2006-236
ORIGINAL 47_11,O L 7 u• -1 Document G701TM - 2001 a � 0 a ® Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 011 OWNER: New County Administration Building DATE: July 11 , 2006 ARCHITECT: Lying Between the Main Relief Canal to the North, the Lateral D Canal on the CONTRACTOR: Sounth and East and 20th Avenue to the West FIELD: ❑ TO CONTRACTOR (Name and address): ARCHITECTS PROJECT NUMBER: 2102 OTHER: ❑ Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - Orlando, Florida 32803 Construction Manager at Risk THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, alry undisputed anamt attributable la previously executed Construction Change Directives) Reference: Description COR 041 Add remaining portion of roadway work outside of contract line at northwest corner of site. $ 86.368.00 This Change Order will increase the CMP by $49,020* and decrease the Owner's Contingency by $37,348 *The amount of $49,570 was credited back to Indian River County by Change Order No. I with Bridge Contractors, Cone and Graham. After forwarding $550 to Public Works for overtime expenditures for bridge inspections, a net amount of $49,020 was avaialble to complete the road work through this change order with Turner Construction. The original Guaranteed Maximum Price was $ 33,086,442.00 The net change by previously authorized Change Orders $ (5, 136, 199.00) The Guaranteed Maximum Price prior to this Change Order was $ 27,950,243.00 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 49,020.00 The new Guaranteed Maximum Price including this Change Order will be $ 27,999,263.00 The Contract Time will be increased by Zero ( 0 ) days. The dale of Substantial Completion as of the date of this Change Order therefore is January 21 , 2007. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County Commissioners ARCHITECT (Finn name) CONTRACTOR (Firm name) OWNER (Finn name) 609 17th Street, Vero Beach, Florida 1840 25th Street, Vero Beach,Florida 32960 32960 AD OR ES / DDRESS l v [ , (Si re) BY (Sigt>�m'e.) (Signa rre) Anthony Donadio Louis Fiore fioseph A. Baird, County Administrator (Typed nam iJ (7 yped mune/) (Typed name) DAT DATE DAT Reviewed and commended for Approval : 7 �• t Steve Blum, Project Manager Thomas W. Frame, Gene I Services Director Jason rown, bWget Director AIA Document G701Te — 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. II rights ileserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reprotluctlon ar tlisir bution o this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent ossibl under the law. This document was produced by AIA software at 17:38:36 on 06/27/2006 under Order No. 1000192296_I which expires on 8/8/200fi, no not for resale. User Notes: (3740514317)