Loading...
HomeMy WebLinkAbout2008-417A GREAT AMERICAN INSURANCE COMPANY@ Administrative Office : 580 WALNUT STREET • CINCINNATI , OHIO 45202 • 513-369-5000 • FAX 513423-2740 The number of persons authorized by this power of attorney is not more than THREE No. 0 18509 - 95 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS : That the GREAT AMERICAN INSURANCE COMPANY, a corporation organized and existing under and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below its true and lawful attorney-in- fact, for it and in its name, place and stead to execute in behalf of the said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power TODD L. JOHNSON ALL OF ALL FRANCIS T. O' REARDON ORLANDO, FLORIDA $75,0009000 JOANN H . BEBOUT This Power of Attorney revokes all previous powers issued in behalf of the attorneys)-in-fact named above. IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 7TH day of FEBRUARY , 2008 Attest GREAT AMERICAN INSURANCE COMPANY STATE OF OHIO, COUNTY OF HAMILTON - ss : DAVID C. KITCHIN (513-412-4602) On this 7TH day of FEBRUARY 2008 before me personally appeared DAVID C. KITCHIN, to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is the Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed his name thereto by like authority. This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company by unanimous written consent dated March 1 , 1993 . RESOLVED: That the Divisional President, the Divisional Senior Vice President, the several Divisional Vice Presidents and Divisonal Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations its the nature thereof; to prescribe their respective duties and the respective limits of their authority; and to revoke any .such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond undertaking, contract or suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company. to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION r 1, RONALD C . HAYES , Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of �q ' Resolutions of the Board of Directors of March 1 , 1993 have not been revoked and are now in full force and effect. = ` 4 `t XV ' YvA Signed and sealed this day of � `Lq,,YU �� � .i;��;` • �` � , ,.�:` :,� ' '► 7T �f}sr Y� ntt IC 4 .0 f � li � 1• S1 029W (6/07) - .,i.' 4 _,,x, t ..... 6 . 08 Permits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 6 . 09 Laws and Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . . . . 22 6 . 10 Taxes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 6 . 11 Use of Site and Other Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 6 . 13 Safety and Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 6 . 14 Safety Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 6 . 15 Hazard Communication Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 6 . 16 Emergencies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 6 . 17 Shop Drawings and Samples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 6 . 18 Continuing the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 6 . 19 CONTRACTOR 's General Warranty and Guarantee . . . . . . . . . . . . . . . . m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P . . . . . 25 6 . 20 Indemnification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 ARTICLE7 - OTHER WORK . . . . . . . . . . . . . . m . . . . . . . . . . . . . . . . . . . 00 . . b . 0 . . . b . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . 26 7 . 01 Related Work at Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 7 . 02 Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 ARTICLE 8 - OWNER' S RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 01 Communications to Contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 02 Replacement of ENGINEER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 03 Furnish Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 04 Pay Promptly When Due . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 05 Lands and Easements; Reports and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 06 Insurance . . . . . . . . . . . . . . . 0 . 0 . . b . 0 . . . . . . . . 0 . . . . . . . . . . 0 . . . . . . . . 0 . . . . . . . . . . . . . . . . e . . . . . . . . m . 0 . . 0 . . . . . . . . m . . . . . . . . . . . . . . . & . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 07 Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 08 Inspections, Tests, and Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 09 Limitations on OWNER 's Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 . 10 Undisclosed Hazardous Environmental Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 8 . 11 Evidence of Financial Arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 ARTICLE 9 - ENGINEER' S STATUS DURING CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 01 OWNER 'S Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 02 Visits to Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 03 Project Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 04 Clarifications and Interpretations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 05 Authorized Variations in Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 . 06 Rejecting Defective Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 9 . 07 Shop Drawings, Change Orders and Payments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 9 . 09 Decisions on Requirements of Contract Documents and Acceptability of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 9 . 10 Limitations on ENGINEER 's Authority and Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 ARTICLE 10 - CHANGES IN THE WORK; CLAIMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 10 . 01 Authorized Changes in the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 10 . 02 Unauthorized Changes in the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 10 . 03 Execution of Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 10 .04 Notification to Surety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 10 . 05 Claims and Disputes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 ARTICLE 11 - COST OF THE WORK ; CASH ALLOWANCES ; UNIT PRICE WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 11 . 01 Cost of the Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 11 . 02 Cash Allowances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 11 . 03 Unit Price Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 ARTICLE 12 - CHANGE OF CONTRACT PRICE ; CHANGE OF CONTRACT TIMES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 00700 - General Conditions REV 04-07 . doc 00700 - 3 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc 12 . 01 Change of Contract Price . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 12 .02 Change of Contract Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 12 . 03 Delays Beyond CONTRACTOR 's Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 12 . 04 Delays Within CONTRACTOR 's Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 12 . 06 Delay Damages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 ARTICLE 13 - TESTS AND INSPECTIONS ; CORRECTION , REMOVAL OR ACCEPTANCE OF DEFECTIVEWORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 13 . 01 Notice of Defects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 13 . 02 Access to Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 13 . 03 Tests and Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 13 . 04 Uncovering Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 13 . 05 OWNER May Stop the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 13 . 06 Correction or Removal of Defective Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 13 . 07 Correction Period . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 13 . 08 Acceptance of Defective Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 13 . 09 OWNER May Correct Defective Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 14 . 01 Schedule of Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 14 . 02 Progress Payments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 14 . 03 CONTRACTOR 's Warranty of Title . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 14 .04 Substantial Completion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 14 . 05 Partial Utilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 14 . 06 Final Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 14 . 07 Final Payment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 14 . 09 Waiver of Claims . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 15 . 01 OWNER May Suspend Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 15 . 02 OWNER May Terminate for Cause . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 15 . 03 OWNER May Terminate For Convenience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 15 . 04 CONTRACTOR May Stop Work or Terminate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 ARTICLE 16 - DISPUTE RESOLUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 16 . 01 Methods and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 ARTICLE 17 - MISCELLANEOUS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 17 . 01 Giving Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 17 . 02 Computation of Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 17 . 03 Cumulative Remedies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 17 . 04 Survival of Obligations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 17 . 05 Controlling Law . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 00700 - General Conditions REV 04-07 . doc 00700 - 4 FAEngineermg\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc GENERAL CONDITIONS ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 10 . Claim--A demand or assertion by OWNER or CONTRACTOR seeking an adjustment of Contract Price or Contract Times , or both , or other 1 . 01 Defined Terms relief with respect to the terms of the Contract . A demand for money or services by a third party is not a A . Wherever used in the Contract Documents Claim . and printed with initial or all capital letters , the terms listed below will have the meanings indicated which 11 . Contract--The entire and integrated are applicable to both the singular and plural thereof. written agreement between the OWNER and CONTRACTOR concerning the Work . The Contract 1 . Addenda --Written or graphic instruments supersedes prior negotiations , representations , or issued prior to the opening of Bids which clarify, agreements , whether written or oral . correct, or change the Bidding Requirements or the Contract Documents . 12 . Contract Documents--The Contract Documents establish the rights and obligations of the 2 . Agreement--The written instrument which parties and include the Agreement , Addenda (which is evidence of the agreement between OWNER and pertain to the Contract Documents ) , CONTRACTOR' s CONTRACTOR covering the Work . Bid ( including documentation accompanying the Bid and any post Bid documentation submitted prior to the 3 . Application for Payment--The form Notice of Award ) when attached as an exhibit to the acceptable to ENGINEER which is to be used by Agreement , the Notice to Proceed , the Bonds , these CONTRACTOR during the course of the Work in General Conditions , the Supplementary Conditions , requesting progress or final payments and which is to the Specifications and the Drawings as the same are be accompanied by such supporting documentation more specifically identified in the Agreement , together as is required by the Contract Documents . with all Written Amendments , Change Orders , Work Change Directives , Field Orders , and ENGINEER' s 4 . Asbestos--Any material that contains written interpretations and clarifications issued on or more than one percent asbestos and is friable or is after the Effective Date of the Agreement . Approved releasing asbestos fibers into the air above current Shop Drawings and the reports and drawings of action levels established by the United States Occupa- subsurface and physical conditions are not Contract tional Safety and Health Administration . Documents . Only printed or hard copies of the items listed in this paragraph are Contract Documents . Files 5 . Bid--The offer or proposal of a bidder in electronic media format of text, data , graphics , and submitted on the prescribed form setting forth the the like that may be furnished by OWNER to prices for the Work to be performed . CONTRACTOR are not Contract Documents . 