1 Coral stone trim ST-2 is based on profile AP - 226 - R . The profile listed in the specifications is for a column capital . Page 12 4f Indian River County Turner 7 • � Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 9b Acoustical Ceilings Specifications : 1 09520 - Acoustical ceiling panels are not indicated on the drawings and are not included in the GMP . Drawings • no clarification Bid Package 9c VCT and Carpet Specifications : no clarification Drawings : no clarification Bid Package 9d Painting Specifications : no clarification Drawings : 1 Paint ( PNT- 1 ) is included as noted on Interior Finishes Plans per Interior Finish Legend on all drywall partitions , GWB ceilings , exposed structure ceilings , plaster ceilings , hollow metal doors and frames . Unless otherwise designated per Wall Finishes Legend . 2 An Allowance of $ 10 , 000 is included for the Custom Airbrushed Mural paint finish . 3 An Allowance of $ 10 , 000 is included for the Custom Digital Mural wall covering . Bid Package 10 Toilet Accessories and Partitions Specifications : 1 10800 - All mirrors included in the GMP are glass in lieu of polished stainless steel . Drawings • no clarification Page 13 Indian River County Turner • Administration Complex RI Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 10a Louvers Specifications : no clarification Drawings .9 no clarification Bid Package 10b Flagpoles Specifications : 1 One seamless tapered flagpole is included in the GMP . Drawings : no clarification f Bid Package 10c Signage Specifications : no clarification Drawings : 1 All signage included is per signage schedule drawings 1 -A9 . 0 . 2 , 2 -A9 . 0 . 2 , 0 -A10 . D . 2 . No provision is made for any signage required for life safety not shown on the signage drawings . Bid Package 10d Fire Extinguishers Specifications : 1 10520 - All fire extinguishers included in the GMP are 5 pound capacity . Drawings do not differentiate between FEC - 1 and FEC - 2 . Drawings : 1 Fire blankets and associated cabinets are not indicated on drawings and are excluded from the GMP . Page 14 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 10e Metal Shelving Specifications . 1 Metal shelving is excluded from this GMP and is not considered part of Turner's scope of work . Drawings : no clarification Bid Package 10f Access Flooring Specifications . 1 No specifications were provided . The GMP is based on "Tate " ConCore 1000 panel with PosiLock understructure . Drawings .0 no clarification Bid Package 11 Projection Screens Specifications . 1 Projection screens are excluded from this GMP . Drawings : no clarification Bid Package 11 a Residential Appliances Specifications : 1 Residential appliances are excluded from this GMP . Drawings : no clarification Bid Package 12 Floor Mats Specifications : no clarification Page 15 Z Indian River County Turner Administration Complex RI Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Drawings : 1 Floor mats are not indicated on drawings and are included in the GMP as an allowance . Bid Package 12a Window Treatments Specifications : 1 12510 - Window treatments are included at all exterior windows except at the building atrium windows . Window treatments at the building atriums are excluded from the GMP . 2 12510 - Window treatments are excluded from the GMP at all interior window locations . Drawings • no clarification Bid Package 12b Auditorium Seating Specifications : 1 12610 - Auditorium seating does not include movable bases in the GMP . 2 12610 - Auditorium seating includes tablet arms at the first row only . Drawings : no clarification Bid Package 14 Elevators Specifications : 1 Cab finish allowances are included at $7 , 500 per cab . 2 #4 Stainless steel entrances and frames are included for all elevators Drawings : no clarification Bid Package 14a Pneumatic Tube System Specifications : 1 Three pneumatic tube systems , one at the west end of building two , and two at the utilities drive thru , are included in the GMP . Page 16 Indian River County Turner { R Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Drawings : no clarification Bid Package 15 Fire Protection Specifications : 1 Ref , Section 13915 - 2- 2 . 3 & 2 . 4 and 15300 -3 - 2 . 03 . 6 . 1 , 2 : The GMP includes black steel schedule 10 piping for sizes 2 . 5 " & above and black steel schedule 40 piping for sizes 2" & below . 2 Ref . Section 13915 - 10 - 4 . 2 . D . 1 . b : The GMP includes controls from five (5) relay panels to fourteen ( 14 ) motorized dampers required ( not shown ) to regulate FM - 200 gas volume . Controls to operate fire/smoke dampers for the Sprinkler/FM200 systems is furnished and installed by the Fire Alarm contractor . 3 Section 15300 : The GMP is based on water supply flow rates provided in the specifications per Staley Consulting , Inc . 4 The GMP excludes the following : a . Ref . Section 13915 -3 -2 . 8 : Dry pipe system , including air compressor , dry type sprinklers , dry valves and piping . b . Ref . Section 13915-9 -3 . 16 and 15300 - 9 -3 . 01 . E : Cleaning and painting the exterior of sprinkler piping . Galvanized piping is not painted . Painting of exposed piping is provided by Section 09900 . c . Ref . Section 13915 - 10 -4 . 2 . D . 1 . b : Graphic annunciator panels for FM200 systems . 5 The sprinklers heads are included within 3 " of the center of the ceiling tiles . Drawings : 1 Ref . 1 - FP1 . 2 . 1 and 2- FP1 . 1 . 1 : The GMP includes 155 degree white concealed heads as shown ; upright heads are 155 degree brass quick response and one foot from deck ; other upright heads are 200 degree on sprig - ups , one foot from deck to be relocated in the future ; sidewall heads are 200 degree brass for bottom of elevator pits and covered exterior patio . 2 Ref . 1 - FP1 . 2 . 1 and 2 - FP1 . 1 . 1 : All heads will be within 3 " of center of tile . 3 The GMP excludes the following : a . Pre - engineered and dry chemical fire protection systems for kitchen hoods . b . Preaction , dry- pipe and anti -freeze loop fire protection systems . Page 17 Indian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date : August 16, 2005 Bid Package 15a HVAC & Plumbing Specifications : 1 Ref , Equipment Sections 15035 , 15440 , 15680 , 15740 , 15760 , 15800 , 15860 , 15850 and 15930 : The GMP is based upon non -proprietary design or equipment manufacturers . 2 Ref . Section 15400 - 2-2 . 02 : Piping for well water is the same as specified for domestic water pipe . 3 Reference Section 15410 -4 -2 . 07 . A . 1 & 2 : Insulation of domestic cold water piping is not included in the GMP . 4 Ref . Section 15880 -3 - 2 . 05 . A : The GMP includes fourteen ( 14) motorized dampers for the FM200 fire suppression system . Drawings : 1 Ref . 0- P6 . 1 . 