Task 04 - Roseland Area Stormwater Improvements
WORK ORDER NO . 10 TO THE PROFESSIONAL
CIVIL SERVICES MASTER AGREEMENT
BETWEEN CARTER ASSOCIATES , INC . ,
DATED AUGUST 4 , 1998 AND
INDIAN RIVER COUNTY, FLORIDA
Pursuant to the Professional Services Agreement ( MASTER AGREEMENT ) dated
August 4 , 19989 by and between Indian River County , a political subdivision of the State of
Florida , hereinafter referred to as the COUNTY , and CARTER ASSOCIATES , INC . , 1708
21st Street , Vero Beach , Florida , hereinafter referred to as the ENGINEER , this Work Order
No . 10 is an extension of and hereby becomes a part of the MASTER AGREEMENT as
follows :
SECTION 1 - PROJECT LIMITS AND DESCRIPTION
These services will include the revised final design , permitting , and construction plan
preparation for the Roseland Area Stormwater project . The Roseland Area Stormwater
Improvement Project consists of the construction of two (2 ) stormwater detention ponds
( lakes ) , conveyance pipe and swales and control structures that will provide flood control and
stormwater quality treatment for a portion of Roseland lying east of the Florida East Coast
( FEC ) Railroad . The limits of the work are the east Roseland Watershed north of the City of
Sebastian , east of the FEC Railroad , south of the St . Sebastian River, and west of US 19
including connecting tributaries . The plans and specifications to be provided to the COUNTY
for use in constructing the work , shall be based on the COUNTY approved conceptual plan
as modified during the progress meeting with SJRWMD and a landowner on June 9 , 2003 .
The following work items will be installed by a combination of COUNTY forces and a
Contractor selected through a bid process .
1 . Project work items include :
A . Swale/Pipe Conveyance System from 78th Court to 81 st Ave . along 135th Street .
This conveyance system will route water to the south lake .
B . The south wet detention lake consisting of: 2 . 8 ± acres of water surface area ,
two (2 ) ± acres of perimeter buffer, inlet structure (s ) and an overflow structure .
C . The north wet detention lake consisting of: 1 . 4 ± acres of water surface area ,
1 . 2 ± acres of perimeter buffer, a wetland system to be incorporated into the
lake design , an inlet structure and an overflow structure .
D . The lake improvements and control structures will be located in easements or
property to be acquired by the COUNTY . The north lake overflow structure
shall run north on an easement that will be centered on the east property line of
parcel no . 21 -30-38-00001 -0000-00004 . 1 .
E . Wetland impacts are to be mitigated onsite through a combination of wetland
enhancement and upland preservation .
F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 1 of 6
• l
SECTION II - COUNTY OBLIGATIONS
The COUNTY agrees to provide the ENGINEER with the following material , data or
services as required in connection with the work to be performed under this Agreement :
A . Currently available drainage studies , survey drawings , plans , calculations and
other data pertinent to the project .
Be Title information and title opinion relating to land necessary for the project .
C . Landowner authorizations to inspect the site (s ) with jurisdictional agencies to
determine existing environmental conditions .
D . Landowner negotiations to acquire easements and/or right-of-way necessary
for the project.
E . Property appraisal information for areas of potential acquisition .
F . Soils testing as required , under the direction of the ENGINEER .
G . Permit Fees
SECTION III - SCOPE OF SERVICES
A . The ENGINEER will perform all necessary environmental investigation ,
engineering design , surveying , drainage design , permitting , and incidental work
for the drainage and related improvements to the east Roseland Area
Stormwater Improvement project . Detailed Plans and Specifications shall be
prepared so that the construction can be properly bid . The ENGINEER will
prepare revised plans drainage calculations and resubmit the new information
to St. Johns River Water Management District ( SJRWMD ) and the US Army
Corps of Engineers ( USACOE ) .
Be Based on a verbal authorization to proceed , the ENGINEER has developed the
final re-design based on the COUNTY approved revised plan . The ENGINEER
will continue to expedite the permitting schedule in an effort to meet certain
grant contract milestone dates .
C . The ENGINEER will strive to complete his work on the PROJECT within the
time allowed by maintaining an adequate staff of registered engineers ,
biologists , draftsmen , and other employees on the work at all times .
D . The ENGINEER shall report the status of this project to the Director of Public
Works Department upon request and hold all drawings , calculations and
revised work open to the inspection of the Director or his authorized agent at
any time , upon reasonable request .
E . TASK 04- PROJECT DEFINITION
The ENGINEER will utilize previously prepared topographic and land surveying
information required of all areas of work . Location of existing structures such
as mailboxes , above and below ground utilities (to the extent visible , utilities will
not be dug up ) , driveways , trees , etc. shall be provided . The ENGINEER will
coordinate with the COUNTY to assure access to the property.
