HomeMy WebLinkAbout2003-259 9 _ ;2 Indian River County 03 " 2S5' Task 04 - Roseland Area Stormwater Improvements WORK ORDER NO . 10 TO THE PROFESSIONAL CIVIL SERVICES MASTER AGREEMENT BETWEEN CARTER ASSOCIATES , INC . , DATED AUGUST 4 , 1998 AND INDIAN RIVER COUNTY, FLORIDA Pursuant to the Professional Services Agreement ( MASTER AGREEMENT ) dated August 4 , 19989 by and between Indian River County , a political subdivision of the State of Florida , hereinafter referred to as the COUNTY , and CARTER ASSOCIATES , INC . , 1708 21st Street , Vero Beach , Florida , hereinafter referred to as the ENGINEER , this Work Order No . 10 is an extension of and hereby becomes a part of the MASTER AGREEMENT as follows : SECTION 1 - PROJECT LIMITS AND DESCRIPTION These services will include the revised final design , permitting , and construction plan preparation for the Roseland Area Stormwater project . The Roseland Area Stormwater Improvement Project consists of the construction of two (2 ) stormwater detention ponds ( lakes ) , conveyance pipe and swales and control structures that will provide flood control and stormwater quality treatment for a portion of Roseland lying east of the Florida East Coast ( FEC ) Railroad . The limits of the work are the east Roseland Watershed north of the City of Sebastian , east of the FEC Railroad , south of the St . Sebastian River, and west of US 19 including connecting tributaries . The plans and specifications to be provided to the COUNTY for use in constructing the work , shall be based on the COUNTY approved conceptual plan as modified during the progress meeting with SJRWMD and a landowner on June 9 , 2003 . The following work items will be installed by a combination of COUNTY forces and a Contractor selected through a bid process . 1 . Project work items include : A . Swale/Pipe Conveyance System from 78th Court to 81 st Ave . along 135th Street . This conveyance system will route water to the south lake . B . The south wet detention lake consisting of: 2 . 8 ± acres of water surface area , two (2 ) ± acres of perimeter buffer, inlet structure (s ) and an overflow structure . C . The north wet detention lake consisting of: 1 . 4 ± acres of water surface area , 1 . 2 ± acres of perimeter buffer, a wetland system to be incorporated into the lake design , an inlet structure and an overflow structure . D . The lake improvements and control structures will be located in easements or property to be acquired by the COUNTY . The north lake overflow structure shall run north on an easement that will be centered on the east property line of parcel no . 21 -30-38-00001 -0000-00004 . 1 . E . Wetland impacts are to be mitigated onsite through a combination of wetland enhancement and upland preservation . F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 1 of 6 • l SECTION II - COUNTY OBLIGATIONS The COUNTY agrees to provide the ENGINEER with the following material , data or services as required in connection with the work to be performed under this Agreement : A . Currently available drainage studies , survey drawings , plans , calculations and other data pertinent to the project . Be Title information and title opinion relating to land necessary for the project . C . Landowner authorizations to inspect the site (s ) with jurisdictional agencies to determine existing environmental conditions . D . Landowner negotiations to acquire easements and/or right-of-way necessary for the project. E . Property appraisal information for areas of potential acquisition . F . Soils testing as required , under the direction of the ENGINEER . G . Permit Fees SECTION III - SCOPE OF SERVICES A . The ENGINEER will perform all necessary environmental investigation , engineering design , surveying , drainage design , permitting , and incidental work for the drainage and related improvements to the east Roseland Area Stormwater Improvement project . Detailed Plans and Specifications shall be prepared so that the construction can be properly bid . The ENGINEER will prepare revised plans drainage calculations and resubmit the new information to St. Johns River Water Management District ( SJRWMD ) and the US Army Corps of Engineers ( USACOE ) . Be Based on a verbal authorization to proceed , the ENGINEER has developed the final re-design based on the COUNTY approved revised plan . The ENGINEER will continue to expedite the permitting schedule in an effort to meet certain grant contract milestone dates . C . The ENGINEER will strive to complete his work on the PROJECT within the time allowed by maintaining an adequate staff of registered engineers , biologists , draftsmen , and other employees on the work at all times . D . The ENGINEER shall report the status of this project to the Director of Public Works Department upon request and hold all drawings , calculations and revised work open to the inspection of the Director or his authorized agent at any time , upon reasonable request . E . TASK 04- PROJECT DEFINITION The ENGINEER will utilize previously prepared topographic and land surveying information required of all areas of work . Location