6 . Bidding Documents--The Bidding 13 . Contract Price--The moneys payable by Requirements and the proposed Contract Documents OWNER to CONTRACTOR for completion of the ( including all Addenda issued prior to receipt of Bids ) . Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of 7 . Bidding Requirements--The paragraph 11 . 03 in the case of Unit Price Work ) . Advertisement or Invitation to Bid , Instructions to Bidders , Bid security form , if. any, and the - Bid form 14 . Contract Times--The number of days or with any supplements . the dates stated in the Agreement to : ( i ) achieve Substantial Completion ; and ( ii ) complete the Work so 8 . Bonds--Performance and payment bonds that it is ready for final payment as evidenced by and other instruments of security. ENGINEER' s written recommendation of final pay- ment . 9 . Change Order--A document recommend- ed by ENGINEER which is signed by CONTRACTOR 15 . CONTRACTOR--The individual or entity and OWNER and authorizes an addition , deletion , or with whom OWNER has entered into the Agreement . revision in the Work or an adjustment in the Contract Price or the Contract Times , issued on or after the 16 . Cost of the Work--See paragraph 11 . 01 .A Effective Date of the Agreement . for definition . 00700 - General Conditions REV 04-07 .doc 00700 - 5 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc i i 17 . Drawings--That part of the Contract completion date or time prior to Substantial Comple- Documents prepared or approved by ENGINEER tion of all the Work . which graphically shows the scope , extent , and character of the Work to be performed by 28 . Notice of Award--The written notice by CONTRACTOR . Shop Drawings and other OWNER to the apparent successful bidder stating that CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful defined . bidder with the conditions precedent listed therein , OWNER will sign and deliver the Agreement . ill 18 . Effective Date of the Agreement--The i date indicated in the Agreement on which it becomes 29 . Notice to Proceed--A written notice given effective , but if no such date is indicated , it means the by OWNER to CONTRACTOR fixing the date on date on which the Agreement is signed and delivered which the Contract Times will commence to run and by the last of the two parties to sign and deliver . on which CONTRACTOR shall start to perform the Work under the Contract Documents . 19 . ENGINEER--The individual or entity named as such in the Agreement. 30 . OWNER--The individual , entity, public body, or authority with whom CONTRACTOR has i 20 . ENGINEER 's Consultant--An individual or entered into the Agreement and for whom the Work is entity having a contract with ENGINEER to furnish to be performed . services as ENGINEER' s independent professional associate or consultant with respect to the Project and 31 . Partial Utilization--Use by OWNER of a j who is identified as such in the Supplementary substantially completed part of the Work for the pur- Conditions . pose for which it is intended (or a related purpose ) prior to Substantial Completion of all the Work . 21 . Field Order--A written order issued by ENGINEER which requires minor changes in the 32 . PCBs--Polychlorinated biphenyls . Work but which does not involve a change in the Contract Price or the Contract Times . 33 . Petroleum--Petroleum , including crude oil 4 or any fraction thereof which is liquid at standard 22 . General Requirements--Sections of conditions of temperature . and pressure (60 degrees II Division 1 of the Specifications . The General Fahrenheit and 14 . 7 pounds per square inch Requirements pertain to all sections of the Specifica- absolute) , such as oil , petroleum , fuel oil , oil sludge , oil tions . refuse , gasoline , kerosene , and oil mixed with other non- Hazardous Waste and crude oils . 23 . Hazardous Environmental Condition--The presence at the Site of Asbestos , PCBs , Petroleum , 34 . Project--The total construction of which Hazardous Waste , or Radioactive Material in such the Work to be performed under the Contract quantities or circumstances that may present a Documents may be the whole , or a part as may be substantial danger to persons or property exposed indicated elsewhere in the Contract Documents . thereto in connection with the Work . 35 . Project Manual--The bound documentary 24 . Hazardous Waste--The term Hazardous information prepared for bidding and constructing the Waste shall have the meaning provided in Section Work . A listing of the contents of the Project Manual , 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes , is Section 6903 ) as amended from time to time . contained in the table( s ) of contents . i 25 . Laws and Regulations; Laws or Regulat- 36 . Radioactive Material--Source , special ions--Any and all applicable laws , rules , regulations , nuclear, or byproduct material as defined by the ordinances , codes , and orders of any and all govern- Atomic Energy Act of 1954 (42 USC Section 2011 et mental bodies , agencies , authorities , and courts seq . ) as amended from time to time . having jurisdiction . 37 . Resident Project Representative--The 26 . Liens--Charges , security interests , or authorized representative of ENGINEER who may be encumbrances upon Project funds , real property, or assigned to the Site or any part thereof. personal property. 38 . Samples--Physical examples of 27 . Milestone--A principal event specified in materials , equipment, or workmanship that are the Contract Documents relating to an intermediate representative of some portion of the Work and which 00700 - General Conditions REV 04-07 .doc 00700 - 6 I F1Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc I I establish the standards by which such portion of the Work will be judged . 47 . Unit Price Work--Work to be paid for on the basis of unit prices . 39 . Shop Drawings--All drawings , diagrams , illustrations , schedules , and other data or information 48 . Work--The entire completed construction which are specifically prepared or assembled by or for or the various separately identifiable parts thereof re- CONTRACTOR and submitted by CONTRACTOR to quired to be provided under the Contract Documents . illustrate some portion of the Work . Work includes and is the result of performing or providing all labor, services , and documentation 40 . Site--Lands or areas indicated in the necessary to produce such construction , and Contract Documents as being furnished by OWNER furnishing , installing , and incorporating all materials upon which the Work is to be performed , including and equipment into such construction , all as required rights-of-way and easements for access thereto , and by the Contract Documents . such other lands furnished by OWNER which are designated for the use of CONTRACTOR . 49 . . Work Change Directive--A written statement to CONTRACTOR issued on or . after the 41 . Specifications--That part of the Contract Effective Date of the Agreement and signed by Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering of materials , equipment , systems , standards , and an addition , deletion , or revision in the Work , or workmanship as applied to the Work and certain responding to differing or unforeseen subsurface or administrative details applicable thereto . physical conditions under which the Work is to be performed or to emergencies . A Work Change 42 . Subcontractor--An individual or entity Directive will not change the Contract Price or the having a direct contract with CONTRACTOR or with Contract Times but is evidence that the parties expect any other Subcontractor for the performance of a part that the change ordered or documented by a Work of the Work at the Site . Change Directive will be incorporated in a subse- quently issued Change Order following negotiations by 43 . Substantial Completion--The time at the parties as to its effect, if any, on the Contract Price which the Work ( or a specified part thereof) has or Contract Times . progressed to the point where , in the opinion of ENGINEER , the Work (or a specified part thereof) is 50 . Written Amendment--A written statement sufficiently complete , in accordance with the Contract modifying the Contract Documents , signed by Documents , so that the Work (or a specified part OWNER and CONTRACTOR on or after the Effective thereof) can be utilized for the purposes for which it is Date of the Agreement and normally dealing with the intended . The terms "substantially complete" and nonengineering or nontechnical rather than strictly " substantially completed " as applied to all or part of the construction-related aspects of the Contract Docu - Work refer to Substantial Completion thereof. ments . 44 . Supplementary Conditions--That part of 1 . 02 Terminology the Contract Documents which amends or supplements these General Conditions . A. Intent of Certain Terms or Adjectives 45 . Supplier--A manufacturer, fabricator, 1 . Whenever in the Contract Documents the supplier, distributor, materialman , or vendor having a terms " as allowed , " " as approved , " or terms of like direct contract with CONTRACTOR or with any effect or import are used , or the adjectives Subcontractor to furnish materials or equipment to be " reasonable , " " suitable , " " acceptable , " " proper, " incorporated in the Work by CONTRACTOR or any " satisfactory, " or adjectives of like effect or import Subcontractor. are used to describe an action or determination of ENGINEER as to the Work , it is intended that such 46 . Underground Facilities--All underground action or determination will be solely to evaluate , in pipelines , conduits , ducts , cables , wires , manholes , general , the completed Work for compliance with vaults , tanks , tunnels , or other such facilities or the requirements of and information in the Contract attachments , and any encasements containing such Documents and conformance with the design facilities , including those that convey electricity, gases , concept of the completed Project as a functioning steam , liquid petroleum products , telephone or other whole as shown or indicated in the Contract communications , cable television , water, wastewater, Documents ( unless there is a specific statement storm water, other liquids or chemicals , or traffic or indicating otherwise) . The use of any such term or other control systems . adjective shall not be effective to assign to ENGI- 00700 - General Conditions REV 04-07 .doc 00700 - 7 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.do600700 - General Conditions REV 04-07.doc i li f NEER any duty or authority to supervise or direct E . Unless stated otherwise in the Contract Docu- the performance of the Work or any duty or ments , words or phrases which have a well-known authority to undertake responsibility contrary to the technical or construction industry or trade meaning are provisions of paragraph 9 . 10 or any other provision used in the Contract Documents in accordance with of the Contract Documents . such recognized meaning . B . Day ARTICLE 2 - PRELIMINARY MATTERS 1 . The word " day' shall constitute a calendar day of 24 hours measured from midnight to the next midnight . 