Loading...
HomeMy WebLinkAbout2007-300C "I J2. C4 - t , - t� � R`vER Board of County Commissioners A 'Z 1840 25th Street Vero Beach, Florida 32960 1F �F Telephone: (772) 567-8000 �LORID� FAX- 772- 778-9391 RENEWAL OF PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES IRC PROJECT NO. 0534 This shall serve as mutual consent to extend the Agreement between Indian River County and Ardaman & Associates, Inc. for Professional Geotechnical Services from October 1 , 2007 to September 30, 2008. All provisions of the original agreement, approved November 2, 2004 shall remain in full force and effect. The fee schedule for October 1 , 2007 through September 30, 2008 shall remain in effect from October 1 , 2007 through September 30, 2008 as stated in "Exhibit A" (attached) . ARDAMAN & ASSOCIATES, INC INDIAN RIVER COUNTY, FLORIDA Da J. L •al ack, P.E. Gary eeler, Cha frin4n.; Approved-by BCC 7 Attest: `^®. A C\" Jeffrey K. Barton Clerk of Circuit Court William G. Collins, II, County Attorney Approved as to Form and Legal Sufficiency n J eph A. Baird �h ounty Administrator F:\EngineeringlCapital Projects\0534 Annual Geotechnical Service Contract\0534 Agreement Renewal-Ardaman 07-08.doc EXHIBIT "A" EX H 16 if " A " ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) SITE PREPARATION PROCEDURES INSPECTION , SAMPLING AND TESTING SERVICES Monitoring of the removal of deleterious soils or materials Inspection of placement and compaction of fill material . Penetrometer tests. Sampling of natural or fill material Inspection of borrow areas. Engineering technician $42.00/hour Senior engineering technician $48.001hour Density Tests In-situ density tests, nuclear or drive sleeve method (minimum of four per trip) $22.001test Sampling of natural or fill material for laboratory testing : Engineering technician $42 .00/hour SFWMD Permeability/percolation/exfiltration tests $350.00/each Double ring infiltration $350.00/each ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING Engineering technician time for field sampling $42 .00/hour Coring: Mobilization of coring equipment: With power supplied $ 125 .00/trip Without power supplied $ 100.00/trip Certified engineering technician to inspect preparation of base course/surface installation or plant control $48.00/hour Asphalt mix designs $485. 00/design Marshall Stability and Flow Test (Includes pill densities) $90. 001test Extraction and gradation tests (sampled hot) $90. 00/test Extraction and gradation tests (sampled from pavement) $ 125.00/test Density tests $22.00/test Depth measurements $7 .00/test STRUCTURAL STEEL: Field inspection for visual examination of welds, ultrasonic testing , dye penetrant, magnetic particle, etc. Metals technician $55.00/hour (Equipment charge determined by project) ROOFING : Testing of 12 x 12 inch samples (includes technician time for obtaining samples, testing and report of findings) $315 .00/sample OVERTIME AND HOLIDAY Charges will be increased 25% for work performed during weekends and official holidays. SUB-CONTRACTING SERVICES Cost Plus 12 % — _ Ardaman & Associates, Inc . EXHIBIT "A" 6f i ARDAMAN 8: ASSOCIATES, INC . FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) CONCRETE SAMPLING AND TESTING Cylinder samples (up to 4 cylinders per set): molding curing , and strength testing (ASTM C-31 and C-39). Cylinders shall be left in a place provided by the Contractor, covered with plastic caps and attempts made to provide shade thereon . If temperature of the air is critical to first 24 hours (during field curing), equipment to maintain such controls shall be provided by others. $70.00/set Additional cylinders $13.00/cylinder Technician time due to construction delays in excess of 1 .0 hour on-site on the date cylinders are made $42 .00/hour Technician time transporting cylinders from site to office if no otherwork is required $42.00/hour Curing and strength testing samples delivered to our laboratory (ASTM C-39) $12. 00/cylinder Continuous monitoring of concrete placement and/or extra slump and temperature tests, technician time $42.00/hour Slump tests (ASTM C- 143) $ 12.00/test Air Entrainment (ASTM C-173) $22.00/test Unit weight Yield tests $30. 