Loading...
HomeMy WebLinkAbout2008-119aoog - I c 9 -15 -o8 G. K. ENVIRONMENTAL, INC. "Providing Common Ground Solutions" 155 McKee Lane GEoRCE R. KULe2YCK1, C.K.s., C.E.1. Vero Beach, FL 32960 President / Principle Ecologist April 9, 2008 Mr. Michael D. Nixon, P.E., Roadway Production Manager Indian River County Engineering 1801 27th Street Vero Beach, Florida 32960-3388 RE: Oslo Boat Ramp Improvements — Cultural Resource Assessment Survey Dear Mr. Nixon: Please consider this letter and attached documentation as a proposal for an archaeological and historical survey to be performed to the area south of Oslo Road by G.K. Environmental, Inc. and Panamerican Consultants, Inc. for a lump sum fee of $995.35. If this is acceptable, please sign below and we will proceed with the work within seven days of approval. If you have any questions, please do not hesitate to call me. SinceAely, Q, Geor e R. czycki, Pres' ent ,li!ulat, ACCEPTED) r - BY: Bnr1RD 4E f (L QTY 001v,MISSIONERS INDIAN RIVER COUNTY .,Y;\ S a L 3 owMden, Chairman I h p0 I �as to/I/ ayt�I,7 Surciency: Attest; J. K. Barton Clerk of Court ->?, By. f Approved: Office (772) 567-9129 E-mail grk@ske)s.org Fax (772) 567-6245 C UD ftftems and Settings\Geurge\Lucai SeningslTemporary Internet Files`.Content. IE5WF8L50A\0K Left" for Approval Cultural Resource Assessment Survey 00.09-og REN, &e Printed on Recycled Paper Authorization to Perform Work (APW) To: George R. Kulczycki G.K. Environmental, Inc. From: Ramie A. Gougeon, Ph.D., RPA Panamerican Consultants, Inc. Re: A Cultural Resource Assessment Survey of the Oslo Boat Ramp Improvements Mitigation Project Area in Indian River County, Florida. This document constitutes an agreement between Panamerican Consultants, Inc. and G.K. Environmental, Inc. to perform the work described in the attached proposal. Panamerican Consultants will perform the survey of the limited areas south of Oslo Road for a fixed price of $995.35. These prices are good for 90 days from the proposal date. After this time, prices may be altered. Panamerican Consultants will submit invoices to G.K. Environmental, Inc., 155 McKee Lane, Vero Beach, FL, 32960, upon completion of work. After receipt of an invoice, G.K. Environmental, Inc. agrees to pay Panamerican Consultants within sixty (60) days from the invoice date. The parties to this agreement shall be responsible for maintaining all required insurance, including but not limited to, liability insurance and workman's compensation insurance in accordance with the laws of the State in which the work will be performed. The parties agree that any dispute arising between them shall be asserted and maintained in the State and County of the corporate headquarters of Panamerican Consultants, Inc. The following items are agreed to by: Panamerican Consultants, Inc. me A. G uge ranch Manager 0• Date G.K. Environmental, Inc. Proposal for Coastal Design Consultants Archaeological and Historical Survey of the Oslo Boat Ramp Improvements Mitigation Project Area Indian River County, Florida Respondent proposes to complete an archaeological and historical survey of a limited area south of Oslo Road for G.K. Environmental, Inc., of Vero Beach, Florida. The respondent will perform a field survey in accordance with the National Historic Preservation Act of 1966 (PL 89-665) as amended and the Archaeological and Historic Preservation Act of 1974 (PL 93-291) as amended and will be performed under the direction of a RPA -registered professional archaeologist. In addition, all work will meet the guidelines set forth in the Historic Preservation Compliance Review Program of the Florida Department of State, Division of Historical Resources and any local county requirements. Survey methodology will employ judgmental shovel testing in areas to be disturbed during mitigation efforts at the site. All soil will be screened through 1/4" hardware cloth and all material recovered will be stabilized and analyzed at the respondent's laboratory facilities in Tampa. A recommendation for determination of eligibility or ineligibility for the National Register of Historic Places will be contained in the report following completion of the survey. This budget is good for 90 days, after this time, the budget may be modified. Proposed Budget People Price Hours Totai Background 1 Research Assistant $30.90 1 $30.90 Field 1 Field Director $36.65 9 $32985 Report 1 Project Archaeologist $40.25 8 $32200 1 GIS/Drafting $40.25 2 $80.50 1 Editor $3605 2 $72 10 Expenses 1 4 -wheel drive vehicle $75.00 1 $75.00 1 Per Diem $25.00 1 $2500 2 Printing $3000 1 $6000 Total Project $995.35