2 . 01 Delivery of Bonds C . Defective A . When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also 1 . The word "defective , " when modifying deliver to OWNER such Bonds as CONTRACTOR the word "Work , " refers to Work that is may be required to furnish . I unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents or does 2 . 02 Copies of Documents not meet the requirements of any inspection , reference standard , test , or approval referred to A . OWNER shall furnish to CONTRACTOR up j in the Contract Documents , or has been to ten copies of the Contract Documents . Additional damaged prior to ENGINEER's recom - copies will be furnished upon request at the cost of mendation of final payment ( unless responsi- reproduction . bility for the protection thereof has been assumed by OWNER at Substantial 2 . 03 Commencement of Contract Times; Notice Completion in accordance with paragraph to Proceed 14 . 04 or 14 . 05 ) . A . The Contract Times will commence to run on D . Furnish, Install, Perform, Provide the thirtieth day after the Effective Date of the Agree- ment or, if a Notice to Proceed is given , on the day 1 . The word "furnish , " when used in indicated in the Notice to Proceed . A Notice to Pro- connection with services , materials , or ceed may be given at any time within 30 days after the equipment , shall mean to supply and deliver Effective Date of the Agreement . In no event will the said services , materials , or equipment to the Contract Times commence to run later than the Site ( or some other specified location ) ready for sixtieth day after the day of Bid opening or the thirtieth use or installation and in usable or operable day after the Effective Date of the Agreement , condition . whichever date is earlier. 2 . The word " install , " when used in 2 . 04 Starting the Work I . connection with services , materials , or equipment , shall mean to put into use or place A . CONTRACTOR shall start to perform the in final position said services , materials , or Work on the date when the Contract Times com - equipment complete and ready for intended mence to run . No Work shall be done at the Site prior use . to the date on which the Contract Times commence to . run . 3 . The words " perform " or " provide , " when used in connection with services , 2 . 05 Before Starting Construction materials , or equipment, shall mean to furnish and install said services , materials , or A . CONTRACTOR 's Review of Contract Docu- equipment complete and ready for intended meets: Before undertaking each part of the Work , use . CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent 4 . When "furnish , " " install , " " perform , " or figures therein and all applicable field measurements . " provide" is not used in connection with services , CONTRACTOR shall promptly report in writing to I materials , or equipment in a context clearly ENGINEER any conflict, error, ambiguity, or requiring an obligation of CONTRACTOR, discrepancy which CONTRACTOR may discover and " provide" is implied . shall obtain a written interpretation or clarification from I ENGINEER before proceeding with any Work affected 00700 - General Conditions REV 04-07 .doc 00700 - 8 j FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc i I thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules to OWNER or ENGINEER for failure to report any conflict , error, ambiguity, or discrepancy in the A . Unless otherwise provided in the Contract Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the reasonably should have known thereof. first Application for Payment a conference attended by CONTRACTOR, ENGINEER, and others as appropri- B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - the Effective Date of the Agreement ( unless otherwise NEER as provided below the schedules submitted in specified in the General Requirements ) , CONTRAC- accordance with paragraph 2 . 05 . 13 . CONTRACTOR TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections and adjustments and to complete and resubmit the 1 . a preliminary progress schedule schedules . No progress payment shall be made to indicating the times ( numbers of days or dates ) CONTRACTOR until acceptable schedules are for starting and completing the various stages submitted to ENGINEER . of the Work , including any Milestones specified in the Contract Documents ; 1 . The progress schedule will be acceptable to ENGINEER if it provides an 2 . a preliminary schedule of Shop orderly progression of the Work to completion Drawing and Sample submittals which will list within any specified Milestones and the each required submittal and the times for sub- Contract Times . Such acceptance will not mitting , reviewing , and processing such impose on ENGINEER responsibility for the submittal ; and progress schedule , for sequencing , scheduling , or progress of the Work nor interfere with or 3 . a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR' s all of the Work which includes quantities and full responsibility therefor . prices of items which when added together equal the Contract Price and subdivides the 2 . CONTRACTOR' s schedule of Shop Work into component parts in sufficient detail to Drawing and Sample submittals will be serve as the basis for progress payments acceptable to ENGINEER if it provides 'a during performance of the Work . Such prices workable arrangement for reviewing and will include an appropriate amount of overhead processing the required submittals . and profit applicable to each item of Work . 3 . CONTRACTOR' s schedule of values will be acceptable to ENGINEER as to form the Site is started , CONTRACTOR and OW NE all and substance if it provides a reasonable each deliver to the other, with cop o each allocation of the Contract Price to component additional insured identified in t upplementary parts of the Work . Conditions , certificates of urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , evidence of insuranc ich either of them or any AMENDING , REUSE additional insur may reasonably request) which CONTRA and OWNER respectively are 3 . 01 Intent Gle 5 . A . The Contract Documents are comple- 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as if called for by all . to run , but before any Work at RheEldto arted , a B . It is the intent of the Contract Documents to conference attended by CONTRNGINEER, describe a functionally complete Project (or part there- and others as appropriate w' stablish a of) to be constructed in accordance with the Contract working understandin ong the parties as to the Documents . Any labor, documentation , services , Work and to dis the schedules referred to in para- materials , or equipment that may reasonably be graph 2 . 0 procedures for handling Shop Drawings inferred from the Contract Documents or from an er submittals , processing Applications for prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to OWNER . 00700 - General Conditions REV 04-07.doc 00700 - 9 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc C . Clarifications and interpretations of the failure to report any such conflict , error, Contract Documents shall be issued by ENGINEER ambiguity, or discrepancy unless CON- as provided in Article 9 . TRACTOR knew or reasonably should have known thereof. 3 . 02 Reference Standards B . Resolving Discrepancies A . Standards, Specifications, Codes, Laws, and Regulations 1 . Except as may be otherwise specifically stated in the Contract Documents , 1 . Reference to standards , specifica- the provisions of the Contract Documents shall tions , manuals , or codes of any technical take precedence in resolving any conflict , error , society, organization , or association , or to Laws ambiguity, or discrepancy between the or Regulations , whether such reference be provisions of the Contract Documents and : specific or by implication , shall mean the stan- dard , specification , manual , code , or Laws or a . the provisions of any standard , Regulations in effect at the time of opening of specification , manual , code , or instruction Bids (or on the Effective Date of the Agreement (whether or not specifically incorporated by if there were no Bids ) , except as may be reference in the Contract Documents ) ; or otherwise specifically stated in the Contract Documents . b . the provisions of any Laws or Regulations applicable to the performance 2 . No provision of any such standard , of the Work ( unless such an interpretation of specification , manual or code , or any instruction the provisions of the Contract Documents of a Supplier shall be effective to change the would result in violation of such Law or duties or responsibilities of OWNER, Regulation ) . CONTRACTOR, or ENGINEER , or any of their subcontractors , consultants , agents , or employ- 3 . 04 Amending and Supplementing Contract ees from those set forth in the Contract Documents Documents , nor shall any such provision or instruction be effective to assign to OWNER, A . The Contract Documents may be amended to ENGINEER, or any of ENGINEER's provide for additions , deletions , and revisions in the Consultants , agents , or employees any duty or Work or to modify the terms and conditions thereof in authority to supervise or direct the performance one or more of the following ways : ( i ) a Written of the Work or any duty or authority to Amendment; ( ii ) a Change Order; or ( iii ) a Work undertake responsibility inconsistent with the Change Directive . provisions of the Contract Documents . B . The requirements of the Contract Documents 3 . 03 Reporting and Resolving Discrepancies may be supplemented , and minor variations and deviations in the Work may be authorized , by one or A . Reporting Discrepancies more of the following ways : ( i ) a Field Order; ( ii ) ENGINEER's approval of a Shop Drawing or Sample ; 1 . If, during the performance of the or ( iii ) ENGINEER Is written interpretation or clarifi- Work , CONTRACTOR discovers any conflict , cation . error, ambiguity, or discrepancy within the Con- tract Documents or between the Contract 3 . 05 Reuse of Documents Documents and any provision of any Law or Regulation applicable to the performance of the A . CONTRACTOR and any Subcontractor or Work or of any standard , specification , manual Supplier or other individual or entity performing or or code , or of any instruction of any Supplier, furnishing any of the Work under a direct or indirect CONTRACTOR shall report it to ENGINEER in contract with OWNER: ( i ) shall not have or acquire writing at once . CONTRACTOR shall not any title to or ownership rights in any of the Drawings , proceed with the Work affected thereby ( except Specifications , or other documents (or copies of any in an emergency as required by paragraph thereof) prepared by or bearing the seal of 6 . 16 . A) until an amendment or supplement to ENGINEER or ENGINEER' s Consultant, including the Contract Documents has been issued by electronic media editions ; and ( ii ) shall not reuse any one of the methods indicated in paragraph of such Drawings , Specifications , other documents , or 3 . 04 ; provided , however, that CONTRACTOR copies thereof on extensions of the Project or any shall not be liable to OWNER or ENGINEER for other project without written consent of OWNER and 00700 - General Conditions REV 04-07.doc 00700 - 10 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc ENGINEER and specific written verification or Site (except Underground Facilities ) that ENGI - adaption by ENGINEER . This prohibition will survive NEER has used in preparing the Contract final payment , completion , and acceptance of the , Documents . Work , or termination or completion of the Contract . Nothing herein shall preclude CONTRACTOR from B . Limited Reliance by CONTRACTOR on retaining copies of the Contract Documents for record Technical Data Authorized: CONTRACTOR may rely purposes . upon the general accuracy of the "technical data " contained in such reports and drawings , but such reports and drawings are not Contract Documents . ARTICLE 4 - AVAILABILITY OF LANDS ; Such "technical data " is identified in the Supplementa- SUBSURFACE AND PHYSICAL CONDITIONS ; ry Conditions . Except for such reliance on such REFERENCE POINTS "technical data , " CONTRACTOR may not rely upon or make any Claim against OWNER , ENGINEER , or any of ENGINEER's Consultants with respect to : 4 . 