00/test Verification of mix design $ 175.00/each Fineness modules $42.00/each Plant control $42.00/hour Concrete blocks . Strength tests (determined by gross area) $24. 00/block Concrete blocks. Absorption and strength tests (net area) $95.00/set of 3 Block Prism Assembly $220.00/set of 3 Flexural Strength Beams (up to 3 beams) $30.00 each additional beam $ 135. 00/set of 3 Test beams made by others $46.00/each Grout Prisms 3/set (blocks supplied by others) $77.00/set Marsh Funnel Viscosity $22.001test SAMPLING AND TESTING OF IN-PLACE CONCRETEISOIL CEMENT Corina and testing of cored samples Technician time (two technicians may be required) $42. 00/hour Mobilization of coring equipment With power supplied $ 125.00/trip Without power supplied $ 100. 00/trip Trimming, capping and strength test (ASTM C-42 ) $28.00/core Depth measurement $ 15. 00/core Shotcrete panels made by others (panel cores & strength tests) $32 .00/each Concrete Cover/Reinforcing Steel Location Equipment use $ 105. 00/trip Technician time $55. 00/hour Swiss Hammer Mobilization of equipment $50.00/trip Technician time $48. 00/hour - _ Andaman & Associates , Inc. EXHIBIT "A" : ' _ ._ ARDAMAN & ASSOCIATES, INC. iii...... FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) ENGINEERING Data Evaluation, Engineering Analysis , Design, Inspections, Field Monitoring , etc. Principal Engineer Per Hour $ 125.00 Senior Project Engineer (P. E. / Branch Manager) Per Hour $98 .00 Project Engineer Per Hour $85.00 Staff Engineer Per Hour $75.00 CONSTRUCTION MONITORING AND FIELD TESTING Senior Field Technician/Inspector Per Hour $55.00 Senior Field Technician Per Hour $48.00 Field Technician Per Hour $42. 00 SUPPORT PERSONNEL Senior Technical Draftsman Per Hour $45.00 Technical Draftsman I Per Hour $40.00 Technical Secretary Per Hour $40. 00 Ardaman & Associates, Inc . EXHIBIT "A" _ ARDAMAN & ASSOCIATES , INC. E X FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) CLASSIFICATION TESTS Moisture Content (ASTM D-2216) Each $ 15.00 Organic Content • Loss on Ignition (ASTM D-2974) Each $30.00 • Wet Combustion (AASHTO T-194) Each $38.00 Unit Weight/Classification (Undisturbed Sample) Each $48.00 Grain Size Distribution • Sieve Analysis (ASTM D-421 , D-422) Each $65. 00 • Percent Fines (ASTM D-1140) Each $30.00 • Hydrometer Analysis (ASTM D-422) Each $85.00 Afterberg Limits (ASTM 0-4318) • Plasticity Index Less than 150% Per Set $ 105.00 • Plasticity Index Greater than 150% Add'I Per Set $80.00 Shrinkage Limit (ASTM 0-4943) Each $75.00 Specific Gravity (ASTM D-854) Each $65.00 Los Angeles Abrasion Each $325.00 COMPACTION TESTS Standard (ASTM D-698) or Modified Proctor (ASTM D-1557) Per Test $80.00 • Plasticity Index Greater than 20% Add'I Per Test $85.00 Maximum-Minimum Density (ASTM D-4253, D-4254) Per Set $88.00 Limerock Bearing Ratio (3 points) Per Test $250.00 CONSOLIDATION TESTS Incremental Consolidation Test (ASTM D-2435) • Up to Ten Load-Unload Increments Per Test $425.00 • More than Ten Load-Unload Increments Per Add'I Increment $40. 00 Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $550.00 PERMEABILITY TESTS Permeability Test on Sand Each $ 135.00 Permeability Test on Fine Grained Soil • k > 10-acm/sec Each $ 185.00 • k < 10-acm/sec Each $285.00 Test Duration Greater than 7 days Per Add'I Increment $ 16.00 Permeation with Fluids Other Than Water Add'I Per Test $ 115.00 STRENGTH TESTS Strength Index Tests (Torvane, Penetrometer, etc.) Each $ 12.00 Vane Shear Test Each $22.00 Unconfined Compression Test (ASTM D-2166) • Strength Only Each $45. 00 • With Stress-Strain Curve Each $85 .00 Triaxial Tests: • Unconsolidated-Undrained (ASTM D-2850) Each $ 180. 00 • Unconsolidated-Undrained (with pore pressure response) Each $400.00 • Consolidated-Undrained (with pore pressure measurement) Each $390.00 • Consolidated-Drained on Sands Each $310.00 • Consolidated-Drained on Fine Grained Soils Each $450.00 • Use of Fluids Other Than Water Add] Per Test $ 135. 