HomeMy WebLinkAbout2008-360s r ' CHANGE ORDER No. 5 PROJECT Indian River North County Water Treatment Plant Expansion DATE OF ISSUANCE October 10, 2008 EFFECTIVE DATE CHANGE ORDER No. 5 PROJECT Indian River North County Water Treatment Plant Expansion DATE OF ISSUANCE October 10, 2008 EFFECTIVE DATE Ready for final payment: _January 1, 2009 Days or dates Net changes from previous Change Orders OWNER Indian River County Department of Utility Services O WNER's Contract No. 200612 CDM Project No. 6706-43025-155 CONTRACTOR Poole and Kent Company of Florida, Inc.ENGINEER Camp Dresser & McKee Inc. You are directed to make the following changes in the Contract Documents: Description: Various changes and additional work summarized in the attached sheet Reason for change order: Additional work at the owners request to improve plant. Attachments: (List documents sunnorting change) See Change Order 5 Summary Attached. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times $ 21,080,300.00 Substantial Completion: September 3, 2008 Ready for final payment: _January 1, 2009 Days or dates Net changes from previous Change Orders Net change from previous Change Orders No.1 to No. 4 No.1 to No. 4 $ ($253,345) 105 days Contract Price prior to this Change Order Contract Time prior to this Change Order $ 20,826,955.00 Substantial Completion: December 17, 2008 Ready for final payment: ianuary 1, 2009 Das or dates Net Increase (decrease) in this Change Order Net Increase in this Change Order $ $72,458.00 0 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 20,899,413.00 Substantial Completion: December 17, 2008 Ready for final payment: _Ia.nuary 1, 2009 Das or dates RECOMME D �/ii(i�'`'1��[APPI �( ACCEPT D: By:70 Engine (Auth rze Signature) WdSley S aeYis,!ire-Chairmarvontractor(Authorized Signature) lJo" 8 Date: October 10, 2008 Date: 4* 2 Date: D EJCDC No. C-700 (2002 Edition) Prepared by the Engineers Joint, Contract IN c3trnents. Committee and endorsed by The Associated General Contractors of America. ^ , ' • , 6706-43015-155\2/2/07 Conformed 00800-27 CONFORMED Change Order Number 5 Summary Indian River CountyNorth County Water Treatment Plant Expansion Phase II Potential Change Order number Description Amount Explanation 59 Roll up Door in Generator Room $5,641.00 Generator fire door requires electricity to operate during emergency fire shut down. Change adds conduit to provide power. 61 Instrumentation Upgrade $45,546.00 The instrumentations Programmable Logic Controller will be upgraded to expand memory and provided expanded communications capabilities which will enhance plant operation and remote monitoring. 62 Blower Replacement $23,784.00 Existing 10 year old blower could not produce the required air flow by upsizing motor and pulleys which would jeopardize safety. New blower produces required air flow and fits old blower form factor. 64 Concentrate Valve Replacement $6,025.00 These existing valves were previously operated by air and were being changed to electrical operation. The retrofit of the existing valves presented a compatibility problem which is eliminated by replacing the aging valves with ones consistent with the rest of the plant. 65 Credit for Pump Testing ($8,538.00) Deductive change order for reimbursement of Engineer for Factory Witness Witness Testing as per Section 11214 and 11215 for the membrane pumps and transfer pumps. Total Amount Change Order No, 5 Original Contract Price Change Order Number 1 Change Order Number 2 Change Order Number 3 Change Order Number 4 Order Number 5 $72,458.00 $21,0809300.00 ($8041632.00) $288,824.00 $200,527.00 $61,936.00