of existing structures such as mailboxes , above and below ground utilities (to the extent visible , utilities will not be dug up ) , driveways , trees , etc. shall be provided . The ENGINEER will coordinate with the COUNTY to assure access to the property. The following itemized Engineering Services are included : A . Survey Work 1 . Prepare boundary surveys for land acquisition by COUNTY - Parcel 1 — the north lake area , ( Denton property) - Parcel 2 — the mitigation area , ( Denton property) - Parcel 3 — the south lake area , ( Hanson property) 2 . Prepare Conservation Easements Exhibits ( 1 and 2 ) F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 2 of 6 - Legal Descriptions - Sketch of conservation area B . Soils and Archaeological Site Investigation Reports 1 . Schedule and coordinate soil borings at the lake site . Review soils for use as a mining operation . COUNTY to pay sub- consultant direct . 2 . Schedule and coordinate an Archaeological Survey of the project site . C . Environmental report and permitting 1 . Prepare the drawings to implement an on -site mitigation plan Prepare the mitigation plan , including plantings , monitoring , etc . Ref: G . K . Environmental , Inc . — Proposed Draft Mitigation Plan dated June 2003 2 . Review meetings with permitting agencies , provide technical assistance in addressing requests for additional information . D . Permit Plans and Calculations 1 . S . J . R .W . M . D . Environmental Resource Permit , (40C4 ) 2 . U . S .A . C . O . E , E . Engineering final design and specifications 1 . Prepare plans and specifications for structures , piping , excavation , and swales as required for items listed in Section I . Specifications shall include summary of estimated quantities and soils reports from testing laboratory. Plans will include an overall drawing ( 1 " = 200 ft) and lake improvement drawings ( 1 " = 40 ft) . 2 . Review Shop Drawings and provide technical assistance to COUNTY staff F . Five (5 ) review meetings of design and specifications , with COUNTY staff. Three (3 ) review meeting with SJRWMD staff. Three ( 3 ) meetings with landowner. 1 . Meetings with SJRWMD to discuss mitigation plan and stormwater treatment levels 2 . Coordination with landowner, Robert Denton , regarding lake orientation 3 . 60 % drawings and specifications , ( preliminary design ) 4 . 90 % construction plans and specifications , (permit plans ) 5 . 100 % construction plans and specifications , (construction plans ) . COUNTY will supply their Standard Bid documents . G . The following items are specifically excluded from this work order and will be provided on an hourly rate basis as needed by the COUNTY . 1 . Follow through after we submit final plans and specs to the COUNTY , i . e . contract bidding , administration and/or inspection service , except as provided in item E (2 ) above . 2 . Additional engineering to resolve utility conflicts . SECTION IV - TIME FOR COMPLETION A . After receipt of written authorization to proceed , ENGINEER will proceed with the work based on the following schedule : • Submit 60 % plans and specifications - completed • COUNTY Review — completed FAPublic Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 3 of 6 • Submit 90 % plans - completed • COUNTY and SJRWMD and USACOE Review - pending • Submit 100 % plans (following receipt of permits ) - 21 days SECTION V — COMPENSATION The COUNTY agrees to pay , and the ENGINEER agrees to accept fee for services rendered according to the Scope of Services , Task 04 , identified in Section III of this work order with a maximum charge under this work order of $41 ,236 . The fee is summarized as follows : A . Survey Work 1 . Boundary Surveys $ 7 , 500 2 . Conservation Easements $ 2 , 500 B . Soils and Archaeological Site Investigation Reports 1 . Schedule and Coordinate Soil Investigation and Archaeological Survey. $ 540 ( note- the COUNTY shall pay for the soils report directly) 2 . Archaeological Survey $ 2 , 196 C . Environmental Report and Permitting 1 . On -site mitigation plan design . Develop options to mitigate $ 5 , 500 for wetland impacts due to redesign . Prepare grading and planting area plans . 2 . G . K . Environmental , Inc . — Mitigation and Monitoring $ 2 , 500 Plan consultant . ( See G . K . E . , Inc . proposal , 7/ 14/03 . ) D . Permit Plans and Calculations $ 13 , 500 E . Engineering - Final Design , and tech . assistance , 1 . Construction Plans , Specifications , Summary of Quantities $ 2 , 500 2 . Technical assistance and shop drawing review $ 1 , 500 F . Review Meetings with COUNTY , landowner, and SJRWMD $ 3 , 000 Total $41 , 236 SECTION VI = ADDITIONAL SERVICE WORK If changes are requested by the COUNTY or extra work is imposed to the COUNTY by the demands of certain regulatory agencies after the approval by the COUNTY of this AGREEMENT , and upon the issuance of a subsequent work order by the Director of Public Works Department , said extra work may commence in accordance with the following fee schedule : [The remainder of this page was left blank intentionally] FAPublic Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No . 