00 Direct Shear Tests (Coarse Grained Soils) • Conventional 2.3" Box Shear Per Normal Load $210 .00 • With Stress Reversals Per Normal Load $320.00 • Conventional 12" Box Shear Per Normal Load $430.00 • Set- Up Charge for Geosynthetics Add 'I Per Normal Load $70.00 Angle of Repose Each $60. 00 Split Tensile for Rock Cores Each $ 130.00 IIIIIIIIIIIIIIr in- _ Ardaman & Associates, Inc. 5 ARDAMAN & ASSOCIATES, INC . EXHIBIT "A" FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) CHEMICAL TESTS pH Each $ 15.00 Specific Conductance Each $12.00 Fluoride Each $22. 00 Sulfate Each $42 .00 Chloride Each Soil pH $42.00 Each $25.00 Soil Specific Conductance Each $42. 00 Soil Resistivity (ASTM G-57) Each $42 .00 Carbonate Content Each $50.00 Corrosion Series (pH , sulfate, chloride and resistivity) Each $125.00 Soundness - Sodium Sieve Size $105.00 Soundness - Mangesium Sieve Size $ 105.00 CHEMICAL LABORATORY SUBCONSULTANT SERVICES Laboratory Analytical Testing Cost + 12% GEOSYNTHETICS Geomembrane Thickness (ASTM D-1593) Per Sample $30.00 Geomembrane Density (ASTM D-792) Per Sample $46. 00 Geomembrane Tensile Strength (ASTM D-638), Machine and Transverse Direction Per Set $ 110.00 Geomembrane Tear Resistance (ASTM D- 1004), Machine and Transverse Direction Per Set $75.00 Weld Peel and Shear (ASTM D-413, D-882) Per Set $82. 00 Geotextile Tensile Strength (ASTM D-0632) Per Set $ 110.00 Geotextile Trapezoidal Tear (ASTM D-4533) Per Set $ 130. 00 SAMPLE PREPARATION AND SPECIAL TESTS Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for chemical tests) will be charged at $22.00 per sample. Prices for other tests on geomembranes and geotextiles will be determined per project based upon technician man-hours and other considerations. IIIIIIIIIIIIIF In— _ Ardaman & Associates, Inc. EXHIBIT "A" `` " 2 ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) MOBILIZATION AND DEMOBILIZATION • Men and Equipment $ 175.00 • Portable Barge Per Job $5,000.00 Minimum STANDARD DRILLING All Terrain Vehicle Add'I Price Per LF $ 1 .50 Auger Borings (4-inch) Per Lineal Foot $9.00 Wash Borings - Cuttings Only (up to 3 inch) • Soil drilling Per Lineal Foot $8.00 • Rock drilling Per Lineal Foot $ 12.00 Standard Penetration Test (SPT) Borings (ASTM D-1586) in soil (N-values <50): • from surface to 25 feet Per Lineal Foot $ 12.00 • from 25 feet to 50 feet Per Lineal Foot $ 13.00 • from 50 feet to 100 feet Per Lineal Foot $ 14.50 • from 100 feet to 125 feet Per Lineal Foot $ 19.00 • from 125 feet to 150 feet Per Lineal Foot $24. 00 Standard Penetration Test (SPT) Borings in high resistance soil/rock (N-values >50) Add'I Price Per LF $3. 50 Furnish, Install, and Remove Casing (up to 4-inch): • from surface to 50 feet Per Lineal Foot $7.50 • from 50 feet to 100 feet Per Lineal Foot $9.00 • from 100 feet to 150 feet Per Lineal Foot $ 10.50 Drilling (Time Basis)/2 man-crew Per Crew-Hour $ 145.00 Drilling (Time Basis)/3 man-crew Per Crew-Hour $ 170. 00 Support Water Truck (Time Basis) Per Day $ 120.00 Rock Coring (N or H size) • from surface to 50 feet Per Lineal Foot $26 .00 • from 50 feet to 100 feet Per Lineal Foot $28 .00 • from 100 feet to 150 feet Per Lineal Foot $32.00 Field Permeability Per Test $350.00 SAMPLING Additional SPT Sampling: • from 10 feet to 25 feet Per Additional Sample $23.00 • from 26 feet to 50 feet Per Additional Sample $26.00 • from 51 feet to 100 feet Per Additional Sample $29. 00 • from 101 feet to 125 feet Per Additional Sample $34 .00 • from 126 feet to 150 feet Per Additional Sample $39.00 Undisturbed Samples: • Shelby Tube Per Sample $ 100.00 • Fixed-Piston Shelby, Osterberg , Pitcher Per Sample $ 110.00 SOUNDINGS Electric Dutch Cone Soundings Per Lineal Foot $9. 50 Piezocone Soundings Per Lineal Foot $ 10.50 Muck Probing/Clay Sampling Per Crew Hour $ 120 .00 Cone/Piezoprobe Soundings (Time Basis) Per Crew Hour $ 170.00 Piezoprobe Dissipation Monitoring Per Crew Hour $ 130.00 OTHER CHARGES Clearing Difficult Access, Hale Location and Set-Up Per Crew-Hour $ 125.00 Standby Time Per Crew-Hour $ 125.00 Piezometer and Well Installation (plus materials) Per Crew-Hour $ 140.00 Bore Hale Grouting and Sealing (plus materials) Per Crew-Hour $ 140. 