01 Availability of Lands 1 . the completeness of such reports A . OWNER shall furnish the Site . OWNER shall and drawings for CONTRACTOR' s purposes , notify CONTRACTOR of any encumbrances or including , but not limited to , any aspects of the restrictions not of general application but specifically means , methods , techniques , sequences , and related to use of the Site with which CONTRACTOR procedures of construction to be employed by must comply in performing the Work . OWNER will CONTRACTOR , and safety precautions and obtain in a timely manner and pay for easements for programs incident thereto ; or permanent structures or permanent changes in existing facilities . If CONTRACTOR and OWNER are 2 . other data , interpretations , opinions , unable to agree on entitlement to or on the amount or and information contained in such reports or extent , if any, of any adjustment in the Contract Price shown or indicated in such drawings ; or or Contract Times , or both , as a result of any delay in OWNER' s furnishing the Site , CONTRACTOR may 3 . any CONTRACTOR interpretation of make a Claim therefor as provided in paragraph or conclusion drawn from any "technical data" 10 . 05 . or any such other data , interpretations , opinions , or information . B . Upon reasonable written request , OWNER shall furnish CONTRACTOR with a current statement 4 . 03 Differing Subsurface or Physical Conditions of record legal title and legal description of the lands upon which the Work is to be performed and A . Notice : If CONTRACTOR believes that any OWNER's interest therein as necessary for giving subsurface or physical condition at or contiguous to notice of or filing a mechanic' s or construction lien the Site that is uncovered or revealed either : against such lands in accordance with applicable Laws and Regulations . 1 . is of such a nature as to establish that any "technical data" on which CONTRAC- C . CONTRACTOR shall provide for all additional TOR is entitled to rely as provided in paragraph lands and access thereto that may be required for 4 . 02 is materially inaccurate ; or temporary construction facilities or storage of materials and equipment . 2 . is of such a nature as to require a change in the Contract Documents ; or 4 . 02 Subsurface and Physical Conditions 3 . differs materially from that shown or A . Reports and Drawings: The Supplementary indicated in the Contract Documents ; or Conditions identify: 4 . is of an unusual nature , and differs 1 . those reports of explorations and materially from conditions ordinarily tests of subsurface conditions at or contiguous encountered and generally recognized as inher- to the Site that ENGINEER has used in ent in work of the character provided for in the preparing the Contract Documents ; and Contract Documents ; 2 . those drawings of physical then CONTRACTOR shall , promptly after becoming conditions in or relating to existing surface or aware thereof and before further disturbing the subsurface structures at or contiguous to the subsurface or physical conditions or performing any 00700 - General Conditions REV 04-07 .doc 00700 - 11 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc Work in connection therewith ( except in an emergency c . CONTRACTOR failed to give the as required by paragraph 6 . 16 . A) , notify OWNER and written notice within the time and as re- ENGINEER in writing about such condition . quired by paragraph 4 . 03 .A . CONTRACTOR shall not further disturb such condition or perform any Work in connection therewith 3 . If OWNER and CONTRACTOR are ( except as aforesaid ) until receipt of written order to do unable to agree on entitlement to or on the so . amount or extent, if any, of any adjustment in the Contract Price or Contract Times , or both , a B . ENGINEER 's Review: After receipt of written Claim may be made therefor as provided in notice as required by paragraph 4 . 03 .A , ENGINEER paragraph 10 . 05 . However, OWNER, will promptly review the pertinent condition , determine ENGINEER , and ENGINEER's Consultants the necessity of OWNER' s obtaining additional shall not be liable to CONTRACTOR for any exploration or tests with respect thereto , and advise claims , costs , losses , or damages ( including OWNER in writing (with a copy to CONTRACTOR) of but not limited to all fees and charges of ENGINEER' s findings and conclusions . engineers , architects , attorneys , and other professionals and all court or arbitration or other C . Possible Price and Times Adjustments dispute resolution costs ) sustained by CONTRACTOR on or in connection with any 1 . The Contract Price or the Contract other project or anticipated project . Times , or both , will be equitably adjusted to the extent that the existence of such differing 4 . 04 Underground Facilities subsurface or physical condition causes an in- crease or decrease in CONTRACTOR' s cost A . Shown or Indicated: The information and data of, or time required for, performance of the shown or indicated in the Contract Documents with Work ; subject , however , to the following : respect to existing Underground Facilities at or contiguous to the Site is based on information and a . such condition must meet any one or data furnished to OWNER or ENGINEER by the more of the categories described in para- owners of such Underground Facilities , including graph 4 . 03 .A; and OWNER, or by others . Unless it is otherwise expressly provided in the Supplementary Conditions : b . with respect to Work that is paid for on a Unit Price Basis , any adjustment in 1 . OWNER and ENGINEER shall not Contract Price will be subject to the be responsible for the accuracy or com - provisions of paragraphs 9 . 08 and 11 . 03 . pleteness of any such information or data ; and 2 . CONTRACTOR shall not be entitled 2 . the cost of all of the following will be to any adjustment in the Contract Price or included in the Contract Price , and CONTRAC- Contract Times if: TOR shall have full responsibility for: a . CONTRACTOR knew of the a . reviewing and checking all such existence of such conditions at the time information and data , CONTRACTOR made a final commitment to OWNER in respect of Contract Price and b . locating all Underground Facilities Contract Times by the submission of a Bid shown or indicated in the Contract or becoming bound under a negotiated Documents , contract; or c . coordination of the Work with the b . the existence of such condition could owners of such Underground Facilities , reasonably have been discovered or including OWNER , during construction , and revealed as a result of any examination , investigation , exploration , test , or study of d . the safety and protection of all such the Site and contiguous areas required by Underground Facilities and repairing any the Bidding Requirements or Contract damage thereto resulting from the Work . Documents to be conducted by or for CON - TRACTOR prior to CONTRACTOR' s B . Not Shown or Indicated making such final commitment ; or 1 . If an Underground Facility is uncovered or revealed at or contiguous to the 00700 - General Conditions REV 04-07.doc 00700 - 12 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc Site which was not shown or indicated , or not property monuments by professionally qualified shown or indicated with reasonable accuracy in personnel . the Contract Documents , CONTRACTOR shall , promptly after becoming aware thereof and 4 . 06 Hazardous Environmental Condition at Site before further disturbing conditions affected thereby or performing any Work in connection A. Reports and Drawings: Reference is made to therewith (except in an emergency as required the Supplementary Conditions for the identification of by paragraph 6 . 16 .A) , identify the owner of those reports and drawings relating to a Hazardous such Underground Facility and give written Environmental Condition identified at the Site , if any, notice to that owner and to OWNER and ENGI - that have been utilized by the ENGINEER in the NEER . ENGINEER will promptly review the preparation of the Contract Documents . Underground Facility and determine the extent, if any, to which a change is required in the B . Limited Reliance by CONTRACTOR on Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely the consequences of the existence or location upon the general accuracy of the "technical data" of the Underground Facility. During such time , contained in such reports and drawings , but such CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents . safety and protection of such Underground Such "technical data " is identified in the Facility . Supplementary Conditions . Except for such reliance on such "technical data , " CONTRACTOR may not rely 2 . If ENGINEER concludes that a upon or make any Claim against OWNER, change in the Contract Documents is required , ENGINEER or any of ENGINEER' s Consultants with a Work Change Directive or a Change Order respect to : will be issued to reflect and document such consequences . An equitable adjustment shall 1 . the completeness of such reports be made in the Contract Price or Contract and drawings for CONTRACTOR's purposes , Times , or both , to the extent that they are including , but not limited to , any aspects of the attributable to the existence or location of any means , methods , techniques , sequences and Underground Facility that was not shown or procedures of construction to be employed by indicated or not shown or indicated with CONTRACTOR and safety precautions and reasonable accuracy in the Contract programs incident thereto ; or Documents and that CONTRACTOR did not know of and could not reasonably have been 2 . other data , interpretations , opinions expected to be aware of or to have anticipated . and information contained in such reports or If OWNER and CONTRACTOR are unable to shown or indicated in such drawings ; or agree on entitlement to or on the amount or extent, if any, of any such adjustment in 3 . any CONTRACTOR interpretation of Contract Price or Contract Times , OWNER or or conclusion drawn from any "technical data" CONTRACTOR may make a Claim therefor as or any such other data , interpretations , opinions provided in paragraph 10 . 05 . or information . 4 . 05 Reference Points C . CONTRACTOR shall not be responsible for any Hazardous Environmental Condition uncovered or A . OWNER shall provide engineering surveys to revealed at the Site which was not shown or indicated establish reference points for construction which in in Drawings or Specifications or identified in the ENGINEER' s judgment are necessary to enable Contract Documents to be within the scope of the CONTRACTOR to proceed with the Work . CON- Work . CONTRACTOR shall be responsible for a TRACTOR shall be responsible for laying out the Hazardous Environmental Condition created with any Work , shall protect and preserve the established materials brought to the Site by CONTRACTOR, reference points and property monuments , and shall Subcontractors , Suppliers , or anyone else for whom make no changes or relocations without the prior CONTRACTOR is responsible . written approval of OWNER . CONTRACTOR shall report to ENGINEER whenever any reference point or D . If CONTRACTOR encounters a Hazardous property monument is lost or destroyed or requires Environmental Condition or if CONTRACTOR or relocation because of necessary changes in grades or anyone for whom CONTRACTOR is responsible locations , and shall be responsible for the accurate creates a Hazardous Environmental Condition , replacement or relocation of such reference points or CONTRACTOR shall immediately: ( i ) secure or otherwise isolate such condition ; ( ii ) stop all Work in 00700 - General Conditions REV 04-07.doc 00700 - 13 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc connection with such condition and in any area by CONTRACTOR or by anyone for whom affected thereby (except in an emergency as required CONTRACTOR is responsible . Nothing in this para- by paragraph 6 . 