Loading...
HomeMy WebLinkAbout2004-102 b - = o4 Y INDIAN CHANGE ORDER NOLORIDAORIGINVAL PROJECT NO. 0378 L " t d , ACCOUNT NO : 10921441 -066510-02019 PROJECT : 26"' Street Bridge Replacement Over Range Line Canal (74"' Avenue) CONTRACTOR NAME/ADDRESS : Sheltra & Son Construction Company, Inc . PO Box 336 Indiantown, FL 34956 DATE : April 20, 2004 ITEM DESCRIPTION OF PRICE PRICE NO , CHANGE INCREASE DECREASE 1 Delete Item 430- 12-345 $ 191125 . 00 (Pipe conc . Culy. (Class III) )(75LF �72" CD) 2 Delete Item 425 -2- 101 $ 135600 . 00 (Manhole (Special)) (Drainage Structures S - 13 and S - 18 3 Delete Item 430- 11 -323 $61300 . 00 (Pipe Conc . Culv. (Class III)) (210 LF� 15 " SS 4 Delete Item 430-982-223 $735 . 00 (Mitered End Section, concrete Pipe Round) ( 15 " CD 5 Reduction — Item 425 -2-61 $67825 . 00 (Manholes P-8) (< 10 ' ) ( Structures S- 1 , S-20, & S-21 ) (3 Ea. @ $2, 275 . 00 6 Reduction — Item 400- 1 - 11 $665500 . 0 (Class 1 Concrete) (Retaining Walls) ( 140 CY $475 . 00 7 Addition — Item 120- 1 $ 8, 400 . 00 (Excavation, Regular) (600 CY @ $ 14 . 00 CADomnents and Settings\DICK DESTEINTocal Settings\Temporar_y Internet Files\Content. IE5\4DUFOD6N\0378 CO # I -Sheltra-04- 20-04-cjk. doc Page 1 of 4 T ITEM DESCRIPTION OF PRICE PRICE NO . CHANGE INCREASE DECREASE 8 Addition — Item 575 - 1 -4 $ 15600 . 00 (Sodding, St . Augustine) (800 SY @ $2 . 00) 9 Addition — Item 400-2-2 $71150 . 00 (Concrete Class II, Endwalls) ( 11 CY @ $650 . 00 10 Addition — Item 425 -2-63 $300 . 00 (Manholes (P- 8)) (< 10 ' } Partial (Furnish only) (Structures S- 1 , S -20, & S -21 ) (3 Ea. @ $ 1 ,200 . 00 11 Addition — Item 430- 12- $48 , 000 . 00 347 (Pipe Conc . Culv . (Class III)) (96 LF 44" CD @ $ 500 . 00 12 Addition — Item 430- 11 - $41272 . 00 338 (Pipe Conc. Culv. (Class III)) (48 LF � 36" SS @ $89. 00 13 Addition — Item 430- 171 - $5 , 460 . 00 23 (Pipe Culvert, 15 " ADS) (210 SF @ $26 . 00 14 Addition — Item 425 - 10 $ 11400 . 00 (Yard Drains ) ( 1 Ea @ $ 1 ,400 . 00 15 Addition — Item 430- 84- $ 850 . 00 023 (Corrugated Aluminum Pipe Culvert) ( 15 " SS) (20 LF @ $42 . 50) (includes concrete collar 16 Addition — Item 101 - 1 - 1 $650 . 00 (Transport 136 LF of 30" slotted Concrete Pipe Culvert from west side to east side of bride) ( 1 LS 17 Addition — Item 101 - 1 -2 $23200 . 00 (Mobilization / Demobilization / Restocking of 72" Concrete Pipe Culvert) ( 1 CADocuments and Settings\DICK DESTEINTocal Settings\Temporar_y Intemet Fi1es\Content. IE5\4DUF0D6N\0378 CO # 1 - Sheltra-04- 20-04-cjk. doc Page 2 of 4 t 4 ITEM DESCRIPTION OF PRICE PRICE NO . CHANGE INCREASE DECREASE LS 18 Addition — Item 550-73 $ 137200 . 00 (Fencing, Special) (300 LF 6 ' High Vinyl Fence @ $44 . 00 19 Addition — Item 110-3 $ 1 , 700 . 00 Removal of Existing Structures (Remove and dispose of existing drive, concrete endwalls and 36" CMP) ( 1 LS 20 Addition — Item 286- 1 - 1 $ 100 . 00 (Replace Existing Drive) (Replace existing drive to Village Green south entrance) (incl . 1 " Type S- 3 asphalt, 6" Coquina Shell Base and 12" Type B Stabilization) ( 1 LS 21 Addition — 400- 1 -2 $37200 . 00 (Concrete Endwall for 36" Concrete Pipe Culvert) ( 1 Ea. @ $3 , 200 . 00 Total Increase/Decrease $ 1031482 . 00 $ 113 , 085 . 00 NET CHANGE IN AMOUNT ($99603.00) ORIGINAL CONTRACT PRICE $ 1 , 128, 084 . 15 TIME 120 DAYS BEGIN DATE 2/ 16/04 DATE OF SUBSTANTIAL COMPLETION 6/ 16/04 DATE OF FINAL COMPLETION 7/ 17/04 CURRENT CONTRACT PRICE $ 1 . 128 , 084 . 15 TIME 120 DAYS BEGIN DATE 2/ 16/04 DATE OF SUBSTANTIAL COMPLETION 6/ 16/04 DATE OF FINAL COMPLETION 7/ 17/04 NET CHANGE PRICE/TIME FROM THIS CHANGE ORDER NO . 1 ($91603 . 0 44 DAYS NEW CONTRACT PRICE/TIME INCLUDING THIS CHANGE ORDER $ 1 , 118 .481 . 15 164 DAYS DATE OF SUBSTANTIAL COMPLETION 7/31 /04 DATE OF FINAL COMPLETION 8/30/04 CADocuments and Settings\DICK DESTEIMLocal Settings\Temporar_y Internet Fi1es\Content. 1E5\4DUF0D6N\0378 CO # 1 -Sheltra-04- 20-04-cjk. doc Page 3 of 4 INDIAN RIVER COUNTY, FLORIDA CHANGE ORDER NO. 1 PROJECT NO. 0378 APPROVAL ENGINEERS RECOMMENDATION : I have examined the above changes. They are necessary to satisfactorily complete the Contract . The price changes are r onable an I r Nommend that the changes be made. S= 3- a47� 1 stophe a , Jr. , Date County Erngineer I agree to the amendment of the 260' Street Bridge Contract as indicated on the attached (4) four page Change Order No , 1 . This Change Order shall become a part of the 26`h Street Bridge Contract and incorporated therein. SHELTRA & SON CONTRACTORS , INC . INDIAN RIVER COUNTY, FLORIDA r (Name and Title of Signatory, Caroline D . Ginn, Chai an Witnessed by: Approved by BCC May 4 , 2004 Attest : Jeffrey K . Barton, Clerk of Circuit Court r County Attorne Deputy Clerk Approved as to Form and Legal Sufficiency f( 1 [ eph A. Baird, ounty Administrator CADocuments and Settings\DICK DESTEINTocal Settings\Temporar_y Internet Fi1es\Content. IE5\4DUF0D6N\0378 CO # 1 -Sheltra-04- 20-04-cjk.doc Page 4 of 4