The following itemized Engineering Services are included :
A . Survey Work
1 . Prepare boundary surveys for land acquisition by COUNTY
- Parcel 1 — the north lake area , ( Denton property)
- Parcel 2 — the mitigation area , ( Denton property)
- Parcel 3 — the south lake area , ( Hanson property)
2 . Prepare Conservation Easements Exhibits ( 1 and 2 )
F:\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 2 of 6
- Legal Descriptions
- Sketch of conservation area
B . Soils and Archaeological Site Investigation Reports
1 . Schedule and coordinate soil borings at the lake site .
Review soils for use as a mining operation . COUNTY to pay sub-
consultant direct .
2 . Schedule and coordinate an Archaeological Survey of the project site .
C . Environmental report and permitting
1 . Prepare the drawings to implement an on -site mitigation plan
Prepare the mitigation plan , including plantings , monitoring , etc .
Ref: G . K . Environmental , Inc . — Proposed Draft Mitigation Plan
dated June 2003
2 . Review meetings with permitting agencies , provide technical
assistance in addressing requests for additional information .
D . Permit Plans and Calculations
1 . S . J . R .W . M . D . Environmental Resource Permit , (40C4 )
2 . U . S .A . C . O . E ,
E . Engineering final design and specifications
1 . Prepare plans and specifications for structures , piping ,
excavation , and swales as required for items listed in Section I .
Specifications shall include summary of estimated quantities and
soils reports from testing laboratory. Plans will include an overall
drawing ( 1 " = 200 ft) and lake improvement drawings ( 1 " = 40 ft) .
2 . Review Shop Drawings and provide technical assistance to
COUNTY staff
F . Five (5 ) review meetings of design and specifications , with COUNTY
staff. Three (3 ) review meeting with SJRWMD staff. Three ( 3 ) meetings
with landowner.
1 . Meetings with SJRWMD to discuss mitigation plan and
stormwater treatment levels
2 . Coordination with landowner, Robert Denton , regarding lake
orientation
3 . 60 % drawings and specifications , ( preliminary design )
4 . 90 % construction plans and specifications , (permit plans )
5 . 100 % construction plans and specifications , (construction plans ) .
COUNTY will supply their Standard Bid documents .
G . The following items are specifically excluded from this work order and
will be provided on an hourly rate basis as needed by the COUNTY .
1 . Follow through after we submit final plans and specs to the
COUNTY , i . e . contract bidding , administration and/or inspection
service , except as provided in item E (2 ) above .
2 . Additional engineering to resolve utility conflicts .
SECTION IV - TIME FOR COMPLETION
A . After receipt of written authorization to proceed , ENGINEER will proceed with
the work based on the following schedule :
• Submit 60 % plans and specifications - completed
• COUNTY Review — completed
FAPublic Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 3 of 6
• Submit 90 % plans - completed
• COUNTY and SJRWMD and USACOE Review - pending
• Submit 100 % plans (following receipt of permits ) - 21 days
SECTION V — COMPENSATION
The COUNTY agrees to pay , and the ENGINEER agrees to accept fee for services
rendered according to the Scope of Services , Task 04 , identified in Section III of this work
order with a maximum charge under this work order of $41 ,236 . The fee is summarized as
follows :
A . Survey Work
1 . Boundary Surveys $ 7 , 500
2 . Conservation Easements $ 2 , 500
B . Soils and Archaeological Site Investigation Reports
1 . Schedule and Coordinate Soil Investigation and
Archaeological Survey. $ 540
( note- the COUNTY shall pay for the soils report directly)
2 . Archaeological Survey $ 2 , 196
C . Environmental Report and Permitting
1 . On -site mitigation plan design . Develop options to mitigate $ 5 , 500
for wetland impacts due to redesign . Prepare grading and
planting area plans .