0 : The GMP includes a well water system for Building Two used as a secondary system in case of a power failure . 2 Ref . 1 - P1 . 1 . 1 : The GMP includes an allowance of $35 , 000 for kitchen plumbing and ventilation roughin and final connections to equipment ( not shown , provided by Owner) for Building One . 3 Ref . 0 - M3 . 1 and 0 - M3 . 2 : The Mechanical Equipment Schedules identify manufacturers only as a basis of design . The GMP is based on non -proprietary design and equipment manufacturers . 4 Ref 2- M1 . 1 . 2 : The GMP includes fuel oil supply and return piping from storage tank to daytank in Building 2 . 5 Ref 2- M1 . 1 . 2 : The GMP includes one ( 1 ) 4000 gallon double wall above ground fuel storage tank with automatic leak detection and two (2 ) day tanks for generators . Addendum # 1 plan shows a 4000 gallon tank but the detail on same drawing shows a 8000 gallon tank. 6 Ref 2- M1 . 1 . 2 : The GMP includes initial fuel fill of 4550 gallons , including daytanks for testing purposes . Storage tank only will be filled for Owner prior to turnover . 7 Drilling of well for well water system and pumps for well (s) is included in the Landscape package for Building Two only . 8 The GMP excludes the following : a . Sand/oil interceptor for loading dock or garage . b . Heat tracing for exposed piping . c . Natural gas piping . d . Fuel oil supply and return piping from Building 2 storage tank to Building One day tank . No storage tank is included at Building One . e . Building One well water system . f . Carbon monoxide detection system . Page 18 BAIndian River County Turner Administration Complex Final GMP Summary Qualifications & Assumptions Report Date: August 16, 2005 Bid Package 16 Electrical Specifications : 1 16011 - 3 . 4 - E3 : Excavations shall be made to accommodate planed progress , and as required to maximize the efficiency of installation between point A and point B without restrictions, within OSHA guidelines . 2 16011 - 3 . 4 - F4 : Concrete encasement for communications ductbanks included only when crossing beneath a roadway . 3 16011 - 3 . 11 Identification for Division 16 and 17 shall be provided per NEC in lieu of the requirements of this specification section . 4 16102 - 2 . 1 and 2 . 2 : The GMP is based on Leviton as an acceptable manufacturer of devices . 5 16110 - 2 . 3 : All major manufacturers of EMT couplings and connectors as well as non - insulated throat EMT connectors may be utilized . 6 16120 : MC cable shall be utilized where allowed by the NEC . 7 16120 - 2 . 1 - H : Standard type wire / wing nuts shall be utilized for all copper conductor connections # 8 AWG and smaller . 8 16425 - 1 . 7 - A : All major manufacturers shall be included as acceptable . 9 16450 - 2 . 3 : Grounding connections to building steel may be exothermic type in lieu of bolted . 10 16471 - 2 . 11 - A : All major manufacturers shall be included as acceptable . 11 16490 - 1 . 3 - B - 1 : All major manufacturers shall be included as acceptable . 12 16501 : Light fixtures shall be supported per the National Electric Code ( NEC ) . 13 The Decorative " L7 fixtures indicated in the Interior Finish Specifications and shown on the Reflective Ceiling Plans are to be furnished by Song & Associates . The GMP includes installation of these fixtures . 14 16610 : Lightning protection system is included in the GMP . 15 The Sound System , Multimedia System and TV Lighting System in the Commission Chambers are included in the GMP as an allowance . Drawings : 1 Security and CATV raceways are included as an outlet box , plaster ring and 1 " conduit stubbed above the ceiling . 2 0 - E0 . 0 : Paging / Background Music , Intercom , Master Clock , MATV / CATV systems are not included . 3 0 - E1 . 1 : Empty raceways with pull string only for the cameras indicated ( poles cabling , terminations , equipment is included in the security system allowance ) . Page 19 �. Exhibit D AR"r�R August 16 , 2005 Turner Construction Schedule too Lo am& 110 rte.+ wsY.rm _ Y V Act ' Activity` Orig Months ID Description Dur 1 1 3 4 5 6 7 8 9 1 10 1 11 1 12 1 13 14 1 15 1 16 1 17 1 18 CONSTRUCTION Overall Construction Summary MIAA164 ITumer Receive Notice to Proceed (NTP) 0 4 IoTurner Receive Notice to Proceed (NTP) MIAA168 Pre-Construction 14 S re-Construction MIAA169 Overall Project Duration - NTP to Sub Compl 468 Overall Project Dur MIAA190 Substantial Completion 0 Substantial Completio* MIAA200 Close Out 42 Close Ou® MIAA210 Final Completion L 0 Final Completions SUC0000 Bldg 1 Clean & Punch 30 Bldg 1 Clean & Punch SUC0180 Final Inspections, Testing , Obtain CofO 40 Final Inspections, Testing, Obtain Com Sitework Summary --__--_ _T-- -- -- SUSW000 Paving/ Site Amenities/ Landscaping 75* Paving/ Site Amenities/ Landscaping SUSWO04 Early Site - Mob thru Site Utilities 100* Early Site - Mob thru Site Utilities Building 1 Construction Summary B1500 Building 1 Overall Summary 265* 1 Building 1 Overall S B1504 UG MEP, Foundations thru Roof Dry-in 120* UG MEP, Foundations thru Roof Dry-in 81508 MEP/FS Rough-in , Mtl Studs thru Wall 55* MEP/FS Rough-in, Mtl Studs thru Wall Inspections 81512 Barrel Tile Roof System thru Stucco & Ext Paint 75* Barrel Tile Roof System thru Stucco & Ext Paint B1516 Drywall thru Prime Paint 55* Drywall thru Prime Paint B1520 Ceiling Grid , MEP/FS in Grid , Acou Ceiling Tile 55* Ceiling Grid, MEP/FS in Grid, Acou Ceiling T .� 61524 AC , Finish Paint, Tile, Millwk, Carpet, & Clean 55* AC, Finish Paint, Tile, Millwk, Carpet, & Cie UIQ B1528 Clean & Prep, Owner/AE Punch ListNVork 20 Clean & Prep, Owner/AE Punch List/Wo® CD Building 2 Construction Summary IJ tQ B2500 Building 2 Overall Summary 218* Building 2 Overall Summary B2504 UG MEP, Foundations thru Roof Dry-in 91 * UG MEP, Foundations thru Roof Dry-in B2508 MEP/FS Rough-in , Mtl Studs thru Wall 50* MEP/FS Rough-in , Mtl Studs thru Wall Inspections 82512 Barrel Tile Roof System thru Stucco & Ext Paint 60* Barrel Tile Roof System thru Stucco & Ext Paint 82516 Drywall thru Prime Paint 40* ®Drywall thru Prime Paint 82520 Ceiling Grid , MEP/FS in Grid, Acou Ceiling Tile 40* ®Ceiling Grid, MEP/FS in Grid, Acou Ceiling Tile 82524 AC , Finish Paint, Tile, Millwk, Carpet, & Clean 46* AC, Finish Paint, Tile, Millwk, Carpet, & Clete 82528 Clean & Prep, Owner/AE Punch List/Work 20 Clean & Prep, Owner/AE Punch List/WoiIIIIIIIIIIIIIIIIIIIIII SWA00 Mobilize, Instl Site Fence& Erosion Control 15 IIIIIIIIIIIIIlMobilize, Instl Site Fence& Erosion Control SWA04 Install Temp Water & Electrical 10 IIIIIIIIIIIInstall Temp Water & Electrical SWA08 Demo Structures , Site Utilities, and Pvmt 15 Demo Structures, Site Utilities, and Pvmt SWA12 Remove Trees, Clear & Grub Site, Site Grading 25 —Remove Trees, Clear & Grub Site, Site Grading SWA16 Prep Building Pads / Stake & Layout