CHANGE ORDER
No. 5
PROJECT Indian River North County Water Treatment Plant Expansion
DATE OF
ISSUANCE
October
10,
2008
EFFECTIVE DATE
CHANGE ORDER
No. 5
PROJECT Indian River North County Water Treatment Plant Expansion
DATE OF
ISSUANCE
October
10,
2008
EFFECTIVE DATE
Ready for final payment: _January 1, 2009
Days or dates
Net changes from previous Change Orders
OWNER
Indian River
County Department
of Utility Services
O WNER's Contract No. 200612
CDM Project No. 6706-43025-155
CONTRACTOR Poole and Kent Company of Florida, Inc.ENGINEER Camp Dresser & McKee Inc.
You are directed to make the following changes in the Contract Documents:
Description: Various changes and additional work summarized in the attached sheet
Reason for change order: Additional work at the owners request to improve plant.
Attachments: (List documents sunnorting change) See Change Order 5 Summary Attached.
CHANGE IN CONTRACT PRICE
CHANGE IN CONTRACT TIME
Original Contract Price
Original Contract Times
$ 21,080,300.00
Substantial Completion: September 3, 2008
Ready for final payment: _January 1, 2009
Days or dates
Net changes from previous Change Orders
Net change from previous Change Orders
No.1 to No. 4
No.1 to No. 4
$ ($253,345)
105 days
Contract Price prior to this Change Order
Contract Time prior to this Change Order
$ 20,826,955.00
Substantial Completion: December 17, 2008
Ready for final payment: ianuary 1, 2009
Das or dates
Net Increase (decrease) in this Change Order
Net Increase in this Change Order
$ $72,458.00
0
days
Contract Price with all approved Change Orders
Contract Time with all approved Change Orders
$ 20,899,413.00
Substantial Completion: December 17, 2008
Ready for final payment: _Ia.nuary 1, 2009
Das or dates
RECOMME D �/ii(i�'`'1��[APPI �( ACCEPT D:
By:70
Engine (Auth rze Signature) WdSley S aeYis,!ire-Chairmarvontractor(Authorized Signature)
lJo" 8
Date: October 10, 2008 Date: 4* 2 Date: D
EJCDC No. C-700 (2002 Edition)
Prepared by the Engineers Joint, Contract IN c3trnents. Committee and endorsed by The Associated
General Contractors of America. ^ , ' • ,
6706-43015-155\2/2/07 Conformed
00800-27
CONFORMED
Change Order Number 5 Summary
Indian River CountyNorth
County Water Treatment Plant Expansion Phase II
Potential
Change
Order
number
Description
Amount
Explanation
59
Roll up Door in Generator Room
$5,641.00
Generator fire door requires electricity to operate during emergency
fire shut down. Change adds conduit to provide power.
61
Instrumentation Upgrade
$45,546.00
The instrumentations Programmable Logic Controller will be upgraded
to expand memory and provided expanded communications
capabilities which will enhance plant operation and remote monitoring.
62
Blower Replacement
$23,784.00
Existing 10 year old blower could not produce the required air flow by
upsizing motor and pulleys which would jeopardize safety. New
blower produces required air flow and fits old blower form factor.
64
Concentrate Valve Replacement
$6,025.00
These existing valves were previously operated by air and were being
changed to electrical operation. The retrofit of the existing valves
presented a compatibility problem which is eliminated by replacing the
aging valves with ones consistent with the rest of the plant.
65
Credit for Pump Testing
($8,538.00)
Deductive change order for reimbursement of Engineer for Factory
Witness
Witness Testing as per Section 11214 and 11215 for the membrane
pumps and transfer pumps.
Total Amount Change Order No, 5
Original Contract Price
Change Order Number 1
Change Order Number 2
Change Order Number 3
Change Order Number 4
Order Number 5
$72,458.00
$21,0809300.00
($8041632.00)
$288,824.00
$200,527.00
$61,936.00