HomeMy WebLinkAbout2009-179 007--171
INDIAN RIVER COUNTY
Oslo Road Widening from 43rd Avenue to east of 27th Avenue
AMENDMENT NO. 3 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING
SERVICES AGREEMENT BETWEEN KIMLEY -HORN AND ASSOCIATES , INC . AND
INDIAN RIVER COUNTY, FLORIDA .
This is an amendment to the existing Engineering/Land Surveying Services Agreement
(AGREEMENT) dated May 24th , 2005 between Kimley-Horn and Associates , Inc .
(ENGINEER) and Indian River County (COUNTY ) . This amendment addresses changes in
" Section III - Scope of Services " and " Section V - Compensation " of the AGREEMENT .
Amendment Description
This Amendment includes the following :
" SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following :
The ENGINEER agrees to perform professional roadway design and related services in
connection with the project as required and set forth in the following :
A . Supplemental Stormwater Facility Survey :
Additional topographic survey data will be required to facilitate the design and permitting
of two (2) proposed stormwater facilities . The topographic survey is anticipated to
include the proposed pond sites and access/ drainage easements associated with each site .
A tree survey will be conducted within the limits of the proposed stormwater facility to
locate cabbage palms 10 ' overall height or greater and hardwood trees 12" or larger at
diameter breast height (dbh ) . This element will require an environmental scientist to
identify the specific trees that are listed in the County ' s code and may be impacted by the
project .
This task will also include preparation of up to 4 legal descriptions and sketches
associated with parcels identified where acquisition and/or temporary construction
easements are depicted within the Roadway Plans .
B . Supplemental Geotechnical Investigation :
All geotechnical investigation work will be contracted under the County ' s General
Consultant Geotechnical Contract and coordinated by the COUNTY .
C . Roadway Plan Modifications :
The roadway construction plans shall be amended to include Oslo Road east of 27 1h
Avenue for a distance of approximately 550 linear feet to tie to the 5 - lane urban section
Indian River County, Amendment No . 3
Oslo Road Widening from 43rd Avenue
to east of 27'1' Avenue
constructed within Oslo Road Phase I Improvements . A westbound right turn auxiliary
lane will be included within the Oslo Road/ 27 `h Avenue intersection improvement . In
addition , the roadway construction documents will be revised to establish the ultimate
roadway signing and marking plan between 27th Avenue and 20th Avenue .
The roadway construction plans shall be amended to delineate a 6 foot sidewalk along the
south side of Oslo Road between the existing bridge immediately east of 43rd Avenue and
the western most driveway to Oslo Road from the commercial development located in the
southeast quadrant of the Oslo Road/ 43rd Avenue intersection .
D . Drainage Design and Permitting_
1 . Revise the drainage investigations and analysis along Oslo Road between 43rd
Avenue and 27th Avenue necessary to resubmit a design which will drain the
project in accordance with the County , St Johns River Water Management District
( SJRWMD ) , Indian River Farms Water Control District (IRFWCD ) and Army
Corps of Engineers (ALOE) design criteria .
In addition , the existing Oslo Road Phase I SJRWMD ERP shall be modified to
include the addition of the westbound right turn auxiliary lane to the intersection .
2 . The ENGINEER shall prepare stormwater permit applications for the SJRWMD ,
IRFWCD and ACOE for submittal by the COUNTY . This will consist of all
required evaluation , design , coordination , and follow - up work necessary to
support permit applications . The COUNTY will review the permit applications as
necessary . The ENGINEER shall assemble and be responsible for the final
submittal .
3 . The Stormwater Pollution Prevention Plan (SW3P) will be revised in conjunction
with this amendment. The site specific SW3P is a requirement of both the EPA
National Pollutant Discharge Elimination System (NPDES ) General Permit for
Stormwater Discharges from Construction Activities , and the FDEP Generic
Permit for Stormwater Discharges from Construction Activities .
4 . All permit fees will be paid directly by the COUNTY and are not included in the
lump sum fees . Any significant plan revisions caused by changing agency criteria
after our initial design is reviewed with each appropriate agency and similar
factors outside of ENGINEER ' S control , additional meetings or coordination will
be considered as Additional Services .
E . Si nalization Desi
Revise the signalization design located at the Oslo Road and 27th Avenue intersection to
provide for the future lane additions associated with 27 `h Avenue . The 27 `h Avenue lane
additions consist of dual left turn auxiliary lanes , two through lanes and dedicated right
turn auxiliary lane in both the northbound and southbound approaches .
