Loading...
HomeMy WebLinkAbout2007-323 it I _- Cl - le 01 ATTACHMENT # 1 3a GIANNETTI CONTRACTING Main Office CORPORATION Florida Office 6340 Sims Dr. 2660 N .W. 150 Court, Ste. 108 Sterling Heights, Michigan 4831 $ Pompano Beach, Florida 33069 Phone : (586) 268-2090 Phone: (954) 972-8104 Fax: (586) 268.7099 Fax: (954) 972-8108 Lic.# CB-CO57979 BVILDING • DEVELOPMENT • INFRASTRUCTURE Lia# CU-CO56976 August 3, 2007 Eckler Engineering 4700 Riverside Dr. Suite 110 Coral Springs, FL 33067 ATTN: Evan Kennedy RE: Mitigated Sewer Rockridge Subdivision Indian River County project # UCP 2521 Dear Mr. Kennedy, Please find listed below additional casts for the work as described below, as requested by the owner. Item # 1 Clear and grub canal banks and easement and sod @ treatment facility. Bahia sod restoration 900000 SF $ 0.20 $ 16,000.00 Trucking off debris and excess soil 600 CY $ 5.00 $ 4,000, 00 Labor and equipment for grading and excavation 10000 SY S 2.00 $ 20,000.00 Total for Item # 1 $ 42,000.00 Item # 2 Remove existing culverts and replace with 12" ADS pipe @ driveways crossings on vacuum sewer side esirlwalind 49 1 r nor driveways = approximately 3,100 LF, 12" ADS pipe materials 3100 S 5.83 $ 18,073.00 12" ADS Couplings 104 EA $ 5.83 $ 606.32 Remove and dispose ex culverts $ 2. 00 $ 6,200.00 Lahar and equipment 3100 LF 10.00 $ 31 ,0091 Estimated Total for 7t (!! $ 55,879.32 Price per 2 $ 18.03 Item ##33 remove ex CMP drainage culvert @ roadways crossings and replace with hardie pipe. Remove anAai+'pOca-er culvert 446 LF $ 2. 00 $ 87.00 Connect new CMP to ex structures 16 EA $ 500.00 S✓9'Q , 00 Labor and equipment to install 12" - 16" hardle pipe 446 LF .00 S 4,460.00 12" hardie pipe materials only $ 12,99 $ 2,078.40 15" hardle pipe materials only S 12.99 $ 2,675.94 15" hardie pipe materials only 80 LF 14. 31 $ 1 , 144.80 Asphalt restoration ( at prices) 250 LF $ $ 26,00D.00 Sidewalk r n at contract unit prices) 5 LF $ 44. 00 000l Total for item # 3 $ 483471 .14 pg Connect now CMP to ex structures includes removing ox GMP from invert and making new connection to ex structure, and cementing new CMP to inlet. Item # 4 provide electronic ball markers at all fittings on vacuum sewer. Material costs only no charge for labor, 439 markers @ $ 11 .70 each Total for Item # 4 S 61136.30 Item S 6 increaaod ARV from 2" to 4" in size as per previous request. S 2,726,07 Quantities are estimated and to be billed on actual measurements installed. Thank you and lease call should you have an y p y y questions. Sincerely Ricky L Glannetti Project Manager CC: Larry Brown IRC File ATTACHMENT SECTION 00450 CHANGE ORDER FORM CHANGE ORDER NO. 01 DATE: September 6. 2007 CONTRACTOR : Giannetti contractors Coro OWNER: INDIAN RIVER COUNTY AGREEMENT DATE : May 1 2007 PROJECT NAME: Rockridge Subdivision Mitigated Sewer Replacement The following changes are hereby made: 1 ) Item # 1 Clear, stabilize and sod 161h St. canal. 2) Add 439 ball markers. 3) Change 2" ARV to 4" ARV. Original CONTRACT PRICE $ 5. 782. 621 00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ N/A Net Increase (Decrease) Resulting from this CHANGE ORDER $ 49.861 . 37 The current CONTRACT PRICE including this CHANGE ORDER $ 5.832.482 37 ORIGINAL CONTRACT TIME : March 16 2009 No. Days 630 Current CONTRACT TIME adjusted by previous CHANGE ORDER No. Days N/A Net Increase (Decrease) Resulting from this CHANGE ORDER No. Days 0 Current CONTRACT TIME Including this CHANGE ORDER No. Days 630 CHANGES ORDERED : I . GENERAL Misc. additions to contract. . II . REQUIRED CHANGES Items # 1 .4 and 5 of Attachment 1 III . JUSTIFICATION The change order is necessary to improve street drainage to reduce construction delays due to standing water in streets . IV. WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment in contract price or time as a result of increases or decreases in costs and/or time of performance caused directly and indirectly from the change . Change Order Fonn 00 - - I - PftUrilitics�UTILITY - EMPLOYEE FOLDERS\Larry 9rown,AA - ppysp . Change Order NoI - ARachmcnt2Gianncni RocAridye.dw This Change Order represents an equitable adjustment to the contract and CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is properly executed . V. APPROVAL AND CHANGE AUTHORIZATION Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein . Change Order Request By: L . R . Brown Department of Utility Services, Indian ''River .C{//o rit�y, Floriiiia Approved By: Michael C. Hotchkiss ` 1 Yd Capital Projects Mgr. Signature Approval By: W . Erik Olson Director of Utility Services Signa ure APPROVED BY; Giannetti Contractors Corp. . Contra r 4NDIAN RIVER COUNTY, FLORIDA Signature and Date G_ VC . Wheeler, Chairman , Board of County Commissioners END OF SECTION * " 00450 - 2 - Change Order Form F:AAiIAics\UTILITY - EMPLOYEE F'OLDERSLarry NrowmAA - 00450 - Change Order No I - Artaehmont 20iannmti Rnckridgadue