Buildings 5 EPrep Building Pads / Stake & Layout Buildings SWA20 Bldg 2 Building Pad Ready 0 *Bldg 2 Building Pad Ready SWA24 Site Utilities - incl Storm 80 Site Utilities - incl Storm SWA28 Construct Roadway Subgrade and Base 20 Construct Roadway Subgrade and Base SWA32 Pavement & Sidewalks 30 ®Pavement & Sidewalks Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 1 of 4 R01 Project Schedule c^-- Finish Date 08DEC06 Data Date 11APR05 Indian River County Administration Facility © Primavera Systems , Inc. GMP Summary Schedule Act Activity Orig ID Description Dur _1 1 7 1 8 TQR91h51 10 1 11 1 12 1 13 1 14 1 15 1 16 17 1 SWA36 Site Lighting --- ^ — 15 ®Site Lighting SWA40 Irrigation & Landscaping 30 ®Irrigation & Landscaping SWA44 Demo Fiber Optic, CAN & OH Lines (by others) 15 IIIIIIIIIIIIIIIIDerno Fiber Optic, CAN & OH Lines ( by others) SWA48 Pavers & Site Amenities 30 ®Pavers & Site Amenities SWA52 Bldg 1 Building Pad Ready 0 ®Bldg 1 Building Pad Ready Foundations - Piles thru Lvl 1 Verticals B1000 Deep UG MEP Utilities (Below Footings) 10 IIIIIINDeep UG MEP Utilities (Below Footings) B1004 Excavate, Form_ , Rebar, Pour, Strip Footings 30 SExcavate, Form, Rebar, Pour, Strip Footings Structure, Exterior, Roof B1008 CMU Walls & Tie-Beams to 2nd Lvl 35 —CMU Walls & Tie-Beams to 2nd Lvl 81012 Rebar, Form , Pour, Strip Conc Columns to 2nd 15 i Rebar, Form, Pour, Strip Conc Columns to 2nd Lvincl any conc beams 81016 Backfill & Compact SOG area 20 IIIIIIIIIIIIIIIIIIIII13ackfill & Compact SOG area intermittent B1020 Scaffold , Set PSI Soffit Bms, Layout for Joists 15 IIIIIIIIIIIIIIIIScaffold, Set PSI Soffit Bms, Layout for Joistsincl set spacers B1024 Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab 20 i1,Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab 81028 Rebar, Form , Pour, Strip Conc Cols to Roof Lvl 15 _Rebar, Form, Pour, Strip Conc Cols to Roof Lvlincl any conc beams 81032 Set Precast Columns, Beams & Arches 15 IIIl11III11IIII11Set PreCast Columns, Beams & Arches B1036 CMU Walls & Tie Beams to Roof Lvl 20 ®CMU Walls & Tie Beams to Roof Lvl B1040 Metal Pan Stairs, Conc Fill , Railings 20 ®Metal Pan Stairs, Conc Fill, Railings B1044 Remove Forms & Shores, UG Utilities thru SOG 25 Remove Forms & Shores, UG Utilities thru SOG 81048 Erect Structural Steel , Bar Joists & Mtl Deck 25 ®Erect Structural Steel, Bar Joists & Mtl Deck 'C3 B1052 Upper Rf - Lt Gage Frm'g thru Asph Sheets 10 Ii•Upper Rf - Lt Gage Frm'g thru Asph Sheets B1056 Upper Rf - Facia, Block'g , Insul, Sheath 'g , Asph 20 f1IIIIIIIIIIIIIIIIIII11Upper Rf - Facia, Block'g, Insul , Sheath'g, Asph fp 61060 Upper Rf - Barrel Roof Tile & Gutters 25 IIIIIIIIIIIIIIIIIIIIIIIIIIIIILIpper Rf - Barrel Roof Tile & Gutters lV W 81064 Lower Rf - Mansard Trusses, Formdk, Sheathing 15 it•Lower Rf - Mansard Trusses, Formdk, Sheathin§ Asph Sheet 81068 Lower Rf - Flat Rf Insulation & Lt Weight Conc 15 It•Lower Rf - Flat Rf Insulation & Lt Weight Conc B1072 Lower Rf - Flat Rf Modified Bitumin Roofing 10 IIIIIIINLower Rf - Flat Rf Modified Bitumin Roofing B1076 Lower Rf - Mansard Barrel Tile & Gutters 15 OLower Rf - Mansard Barrel Tile & Gutters 81080 Lath & Stucco (incl molded crown & trim ) 50 ®Lath & Stucco (incl molded crown & trim) B1084 IStanding Seam Roof 15 It•Standing Seam Roof• incl peel & stick wtrproof membrane 81088 Window / Storefront & Ext. Doors 30 Window / Storefront & Ext. Doors 61092 Exterior Paint 25 ®Exterior Paint Interior / Finishes 81096 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 25 ®MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) B1100 Plumbing Rough-in (incl water piping & insul) 35 ®Plumbing Rough-in (incl water piping & insul)CW, HW, Dom , VW 81104 HVAC Rough-in ( Ductwork, Insulation) 70 HVAC Rough-in (Ductwork, Insulation) incls Set AHUs B1108 Elect Pwr/Ltg/FA/Systems Rough-in 70 IIIIIIIIIIIIIIIIIIIIIElect Pwr/Ltg/FA/Systems Rough-in Walls/Ceilings 81112 Fire Sprinkler Rough-in & Pressure Test 50 ®Fire Sprinkler Rough-in & Pressure Test B1116 HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 50 ®HMtl Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 81120 Install Hydraulic Elevators, Finish , Inspections 55 Install Hydraulic Elevators, Finish , Inspections 81124 Drywall , Tape & Finish Walls, Soffits & Ceilings 50 ®Drywall, Tape & Finish Walls, Soffits & Ceiling 81128 Main Stair & Balconys - Stru, Railings, Finish 50 Main Stair & Balconys - Stru, Railings, Finite B1132 Controls - Wiring , Devices , Test & Check-out 35 ®Controls - Wiring, Devices, Test & Check-ot B1136 1st Coat & Prime Paint 40 ®1st Coat & Prime Paint Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 2of4 It01 Project Schedule Finish Date 08DEC06 Data Date 11APR05 Indian River County Administration Facility GMP Summary Schedule RIZ © Primavera Systems , Inc. Act Activity Orig Ip Description Dur _ 1 2 1 3 4 5 9 1 10 1 11 1 12 1 13 14 1 15 11 1 B1140 Ceiling Grid 30 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIICeiling Grid B1144 Drops, Diffusers in Ceil'g Grid 30 —Drops, Diffusers in Ceil'g Grid B1148 Light Fixutres in Ceilg Grid 30 —Light Fixutres in Ceilg Grid 61152 Instl Fire Alarm Devices / Exit Signs Z5 �Insti Fire Alarm Devices / Exit Signs B1156 Fire Sprinkler Cut Drops & Instl Spr Heads 20 IIIIIIIIIIIIIIIIIIIIIFire Sprinkler Cut Drops & Instl Spr Head B1160 Instl Acoustic Ceiling Tile 20 �Instl Acoustic Ceiling Tile B1164 Start-up AC - Run Air 0 ®Start-up AC - Run Air 61168 Hang Doors & Install Hardware 15 ®Hang Doors & Install Hardware 81172 Interior Glass & Glazing 10 ®Interior Glass & Glazing B1176 Test & Balance HVAC 15 ®Test & Balance HVAC 131180 Millwork- Cabinets, Arch Wdwk, Shelving , Ctrtops 20 Millwork- Cabinets , Arch Wdwk, Shelving, Ctrto� 61184 Finish Paint 20 ®Finish Paint 81188 Floor Tile & Base 30 ®Floor Tile & Base 81192 MEP/FS Trim-out 20 ®MEP/FS Trim-out B1196 VCT, Carpet & Base 20 VCT, Carpet & Base B1200 Misc Furnishings 15 �Misc Furnishings I Misc Specialties B1204 Misc Specialties 15 81208 GC Clean (sub punch) 15 GC Clean (sub punch 81212 Restrooms - Tile 30 ®Restrooms - Tile 81216 Restrooms - Vanities & Countertops 5 ■Restrooms - Vanities & Countertops 81220 I Restrooms - Plumbing Fixtures 20 ®Restrooms - Plumbing Fixture B1224 Restrooms - Toilet Partitions & Accessories 10 Restrooms - Toilet Partitions & Accessori® CD Foundations - Piles thru Lvl' 1 Verticals [v A 82000 Deep UG MEP Utilities (Below Footings) 10 IIIIIINDeep UG MEP Utilities (Below Footings) B2004 Excavate, Form , Rebar, Pour, Strip Footings 20 Excavate, Form, Rebar, Pour, Strip Footings Structure, Exterior, Roof y 82008 CMU Walls & Tie-Beams to 2nd Lvl 25 SCMU Walls & Tie-Beams to 2nd Lvl 82012 Rebar, Form , Pour, Strip Conc Columns to 2nd 11 =Rebar, Form, Pour, Strip Conc Columns to 