Loading...
HomeMy WebLinkAbout2009-2203 `5 AMENDMENT NUMBER 3 TO WORK ORDER NUMBER 5 This Amendment Number 3 to Work Order Number 5 is entered into as of this 18th day of August , 2009, pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of April 6, 2004 and amended effective April 7, 2007 (as so amended, the "Agreement"), by and between Indian River County, a political subdivision of the State of Florida ("County") and POST, BUCKLEY, SCHUH & JERNIGAN, INC. ("CONSULTANT"). 1. The County has selected the Consultant to perform the professional services set forth in existing Work Order Number_ 5� Effective Date July 12, 2005. 2. 'The County and the Consultant desire to amend this Work Order as set forth on Exhibit 1 attached to this Amendment and made a part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 1 and within the timeframe more particularly set forth in Exhibit 1, all in accordance with the terms and provisions set forth in the Agreement. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed phis Amendment to Work Order as of the date first written above. CONSULTt��i I': P S� UCKLEY, BOARD OF COUNTY COMMISSIONERS SCHUH D,iE ' l .N�,1NC. O INDIAN RIVER�COUNTY 3 ye l; ? Wesley S. Davis, Chairman �t Title: Vice President BCC Approved Date: August 18, 2009 Date: , ///0 ;`1 Attest: J.K. Barton, Clerk of Court By ._ Deputy Clerk /Abinoved: of Attorney as to form and IegaYsufficiency: E. Fell, SenidrA3'S'isYa nt County Exhibit 1 - Proposal Amendment No.3 To Work Order No. 5 Scope of Services Indian River County Department of Utility Services 2008/2009 PERMIT RENEWAL The current Indian River County IRCUD/West Regional WWTF Wastewater Facility - Permit No. FL0041637 is expiring on March 27, 2010. According to the courtesy reminder letter dated July 17, 2009, the renewal application is due on or before September 27, 2009. According to the letter, failure to submit the application 180 days prior to the expiration date of the referenced permit will result in enforcement action. PBS&J has contacted FDEP regarding the renewal of the renewal of the permit for the referenced facility and they indicated that the following forms and/or information will be required 1. FDEP Form 1 2. FDEP Form 2A 3. O&M Performance Report 4. Process Flow Diagram 5. Site Plan 6. Location Map 7. Binding Agreements and Documentation of Controls on Individual Users of Reclaimed Water 8. Reclaimed Water or Effluent Analysis Report 9. Since the current flows to the WWTP are well below 50% of the design capacity, according to rule 62-600.405(4)(C) a capacity analysis report is in not required, however based on discussion with FDEP, they would require a certified statement to this effect. PBS&J will address this either in the signed and sealed cover letter or in the O&M performance report. Based on the above PBS&J has prepared the following scope. Details of the data requirements are attached in Attachment A. Task 1 Proiect Kick off and Data Collection Task 1 requires gathering the data and updating Form 1, Form 2A and the permitting package. PBSJ will work directly with the IRC and West WRF staff to obtain the required data and complete the required forms and reports. A Project Kickoff meeting must be held with the Staff and will be combined with the O&M performance report inspection. Task 2 Permitting Forms Task 2 requires gathering the data and updating Form 1 and Form 2A as submitted for the plant expansion. IRC will be required to complete or provide the following: 1. Section 3. A. Discharges To Surface Water, Items 12, 13, and 14. A detailed explanation of the required information is attached in Attachment A. 2. Section 5. Industrial Pretreatment for each SIU or significant industrial user 3. The Annual Average Daily Flow and the Maximum Daily Flows for calendar years 2007, 2008, and 2009 (thru July 2009). Required for Form 2A 4. A summary of the annual effluent toxicity test results 5. A Copy of the most recent Annual Wetlands System Treatment Compliance and Performance Report 6. The most recent Annual Reclaimed Water or Effluent Analysis Report (due annually by June 28th) 7. A rnap of the monitoring well locations with GPS coordinates. 8. Copies of any orders or notices issued by FDEP 9. Copies of the Annual Flow meter Certifications for every flow meter 10. Digital copies of binding agreements with major reclaimed water users Details of the required information are attached in Attachment A Task 3 (?&M Performance Report The O&M Performance report requires an inspection of the facility in the company of the chief operator and an evaluation of the performance of the treatment plant. The inspection will be combined with the project kick off meeting. Data required include the following: 1. A Digital Summary of 24 months of flow and all influent and effluent data covering the period from July 1, 2007 through July 30, 2009. (a digital summary of the data) 2. A Digital Summary of the Quarterly Groundwater Monitoring Data (3`d and 4th Quarter 2008, 1 st and 2" Quarter 2009) for all of the groundwater monitoring wells. 3. The Operating Protocol for the Facility PBS&J will develop the required report and submit a draft for review prior to final submittal. The owner and the chief operator will be required to sign the final document prior to submission to FDEP. Task 4 Response to Request for Additional Information Although every effort will be made to submit a complete permitting package, this is an NPDES permit and request for additional information from FDEP in response to EPA overview can be expected. Should additional time an effort in excess of this fee be required, PBSJ will advise the IRC prior to proceeding. Submittals PBSJ will provide digital copies of portions each form or report for review and comment prior to assembly of the final permitting package. The final permitting package will be assembled in a single bound document for signature and submittal to FDEP. The submittal package will include the following: 1. Three copies for signature and submittal along with the permit fee of $5,000 provided by IRC. The check for the permit fee should be made out to the Florida Department of Environmental Regulation for renewal of IRC West WRF Plant Operating Permit # FL00416374 2I Two copies of the final package for distribution to the treatment plant and the IRC files. 3. A CD containing the electronic files for the submittal. Total Estimated Cost The total Lump Sum cost for the Scope of Work presented above is $37,128. Schedule For this project, PBS&J estimates that if the required data and the reviews of the draft submittals can be provided in a timely manner the final permitting package can be completed and ready for submittal within by the due date of September 27, 2009 for the permit application. However, if for any reason there are delays, Form 1 and the permit fee may be submitted to extend the submittal deadline. Attachment: Data Request