10 - Carter Associates.doc Page 4 of 6 5 ENGINEER I ( Principal ) , . " . . $ 125 . 00/hr ENGINEER II ( Registered ) , . , , go * @ sea seamseesoss a 16 , 606 , 0004 1 , $ 90 . 00/hr ENGINEERIII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 65 . 00/hr ENGINEER TECHNICIAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50 . 00/hr SURVEYOR I ( Principal ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 115 . 00/hr SURVEYOR II ( Registered ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 85 . 00/hr SURVEYOR III ( Registered ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 75 . 00/hr SURVEY CREW (3-MAN ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 95 . 00/hr CADD TECHNICIAN , sees , as@ WIN oleo * $ 50 . 00/hr SECRETARY/WORD PROCESSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 35 . 00/hr INSPECTOR , I Nepalese@ * , Ise saw , loloseaespeas $ 40 . 00/hr RECORDING AND PERMIT FEES . . . . . . . . . . . ossesseepoes Dow assovessecost MATERIALS . . a , asselloyeall age as , a sea ' s peso , , one Bob 10609 * 1690 * 111asseacost SUB -CONSULTANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost REIMBURSABLE EXPENSES : Long Distance Calls , Federal express , etc . . . . . . . . . . . . . . . . Cost Blueprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0 . 25/sf Mylars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 . 75/sf Photocopy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 0 . 15 SECTION VII = PARTIAL PAYMENTS The COUNTY shall make monthly partial payments to the ENGINEER for all authorized work pertaining directly to this project performed during the previous calendar month . The ENGINEER shall submit invoices monthly for services performed and expenses incurred pursuant to this Agreement during the prior month . The ENGINEER shall submit duly certified invoices in duplicate to the Director of the Public Works Department . For lump sum line items , the amount submitted shall be the prorated amount due for all work performed to date under this phase , determined by applying the percentage of the work completed as certified by the ENGINEER , to the total due for this phase of the work . For time and material line items , the amount submitted shall be based on the actual hours worked and expenses incurred for the billing period . The amount of the partial payment due the ENGINEER for the work performed to date under these phases shall be an amount calculated in accordance with the previous paragraph , less ten percent ( 10 % ) of the invoice amount thus determined , which shall be withheld by the COUNTY as retainage , and less previous payments . Per F . S . 218 . 74 (2 ) , the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY receives the ENGINEER' s invoice . Per F . S . 218 . 74 (2 ) , the ten percent ( 10 % ) retainage withheld shall be paid in full to the ENGINEER by the COUNTY, on or before the forty-fifth day after the date of final acceptance of the Work by the Public Works Director. The Agreement is broken into deliverable units . No payment shall be made unless the Public Works Director has received and approved the work products required under the "Scope of Services Provided by the ENGINEER , " herein . [The remainder of this page was left blank intentionally] F :\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates .doc Page 5 of 6 SECTION VIII - VENUE Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida , or, in the event of a federal jurisdiction , in the United States District Court for the Southern District of Florida . SECTION IX - RELATIONSHIP TO MASTER AGREEMENT AND LAWS OF FLORIDA All conditions set forth in the MASTER AGREEMENT shall control unless otherwise specified in this WORK ORDER . This Contract, regardless of where executed , shall be governed by the laws of the State of Florida . IN WITNESS WHEREOF the parties hereto have executed these presents this 23rd day of September , 2003 . CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA 170821ST STREET BOARD OF COUNTY COMMISSIONERS VERO BEACH , FLORIDA 32960 BY: BY Dean F . Lue hje , Vic resident neth R . M cht, Chairman Approved by BCC : September 23 , 2003 Att . ffery K . Barton , er Circuit Court B a� Deputy Clerk Indian River Approved Date t County Administration ` Budget Ja es E . Chandler, County Administrator Legal Risk Management Public Works 4 Stonnw Management '/ ater Sanag04 A Qr�' Mement F :\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 6 of 6 / 14 / LI917 � YJ7 : JL / 12bb / b2a ` GK ENVIRONMENTAL INC PAGE 01 G. K. ENVIRONMENTAL, INC. EnYironmental Consulting GEORM R KU=YMs CES, CHI 155 McKee Lane Vero Beach, FL 32960 ' Phone 772-567-9129 Fax 772=567-6245 TO: George Simons FROM: George Kulczycld AV DATE: July 14, 2003 SUBJECT: Estimated Cost to Complete Roseland Stormwater Permitting / Mitigation Per your request, I estimate the cost for OKE permitting assistance to complete the above referenced project, to be $2, 500. 00. This includes work that was completed in June 2003 and the work completed so far in July. If you bave any questions, please give me a call.