2nd Lvincl any conc beams B2016 Backfill & Compact SOG area 14 _Backfill & Compact SOG area intermittent 82020 Scaffold, Set PSI Soffit Bms, Layout for Joists 11 IIIIIINScaffold, Set PSI Soffit Bms, Layout for Joistsincl set spacers 82024 Set PSI Joists, Deck, Rebar & Pour 2nd Flr Slab 14 ®Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab B2028 Rebar, Form , Pour, Strip Conc Cols to Roof Lvl 11 ®Rebar, Form, Pour, Strip Conc Cols to Roof Lvlincl any conc beams B2032 Set PreCast Columns, Beams & Arches 11 IIIIIINSet Precast Columns, Beams & Arches B2036 CMU Walls & Tie Beams to Roof Lvl 14 I CMU Walls & Tie Beams to Roof Lvl 82040 Metal Pan Stairs, Conc Fill , Railings 14 ®Metal Pan Stairs, Conc Fill, Railings 62044 Remove Forms & Shores, UG Utilities thru SOG 18 ®Remove Forms & Shores, UG Utilities thru SOG B2048 Erect Structural Steel , Bar Joists & Mtl Deck 18 ®Erect Structural Steel, Bar Joists & Mtl Deck 82052 Upper Rf - Lt Gage Frm'g thru Asph Sheets 7 l■Upper Rf - Lt Gage Frm'g thru Asph Sheets 82056 Upper Rf - Facia, Block'g , Insul , Sheath'g , Asph 14 OUpper Rf - Facia, Block'g, Insul, Sheath'g, Asph 1. 6.2060 Upper Rf - Barrel Roof Tile & Gutters 18 IIIIIIIIIIIIIIIIIIIIIIII.Ipper Rf - Barrel Roof Tile & Gutters 82064 Lower Rf - Mansard Trusses , Formdk, Sheathing 11 _Lower Rf - Mansard Trusses, Formdk, Sheathin§ Asph Sheet B2068 Lower Rf - Flat Rf Insulation & Lt Weight Conc 11 MLower Rf - Flat Rf Insulation & Lt Weight Conc 82072 Lower Rf - Flat Rf Modified Bitumin Roofing 7 11111111OLower Rf - Flat Rf Modified Bitumin Roofing Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 3 of4 It01 Project Schedule Finish Date 08DEC06 Data Date 11APR05 Indian River County Administration Facility C Primavera Systems , Inc. GMP Summary Schedule Act Activity Orig o th ID Description bur _1 1 2 3 4 5 6 7 10 11 12 13 1 14 15 16 1 17 18 B2076 Lower Rf - Mansard Barrel Tile & Gutters v 11 I•Lower Rf - Mansard Barrel Tile & Gutters B2080 Lath & Stucco (incl molded crown & trim ) 35 —Lath & Stucco (incl molded crown & trim) 82084 Standing Seam Roof 11 I•Standing Seam Roof- incl peel & stick wtrproof membrane 82088 Window / Storefront & Ext. Doors 21 IIIIIIIIIIIIIIIIIIIWindow / Storefront & Ext. Doors B2092 Exterior Paint 18 —Exterior Paint Interior / finishes 82096 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 18 —MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 82100 Plumbing Rough-in (incl water piping & insul) 25 ®Plumbing Rough-in (incl water piping & insul)CW, HW, Dom , WW, etc. 82104 HVAC Rough-in (Ductwork, Insulation) 49 ®HVAC Rough-in (Ductwork, Insulatiom) incls Set AHUs 82108 Elect Pwr/Ltg/FA/Systems Rough-in 49 Elect Pwr/Ltg/FA/Systems Rough-in Walls/Ceilings 82112 Fire Sprinkler Rough-in & Pressure Test 35 ®Fire Sprinkler Rough-in & Pressure Test B2116 HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 35 ®HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 82120 Install Hydraulic Elevators, Finish , Inspections 39 ®Install Hydraulic Elevators, Finish, Inspections B2124 Drywall , Tape & Finish Walls, Soffits & Ceilings 35 ®Drywall, Tape & Finish Walls, Soffits & Ceilings B2128 Main Stair & Balconys - Stru, Railings, Finish 35 ®Main Stair & Balconys - Stru, Railings, Finish B2132 Controls - Wiring , Devices, Test & Check-out 25 ®Controls - Wiring, Devices, Test & Check-out B2136 1 st Coat & Prime Paint 28 ®1st Coat & Prime Paint 62140 Ceiling Grid 21 I®Ceiling Grid B2144 Drops, Diffusers in Ceil'g Grid 21 ®Drops, Diffusers in Ceil'g Grid B2148 Light Fixutres in Ceilg Grid 21 ®Light Fixutres in Ceilg Grid B2152 Instl Fire Alarm Devices / Exit Signs 18 ®Instl Fire Alarm Devices / Exit Signs B2156 Fire Sprinkler Cut Drops & Instl Spr Heads 14 ®Fire Sprinkler Cut Drops & Instl Spr Heads 7:1 82160 Instl Acoustic Ceiling Tile 14 IIIIIIIIIIIIIIInstl Acoustic Ceiling Tile 0 CD 62164 Start-up AC - Run Air 0 *Start-up AC - Run Air N 82168 Hang Doors & Install Hardware 11 IIIIIIIIIIIHang Doors & Install Hardware 82172 Interior Glass & Glazing 7 ®Interior Glass & Glazing 82176 Test & Balance HVAC 11 ®Test & Balance HVAC B2180 Millwork- Cabinets, Arch Wdwk, Shelving , Ctrtops 14 ®Millwork- Cabinets, Arch Wdwk, Shelving, Ctrtops 82184 Finish Paint 14 ®Finish Paint 82188 Floor Tile & Base 21 ®Floor Tile & Base B2192 MEP/FS Trim-out 14 ®MEP/FS Trim-out B2196 VCT, Carpet & Base 14 —VCT, Carpet & Base B2200 Misc Furnishings 11 =Misc Furnishings B2204 Misc Specialties 11 ®Misc Specialties 82208 GC Clean (sub punch) 11 ®GC Clean (sub punch) B2212 Restrooms - Tile 21 ®Restrooms - Tile 82216 Restrooms - Vanities & Countertops 4 ■Restrooms - Vanities & Countertops B2220 Restrooms - Plumbing Fixtures 14 ®Restrooms - Plumbing Fixtures B2224 Restrooms - Toilet Partitions & Accessories 7 ®Restrooms - Toilet Partitions & Accessories Run Date 26MAY0507:38 IROA Turner Construction Company Sheet of It01 Project Schedule Finish Date 08DEC06 Data Date 11APRo5 - Indian River County Administration Facility GMP Summary Schedule © Primavera Systems , Inc. Exhibit E PART VII FLORIDA PROMPT PAYMENT ACT 218 . 70 Popular name . 218 . 71 Purpose and policy . 218 . 72 Definitions . 218 . 73 Timely payment for nonconstruction services . 218 . 735 Timely payment for purchases of construction services . 218 . 74 Procedures for calculation of payment due dates . 218 . 75 Mandatory interest. 218 . 76 Improper payment request or invoice ; resolution of disputes . 218 . 77 Payment by federal funds . 218 . 78 Report of interest. 218 . 79 Repeal of conflicting laws . 218 . 80 Public Bid Disclosure Act. 1218 . 70 Popular name . --This part may be cited as the "Local Government Prompt Payment Act. " History. --s . 4 , ch . 89-297 ; s . 1 , ch . 2005-230 . ' Note .--Section 16 , ch . 2005-230 , provides that " [n] either the amendments to sections 95 . 11 , 218 . 70 , 218 . 72 , 218 . 735 , and 255 . 071 , Florida Statutes , and subsection (2 ) of section 255 . 05 , Florida Statutes , as provided in this act , nor subsection ( 10) of section 255 . 05 , Florida Statutes , and section 255 . 078 , Florida Statutes , as created by this act, apply to any existing construction contract pending approval by a local governmental entity or public entity, or to any project advertised for bid by the local governmental entity or public entity, on or before October 1 , 2005 . " 218 . 71 Purpose and policy. -- 1 ( 1 ) The purpose of this part is : (a) To provide for prompt payments by local governmental entities and their institutions and agencies . ( b) To provide for interest payments on late payments made by local governmental entities and their institutions and agencies . (c) To provide for a dispute resolution process for payment of obligations . (2) It is the policy of this state that payment for all purchases by local governmental entities be made in a timely manner. History. --s . 