Page 2 of 5
Indian River County, Amendment No . 3
Oslo Road Widening from 43 "' Avenue
to east of 27`t' Avenue
F . Utility Improvement Plans :
Based upon our understanding , the COUNTY does not desire to relocate the existing
force main and water main facilities from their current location , such that they would not
reside under the widened Oslo Road corridor, minor water main relocations will be
needed to ensure fire hydrant access will be maintained along the corridor . The
relocations will provide a fire hydrant access at no less than 500 linear feet along the
corridor.
The force main will be evaluated to ensure that future service connections are positioned
along the corridor in anticipation of future connections and are equipped with a valve
assembly such that interruption of service will not be required .
G . Right- of-Way Acquisition Assistance :
The ENGINEER will coordinate with the COUNTY and/or their legal consultant
regarding the necessity for right- of-way acquisition associated with the Oslo Road and
27 `h Avenue corridors . Additional effort is anticipated in supporting the COUNTY ' S
legal consultant in orders of taking and providing expert testimony to the engineering
necessity associated with the 27 `" Avenue and Oslo Road corridors .
" SECTION V — COMPENSATION " is being modified to incorporate the following :
The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered
pursuant to this Agreement fees inclusive of expenses in accordance with the following :
A . Professional Services Fee
The basic compensation mutually agreed upon by the ENGINEER and the
COUNTY is as follows :
Lump Sum Components
Tasks Labor Fee
Supplemental Stormwater Facility Survey $ 9 ,400
Roadway Plan Modifications $ 34 , 614
Drainage Design and Permitting $ 33 , 255
Signalization Design $ 7 , 210
Utility Improvement Plans $7 , 300
Sub -Total $91 , 779
Page 3 of 5
Indian River County, Amendment No . 3
Oslo Road Widening from 43 "' Avenue
to east of 27`h Avenue
Hourly Not-to-Exceed Components
Task Labor Fee
Right- of-Way Acquisition Assistance $ 15 , 000
Sub -Total $ 15 ,000
Project Total $ 106 , 779
(THE REMAINDER OF THIS PAGE WAS LEFT BLANK INTENTIONALLY )
Page 4 of 5
Indian River County, Amendment No . 3
Oslo Road Widening from 43 "1 Avenue
to east of 27"' Avenue
The AGREEMENT is hereby amended as specifically set forth here in . All other sections of the
AGREEMENT shall remain in full force and effect and are incorporated herein .
This Amendment No . 3 to the AGREEMENT regardless of where executed , shall be governed
by and construed by the laws of the State of Florida .
In witness whereof the parties have executed this Amendment this 23rd day of
J u n P 2009 .
KIMLEY -HORN AND IATES , INC . INDIAN RIVER COiUT1*TTY , FLORIDA .
6012 1ST STREET Board of County Commissioners
VERO B O 960
44000000000
By : By :
Wesley S . Davis , Chairman
Board of County i7ommis�sioners
Attest : Attest:
k16� Daq ty 6 e e ourt
CLERK CIRCUly COURT ti
Attest: Accepted .
Cou ty Administrator
Approv d a to For a d&Lel ffi ' ency :
County Attorney
Page 5 of 5
Summary
Project Name Oslo Road Amendment No . 3
Task Summary Manhours for project
Task Project Project Enviro Analyst Technician Clerical Remarks
Manager Engineer Prof.
$ 150 $ 125 $85 $90 $75 $40
Design Anal sis 20 8 2 8 0 2
Roadway Plans 16 42 0 48 150 0
D12 56 8 79 63 0
Drainage Pians
Permittin 26 36 22 10 0 19
UtilityPlans 18 6 0 8 24 4
9 0 6 40 0
Signing and Markin Plans 5
Si nalization Plans 10 20 0 0 4fl 0
Landscape Plans 0 0 0 0 fl 0
Lighting Plans 0 0 0 0 0 0
Public involvement 0 fl 0 0 0 0
Total Hours = 107 177 32 159 317 25
Labor Fee = $ 16 ,050 $ 22 , 125 $2 ,720 $ 140310 $23 ,775 $ 1 ,000
Total Labor Fee = $79 ,980
Expenses 3 %) _ $2 ,399
Roadway Fee = $82 ,379
supplemental Design Topo Fee = $7 , 200
Legal and Sketch Fee = $2 ,200
R/W Acquisition Assistance = $ 15 , 000 hourly not to exceed
Geotechnical Fee = $0 County to provide
Subsurface Utility Investigation = $0
Total Fee = $ 106 , 779
'This MH estdoes not include Utility Relocation Plans
Amenda03 Manhour Est ( REV 2) . x1s Page 1
Design Analysis
Activity: Design Anatysis ! Revlew
mmmmwmww�
Task Project Project
Enviro Analyst Technician Clerical Remarks
Mans er En sneer Prof.
