Loading...
HomeMy WebLinkAbout2003-184 CIle i NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT CONTINUING CONSULTING SERVICES WORK AUTHORIZATION #4 ORCHID ISLAND / ORCHID ISLE ESTATES WATER/SEWER ASSESSMENT PROJECT • Scope of Services Masteller & Moler, Inc . will provide for a route survey for engineering design purposes for a proposed utility pipelines along the following route . Live Oak Drive, Seacrest Drive, Bayview Court, Riverview Court, Lagoon Court and Orchid Lane. The route survey will locate all visible objects within the right-of-ways (IE : mailboxes, pavements, poles, etc . ) . X-sections will be obtained every 300 feet along the project route. Elevations will be based on NGVD 1929 . Upon completion (5 ) copies and ( 1 ) digital file will be provided. • Consulting Engineer Insurance Requirements B . Work Orders Greater Than OR Equal to $25 ,000 and Less Than $ 500,000 The ENGINEER shall , at least ten ( 10) days prior to the commencement of any work covered by a specific approved Work Order, provide to the COUNTY a certificate of commercial general liability insurance with a reputable insurance company authorized to do business in the State of Florida, subject to approval by the COUNTY ' s risk manager, in an amount not less than $ 1 ,000,000 combined single limit for bodily injury and property damage, including coverage for premises/operations, products/completed operations, contractual liability, and independent contractors, in accordance with the COUNTY ' s Administrative Policy Manual , The ENGINEER shall, at least ten ( 10) days prior to the commencement of any work covered by a specific approved Work Order, provide to the COUNTY a certificate of professional liability insurance with a reputable insurance company authorized to do business in the State of Florida, subject to approval by the COUNTY' s risk manager, in an amount not less than $ 1 ,000,000 . The ENGINEER shall, at least ten ( 10) days prior to commencement of any work covered by a specific approved Work Order, provide to the COUNTY a certificate of business auto liability insurance authorized to do business in the State of Florida, subject to approval by the COUNTY' S risk manager, in an amount not less than $ 1 , 000,000 per occurrence combined single limit for bodily injury and property damage, including coverage for owned autos and other vehicles, hired autos and other vehicles, non-owned autos and other vehicles, in accordance with the COUNTY' s Administrative Policy Manual . The commercial general liability and auto liability insurance policies shall name Indian River County, a political subdivision of the State of Florida, as an additional insured. In addition, the ENGINEER shall , at least ten ( 10) days prior AZTA(EIIEPP 1 1 of 3 Work Authorization #4 07/28/03 Page 2 to the commencement of any work covered by a specific Work Order, provide to the COUNTY a certificate of worker ' s compensation insurance, including employer' s liability, with a reputable insurance company authorized to do business in the State of Florida, subject to approval by the COUNTY' s risk manager, with a limit of $ 100, 000 per accident, $ 500, 000 disease (policy limit), and a $ 100,000 disease (each employee) in compliance with all state and federal laws, and in accordance with the COUNTY ' s Administrative Policy Manual , The ENGINEER shall provide to the COUNTY at least thirty (30) days written notice by registered mail, return receipt requested, addressed to the COUNTY ' s risk manager, prior to cancellation or modification of any required insurance . ENGINEER shall cause any subcontractor performing any work to provide to COUNTY certificates of insurance under the same conditions and with the same policy limits as required of the ENGINEER. • Method and Amount of Compensation Masteller & Moler, Inc . proposes to provide for the above Scope of Services based on the following lump sum fee : Task 1 . Preparation of survey base plans for the purpose of Engineering design of utility pipeline To be constructed at Orchid Isle Estates $21 , 560 . 00 • Printing and Reproduction The County shall make direct payment to our office for the cost of printing project plan sheets required for utility coordination and for copies of reports, drawings, specifications, bidding and construction contract documents, and other pertinent items required by federal , state and local agencies from whom approval of the project must be obtained, prospective bidders, material suppliers, and other interested parties, but may charge only for the actual cost of providing such copies based on the following tabulation : 8 - 1 /2 " x 11 " $ 0 .25/sheet blue line prints $ 0 . 333/SF 11 " x 17" $ 0 . 50/sheet reproducible sepias $ 0 . 75/SF 3 %2" diskette $ 5 . 00/ea. reproducible mylars $ 4 . 40/SF CD $ 10 . 00/ea. • Time of Performance The estimated time frame for completion of services from the approval of this Work Authorization is 60 days from formal authorization : 2 of 3 Work Authorization #4 07/28/03 Page 3 In Witness Where of the parties have executed these presents this 5th day of August 92003 , MASTELLER & MOLER, INC . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA BY: BY Kenneth R.aX4 Title : President Board of County Commiss5 / 200 43 ioners(If not PRESIDENT, attach evidence of Approved by the BCC : authority of sign. ) WITNESS : 1 9 • WITNESS :Q0 ATTEST : Jeffrey K. Barton Clerk of the Court DEPUTY CLERK OF COU APPROVED : ES E. CHANDLER COUNTY ADMINISTRATOR APPROVED AS TO FORM AND LEGAL FFICIENCY: ILLIAM G. COL S , II COUNTY ATTORNEY 3 of 3