4 , ch . 89-297 . 1218 . 72 Definitions .--As used in this part: ( 1 ) 'Proper invoice" means an invoice which conforms with all statutory requirements and with all requirements that have been specified by the local governmental entity to which the invoice is submitted . (2 ) " Local governmental entity" means a county or municipal government, school board , school district, authority, special taxing district, other political subdivision , or any office , board , bureau , commission , department, branch , division , or institution thereof. ( 3) "County" means a political subdivision of the state established pursuant to s . 1 , Art . VIII of the State Constitution . (4) " Municipality" means a municipality created pursuant to general or special law and metropolitan and consolidated governments as provided in s . 6 (e) and (f) , Art. VIII of the State Constitution . (5) 'Purchase" means the purchase of goods , services , or construction services ; the purchase or lease of personal property; or the lease of real property by a local governmental entity . (6) "Vendor" means any person who sells goods or services , sells or leases personal property, or leases real property directly to a local governmental entity. The term includes any person who provides waste hauling services to residents or businesses located within the boundaries of a local government pursuant to a contract or local ordinance . ( 7 ) "Construction services" means all labor, services , and materials provided in connection with the construction , alteration , repair, demolition , reconstruction , or any other improvements to real property. 2 (8) " Payment request' means a request for payment for construction services which conforms with all statutory requirements and with all requirements specified by the local governmental entity to which the payment request is submitted . ( 9) "Agent' means project architect , project engineer, or any other agency or person acting on behalf of the local governmental entity. ( 10 ) "Contractor" or " provider of construction services" means any person who contracts directly with a local governmental entity to provide construction services . History. --s . 4 , ch . 89-297 ; s . 1 , ch . 95-331 ; s . 1 , ch . 2001 - 169 ; s . 2 , ch . 2005-230 . 1Note .--Section 16 , ch . 2005-230 , provides that " [n] either the amendments to sections 95 . 11 , 218 . 709 218 . 72 , 218 . 735 , and 255 . 071 , Florida Statutes , and subsection (2) of section 255 . 05 , Florida Statutes , as provided in this act, nor subsection ( 10) of section 255 . 05 , Florida Statutes , and section 255 . 078 , Florida Statutes , as created by this act, apply to any existing construction contract pending approval by a local governmental entity or public entity , or to any project advertised for bid by the local governmental entity or public entity, on or before October 1 , 2005 . " 218 . 73 Timely payment for nonconstruction services .--The time at which payment is due for a purchase other than construction services by a local governmental entity must be calculated from : ( 1 ) The date on which a proper invoice is received by the chief disbursement officer of the local governmental entity after approval by the governing body, if required ; or (2) If a proper invoice is not received by the local governmental entity, the date : (a) On which delivery of personal property is accepted by the local governmental entity; ( b) On which services are completed ; (c) On which the rental period begins ; or (d ) On which the local governmental entity and vendor agree in a contract that provides dates relative to payment periods ; whichever date is latest. History. --s . 4 , ch . 89-297 ; s . 2 , ch . 95-331 ; s . 2 , ch . 2001 - 169 . 1218 . 735 Timely payment for purchases of construction services . -- 3 ( 1 ) The due date for payment for the purchase of construction services by a local governmental entity is determined as follows : (a) If an agent must approve the payment request or invoice prior to the payment request or invoice being submitted to the local governmental entity, payment is due 25 business days after the date on which the payment request or invoice is stamped as received as provided in s . 218 . 74 ( 1 ) . ( b) If an agent need not approve the payment request or invoice which is submitted by the contractor, payment is due 20 business days after the date on which the payment request or invoice is stamped as received as provided in s . 218 . 74 ( 1 ) . (2) The local governmental entity may reject the payment request or invoice within 20 business days after the date on which the payment request or invoice is stamped as received as provided in s . 218 . 74 ( 1 ) . The rejection must be written and must specify the deficiency in the payment request or invoice and the action necessary to make the payment request or invoice proper. (3) If a payment request or an invoice is rejected under subsection (2) and the contractor submits a corrected payment request or invoice which corrects the deficiency specified in writing by the local governmental entity, the corrected payment request or invoice must be paid or rejected on the later of: (a) Ten business days after the date the corrected payment request or invoice is stamped as received as provided in s . 218 . 74 ( 1 ) ; or ( b) If the governing body is required by ordinance , charter, or other law to approve or reject the corrected payment request or invoice , the first business day after the next regularly scheduled meeting of the governing body held after the corrected payment request or invoice is stamped as received as provided in s . 218 . 74 ( 1 ) . (4 ) If a dispute between the local governmental entity and the contractor cannot be resolved by the procedure in subsection ( 3) , the dispute must be resolved in accordance with the dispute resolution procedure prescribed in the construction contract or in any applicable ordinance . In the absence of a prescribed procedure , the dispute must be resolved by the procedure specified in s . 218 . 