16 ) ; and ( iii ) notify OWNER and ENGI - graph 4 . 06 . E shall obligate OWNER to indemnify any NEER ( and promptly thereafter confirm such notice in individual or entity from and against the consequences writing ) . OWNER shall promptly consult with of that individual ' s or entity' s own negligence . ENGINEER concerning the necessity for OWNER to retain a qualified expert to evaluate such condition or H . To the fullest extent permitted by Laws and take corrective action , if any. Regulations , CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER' s E . CONTRACTOR shall not be required to Consultants , and the officers , directors , partners , resume Work in connection with such condition or in employees , agents , other consultants , and any affected area until after OWNER has obtained subcontractors of each and any of them from and any required permits related thereto and delivered to against all claims , costs , losses , and damages CONTRACTOR written notice : ( i ) specifying that such ( including but not limited to all fees and charges of condition and any affected area is or has been engineers , architects , attorneys , and other rendered safe for the resumption of Work ; or ( ii ) professionals and all court or arbitration or other specifying any special conditions under which such dispute resolution costs ) arising out of or relating to a Work may be resumed safely. If OWNER and Hazardous Environmental Condition created by CONTRACTOR cannot agree as to entitlement to or CONTRACTOR or by anyone for whom on the amount or extent, if any, of any adjustment in CONTRACTOR is responsible . Nothing in this Contract Price or Contract Times , or both , as a result paragraph 4 . 06 . F shall obligate CONTRACTOR to of such Work stoppage or such special conditions indemnify any individual or entity from and against the under which Work is agreed to be resumed by consequences of that individual ' s or entity' s own negli - CONTRACTOR, either party may make a Claim gence . therefor as provided in paragraph 10 . 05 . I . The provisions of paragraphs 4 . 02 , 4 . 03 , and F . If after receipt of such written notice 4 . 04 are not intended to apply to a Hazardous CONTRACTOR does not agree to resume such Work Environmental Condition uncovered or revealed at the based on a reasonable belief it is unsafe , or does not Site . agree to resume such Work under such special condi - tions , then OWNER may order the portion of the Work that is in the area affected by such condition to be ARTICLE 5 - BONDS AND INSURANCE deleted from the Work . If OWNER and CON - TRACTOR cannot agree as to entitlement to or on the amount or extent , if any, of an adjustment in Contract 5 . 01 Performance, Payment, and Other Bonds Price or Contract Times as a result of deleting such portion of the Work , then either party may make a Claim therefor as provided in paragraph 10 . 05 . and payment Bonds , each in an amount at leas ual OWNER may have such deleted portion of the Work to the Contract Price as security for the f ul pertor- performed by OWNER' s own forces or others in mance and payment of all TRACTOR' s accordance with Article 7 . obligations under the Contra ocuments . These Bonds shall remain in e t at least until one year G . To the fullest extent permitted by Laws and after the date wh inal payment becomes due , Regulations , OWNER shall indemnify and hold except as pro ' d otherwise by Laws or Regulations harmless CONTRACTOR, Subcontractors , ENGI - or by the ntract Documents . CONTRACTOR shall NEER , ENGINEER' s Consultants and the officers , als rnish such other Bonds as are required by the directors , partners , employees , agents , other . consultants , and subcontractors of each and any of them from and against all claims , costs , losses , and B . All Bonds shall be in the form prescribed by damages ( including but not limited to all fees and the Contract Documents except as provided otherwise charges of engineers , architects , attorneys , and other by Laws or Regulations , and shall be executed by professionals and all court or arbitration or other such sureties as are named in the current list of " Com - dispute resolution costs ) arising out of or relating to a panies Holding Certificates of Authority as Acceptable Hazardous Environmental Condition , provided that Sureties on Federal Bonds and as Acceptable such Hazardous Environmental Condition : ( i ) was not Reinsuring Companies " as published in Circular 570 shown or indicated in the Drawings or Specifications (amended ) by the Financial Management Service , or identified in the Contract Documents to be included Surety Bond Branch , U . S . Department of the within the scope of the Work , and ( ii ) was not created Treasury . All Bonds signed by an agent must be 00700 - General Conditions REV 04-07 .doc 00700 - 14 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Docurments\The Enclave.doc\00700 - General Conditions REV 04-07 .doc accompanied by a certified copy of such agent' s authority to act . 2 . claims for damages because of bodily injury, occupational sickness or disease , C . If the surety on any Bond furnished by CON - or death of CONTRACTOR's employees ; TRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state 3 . claims for damages because of where any part of the Project is located or it ceases to bodily injury, sickness or disease , or death of meet the requirements of paragraph 5 . 01 . 6 , any person other than CONTRACTOR' s CONTRACTOR shall within 20 days thereafter employees ; substitute another Bond and surety, both of which shall comply with the requirements of paragraphs 4 . claims for damages insured by 5 . 01 . 13 and 5 . 02 . reasonably available personal injury liability coverage which are sustained : ( i ) by any person 5 . 02 Licensed Sureties and Insurers as a result of an offense directly or indirectly related to the employment of such person by A . All Bonds and insurance required by the CONTRACTOR, or ( ii ) by any other person for Contract Documents to be purchased and maintained any other reason ; by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed 5 . claims for damages , other than to the or authorized in the jurisdiction in which the Project is Work itself, because of injury to or destruction located to issue Bonds or insurance policies for the of tangible property wherever located , including limits and coverages so required . Such surety and loss of use resulting therefrom ; and insurance companies shall also meet such additional requirements and qualifications as may be provided in 6 . claims for damages because of the Supplementary Conditions . bodily injury or death of any person or property damage arising out of the ownership , mainte- 5 . 03 Certificates of Insurance nance or use of any motor vehicle . A . CONTRACTOR shall deliver to OWNER, with B . The policies of insurance so required by this copies to each additional insured identified in the paragraph 5 . 04 to be purchased and maintained shall : Supplementary Conditions , certificates of insurance ( and other evidence of insurance requested by OWN- 1 . with respect to insurance required by ER or any other additional insured ) which CON - paragraphs 5 . 04 .A . 3 through 5 . 04 .A. 6 inclusive , TRACTOR is required to purchase and maintain . include as additional insureds ( subject to any customary exclusion in respect of professional to each additional insured identified e Supple- liability) OWNER , ENGINEER , ENGINEER's mentary Conditions , certi ' of insurance (and Consultants , and any other individuals or other evidence rance requested by CONTRAC- entities identified in the Supplementary Condi - TO y other additional insured ) which OWNER tions , all of whom shall be listed as additional insureds , and include coverage for the respec- tive officers , directors , partners , employees , 5 . 04 CONTRACTOR 's Liability Insurance agents , and other consultants and subcontractors of each and any of all such A . CONTRACTOR shall purchase and maintain additional insureds , and the insurance afforded such liability and other insurance as is appropriate for to these additional insureds shall provide the Work being performed and as will provide primary coverage for all claims covered protection from claims set forth below which may arise thereby; out of or result from CONTRACTOR's performance of the Work and CONTRACTOR' s other obligations 2 . include at least the specific under the Contract Documents , whether it is to be per- coverages and be written for not less than the formed by CONTRACTOR, any Subcontractor or limits of liability provided in the Supplementary Supplier , or by anyone directly or indirectly employed Conditions or required by Laws or Regulations , by any of them to perform any of the Work , or by whichever is greater; anyone for whose acts any of them may be liable : 3 . include completed operations 1 . claims under workers' compensation , insurance ; disability benefits , and other similar employee benefit acts ; 00700 - General Conditions REV 04-07.doc 00700 - 15 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 4 . include contractual liability insurance covering CONTRACTOR' s indemnity individuals or entities identified in Yrs obligations under paragraphs 6 . 07 , 6 . 11 , and Supplementary Conditions , and the offi 6 . 20 ; directors , partners , employees , agent , and other consultants and subcontractors f each 5 . contain a provision or endorsement and any of them , each of whom iseemed to that the coverage afforded will not be canceled , have an insurable interest and sh be listed as materially changed or renewal refused until at an additional insured ; least thirty days prior written notice has been given to OWNER and CONTRACTOR and to 2 : be written on a B ' der's Risk "all-risk" each other additional insured identified in the or open peril or special auses of loss policy Supplementary Conditions to whom a certificate form that shall at lea include insurance for of insurance has been issued ( and the physical loss or da ge to the Work , tempo- certificates of insurance furnished by the CON- rary buildings , fal work , and materials and TRACTOR pursuant to paragraph 5 . 03 will so equipment in tra it, and shall insure against at provide ) ; least the follo ng perils or causes of loss : fire , lightning , a nded coverage , theft , vandalism 6 . remain in effect at least until final and mali us mischief, earthquake , collapse , payment and at all times thereafter when CON - debris r moval , demolition occasioned by en- TRACTOR may be correcting , removing , or force ent of Laws and Regulations , water replacing defective Work in accordance with da age , and such other perils or causes of paragraph 13 . 