T . Section Desi n/Review
Pavement Desi n Memorandum
Contract File
Cost. est. conducted at Final Plan
4
Cost Estimate 2 2
Coordination w/ Geotech 2 2
2 Two review su6mitiais to Count
Coordination w/ Surveyor
Coordination w/ County 8
Supplementai S ecifications
Pro ect S ecifications , 2 2 8
Quantit Com utation
QC/QA 2
Pro' ect Mana ement 2
Subtotai 20 8
2 s a 2
Page 2
Rdwy Pians
Activity: Roadway Plans
Task Project Project Enviro Analyst Technician Clerical Remarks
Mana or En sneer Prof.
cover Sheet 0 2
T ical Section Modification 1 0 2 Oslo fld Phase I
Summary of Quantities Sheet 1 2 q 1 sheet
Plan/Profile Sheets 12 36 10 sheets 0 6 ltrs/sht
Oslo Road Phase tt 3 9 10 28 3 sheets a 20 hrs/ sht
Dslo Road Phase ! 3 7
HorizlVert control Sheet 8 8
Cross Sectionsj t5 20 6p 100 it Sections 100 @ 1 .0 hrs per
Oslo Road Phase N 5 4 10 100 it Sections 6 0 4 .0 hrs per
Oslo Road Phase I 1 1
Miscellaneous Const. Details
QC/QA 2
Project Management 2
Subtotal 16 42 0 48 150 0
Page 3
Drainage Plans
Activity: Drainage Plans
Task Project Project Enviro Analyst Technician Clerical Remarks
Mana or En tneer Prof.
Drainage Analysis 2 nd routin s C�? 20 hrs ar
Oslo Road Phase 11 20 20
Oslo Road Phase 1 10 10 emolt modification
Not rovided
Pond Sling Report
Field Review
8 8 site visits
Stormwater Manmeet FacI i 26 12 2 ands 30 hrs per
Oslo Road Phase 1I 4 6 modiiicaiion details
Oslo Road Phase 1 2 4 8 8
$ 15 1 sheet at 20 hrs per sheet
Summary of Drainage Structures
Drainage Structure Sheets Noi rovided
Oslo Road Phase 11 Not rovided
Oslo Road Phase I Not rovided
27th Avenue
Stormwater Pollution Prov. Plans5 14 2 sheets at 12 hrs/sht
Oslo Road Phase 11 1 4
� 5 14 2 sheets at 12 hrs/sht
Oslo Road Phase I 1
QC/QA 2
Pro' ect Mann emeni 2
Subtotal
12 56 8 79 63 d
Page 4
Activity : Permiting
I NEW =
iericai Remarks
Task Project Project Enviro Analyst Technician C
Manager Engineer Prof.
Pre-a licatian Meetin s 1
SJRWMD 4 4 1
IRFWCD 4
ALOE
2 Oslo Road Phase I
SJRWMD letter Modification 6
Permit Package 4 6
SJRWMD 2 8 6
IRFWCD 2 8 4 included within SJRWMD
ACOE
Request for Information8 4 4 1
SJRWMD 2 4 1
IRFWCD 2 8 1
ALOE 2 4 2 2
Pro ect Mana ement 2
Subtotal 26
36 22 10 0 19
Permits Required .
SJRWMD ERP
IRFWCD Draina:e Connection Permit
ACOE
Utitities
Activity : Utility Plans
vlro Analyst Tec
Task Project Project Enhnician Clerical
Remarks
Mana er Engineer Prof.
4
coordination with Coun !y 12
Service Extensions S 24 10 sheers @ 4 hrs/sht
OEM
Oslo Road Phase 11 2 6 0
Oslo Road Phase I 0
0 0
QGJQA 2
Pro ect Mana ement 2
Subtotal 18 8
0 8 24 4 111 ME III I Own
III
iiiiii Mail
Page 6
Sign & Mark
Activity : Signing and Marking Plans
Task Project Project Enviro Analyst Technician Clerical Remarks
Manager En Ineer Prof.
Field Inventory 0
Plan Sheets doubleIan q 10 4 sheets at 8 hrslsht
Oslo Road Phase 11 2
Osfo Road Phase 1 1 1 9
2 6 2 sheets at 10 hrslsht
Detail Sheet 6 24 1 sheet at 30 hrslsht
QC/QA 2
Project Management . 2
Subtotal 5 9 0 6 40 0
Signalization
Activity : Signalization
Remarks
Protect Project Enviro Analyst Technician Clerical
Task
Mana er En ineer Prof.
4 20 40 Revisions for deietion of 27th Ave
Oslo Road/ 27th Avenue
QC/QA 4
Project Management i 2
Subtotal 10 20 0 0 40 0
Page 8