Loading...
HomeMy WebLinkAbout2008-243WORK ORDER NUMBER 7 This Work Order Number 7is entered into as of this 12th day of August , 2007 pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of April 6, 2004 and amended effective April 7, 2007 (as so amended, the "Agreement"), by and between Indian River County, a political subdivision of the State of Florida ("COUNTY") and Schulke, Bittle & Stoddard, L.L.C., ("CONSULTANT"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit 1 (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit 2 (Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit 3 (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed- this Work Order as of the date first written above. CONSULTANT Schulke„ffiltle & Stoddard, L.L.0 By._ Jodah Bittle, P.E. Title: Managing Member BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY board of county commissioners Attest: J.K. Bprton, Clerk of Cou By Deputy Olerk Approved: A JoseA. Baird, County Administrator Appr ved as to form and legal sufficiency: �.. Marian E. Fell, Assistafrt �County Attorney Attachment 2 ESTIMATE COST OF IMPROVEMENTS NEW 12" WATER MAIN Attachment 1 Estimated Unit of Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 J§yrveStake Description Mobilization 30" x 12" Tapping SleeveNalve 12" H.D.P.E. Directional Bore 58th Ave Tem Jumper Connection 12" PVC Water Main 8" HDPE Dir. Bore 2 Bores at 77th St. Testi 12" M.J.G.V. Fire Hydrant Assembly W/6" G.V. Water Service 2" Blow Off Connect toEbstin Restoration Out/ As Builts Quantity 1 1 133 1 1182 120 1 2 2 1 1 1 1 1 Measure LS LS LF LS LF LF LS EA EA EA EA LS LS LS Unit Price $15 000.00 $11,500.00 $65.00 $2,500.00 $45.00 $45.00 $2X0.00 $21500.00 $4,500.00 $750.00 $750.00 $1,000.00 $50000.00 $3)000.00 Total Price $15 000.00 $11,500.00 $80645.00 $2,500.00 $53,190.00 $5,400 00 $2,000.00 $51000.N $9,000.00 $75000 _ $750.00 $1,000.00 $50000.00 $3,000.00 Subtotal: $122,735.00 Contingency 10%: 1 $12,273.50 Total Improvement Cost: 1 $13508.60 Attachment 1 EXHIBIT `1' SCOPE OF WORK WORK ORDER NO.7 Project Description The proposed project will provide engineering design and permitting for the modifications to approximately 1000 LF of 16" PVC Utility Transmission Main, which currently carries the Brine concentrate water from the IRC north R.O.W.T.P., to convert the utility main to a potable water distribution main. The main is located on 77`x' street. The modifications will include a portion of the main running from 58'x' ave. east on 77`x' st. approximately 1000 ft. The work is anticipated to include decommissioning the existing main, cleaning and disinfecting the main, testing the main for contaminailts, connecting the main to an existing 30" potable water main on 58'xave, constructing and connecting two (2) fire hydrants and a water service, and clearing the main for use to distribute potable water_ Scope of Services Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, preparation of an informal proposal of the work for submittal to the FDEP, preliminary water sample and laboratory test for contaminants, engineering design, preparation of construction plans, preparation and submittal of permit applications, construction administration and periodic construction field inspection for the construction and testing required for the utility main conversion lying within or adjacent to 58°1 ave and 77°' st. (see Attachment "A" for location and Attachment "B" for cost tabulation). The estimated construction cost of this project is S 118,937.50 In connection with this project, the County will provide the Engineer with a copy of any pertinent Preliminary Data or Reports; all available drawings in electronic AutoCADD format; all surveys, maps and other documentation in the possession of or reasonably available to the County that are pertinent to the project. Services not included in this scope of services are listed as follows: • Any services associated with assisting Indian River County in review and evaluation of patent related disputes, issues, or claims including preparing to serve or serving as a consultant or witness for Indian River County in litigation, arbitration, public or private hearings, or other legal administrative proceedings involving patent related disputes, issues or claims. • Any services in connection with the project not otherwise provided for in this scope of services. in order to execute this project in the most cost effective manner with the most aggressive schedule, Schulke, Bittle & Stoddard, L.L.C. is using the following consultants: -Houston, Schulke, Bittle & Stoddard, L.L.C. for necessary survey inforimation_ - HBEL, INC, for water sample testing. -Sitewerks, INC, to uncover existing utility main for inspection Attachment 3 A EXHIBIT *21 FEESCHEDULE WORK ORDER NO. 7 ,Nlethod and Amount of Compensation Schulkc. Rittle & Stoddard, L.L.C., proposes to provide the above Scope of Services based on the following lump sunt fees: Task 1. Surveving: Establish state plain coordinate. on Brine Main. $ 1.800.00 establish a baseline of construction and prepare topo survey along the route (locate EOP Brine Main and adjacent tore main) and detailed locations at the water main directional bore and connection point (N.E. contcr of 58`h aveJ77'h St.) I ask 2 Uncover the utility main. The main will be excavated for inspection $1.200.00 at three locations (potholed and inspected) Task 3 A sample of the brine solution will be tested for primary and secondary $2.250.00 maximum contaminant levels -(drinking water sweep) Task 4 Prepare an informal proposal for submittal to the FDEP which will $2,000.00 detail the project scope, testing, cleaning. disinfection and construction procedures proposed to convert and clear the main for potable water use. "['ask 5. Vngineering design, preparation of Construction Plans & $8.000.00 Specifications, preparation and submittal of permit applications. Preparation of bid documents. Task b. Assistance during bidding, bid evaluation, contracl award and Construction Administration (Pre -con, shop review, pay requests. $4.500.00 minor plan modifications, Periodic Construction!Field Inspections. As -Built review, final documentation for close-out and final certifications.) Total S 19.750.00 Printing and Reproduction The County shall make direct payment to our office for the cost of printing project plan sheets required lbr utility coordination and for copies of reports, drawings, specifications, and other pertinent items required by federal, state and local agencies from whom approval of the project must be obtained. material suppliers, and other interested parties. but may charge only for the actual cost of providing such copies based on the following tabulation: 8 1/2" x 1 I" $ 0.12/sheet Blue Line Prints $ 0.3331SF I 1" x 17" $ 0.50/sheet Reproducible Sepias $ 0.75/SF 31/2" diskette $ 2.00/each Reproducible Mylars $ 1.00/SF CD $ 4.00/each Application Fees The county shall make direct payment to our office for the actual cost of all construction permit application fees paid to jurisdictional agencies, including but not limited to: F.D.E.P.. I.R.C_ Engineering (Right -of -Way), I.R.F.W.C.D.. S.J.R.W.M.D._ F.D.O.T. 2 Attachment 4 EXHIBIT '31 TIME. SCHEDULE WORK ORDER NO. 7 Time of Performance The estimated time tame for completion of services from the approval of this Work Authorization is a follows: Surveying. Engineering Design & Preparation of 2 Months Construction Plans. specifications and Bid Documents 2. Submittal of Permit Applications and Receipt of permits ; Months And Bidding/Contract Award (Done Concurrenllv) 3. Construction 2 Months Remainder of Page Intentionally Left Blank Attachment 5