07 ; and I s as may be specifically required by the e. , ditions- 7 . with respect to completed operations insurance , and any insurance coverage written on a claims-made basis , remain in effect for at least two years after final payment ( and CONTRACTOR shall furnish OWNER and a gineers and architects ) ; each other additional insured identified in the Supplementary Conditions , to whom a cover materials and equipment certificate of insurance has been issued , store at the Site or at another location that was evidence satisfactory to OWNER and any such agree to in writing by OWNER prior to being additional insured of continuation of such incorpo ted in the Work , provided that such insurance at final payment and one year materials and equipment have been included in thereafter) . an Applic tion for Payment recommended by ENGINEE 5 . 05 OWNER 's Liability Insurance 5 . allo for partial utilization of the Work by OWNER ; provided by CONTRACTOR under par 5 . 04 , OWNER, at OWNER' s option y purchase and 6 . include sting and startup ; and maintain at OWNER' S se OWNER' s own liability insurance asi protect OWNER against claims 7 . be maintai ed in effect until final pay- ment is made unles otherwise agreed to in writing by OWNER, CONTRACTOR , and ENGINEER with 30 day written notice to each 5 . 06 Property Insurance other additional insured t whom a certificate of mentary Conditions , OWNER shall purch a d maintain property insurance upon the W at the ite in the amount of the full replace t cost th reof R66lFaRGe a6 rRay be Fequilted by the Supplemental ( subject to such deductible ounts as m y be provided in the Supplem ry Conditions or r quired by Laws and Regul s ) . This insurances II : Subsentrasters , € NEIN € €F €� to;"�E€R' s r ;- I the interests o OWNER , 00700 - General Conditions REV 04-07.doc 00700 - 16 F:\Engineering\Special Projects\Enclave Subdivision\Contras Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc WAWkWAIUMMIMIKKILWANNSWA Mill 111 11 111111111111111111 1111111 Awiffillift,"I'AILWAM� w • ♦ . • - • . . . •• • • . . r . . . • . . • • • . . • . . - • . . u • . • . • • . • - . . . . r . • - • - . • . a u . • • - a a a a (. • • • . • • . . a a a a a Is • • . • . III, w . •. .. - . • . . - • . • • • r • u • • . . � . • - INw • • • I • • • ' • ' r' • • . - • . - •••ate •'•' \• • • • a • ' • IF w IF 0 do • • w • • • • ' . . • • . I, a • • \ 1 • • . • . . • . ^tf7== . . . .IIN IN v N • ' • • ' • ' • • 1 • • • • • • - • . r • - • • _ • • . 01 0 IN O 1 \ • • . • RED • • • . • • qM mm . . . . . • . IS 1o.r.1r.Twur.". . u • _ _ MINA I, Am am • - 11 / 1 • • 1 ' 1 • • 5 . 08 Receipt and Application of Insurance and a Change Order shall be issued to adjust the Proceeds A. ARY inr8d, less—und. r the —p9liGieG of 5 . 10 Partial Utilization, Acknowledgment of insurance required by paragraph 5 . 06 will be adjust Property Insurer with OWNER and made payable to OWNER as fiduciary for the insureds , as their interests may A . If OWNER finds it necessary to occupy or use appear , subject to the requirements of any ap icable a portion or portions of the Work prior to Substantial mortgage clause and of paragraph 5 . 08 . B . WNER Completion of all the Work as provided in paragraph shall deposit in a separate account any money so 14 . 05 , no such use or occupancy shall commence received and shall distribute it in accorda ce with such before the insurers providing the property insurance agreement as the parties in interest y reach . If no pursuant to paragraph 5 . 06 have acknowledged notice other special agreement is reach the damaged thereof and in writing effected any changes in cover- Work shall be repaired or replac d , the moneys so age necessitated thereby. The insurers providing the received applied on account t reof, and the Work property insurance shall consent by endorsement on and the cost thereof cover d by an appropriate the policy or policies , but the property insurance shall Change Order or Written A ndment . not be canceled or permitted to lapse on account of any such partial use or occupancy. B . OWNER as fi ciary shall have power to adjust and settle any I s with the insurers unless one of the parties in inter st shall object in writing within 15 ARTICLE 6 - CONTRACTOR' S RESPONSIBILITIES days after the currence of loss to OWNER' s exercise of this ower. If such objection be made , OWNER as fl uciary shall make settlement with the 6 . 01 Supervision and Superintendence insurers in cordance with such agreement as the parties in ' terest may reach . If no such agreement A . CONTRACTOR shall supervise , inspect, and among a parties in interest is reached , OWNER as direct the Work competently and efficiently, devoting fiduci shall adjust and settle the loss with the such attention thereto and applying such skills and insu rs and , if required in writing by any party in expertise as may be necessary to perform the Work in in rest, OWNER as fiduciary shall give bond for the accordance with the Contract Documents . CON- TRACTOR shall be solely responsible for the means , methods , techniques , sequences , and procedures of 5 . 09 Acceptance of Bonds and Insurance; Option construction , but CONTRACTOR shall not be to Replace responsible for the negligence of OWNER or ENGINEER in the design or specification of a specific means , method , technique , sequence , or procedure of objection to the coverage afforded by or other p vi- construction which is shown or indicated in and sions of the Bonds or insurance required be expressly required by the Contract Documents . CON- purchased and maintained by the other party ' accor- TRACTOR shall be responsible to see that the dance with Article 5 on the basis of non -co ormance completed Work complies accurately with the Contract with the Contract Documents , the objecti party shall Documents . so notify the other party in writing with 10 days after receipt of the certificates ( or other evidence B . At all times during the progress of the Work , requested ) required by paragrap 2 . 05 . C . OWNER CONTRACTOR shall assign a competent resident and CONTRACTOR shall eac provide to the other superintendent thereto who shall not be replaced such additional information respect of insurance without written notice to OWNER and ENGINEER provided as the other m reasonably request . If except under extraordinary circumstances . The either party does not pu hase or maintain all of the superintendent will be CONTRACTOR' s Bonds and insurance equired of such party by the representative at the Site and shall have authority to Contract Document such party shall notify the other act on behalf of CONTRACTOR . All communications party in writing of ch failure to purchase prior to the given to or received from the superintendent shall be start of the Wor , or of such failure to maintain prior to binding on CONTRACTOR . any change in the required coverage . Without prejudice to ny other right or remedy, the other party 6 . 02 Labor; Working Hours may elec toobtain equivalent Bonds or insurance to protect uch other party's interests at the expense of A . CONTRACTOR shall provide competent , the rty who was required to provide such coverage , suitably qualified personnel to survey, lay out, and construct the Work as required by the Contract Docu - 00700 - General Conditions REV 04-07 .doc 00700 - 18 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc ments . CONTRACTOR shall at all times maintain ly will comply with any provisions of the General good discipline and order at the Site . Requirements applicable thereto . B . Except as otherwise required for the safety or 2 . Proposed adjustments in the protection of persons or the Work or property at the progress schedule that will change the Contract Site or adjacent thereto , and except as otherwise Times (or Milestones ) shall be submitted in stated in the Contract Documents , all Work at the Site accordance with the requirements of Article 12 . shall be performed during regular working hours , and Such adjustments may only be made by a CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor- performance of Work on Saturday, Sunday, or any dance with Article 12 . legal holiday without OWNER's written consent (which will not be unreasonably withheld ) given after prior 6 . 05 Substitutes and "Or-Equals " written notice to ENGINEER . A. Whenever an item of material or equipment is specified or described in the Contract Documents by 6 . 03 Services, Materials, and Equipment using the name of a proprietary item or the name of a particular Supplier , the specification or description is A . Unless otherwise specified in the General Re- intended to establish the type , function , appearance , quirements , CONTRACTOR shall provide and and quality required . Unless the specification or assume full responsibility for all services , materials , description contains or is followed by words reading equipment , labor , transportation , construction that no like , equivalent , or " or-equal " item or no equipment and machinery, tools , appliances , fuel , substitution is permitted , other items of material or power, light , heat , telephone , water, sanitary facilities , equipment or material or equipment of other Suppliers temporary facilities , and all other facilities and may be submitted to ENGINEER for review under the incidentals necessary for the performance , testing , circumstances described below. start-up , and completion of the Work . 1 . "Or-Equal" Items: If in ENGINEER' s B . All materials and equipment incorporated into sole discretion an item of material or equipment the Work shall be as specified or, if not specified , shall proposed by CONTRACTOR is functionally be of good quality and new, except as otherwise equal to that named and sufficiently similar so provided in the Contract Documents . All warranties that no change in related Work will be required , and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an tions shall expressly run to the benefit of OWNER . If " or-equal " item , in which case review and required by ENGINEER , CONTRACTOR shall furnish approval of the proposed item may, in satisfactory evidence ( including reports of required ENGINEER's sole discretion , be accomplished tests ) as to the source , kind , and quality of materials without compliance with some or all of the and equipment. All materials and equipment shall be requirements for approval of proposed substi- stored , applied , installed , connected , erected , tute items . For the purposes of this paragraph protected , used , cleaned , and conditioned in 6 . 05 .A. 1 , a proposed item of material or accordance with instructions of the applicable equipment will be considered functionally equal Supplier, except as otherwise may be provided in the to an item so named if: Contract Documents . a . in the exercise of reasonable 6 . 04 Progress Schedule judgment ENGINEER determines that : ( i ) it is at least equal in quality, durability, A . CONTRACTOR shall adhere to the progress appearance , strength , and design schedule established in accordance with paragraph characteristics ; ( ii ) it will reliably perform at 2 . 07 as it may be adjusted from time to time as least equally well the function imposed by provided below. the design concept of the completed Project as a functioning whole , and ; 1 . CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indi- b . CONTRACTOR certifies that : ( i ) cated in paragraph 2 . 07) proposed adjustments there is no increase in cost to the OWNER ; in the progress schedule that will not result in and ( ii ) it will conform substantially, even changing the Contract Times (or Milestones ) . with deviations , to the detailed requirements Such adjustments will conform generally to the of the item named in the Contract progress schedule then in effect and additional - Documents . 00700 - General Conditions REV 04-07. doc 00700 - 19 FAEngineering\Special Projects\Enclave Subdivision\Conlract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc 2 . Substitute Items directly or indirectly from use of such substitute item , including costs of redesign a . If in ENGINEER's sole discretion an and claims of other contractors affected by item of material or equipment proposed by any resulting change , all of which will be CONTRACTOR does not qualify as an considered by ENGINEER in evaluating the " or-equal " item under paragraph 6 . 