76 (2) . (5) If a local governmental entity disputes a portion of a payment request or an invoice , the undisputed portion shall be paid timely, in accordance with subsection ( 1 ) . (6) When a contractor receives payment from a local governmental entity for labor, services , or materials furnished by subcontractors and suppliers hired by the contractor, the contractor shall remit payment due to those subcontractors and suppliers within 10 days after the contractor's receipt of payment. When a subcontractor receives payment from a contractor for labor, services , or materials furnished by 4 subcontractors and suppliers hired by the subcontractor, the subcontractor shall remit payment due to those subcontractors and suppliers within 7 days after the subcontractor's receipt of payment. Nothing herein shall prohibit a contractor or subcontractor from disputing , pursuant to the terms of the relevant contract, all or any portion of a payment alleged to be due to another party if the contractor or subcontractor notifies the party whose payment is disputed , in writing , of the amount in dispute and the actions required to cure the dispute . The contractor or subcontractor must pay all undisputed amounts due within the time limits imposed by this section . (7) ( a) Each contract for construction services between a local governmental entity and a contractor must provide for the development of a list of items required to render complete , satisfactory , and acceptable the construction services purchased by the local governmental entity. The contract must specify the process for the development of the list, including responsibilities of the local governmental entity and the contractor in developing and reviewing the list and a reasonable time for developing the list, as follows : 1 . For construction projects having an estimated cost of less than $ 10 million , within 30 calendar days after reaching substantial completion of the construction services purchased as defined in the contract, or, if not defined in the contract, upon reaching beneficial occupancy or use ; or 2 . For construction projects having an estimated cost of $ 10 million or more , within 30 calendar days , unless otherwise extended by contract not to exceed 60 calendar days , after reaching substantial completion of the construction services purchased as defined in the contract, or, if not defined in the contract, upon reaching beneficial occupancy or use . ( b) If the contract between the local governmental entity and the contractor relates to the purchase of construction services on more than one building or structure , or involves a multiphased project, the contract must provide for the development of a list of items required to render complete , satisfactory, and acceptable all the construction services purchased pursuant to the contract for each building , structure , or phase of the project within the time limitations provided in paragraph (a) . (c) The failure to include any corrective work or pending items not yet completed on the list developed pursuant to this subsection does not alter the responsibility of the contractor to complete all the construction services purchased pursuant to the contract. (d ) Upon completion of all items on the list , the contractor may submit a payment request for all remaining retainage withheld by the local governmental entity pursuant to this section . If a good faith dispute exists as to whether one or more items identified on the list have been completed pursuant to the contract, the local governmental entity may continue to withhold an amount not to exceed 150 percent of the total costs to complete such items . 5 (e) All items that require correction under the contract and that are identified after the preparation and delivery of the list remain the obligation of the contractor as defined by the contract. (f) Warranty items may not affect the final payment of retainage as provided in this section or as provided in the contract between the contractor and its subcontractors and suppliers . (g) Retainage may not be held by a local governmental entity or a contractor to secure payment of insurance premiums under a consolidated insurance program or series of insurance policies issued to a local governmental entity or a contractor for a project or group of projects , and the final payment of retainage as provided in this section may not be delayed pending a final audit by the local governmental entity's or contractor's insurance provider. ( h ) If a local governmental entity fails to comply with its responsibilities to develop the list required under paragraph (a) or paragraph ( b) , as defined in the contract, within the time limitations provided in paragraph (a) , the contractor may submit a payment request for all remaining retainage withheld by the local governmental entity pursuant to this section . The local governmental entity need not pay or process any payment request for retainage if the contractor has , in whole or in part, failed to cooperate with the local governmental entity in the development of the list or failed to perform its contractual responsibilities , if any, with regard to the development of the list or if paragraph (8) (f) applies . (8) (a) With regard to any contract for construction services , a local governmental entity may withhold from each progress payment made to the contractor an amount not exceeding 10 percent of the payment as retainage until 50- percent completion of such services . ( b) After 50- percent completion of the construction services purchased pursuant to the contract, the local governmental entity must reduce to 5 percent the amount of retainage withheld from each subsequent progress payment made to the contractor. For purposes of this subsection , the term "50-percent completion" has the meaning set forth in the contract between the local governmental entity and the contractor or, if not defined in the contract, the point at which the local governmental entity has expended 50 percent of the total cost of the construction services purchased as identified in the contract together with all costs associated with existing change orders and other additions or modifications to the construction services provided for in the contract. However, notwithstanding this subsection , a municipality having a population of 25, 000 or fewer, or a county having a population of 100 , 000 or fewer, may withhold retainage in an amount not exceeding 10 percent of each progress payment made to the contractor until final completion and acceptance of the project by the local governmental entity . (c) After 50-percent completion of the construction services purchased pursuant to the contract, the contractor may elect to withhold retainage from payments to its subcontractors at a rate higher than 5 percent. The specific amount to be withheld must be determined on a case-by-case basis and must be 6 � � based on the contractor's assessment of the subcontractor's past performance , the likelihood that such performance will continue , and the contractor's ability to rely on other safeguards . The contractor shall notify the subcontractor, in writing , of its determination to withhold more than 5 percent of the progress payment and the reasons for making that determination , and the contractor may not request the release of such retained funds from the local governmental entity. (d ) . After 50-percent completion of the construction services purchased pursuant to the contract, the contractor may present to the local governmental entity a payment request for up to one- half of the retainage held by the local governmental entity. The local governmental entity shall promptly make payment to the contractor, unless the local governmental entity has grounds , pursuant to paragraph (f) , for withholding the payment of retainage. If the local governmental entity makes payment of retainage to the contractor under this paragraph which is attributable to the labor, services , or materials supplied by one or more subcontractors or suppliers , the contractor shall timely remit payment of such retainage to those subcontractors and suppliers . (e) This section does not prohibit a local governmental entity from withholding retainage at a rate less than 10 percent of each progress payment, from incrementally reducing the rate of retainage pursuant to a schedule provided for in the contract, or from releasing at any point all or a portion of any retainage withheld by the local governmental entity which is attributable to the labor, services , or materials supplied by the contractor or by one or more subcontractors or suppliers . If a local governmental entity makes any payment of retainage to the contractor which is attributable to the labor, services , or materials supplied by one or more subcontractors or suppliers , the contractor shall timely remit payment of such retainage to those subcontractors and suppliers . (f) This section does not require the local governmental entity to pay or release any amounts that are the subject of a good faith dispute , the subject of a claim brought pursuant to s . 255 . 05 , or otherwise the subject of a claim or demand by the local governmental entity or contractor. (g) The time limitations set forth in this section for payment of payment requests apply to any payment request for retainage made pursuant to this section . ( h ) Paragraphs (a)-(d ) do not apply to construction services purchased by a local governmental entity which are paid for, in whole or in part, with federal funds and are subject to federal grantor laws and regulations or requirements that are contrary to any provision of the Local Government Prompt Payment Act. ( i ) This subsection does not apply to any construction services purchased by a local governmental entity if the total cost of the construction services purchased as identified in the contract is $200 , 000 or less . 7 ( 9) All payments due under this section and not made within the time periods specified by this section shall bear interest at the rate of 1 percent per month , or the rate specified by contract, whichever is greater. History. --s . 3 , ch . 95-331 ; s . 3 , ch . 2001 - 169 ; s . 3 , ch . 2005-230 . ' Note .--Section 16 , ch . 2005-230 , provides that " [n] either the amendments to sections 95 . 11 , 218 . 70 , 218 . 72 , 218 . 735 , and 255 . 071 , Florida Statutes , and subsection (2) of section 255 . 05 , Florida Statutes , as provided in this act, nor subsection ( 10) of section 255 . 05 , Florida Statutes , and section 255 . 078 , Florida Statutes , as created by this act, apply to any existing construction contract pending approval by a local governmental entity or public entity, or to any project advertised for bid by the local governmental entity or public entity, on or before October 1 , 2005 ." 218 . 74 Procedures for calculation of payment due dates . -- ( 1 ) Each local governmental entity shall establish procedures whereby each payment request or invoice received by the local governmental entity is marked as received on the date on which it is delivered to an agent or employee of the local governmental entity or of a facility or office of the local governmental entity . (2) The payment due date for a local governmental entity for the purchase of goods or services other than construction services is 45 days after the date specified in s . 218 . 73 . The payment due date for the purchase of construction services is specified in s . 218 . 735 . (3) If the terms under which a purchase is made allow for partial deliveries and a payment request or proper invoice is submitted for a partial delivery, the time for payment for the partial delivery must be calculated from the time of the partial delivery and the submission of the payment request or invoice in the same manner as provided in s . 218 . 73 or s . 218 . 735 . (4) All payments , other than payments for construction services , due from a local governmental entity and not made within the time specified by this section bear interest from 30 days after the due date at the rate of 1 percent per month on the unpaid balance . The vendor must invoice the local governmental entity for any interest accrued in order to receive . the interest payment. Any overdue period of less than 1 month is considered as 1 month in computing interest. Unpaid interest is compounded monthly. For the purposes of this section , the term " 1 month" means a period beginning on any day of one month and ending on the same day of the following month . History. --s . 4 , ch . 89-297 ; s . 4 , ch . 95-331 ; s . 4 , ch . 2001 - 169 . 8 Y47 b 218 . 75 Mandatory interest. -- No contract between a local governmental entity and a vendor or a provider of construction services shall prohibit the collection of late payment interest charges allowable under this part. History. --s . 4 , ch . 89-297 ; s . 5 , ch . 2001 - 169 . 218 . 76 Improper payment request or invoice ; resolution of disputes .-- ( 1 ) In any case in which an improper payment request or invoice is submitted by a vendor, the local governmental entity shall , within 10 days after the improper payment request or invoice is received by it , notify the vendor that the payment request or invoice is improper and indicate what corrective action on the part of the vendor is needed to make the payment request or invoice proper. ( 2) In the event a dispute occurs between a vendor and a local governmental entity concerning payment of a payment request or an invoice , such disagreement shall be finally determined by the local governmental entity as provided in this section . Each local governmental entity shall establish a dispute resolution procedure to be followed by the local governmental entity in cases of such disputes . Such procedure shall provide that proceedings to resolve the dispute shall be commenced not later than 45 days after the date on which the payment request or proper invoice was received by the local governmental entity and shall be concluded by final decision of the local governmental entity not later than 60 days after the date on which the payment request or proper invoice was received by the local governmental entity. Such procedures shall not be subject to chapter 120 , and such procedures shall not constitute an administrative proceeding which prohibits a court from deciding de novo any action arising out of the dispute . If the dispute is resolved in favor of the local governmental entity, then interest charges shall begin to accrue 15 days after the local governmental entity's final decision . If the dispute is resolved in favor of the vendor, then interest shall begin to accrue as of the original date the payment became due . ( 3) In an action to recover amounts due under ss . 