2 . G . K . Environmental , Inc . — Mitigation and Monitoring $ 2 , 500
Plan consultant . ( See G . K . E . , Inc . proposal , 7/ 14/03 . )
D . Permit Plans and Calculations $ 13 , 500
E . Engineering - Final Design , and tech . assistance ,
1 . Construction Plans , Specifications , Summary of Quantities $ 2 , 500
2 . Technical assistance and shop drawing review $ 1 , 500
F . Review Meetings with COUNTY , landowner, and SJRWMD $ 3 , 000
Total $41 , 236
SECTION VI = ADDITIONAL SERVICE WORK
If changes are requested by the COUNTY or extra work is imposed to the COUNTY
by the demands of certain regulatory agencies after the approval by the COUNTY of this
AGREEMENT , and upon the issuance of a subsequent work order by the Director of Public
Works Department , said extra work may commence in accordance with the following fee
schedule :
[The remainder of this page was left blank intentionally]
FAPublic Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No . 10 - Carter Associates.doc Page 4 of 6
5
ENGINEER I ( Principal ) , . " . . $ 125 . 00/hr
ENGINEER II ( Registered ) , . , , go * @ sea seamseesoss a 16 , 606 , 0004 1 , $ 90 . 00/hr
ENGINEERIII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . $ 65 . 00/hr
ENGINEER TECHNICIAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50
. 00/hr
SURVEYOR I ( Principal ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. $ 115 . 00/hr
SURVEYOR II ( Registered ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
$ 85 . 00/hr
SURVEYOR III ( Registered ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. $ 75 . 00/hr
SURVEY CREW (3-MAN ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. $ 95 . 00/hr
CADD TECHNICIAN , sees , as@ WIN oleo * $ 50 . 00/hr
SECRETARY/WORD PROCESSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 35 . 00/hr
INSPECTOR , I Nepalese@ * , Ise saw , loloseaespeas $ 40 . 00/hr
RECORDING AND PERMIT FEES . . . . . . . . . . . ossesseepoes Dow assovessecost
MATERIALS . . a , asselloyeall age as , a sea ' s peso , , one Bob 10609 * 1690 * 111asseacost
SUB -CONSULTANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . Cost
REIMBURSABLE EXPENSES :
Long Distance Calls , Federal express , etc . . . . . . . . . . . . . . . . Cost
Blueprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . $0 . 25/sf
Mylars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . $ 1 . 75/sf
Photocopy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . $ 0 . 15
SECTION VII = PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the ENGINEER for all
authorized work pertaining directly to this project performed during the previous calendar
month . The ENGINEER shall submit invoices monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month .
The ENGINEER shall submit duly certified invoices in duplicate to the Director of
the Public Works Department . For lump sum line items , the amount submitted shall be the
prorated amount due for all work performed to date under this phase , determined by
applying the percentage of the work completed as certified by the ENGINEER , to the total
due for this phase of the work . For time and material line items , the amount submitted
shall be based on the actual hours worked and expenses incurred for the billing period .
The amount of the partial payment due the ENGINEER for the work performed to
date under these phases shall be an amount calculated in accordance with the previous
paragraph , less ten percent ( 10 % ) of the invoice amount thus determined , which shall be
withheld by the COUNTY as retainage , and less previous payments . Per F . S . 218 . 74 (2 ) ,
the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY
receives the ENGINEER' s invoice .
Per F . S . 218 . 74 (2 ) , the ten percent ( 10 % ) retainage withheld shall be paid in full to
the ENGINEER by the COUNTY, on or before the forty-fifth day after the date of final
acceptance of the Work by the Public Works Director.
The Agreement is broken into deliverable units . No payment shall be made unless
the Public Works Director has received and approved the work products required under
the "Scope of Services Provided by the ENGINEER , " herein .
[The remainder of this page was left blank intentionally]
F :\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates .doc Page 5 of 6
SECTION VIII - VENUE
Venue for any lawsuit brought by either party against the other party or otherwise arising
out of this Contract shall be in Indian River County, Florida , or, in the event of a federal
jurisdiction , in the United States District Court for the Southern District of Florida .
SECTION IX - RELATIONSHIP TO MASTER AGREEMENT AND LAWS OF FLORIDA
All conditions set forth in the MASTER AGREEMENT shall control unless otherwise
specified in this WORK ORDER .
This Contract, regardless of where executed , shall be governed by the laws of the
State of Florida .
IN WITNESS WHEREOF the parties hereto have executed these presents this 23rd
day of September , 2003 .
CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA
170821ST STREET BOARD OF COUNTY COMMISSIONERS
VERO BEACH , FLORIDA 32960
BY: BY
Dean F . Lue hje , Vic resident neth R . M cht, Chairman
Approved by BCC : September 23 , 2003
Att . ffery K . Barton , er Circuit Court
B a�
Deputy Clerk
Indian River Approved Date t
County
Administration `
Budget Ja es E . Chandler, County Administrator
Legal
Risk
Management
Public Works 4
Stonnw
Management
'/
ater
Sanag04 A Qr�'
Mement
F :\Public Works\KeithM\Stormwater Projects\Roseland\Work Orders\Work Order No. 10 - Carter Associates.doc Page 6 of 6
/ 14 / LI917 � YJ7 : JL / 12bb / b2a ` GK ENVIRONMENTAL INC
PAGE 01
G. K. ENVIRONMENTAL, INC.
EnYironmental Consulting
GEORM R KU=YMs CES, CHI
155 McKee Lane
Vero Beach, FL 32960 '
Phone 772-567-9129
Fax 772=567-6245
TO: George Simons
FROM: George Kulczycld AV
DATE: July 14, 2003
SUBJECT: Estimated Cost to Complete Roseland Stormwater Permitting / Mitigation
Per your request, I estimate the cost for OKE permitting assistance to complete
the above referenced project, to be $2, 500. 00. This includes work that was completed in
June 2003 and the work completed so far in July.
If you bave any questions, please give me a call.