05 .A . 1 , it proposed substitute item . ENGINEER may will be considered a proposed substitute require CONTRACTOR to furnish additional item . data about the proposed substitute item . b . CONTRACTOR shall submit suffi- B . Substitute Construction Methods or Proce- cient information as provided below to allow dures: If a specific means , method , technique , se- ENGINEER to determine that the item of quence , or procedure of construction is shown or material or equipment proposed is indicated in and expressly required by the Contract essentially equivalent to that named and an Documents , CONTRACTOR may furnish or utilize a acceptable substitute therefor . Requests for substitute means , method , technique , sequence , or review of proposed substitute items of procedure of construction approved by ENGINEER . material or equipment will not be accepted CONTRACTOR shall submit sufficient information to by ENGINEER from anyone other than allow ENGINEER, in ENGINEER' s sole discretion , to CONTRACTOR . determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents . C . The procedure for review by ENGI - The procedure for review by ENGINEER will be similar NEER will be as set forth in paragraph to that provided in subparagraph 6 . 05 .A . 2 . 6 . 05 .A . 2 . d , as supplemented in the General Requirements and as ENGINEER may C . Engineer's Evaluation: ENGINEER will be decide is appropriate under the allowed a reasonable time within which to evaluate circumstances . each proposal or submittal made pursuant to para- graphs 6 . 05 .A and 6 . 05 . 13 . ENGINEER will be the d . CONTRACTOR shall first make sole judge of acceptability. No " or-equal " or substitute written application to ENGINEER for review will be ordered , installed or utilized until ENGINEER's of a proposed substitute item of material or review is complete , which will be evidenced by either a equipment that CONTRACTOR seeks to Change Order for a substitute or an approved Shop furnish or use . The application shall certify Drawing for an " or equal . " ENGINEER will advise that the proposed substitute item will CONTRACTOR in writing of any negative perform adequately the functions and determination . achieve the results called for by the general design , be similar in substance to that D . Special Guarantee : OWNER may require specified , and be suited to the same use as CONTRACTOR to furnish at CONTRACTOR' s ex- that specified . The application will state the pense a special performance guarantee or other extent, if any, to which the use of the pro- surety with respect to any substitute . posed substitute item will prejudice CONTRACTOR' s achievement of Substan- E . ENGINEER 's Cost Reimbursement: tial Completion on time , whether or not use ENGINEER will record time required by ENGINEER of the proposed substitute item in the Work and ENGINEER' s Consultants in evaluating substitute will require a change in any of the Contract proposed or submitted by CONTRACTOR pursuant to Documents (or in the provisions of any other paragraphs 6 . 05 .A . 2 and 6 . 05 . 13 and in making direct contract with OWNER for work on the changes in the Contract Documents (or in the Project) to adapt the design to the proposed provisions of any other direct contract with OWNER substitute item and whether or not for work on the Project) occasioned thereby. Whether incorporation or use of the proposed substi- or not ENGINEER approves a substitute item so pro- tute item in connection with the Work is sub- posed or submitted by CONTRACTOR , CON - ject to payment of any license fee or royalty . TRACTOR shall reimburse OWNER for the charges All variations of the proposed substitute of ENGINEER and ENGINEER's Consultants for item from that specified will be identified in evaluating each such proposed substitute . the application , and available engineering , sales , maintenance , repair, and F . CONTRACTOR 's Expense: CONTRACTOR replacement services will be indicated . The shall provide all data in support of any proposed application will also contain an itemized esti- substitute or "or-equal " at CONTRACTOR' s expense . mate of all costs or credits that will result 00700 - General Conditions REV 04-07 .doc 00700 - 20 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 6 . 06 Concerning Subcontractors, Suppliers, tractors , Suppliers , and other individuals or entities and Others performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR . A . CONTRACTOR shall not employ any Subcontractor, Supplier, or other individual or entity E . CONTRACTOR shall require all Subcontrac- ( including those acceptable to OWNER as indicated in tors , Suppliers , and such other individuals or entities paragraph 6 . 06 . 13 ) , whether initially or as a performing or furnishing any of the Work to commu - replacement , against whom OWNER may have nicate with ENGINEER through CONTRACTOR . reasonable objection . CONTRACTOR shall not be required to employ any Subcontractor, Supplier , or F . The divisions and sections of the Specifica- other individual or entity to furnish or perform any of tions and the identifications of any Drawings shall not the Work against whom CONTRACTOR has reason- control CONTRACTOR in dividing the Work among able objection . Subcontractors or Suppliers or delineating the Work to be performed by any specific trade . B . If the Supplementary Conditions require the identity of certain Subcontractors , Suppliers , or other G . All Work performed for CONTRACTOR by a individuals or entities to be submitted to OWNER in Subcontractor or Supplier will be pursuant to an advance for acceptance by OWNER by a specified appropriate agreement between CONTRACTOR and date prior to the Effective Date of the Agreement , and the Subcontractor or Supplier which specifically binds if CONTRACTOR has submitted a list thereof in the Subcontractor or Supplier to the applicable terms accordance with the Supplementary Conditions , and conditions of the Contract Documents for the OWNER' s acceptance ( either in writing or by failing to benefit of OWNER and ENGINEER . Whenever any make written objection thereto by the date indicated such agreement is with a Subcontractor or Supplier for acceptance or objection in the Bidding Documents who is listed as an additional insured on the property or the Contract Documents ) of any such Subcon- insurance provided in paragraph 5 . 06 , the agreement tractor, Supplier, or other individual or entity so between the CONTRACTOR and the Subcontractor identified may be revoked on the basis of reasonable or Supplier will contain provisions whereby the objection after due investigation . CONTRACTOR Subcontractor or Supplier waives all rights against shall submit an acceptable replacement for the OWNER , CONTRACTOR, ENGINEER , ENGINEER's rejected Subcontractor , Supplier, or other individual or Consultants , and all other individuals or entities entity, and the Contract Price will be adjusted by the identified in the Supplementary Conditions to be listed difference in the cost occasioned by such as insureds or additional insureds (and the officers , replacement , and an appropriate Change Order will be directors , partners , employees , agents , and other issued or Written Amendment signed . No acceptance consultants and subcontractors of each and any of by OWNER of any such Subcontractor, Supplier, or them ) for all losses and damages caused by, arising other individual or entity, whether initially or as a out of, relating to , or resulting from any of the perils or replacement, shall constitute a waiver of any right of causes of loss covered by such policies and any other OWNER or ENGINEER to reject defective Work . property insurance applicable to the Work . If the insurers on any such policies require separate waiver C . CONTRACTOR shall be fully responsible to forms to be signed by any Subcontractor or Supplier , OWNER and ENGINEER for all acts and omissions of CONTRACTOR will obtain the same . the Subcontractors , Suppliers , and other individuals or entities performing or furnishing any of the Work just 6 . 07 Patent Fees and Royalties as CONTRACTOR is responsible for CONTRACTOR' s own acts and omissions . Nothing in A . CONTRACTOR shall pay all license fees and the Contract Documents shall create for the benefit of royalties and assume all costs incident to the use in any such Subcontractor, Supplier , or other individual the performance of the Work or the incorporation in or entity any contractual relationship between OWNER the Work of any invention , design , process , product , or ENGINEER and any such Subcontractor , Supplier or device which is the subject of patent rights or or other individual or entity, nor shall it create any copyrights held by others . If a particular invention , obligation on the part of OWNER or ENGINEER to design , process , product, or device is specified in the pay or to see to the payment of any moneys due any Contract Documents for use in the performance of the such Subcontractor , Supplier, or other individual or Work and if to the actual knowledge of OWNER or entity except as may otherwise be required by Laws ENGINEER its use is subject to patent rights or and Regulations . copyrights calling for the payment of any license fee or royalty to others , the existence of such rights shall be D . CONTRACTOR shall be solely responsible disclosed by OWNER in the Contract Documents . To for scheduling and coordinating the Work of Subcon- the fullest extent permitted by Laws and Regulations , 00700 - General Conditions REV 04-07 .doc 00700 - 21 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc CONTRACTOR shall indemnify and hold harmless of the Agreement if there were no Bids ) having an OWNER , ENGINEER, ENGINEER' s Consultants , and effect on the cost or time of performance of the Work the officers , directors , partners , employees or agents , may be the subject of an adjustment in Contract Price and other consultants of each and any of them from or Contract Times . If OWNER and CONTRACTOR and against all claims , costs , losses , and damages are unable to agree on entitlement to or on the ( including but not limited to all fees and charges of amount or extent , if any, of any such adjustment, a engineers , architects , attorneys , and other Claim may be made therefor as provided in paragraph professionals and all court or arbitration or other 10 . 05 . dispute resolution costs ) arising out of or relating to any infringement of patent rights or copyrights incident 6 . 10 Taxes to the use in the performance of the Work or resulting from the incorporation in the Work of any invention , A . CONTRACTOR sh ;J pay all sales , APARI IGA design , process , product, or device not specified in the er, use , and other similar taxes r to be Contract Documents . paid by CONTRACTO accordance with the Laws and ations of the place of the 6 . 08 Permits Pro e ich are applicable during the A . Unless otherwise provided in the Supple- mentary Conditions , CONTRACTOR shall obtain and B . OWNER qualifies for state and local sales tax pay for all construction permits and licenses . OWNER exemption in the purchase of all material and shall assist CONTRACTOR , when necessary, in equipment . obtaining such permits and licenses . CONTRACTOR shall pay all governmental charges and inspection 6 . 