218 . 70-218 . 80 , the court shall award court costs and reasonable attorney's fees , including fees incurred through any appeal , to the prevailing party, if the court finds that the nonprevailing party withheld any portion of the ppyment that is the subject of the action without any reasonable basis in law or fact to dispute the prevailing party's claim to those amounts . History. --s . 4 , ch . 89-297 ; s . 6 , ch . 2001 - 169 ; s . 34 , ch . 2002- 1 . 218 . 77 Payment by federal funds .--A local governmental entity which intends to pay for a purchase with federal funds shall not make such purchase without reasonable assurance that federal funds to cover the cost thereof will be received . Where payment or the time of payment is contingent on receipt of federal funds or federal approval, any contract and any solicitation to bid shall clearly state such contingency. History. --s . 4 , ch . 89-297 . 9 218 . 78 Report of interest.-- If the total amount of interest paid during the preceding fiscal year exceeds $ 250 , each local governmental entity shall , during December of each year, report to the board of county commissioners or the municipal governing body the number of interest payments made by it during the preceding fiscal year and the total amount of such payments made under this part. History. --s . 4 , ch . 89-297 ; s . 5 , ch . 95-331 . 218 . 79 Repeal of conflicting laws .--All laws and parts of laws in conflict with this part are repealed . History. --s . 4 , ch . 89-297 . 218 . 80 Public Bid Disclosure Act. -- ( 1 ) This section may be cited as the " Public Bid Disclosure Act . " (2) It is the intent of the Legislature that a local governmental entity shall disclose all of the local governmental entity's permits or fees , including , but not limited to , all license fees , permit fees , impact fees , or inspection fees , payable by the contractor to the unit of government that issued the bidding documents or other request for proposal , unless such permits or fees are disclosed in the bidding documents or other request for proposal for the project at the time the project was let for bid . It is further the intent of the Legislature to prohibit local governments from halting construction to collect any undisclosed permits or fees which were not disclosed or included in the bidding documents or other request for proposal for the project at the time the project was let for bid . (3) Bidding documents or other request for proposal issued for bids by a local governmental entity, or any public contract entered into between a local governmental entity and a contractor shall disclose each permit or fee which the contractor will have to pay before or during construction and shall include the dollar amount or the percentage method or the unit method of all permits or fees which may be required by the local government as a part of the contract. If the request for proposal does not require the response to include a final fixed price , the local governmental entity is not required to disclose any fees or assessments in the request for proposal . However, at least 10 days prior to requiring the contractor to submit a final fixed price for the project, the local governmental entity shall make the disclosures required in this section . Any of the local governmental entity's permits or fees which are not disclosed in the bidding documents , other request for proposal , or a contract between a local government and a contractor shall not be assessed or collected after the contract is let. No local government shall halt construction under any public contract or delay completion of the contract in order to collect any permits or fees which were not provided for or specified in the bidding documents , other request for proposal , or the contract. 10 �>�S (4) This section does not require disclosure in the bidding documents of any permits or fees imposed as a result of a change order or a modification to the contract. The local government shall disclose all permits or fees imposed as a result of a change order or a modification to the contract prior to the date the contractor is required to submit a price for the change order or modification . History. --s . 1 , ch . 93-76 . 11 Exhibit F aaRi� e Turner Final GMP Summary k" ido kAo Imp All is ETNA I NE i i Indian River County Administration Complex Turner Indian River County, Florida M FINAL GMP SUMMARY i Report Date : August 16 , 2005 Bid Package Description GMP Total 1 General Requirements $ 175 , 000 2 Sitework $2 , 5023340 2a Demolition $ 1287630 2b Tree Relocation $402900 2c Temporary Fence $309138 2d Landscaping $521 , 997 2e Site Furnishing $ 1 , 314 2f Hardscape allowance $217 , 810 3 Foundation Concrete with concrete 3a Concrete $3 , 6325465 4 Masonry $ 154465092 5 Structural Steel & Miscellaneous Metals $ 1 , 1753011 6 Millwork $550 , 539 6a Cast Stone Columns $42, 648 7 Waterproofing $54, 567 7a Roofing $ 1 , 945 , 210 7b Foamed-in-place Insulation $ 183800 8 Doors , Frames , & Hardware $468 , 008 8a Overhead Doors $49636 8b Glass & Glazing $576 ,706 9 Drywall & Stucco $254905728 9a Tile $623 , 084 9b Acoustical Ceiling $2629840 9c VCT & Carpet $6233395 9d Painting & Wall Coverings $445 , 078 10 Toilet & Bath Accessories $70 , 720 10a Louvers $45 , 321 10b Flagpoles $3 , 856 10c Signage $82 , 946 10d Fire Extinguishers & Cabinets $ 12 , 539 10f Access Flooring $49 , 435 12 Floor Mats allowance $ 105000 12a Window Treatments $ 155600 12b Auditorium Seating $24 , 720 14 Elevators $210 , 625 14a Pneumatic Tube S stem $55 , 922 15 Fire Protection $367 , 798 15a HVAC and Plumbing $47125 , 727 16 Electrical $490473831 17 Commission Chambers Audio Visual allowance $315 , 000 17 Security System allowance $2503000 Shell Space at Emergency Operations Center ($524 , 000) Owner's Contingency * included Construction Contingency $813 , 029 Subguard $352 ,313 Total Direct Work $2893079318 General Liability Insurance $4795753 P & P Bond $344 , 099 Builder's Risk Insurance $287 , 050 General Conditions $29262 , 048 Fee $ 134069174 Final GMP Total $3370869442 * See items 18 and 19 in General Section of Qualifications and Assumptions / Page 1