00 Well Clearing/Sensitivity/Water Level Per Crew-Hour $ 125 .00 Air Boat Use Per Day $300. 00 Instrumentation Unit Use Per Day $ 150.00 Materials Per Job At Cost + 12 Zqe 2"a§§an & Associates, Inc. Normal drilling rates times 1 .5 Borings Normal drilling rates times 1 , 5 EXHIBIT "A" � ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30, 2008) ENVIRONMENTAL SITE ASSESSMENTS Phase I Environmental Site Assessments Tracts 50 acres or less (contiguous properties or per individual tract) $2 , 100.00 Tracts between 51 and 500 acres (contiguous properties) $2 ,600.00 Tracts greater than 500 acres varies Phase II Environmental Site Assessments varies Analytical Laboratory testing for hazardous or petroleum contamination (soil , sediment and groundwater) cost + 15% OTHER RELATED ENVIROMENTAL DRILLING CHARGES Support Water Truck Per Day $ 120.00 Drumming Contaminated Soil/Drilling Fluids In 55 gallon drums (Disposal not Included) Per Drum $ 110.00 Drum Disposal Per Drum Varies Visqueen ( 100 feet by 20 feet) Per Roll $85 .00 MONITORING WELL INSTALLATION Temporary 2-inch PVC Wellpoint (Piezometer)) Per Foot $18.00 2-inch PVC Per Foot $37. 00 NOTE: Double cased deep monitoring well (above cost x 2) VAULT/PAD INTALLATION – MONITORING WELLS Well Size Vault Size 2., 8" w/pad $275.00 4" 12" w/pad $380.00 2" or 4" Above ground riser w/pad $275. 00 RECOVERY WELL INSTALLATION 4-inch PVC Per Foot $82. 00 6-inch PVC Per Foot $ 112.00 8-inch PVC Per Foot $ 165. 00 VAULT/PAD INSTALLATION – RECOVERY WELLS Well Size Vault Size 4" 24" square w/pad $720.00 6" 24' square w/pad $770. 00 8„ 36" square w/pad $ 1 ,050.00 DIRECT PUSH GROUNDWATER SAMPLING Direct Push Sampler (minimum 1 day) Per Day $ 1 ,500. 00 ENVIRONMENTAL FIELD TESTING SERVICES Slug Injection/Withdrawal Permeability Test Each $250.00+$80.001mr Double Ring Infiltrometer Test (ASTM D-3385-75) Each $450 .00 SPECIAL DRILLINGISOUNDING Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NO wire line coring: large diameter borings; drilling in corrosive. contaminated or hazardous materials; drilling at great depths ; installing large diameter temporary casing ; etc. ) field vane testing, and other specialized sampling or field tests will be determined per project. INSTRUMENTATION Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and packer tests will be determined per project. — _ Ardaman & Associates, Inc. by If EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1 , 2007 through September 30 , 2008) GENERAL FIELD EQUIPMENT: Field Gas Chromatograph Per Day $300. 00 Data Logger Per Day $240.00 Organic Vapor Analyzer (OVA 128 or Gastech) Per Day $ 120.00 Photo Ionization Detector (Photovac Tip) Per Day $ 110.00 Generator Per Day $95.00 Steam Cleaner Per Day $ 100. 00 Surveying Equipment (Water Table Elevations) Per Day $55.00 Centrifugal Development Pump Per Day $50.00 Submersible Development Pump Per Day $ 100.00 Peristaltic Purging Pump Per Day $40.00 Magnetometer Per Day $35.00 Product/Water Interface Probe Per Day $35. 00 pH/Conductivity Meter Per Day $25.00 Turbidity Meter Per Da y $55.00 Water Level Indicator Per Day $20.00 Bailer Usage (Stainless Steel or Teflon-Per Each) Per Day $ 18.00 Measuring Wheel Camera Per Day $8.00 35 mm Came Per Da Barricade (per unit) Per Day $3. 00 Concrete Saw Per Day $ 100. 00 EXPENDABLE SUPPLIES: High Capacity (0.45 micron) Filter Each $22 .00 Disposable Teflon Bailer Each $ 18.00 Disposable Polyethylene Bailer Each $13.00 Isopropyl Alcohol (decontamination) Per Gallon $ 15.00 Deionized Water (decontamination) Per Five Gallon $ 14. 00 16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $ 10 .00 Tygon Tubing Per Foot $2. 50 Polyethylene Tubing Per Foot $.60 55-gallon Drum Each $65.00 HEAVY EQUIPMENT: Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc. Per Job Cost + 15 REMEDIATION EQUIPMENT : Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis . Ardaman & Associates, Inc. 11111111110#11111