HomeMy WebLinkAbout2008-252WORK ORDER NUMBER MCI
WATER QUALITY TESTING AND SUPPORT SERVICES FOR THE MAIN
RELIEF CANAL POLLUTION CONTROL SYSTEM
This Work Order Number MC1 is entered into as of this 19th day of
August 2008, pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of March 15, 2005 ("Agreement"), by and between
Indian River County, a political subdivision of the State of Florida ("COUNTY") and
Peninsula hydrologic Data Specialists, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional services
set forth on Attachment 1, attached to this Work Order and made part hereof by this
reference. The professional services will be performed by the CONSULTANT for the fee
schedule set forth in Attachment 2, attached to this Work Order and made a part hereof by
this reference. The CONSULTANT will perform the professional services within the
timeframe more particularly set forth in Attachment 3, attached to this Work Order and
made a part hereof by this reference, all in accordance with the terms and provisions set
forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in
any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set
forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of
the date first written above.
CaNSuI.TA.NT
P In D 5, i• n c .
Y=
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
".t
Attest: J.K. Barton,
as
e
Clerk of Court
ird, County Administrator
as to form and legal sufficiency:
Marian E. Fell, Senior(Couhty Attorney
Page 1 of 4
CADomments and Settings\Michaell=al Settings\Temporary Internet Fi1es\Content.IE5\86AF671X\PhDS Work Order No. MCI.doc
ATTACHMENT 1 to WORK ORDER NO. MC1
WATER QUALITY TESTING AND SUPPORT SERVICES FOR THE MAIN
RELIEF CANAL POLLUTION CONTROL SYSTEM
SCOPE OF WORK
The COUNTY has requested that the CONSULTANT provide professional water sampling
and support services related to an approved Quality Assurance Project Plan (QAPP) for
the COUNTY's Main Relief Canal Pollution Control System Project. The QAPP is herein
incorporated into this Work Order by reference. The Work under this Work Order is further
described in Exhibit A, included herein.
**END OF ATTACHMENT 1**
Page 2of4
F:\Public Works\KeithM\Stormwater Projects\Main Relief Canal\Work Orders\PhDS Work Order No. MCl.doc
ATTACHMENT 2 to WORK ORDER NO. MCI
WATER QUALITY TESTING AND SUPPORT SERVICES FOR THE MAIN
RELIEF CANAL POLLUTION CONTROL SYSTEM
1. COMPENSATION
The COUNTY agrees to pay and the CONSULTANT agrees to accept, a fee of $23,475.00
for services rendered according to Attachment 1 of this Work Order. Hourly rates shall be
as set forth in the Agreement and a breakdown of the fees is set forth in Exhibit A, included
herein.
2. PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the CONSULTANT for all
authorized work pertaining directly to this project performed during the previous calendar
month. The CONSULTANT shall submit invoices monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month.
The CONSULTANT shall submit duly certified invoices in duplicate to the Director of
the Public Works Department. For lump sum line items, the amount submitted shall be the
prorated amount due for all work performed to date under this phase, determined by
applying the percentage of the work completed as certified by the CONSULTANT, to the
total due for this phase of the work. For time and material line items, the amount
submitted shall be based on the actual hours worked and expenses incurred for the billing
period.
The amount of the partial payment due the CONSULTANT for the work performed
to date under these phases shall be an amount calculated in accordance with the previous
paragraph, less ten percent (10%) of the invoice amount thus determined, which shall be
withheld by the COUNTY as retainage, and less previous payments. Per F.S. 218.74(2),
the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY
receives the CONSULTANT's invoice.
Per F.S. 218.74(2), the ten percent (10%) retainage withheld shall be paid in full to
the CONSULTANT by the COUNTY, on or before the forty-fifth day after the date of final
acceptance of the Work by the Public Works Director.
**END OF ATTACHMENT 2**
Page 3 of 4
F:\Public Works\KeithM\Stormwater Projects\Main Relief Canal\Work Orders\PhDS Work Order No. MC I .doc
WATER QUALITY TESTING AND SUPPORT SERVICES FOR THE MAIN
RELIEF CANAL POLLUTION CONTROL SYSTEM
1. TIME FOR COMPLETION
The CONSULTANT will begin setting up and maintaining the sampling stations
within two weeks of receiving the Notice -to -Proceed from the COUNTY. The
CONSULTANT will perform all required duties in an expeditious manner
**END OF ATTACHMENT 3**
Page 4 of 4
F:\Public Works\KeithM\Stormwater Projects\Main Relief Canal\Work Orders\PhDS Work Order No. MC I .doc
f:OXH ► S (T A
PhDSinc.0
Peninsula hydrologic Data Specialists, Inc.
103 Mar Brisa Court
Satellite Beach, FL 32937
(321) 7774915/ (321) 506-6913
Email: phds—mi�bellsouth.net
------------------------------------------------------------COST PROPOSAL------
Customer.
Indian River County
Department of Public Works
Stormwater Division
4375 43`d Ave, Unit 102
Vero Beach, Florida 32967
Phone: (772) 226-3478
Fax: (772) 226-3481
Contact: Keith McCully, P.E.
Date: June 21, 2008
Project: Main Canal Filtration Project Manager: Keith McCully, P.E.
Payment/Cost Schedule
• Site Installation - * $1750.00
Includes all support equipment and
replacement hardware except batteries, logger
equipment, sensors (ie. rain gauge, 4150 flowlogger,
3700 autosampler, velocity cable, and solar panel.
These items are covered under miscellaneous
equipment lease) *(Site removal cost is 1/2 installation cost)
• Site QA Visits — Weekly/Biweekly $175.00
Covers up to a one hour visit. In the event that a visit
extends beyond one hour the hourly rate of $75.00
applies in'/z hour increments.
• Calibration Visits — Pre/Post Sampling Events $175.00
Covers up to a one hour visit. In the event that a visit
extends beyond one hour the hourly rate of $75.00
applies in '/2 hour increments.
• Site Administrative Work — Hourly Rate $75.00/hr
Update site files, emails, forms, copies, reports to
project manager, photo processing, data
processing, etc.
• Equipment Lease — Monthly Rate
1. ISCO 4150 Flowlogger (+ I replacement) $250.00
2. 3700 Portable Sampler (+ 1 replacement) $250.00
3. Miscellaneous equipment lease: $75.00
To include: shelters, batteries, site hardware,
wire, PVC, solar panel (if in a remote location)
dessicant, pest control, cleaning agents and
their unlimited replacements during the time
period of this project.
• Miscellaneous Work—Hourly Rate $75.00/hr
To include: surveying, diving, and lab courier (timely
delivery of samples to the lab or to the courier when
required; sample kits can be sent by any reliable shipper
if acceptable by the County's Project Manager.)
• Work Not Covered - TBD
Heavy equipment support/operation, ditch/channel
maintenance, any type of aquatic vegetation control, and any/or
work not specified in this proposal. The county will provide
this support (manpower and equipment) when needed. The lab
will perform all required water sample testing (to include ph,
conductivity, temperature, etc.)
• Total Cost for 1 year, beginning September 1. 2008 is:
1) Site Installation - $1750.00; Site Removal = $875.00 = $2625.00...Plus
2) $550(Lease) + $700(QA Visits) +$75(Lease) + $150(2 Hours Admin) _
$1475.00 Monthly X 12 Months = $17, 700.00 ...Plus
3) $450.00(Autosampling Event Visit) X 7(Rain Events) _ $3150.00... Plus
4) Total = $2625.00 + $17, 700.00 + $3150.00 =$13,475.00
5) Total =
Signed:
Michael lckwire, Y.P. PhDS,inc.
Signed: