RENEWAL OF
PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES
IRC PROJECT NO. 0534
This shall serve as mutual consent to extend the Agreement between Indian River County
and Ardaman & Associates, Inc. for Professional Geotechnical Services from October 1 , 2007 to
September 30, 2008.
All provisions of the original agreement, approved November 2, 2004 shall remain in full
force and effect. The fee schedule for October 1 , 2007 through September 30, 2008 shall remain
in effect from October 1 , 2007 through September 30, 2008 as stated in "Exhibit A" (attached) .
ARDAMAN & ASSOCIATES, INC INDIAN RIVER COUNTY, FLORIDA
Da J. L •al ack, P.E. Gary eeler, Cha frin4n.;
Approved-by BCC 7
Attest: `^®. A C\"
Jeffrey K. Barton Clerk of Circuit Court
William G. Collins, II, County Attorney
Approved as to Form and Legal Sufficiency
n J eph A. Baird
�h ounty Administrator
F:\EngineeringlCapital Projects\0534 Annual Geotechnical Service Contract\0534 Agreement Renewal-Ardaman 07-08.doc
EXHIBIT "A" EX H 16 if " A "
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
SITE PREPARATION PROCEDURES INSPECTION , SAMPLING AND TESTING SERVICES
Monitoring of the removal of deleterious soils or materials
Inspection of placement and compaction of fill material .
Penetrometer tests. Sampling of natural or fill material
Inspection of borrow areas.
Engineering technician $42.00/hour
Senior engineering technician $48.001hour
Density Tests
In-situ density tests, nuclear or drive sleeve method
(minimum of four per trip) $22.001test
Sampling of natural or fill material for
laboratory testing : Engineering technician $42 .00/hour
SFWMD Permeability/percolation/exfiltration tests $350.00/each
Double ring infiltration $350.00/each
ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING
Engineering technician time for field sampling $42 .00/hour
Coring:
Mobilization of coring equipment:
With power supplied $ 125 .00/trip
Without power supplied $ 100.00/trip
Certified engineering technician to inspect
preparation of base course/surface installation or plant control $48.00/hour
Asphalt mix designs $485. 00/design
Marshall Stability and Flow Test (Includes pill densities) $90. 001test
Extraction and gradation tests (sampled hot) $90. 00/test
Extraction and gradation tests (sampled from pavement) $ 125.00/test
Density tests $22.00/test
Depth measurements $7 .00/test
STRUCTURAL STEEL:
Field inspection for visual examination of welds, ultrasonic
testing , dye penetrant, magnetic particle, etc.
Metals technician
$55.00/hour
(Equipment charge determined by project)
ROOFING :
Testing of 12 x 12 inch samples (includes technician time for
obtaining samples, testing and report of findings) $315 .00/sample
OVERTIME AND HOLIDAY
Charges will be increased 25% for work performed during weekends and official holidays.
SUB-CONTRACTING SERVICES
Cost Plus 12 %
— _ Ardaman & Associates, Inc .
EXHIBIT "A" 6f i
ARDAMAN 8: ASSOCIATES, INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
CONCRETE SAMPLING AND TESTING
Cylinder samples (up to 4 cylinders per set): molding
curing , and strength testing (ASTM C-31 and C-39).
Cylinders shall be left in a place provided by the
Contractor, covered with plastic caps and attempts
made to provide shade thereon . If temperature of
the air is critical to first 24 hours (during field curing),
equipment to maintain such controls shall be provided
by others.
$70.00/set
Additional cylinders $13.00/cylinder
Technician time due to construction delays in excess
of 1 .0 hour on-site on the date cylinders are made $42 .00/hour
Technician time transporting cylinders from site to office
if no otherwork is required $42.00/hour
Curing and strength testing samples delivered to our
laboratory (ASTM C-39) $12. 00/cylinder
Continuous monitoring of concrete placement and/or
extra slump and temperature tests, technician time $42.00/hour
Slump tests (ASTM C- 143) $ 12.00/test
Air Entrainment (ASTM C-173) $22.00/test
Unit weight
Yield tests $30. 00/test
Verification of mix design $ 175.00/each
Fineness modules $42.00/each
Plant control $42.00/hour
Concrete blocks . Strength tests (determined by gross area) $24. 00/block
Concrete blocks. Absorption and strength tests (net area) $95.00/set of 3
Block Prism Assembly $220.00/set of 3
Flexural Strength Beams (up to 3 beams) $30.00 each additional beam $ 135. 00/set of 3
Test beams made by others $46.00/each
Grout Prisms 3/set (blocks supplied by others) $77.00/set
Marsh Funnel Viscosity $22.001test
SAMPLING AND TESTING OF IN-PLACE CONCRETEISOIL CEMENT
Corina and testing of cored samples
Technician time (two technicians may be required) $42. 00/hour
Mobilization of coring equipment
With power supplied $ 125.00/trip
Without power supplied $ 100. 00/trip
Trimming, capping and strength test (ASTM C-42 ) $28.00/core
Depth measurement $ 15. 00/core
Shotcrete panels made by others (panel cores & strength tests) $32 .00/each
Concrete Cover/Reinforcing Steel Location
Equipment use $ 105. 00/trip
Technician time $55. 00/hour
Swiss Hammer
Mobilization of equipment $50.00/trip
Technician time $48. 00/hour
- _ Andaman & Associates , Inc.
EXHIBIT "A" : ' _ ._
ARDAMAN & ASSOCIATES, INC. iii......
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
ENGINEERING
Data Evaluation, Engineering Analysis ,
Design, Inspections, Field Monitoring , etc.
Principal Engineer Per Hour $ 125.00
Senior Project Engineer (P. E. / Branch Manager) Per Hour $98 .00
Project Engineer Per Hour $85.00
Staff Engineer Per Hour $75.00
CONSTRUCTION MONITORING
AND FIELD TESTING
Senior Field Technician/Inspector Per Hour $55.00
Senior Field Technician Per Hour $48.00
Field Technician Per Hour $42. 00
SUPPORT PERSONNEL
Senior Technical Draftsman Per Hour $45.00
Technical Draftsman I Per Hour $40.00
Technical Secretary Per Hour $40. 00
Ardaman & Associates, Inc .
EXHIBIT "A" _
ARDAMAN & ASSOCIATES , INC. E X
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
CLASSIFICATION TESTS
Moisture Content (ASTM D-2216) Each $ 15.00
Organic Content
• Loss on Ignition (ASTM D-2974) Each $30.00
• Wet Combustion (AASHTO T-194) Each $38.00
Unit Weight/Classification (Undisturbed Sample) Each $48.00
Grain Size Distribution
• Sieve Analysis (ASTM D-421 , D-422) Each $65. 00
• Percent Fines (ASTM D-1140) Each $30.00
• Hydrometer Analysis (ASTM D-422) Each $85.00
Afterberg Limits (ASTM 0-4318)
• Plasticity Index Less than 150% Per Set $ 105.00
• Plasticity Index Greater than 150% Add'I Per Set $80.00
Shrinkage Limit (ASTM 0-4943) Each $75.00
Specific Gravity (ASTM D-854) Each $65.00
Los Angeles Abrasion Each $325.00
COMPACTION TESTS
Standard (ASTM D-698) or Modified Proctor (ASTM D-1557) Per Test $80.00
• Plasticity Index Greater than 20% Add'I Per Test $85.00
Maximum-Minimum Density (ASTM D-4253, D-4254) Per Set $88.00
Limerock Bearing Ratio (3 points) Per Test $250.00
CONSOLIDATION TESTS
Incremental Consolidation Test (ASTM D-2435)
• Up to Ten Load-Unload Increments Per Test $425.00
• More than Ten Load-Unload Increments Per Add'I Increment $40. 00
Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $550.00
PERMEABILITY TESTS
Permeability Test on Sand Each $ 135.00
Permeability Test on Fine Grained Soil
• k > 10-acm/sec Each $ 185.00
• k < 10-acm/sec Each $285.00
Test Duration Greater than 7 days Per Add'I Increment $ 16.00
Permeation with Fluids Other Than Water Add'I Per Test $ 115.00
STRENGTH TESTS
Strength Index Tests (Torvane, Penetrometer, etc.) Each $ 12.00
Vane Shear Test Each $22.00
Unconfined Compression Test (ASTM D-2166)
• Strength Only Each $45. 00
• With Stress-Strain Curve Each $85 .00
Triaxial Tests:
• Unconsolidated-Undrained (ASTM D-2850) Each $ 180. 00
• Unconsolidated-Undrained (with pore pressure response) Each $400.00
• Consolidated-Undrained (with pore pressure measurement) Each $390.00
• Consolidated-Drained on Sands Each $310.00
• Consolidated-Drained on Fine Grained Soils Each $450.00
• Use of Fluids Other Than Water Add] Per Test $ 135. 00
Direct Shear Tests (Coarse Grained Soils)
• Conventional 2.3" Box Shear Per Normal Load $210 .00
• With Stress Reversals Per Normal Load $320.00
• Conventional 12" Box Shear Per Normal Load $430.00
• Set- Up Charge for Geosynthetics Add 'I Per Normal Load $70.00
Angle of Repose Each $60. 00
Split Tensile for Rock Cores Each $ 130.00
IIIIIIIIIIIIIIr in- _ Ardaman & Associates, Inc.
5
ARDAMAN & ASSOCIATES, INC .
EXHIBIT "A"
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
CHEMICAL TESTS
pH Each $ 15.00
Specific Conductance Each $12.00
Fluoride Each $22. 00
Sulfate Each $42 .00
Chloride Each
Soil pH $42.00
Each $25.00
Soil Specific Conductance Each $42. 00
Soil Resistivity (ASTM G-57) Each $42 .00
Carbonate Content Each $50.00
Corrosion Series (pH , sulfate, chloride and resistivity) Each $125.00
Soundness - Sodium Sieve Size $105.00
Soundness - Mangesium Sieve Size $ 105.00
CHEMICAL LABORATORY SUBCONSULTANT SERVICES
Laboratory Analytical Testing Cost + 12%
GEOSYNTHETICS
Geomembrane Thickness (ASTM D-1593) Per Sample $30.00
Geomembrane Density (ASTM D-792) Per Sample $46. 00
Geomembrane Tensile Strength (ASTM D-638), Machine and
Transverse Direction Per Set $ 110.00
Geomembrane Tear Resistance (ASTM D- 1004), Machine and
Transverse Direction Per Set $75.00
Weld Peel and Shear (ASTM D-413, D-882) Per Set $82. 00
Geotextile Tensile Strength (ASTM D-0632) Per Set $ 110.00
Geotextile Trapezoidal Tear (ASTM D-4533) Per Set $ 130. 00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for
chemical tests) will be charged at $22.00 per sample. Prices for other tests on geomembranes and geotextiles will be
determined per project based upon technician man-hours and other considerations.
IIIIIIIIIIIIIF In— _ Ardaman & Associates, Inc.
EXHIBIT "A" `` " 2
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
MOBILIZATION AND DEMOBILIZATION
• Men and Equipment $ 175.00
• Portable Barge Per Job $5,000.00 Minimum
STANDARD DRILLING
All Terrain Vehicle Add'I Price Per LF $ 1 .50
Auger Borings (4-inch) Per Lineal Foot $9.00
Wash Borings - Cuttings Only (up to 3 inch)
• Soil drilling Per Lineal Foot $8.00
• Rock drilling Per Lineal Foot $ 12.00
Standard Penetration Test (SPT) Borings
(ASTM D-1586) in soil (N-values <50):
• from surface to 25 feet Per Lineal Foot $ 12.00
• from 25 feet to 50 feet Per Lineal Foot $ 13.00
• from 50 feet to 100 feet Per Lineal Foot $ 14.50
• from 100 feet to 125 feet Per Lineal Foot $ 19.00
• from 125 feet to 150 feet Per Lineal Foot $24. 00
Standard Penetration Test (SPT) Borings in
high resistance soil/rock (N-values >50) Add'I Price Per LF $3. 50
Furnish, Install, and Remove Casing (up to 4-inch):
• from surface to 50 feet Per Lineal Foot $7.50
• from 50 feet to 100 feet Per Lineal Foot $9.00
• from 100 feet to 150 feet Per Lineal Foot $ 10.50
Drilling (Time Basis)/2 man-crew Per Crew-Hour $ 145.00
Drilling (Time Basis)/3 man-crew Per Crew-Hour $ 170. 00
Support Water Truck (Time Basis) Per Day $ 120.00
Rock Coring (N or H size)
• from surface to 50 feet Per Lineal Foot $26 .00
• from 50 feet to 100 feet Per Lineal Foot $28 .00
• from 100 feet to 150 feet Per Lineal Foot $32.00
Field Permeability Per Test $350.00
SAMPLING
Additional SPT Sampling:
• from 10 feet to 25 feet Per Additional Sample $23.00
• from 26 feet to 50 feet Per Additional Sample $26.00
• from 51 feet to 100 feet Per Additional Sample $29. 00
• from 101 feet to 125 feet Per Additional Sample $34 .00
• from 126 feet to 150 feet Per Additional Sample $39.00
Undisturbed Samples:
• Shelby Tube Per Sample $ 100.00
• Fixed-Piston Shelby, Osterberg , Pitcher Per Sample $ 110.00
SOUNDINGS
Electric Dutch Cone Soundings Per Lineal Foot $9. 50
Piezocone Soundings Per Lineal Foot $ 10.50
Muck Probing/Clay Sampling Per Crew Hour $ 120 .00
Cone/Piezoprobe Soundings (Time Basis) Per Crew Hour $ 170.00
Piezoprobe Dissipation Monitoring Per Crew Hour $ 130.00
OTHER CHARGES
Clearing Difficult Access, Hale Location and Set-Up Per Crew-Hour $ 125.00
Standby Time Per Crew-Hour $ 125.00
Piezometer and Well Installation (plus materials) Per Crew-Hour $ 140.00
Bore Hale Grouting and Sealing (plus materials) Per Crew-Hour $ 140. 00
Well Clearing/Sensitivity/Water Level Per Crew-Hour $ 125 .00
Air Boat Use Per Day $300. 00
Instrumentation Unit Use Per Day $ 150.00
Materials Per Job At Cost + 12
Zqe 2"a§§an & Associates, Inc. Normal drilling rates times 1 .5
Borings Normal drilling rates times 1 , 5
EXHIBIT "A" �
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30, 2008)
ENVIRONMENTAL SITE ASSESSMENTS
Phase I Environmental Site Assessments
Tracts 50 acres or less (contiguous properties or per individual tract) $2 , 100.00
Tracts between 51 and 500 acres (contiguous properties) $2 ,600.00
Tracts greater than 500 acres varies
Phase II Environmental Site Assessments varies
Analytical Laboratory testing for hazardous or petroleum contamination
(soil , sediment and groundwater) cost + 15%
OTHER RELATED ENVIROMENTAL DRILLING CHARGES
Support Water Truck Per Day $ 120.00
Drumming Contaminated Soil/Drilling Fluids
In 55 gallon drums (Disposal not Included) Per Drum $ 110.00
Drum Disposal Per Drum Varies
Visqueen ( 100 feet by 20 feet) Per Roll $85 .00
MONITORING WELL INSTALLATION
Temporary 2-inch PVC Wellpoint (Piezometer)) Per Foot $18.00
2-inch PVC Per Foot $37. 00
NOTE: Double cased deep monitoring well (above cost x 2)
VAULT/PAD INTALLATION – MONITORING WELLS
Well Size Vault Size
2., 8" w/pad $275.00
4" 12" w/pad $380.00
2" or 4" Above ground riser w/pad $275. 00
RECOVERY WELL INSTALLATION
4-inch PVC Per Foot $82. 00
6-inch PVC Per Foot $ 112.00
8-inch PVC Per Foot $ 165. 00
VAULT/PAD INSTALLATION – RECOVERY WELLS
Well Size Vault Size
4" 24" square w/pad $720.00
6" 24' square w/pad $770. 00
8„ 36" square w/pad $ 1 ,050.00
DIRECT PUSH GROUNDWATER SAMPLING
Direct Push Sampler (minimum 1 day) Per Day $ 1 ,500. 00
ENVIRONMENTAL FIELD TESTING SERVICES
Slug Injection/Withdrawal Permeability Test Each $250.00+$80.001mr
Double Ring Infiltrometer Test (ASTM D-3385-75) Each $450 .00
SPECIAL DRILLINGISOUNDING
Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NO wire line coring: large diameter
borings; drilling in corrosive. contaminated or hazardous materials; drilling at great depths ; installing large diameter
temporary casing ; etc. ) field vane testing, and other specialized sampling or field tests will be determined per project.
INSTRUMENTATION
Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability
and packer tests will be determined per project.
— _ Ardaman & Associates, Inc.
by
If
EXHIBIT "A"
ARDAMAN & ASSOCIATES, INC.
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(October 1 , 2007 through September 30 , 2008)
GENERAL FIELD EQUIPMENT:
Field Gas Chromatograph Per Day $300. 00
Data Logger Per Day $240.00
Organic Vapor Analyzer (OVA 128 or Gastech) Per Day $ 120.00
Photo Ionization Detector (Photovac Tip) Per Day $ 110.00
Generator Per Day $95.00
Steam Cleaner Per Day $ 100. 00
Surveying Equipment (Water Table Elevations) Per Day $55.00
Centrifugal Development Pump Per Day $50.00
Submersible Development Pump Per Day $ 100.00
Peristaltic Purging Pump Per Day $40.00
Magnetometer Per Day $35.00
Product/Water Interface Probe Per Day $35. 00
pH/Conductivity Meter Per Day $25.00
Turbidity Meter Per Da
y $55.00
Water Level Indicator Per Day $20.00
Bailer Usage (Stainless Steel or Teflon-Per Each) Per Day $ 18.00
Measuring Wheel
Camera Per Day $8.00
35 mm Came
Per Da
Barricade (per unit) Per Day $3. 00
Concrete Saw Per Day $ 100. 00
EXPENDABLE SUPPLIES:
High Capacity (0.45 micron) Filter Each $22 .00
Disposable Teflon Bailer Each $ 18.00
Disposable Polyethylene Bailer Each $13.00
Isopropyl Alcohol (decontamination) Per Gallon $ 15.00
Deionized Water (decontamination) Per Five Gallon $ 14. 00
16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $ 10 .00
Tygon Tubing Per Foot $2. 50
Polyethylene Tubing Per Foot $.60
55-gallon Drum Each $65.00
HEAVY EQUIPMENT:
Vacuum Truck, Dump Truck, Crane, Excavator,
Trackhoe, Backhoe, etc. Per Job Cost + 15
REMEDIATION EQUIPMENT :
Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis .
Ardaman & Associates, Inc.