11 Use of Site and Other Areas fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids , or , if A. Limitation on Use of Site and Other Areas there are no Bids , on the Effective Date of the Agreement . CONTRACTOR shall pay all charges of 1 . CONTRACTOR shall confine utility owners for connections to the Work , and construction equipment , the storage of OWNER shall pay all charges of such utility owners materials and equipment , and the operations of for capital costs related thereto , such as plant workers to the Site and other areas permitted investment fees . by Laws and Regulations , and shall not unreasonably encumber the Site and other 6 . 09 Laws and Regulations areas with construction equipment or other materials or equipment. CONTRACTOR shall A . CONTRACTOR shall give all notices and assume full responsibility for any damage to comply with all Laws and Regulations applicable to the any such land or area , or to the owner or performance of the Work . Except where otherwise occupant thereof, or of any adjacent land or expressly required by applicable Laws and areas resulting from the performance of the Regulations , neither OWNER nor ENGINEER shall be Work . responsible for monitoring CONTRACTOR' s compli- ance with any Laws or Regulations . 2 . Should any claim be made by any such owner or occupant because of the B . If CONTRACTOR performs any Work know- performance of the Work , CONTRACTOR shall ing or having reason to know that it is contrary to Laws promptly settle with such other party by or Regulations , CONTRACTOR shall bear all claims , negotiation or otherwise resolve the claim by costs , losses , and damages ( including but not limited arbitration or other dispute resolution . to all fees and charges of engineers , architects , proceeding or at law. attorneys , and other professionals and all court or arbitration or other dispute resolution costs ) arising out 3 . To the fullest extent permitted by of or relating to such Work ; however, it shall not be Laws and Regulations , CONTRACTOR shall CONTRACTOR's primary responsibility to make indemnify and hold harmless OWNER , certain that the Specifications and Drawings are in ENGINEER , ENGINEER's Consultant , and the accordance with Laws and Regulations , but this shall officers , directors , partners , employees , agents , not relieve CONTRACTOR of CONTRACTOR' s and other consultants of each and any of them obligations under paragraph 3 . 03 . from and against all claims , costs , losses , and damages ( including but not limited to all fees C . Changes in Laws or Regulations not known at and charges of engineers , architects , attorneys , the time of opening of Bids (or , on the Effective Date and other professionals and all court or 00700 - General Conditions REV 04-07.doc 00700 - 22 F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc arbitration or other dispute resolution costs ) 1 . all persons on the Site or who may arising out of or relating to any claim or action , be affected by the Work ; legal or equitable , brought by any such owner or occupant against OWNER , ENGINEER, or 2 . all the Work and materials and equip- any other party indemnified hereunder to the ment to be incorporated therein , whether in extent caused by or based upon storage on or off the Site ; and CONTRACTOR's performance of the Work . 3 . other property at the Site or adjacent B . Removal of Debris During Performance of the thereto , including trees , shrubs , lawns , walks , Work: During the progress of the Work CONTRAC- pavements , roadways , structures , utilities , and TOR shall keep the Site and other areas free from Underground Facilities not designated for accumulations of waste materials , rubbish , and other removal , relocation , or replacement in the debris . Removal and disposal of such waste materi- course of construction . als , rubbish , and other debris shall conform to applica- ble Laws and Regulations . B . CONTRACTOR shall comply with all applica- ble Laws and Regulations relating to the safety of C . Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or the Work CONTRACTOR shall clean the Site and property from damage , injury, or loss ; and shall erect make it ready for utilization by OWNER . At the com - and maintain all necessary safeguards for such safety pletion of the Work CONTRACTOR shall remove from and protection . CONTRACTOR shall notify owners of the Site all tools , appliances , construction equipment adjacent property and of Underground Facilities and and machinery, and surplus materials and shall other utility owners when prosecution of the Work may restore to original condition all property not designated affect them , and shall cooperate with them in the for alteration by the Contract Documents . protection , removal , relocation , and replacement of their property. All damage , injury, or loss to any D . Loading Structures: CONTRACTOR shall not property referred to in paragraph 6 . 13 .A . 2 or 6 . 13 .A . 3 load nor permit any part of any structure to be loaded caused , directly or indirectly, in whole or in part, by in any manner that will endanger the structure , nor CONTRACTOR, any Subcontractor, Supplier, or any shall CONTRACTOR subject any part of the Work or other individual or entity directly or indirectly employed adjacent property to stresses or pressures that will by any of them to perform any of the Work , or anyone endanger it . for whose acts any of them may be liable , shall be remedied by CONTRACTOR (except damage or loss 6 . 12 Record Documents attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER A . CONTRACTOR shall maintain in a safe place or ENGINEER' s Consultant , or anyone employed by at the Site one record copy of all Drawings , Specifica- any of them , or anyone for whose acts any of them tions , Addenda , Written Amendments , Change may be liable , and not attributable , directly or Orders , Work Change Directives , Field Orders , and indirectly, in whole or in part , to the fault or negligence written interpretations and clarifications in good order of CONTRACTOR or any Subcontractor, Supplier, or and annotated to show changes made during other individual or entity directly or indirectly employed construction . These record documents together with by any of them ) . CONTRACTOR's duties and all approved Samples and a counterpart of all responsibilities for safety and for protection of the approved Shop Drawings will be available to ENGI - Work shall continue until such time as all the Work is NEER for reference . Upon completion of the Work, completed and ENGINEER has issued a notice to these record documents , Samples , and Shop OWNER and CONTRACTOR in accordance with Drawings will be delivered to ENGINEER for OWNER . paragraph 14 . 07 . 6 that the Work is acceptable (except as otherwise expressly provided in connection 6 . 13 Safety and Protection with Substantial Completion ) . A . CONTRACTOR shall be solely responsible 6 . 14 Safety Representative for initiating , maintaining and supervising all safety precautions and programs in connection with the A. CONTRACTOR shall designate a qualified Work . CONTRACTOR shall take all necessary and experienced safety representative at the Site precautions for the safety of, and shall provide the whose duties and responsibilities shall be the necessary protection to prevent damage , injury or loss prevention of accidents and the maintaining and to : supervising of safety precautions and programs . 00700 - General Conditions REV 04-07. doc 00700 - 23 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00700 - General Conditions REV 04-07.doc 6 . 15 Hazard Communication Programs approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR . A . CONTRACTOR shall be responsible for coordinating any exchange of material safety data D . Submittal Procedures sheets or other hazard communication information required to be made available to or exchanged be- 1 . Before submitting each Shop tween or among employers at the Site in accordance Drawing or Sample , CONTRACTOR shall have with Laws or Regulations . determined and verified : 6 . 16 Emergencies a . all field measurements , quantities , dimensions , specified performance criteria , A . In emergencies affecting the safety or protec- installation requirements , materials , catalog tion of persons or the Work or property at the Site or numbers , and similar information with adjacent thereto , CONTRACTOR is obligated to act to respect thereto ; prevent threatened damage , injury, or loss . CONTRACTOR shall give ENGINEER prompt written b . all materials with respect to intended notice if CONTRACTOR believes that any significant use , fabrication , shipping , handling , storage , changes in the Work or variations from the Contract assembly, and installation pertaining to the Documents have been caused thereby or are required performance of the Work ; as a result thereof. If ENGINEER determines that a change in the Contract Documents is required be- c . all information relative to means , cause of the action taken by CONTRACTOR in methods , techniques , sequences , and response to such an emergency, a Work Change procedures of construction and safety Directive or Change Order will be issued . precautions and programs incident thereto ; and 6 . 17 Shop Drawings and Samples d . CONTRACTOR shall also have A . CONTRACTOR shall submit Shop Drawings reviewed and coordinated each Shop to ENGINEER for review and approval in accordance Drawing or Sample with other Shop with the acceptable schedule of Shop Drawings and Drawings and Samples and with the Sample submittals . All submittals will be identified as requirements of the Work and the Contract ENGINEER may require and in the number of copies Documents . specified in the General Requirements . The data shown on the Shop Drawings will be complete with 2 . Each submittal shall bear a stamp or respect to quantities , dimensions , specified perfor- specific written indication that CONTRACTOR mance and design criteria , materials , and similar data has satisfied CONTRACTOR's obligations to show ENGINEER the services , materials , and under the Contract Documents with respect to equipment CONTRACTOR proposes to provide and CONTRACTOR' s review and approval of that to enable ENGINEER to review the information for the submittal . limited purposes required by paragraph 6 . 17 . E . 3 . At the time of each submittal , CON - B . CONTRACTOR shall also submit Samples to TRACTOR shall give ENGINEER specific ENGINEER for review and approval in accordance written notice of such variations , if any, that the with the acceptable schedule of Shop Drawings and Shop Drawing or Sample submitted may have Sample submittals . Each Sample will be identified from the requirements of the Contract clearly as to material , Supplier, pertinent data such as Documents , such notice to be in a written com - catalog numbers , and the use for which intended and munication separate from the submittal ; and , in otherwise as ENGINEER may require to enable ENGI - addition , shall cause a specific notation to be NEER to review the submittal for the limited purposes made on each Shop Drawing and Sample sub- required by paragraph 6 . 17 . E . The numbers of each mitted to ENGINEER for review and approval of Sample to be submitted will be as specified in the each such variation . Specifications . E . ENGINEER 's Review C . Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop 1 . ENGINEER will timely review and Drawings and Sample submittals acceptable to ENGI - approve Shop Drawings and Samples in NEER as required by paragraph 2 . 07 , any related accordance with the schedule of Shop Work performed prior to ENGINEER' s review and Drawings and Sample submittals acceptable to 00700 - General Conditions REV 04-07 .doc 00700 - 24 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents7he Enclave.doc\00700 - General Conditions REV 04-07 .doc ENGINEER . ENGINEER' s review and approval will be only to determine if the items 6 . 19 CONTRACTOR 's General Warranty and covered by the submittals will , after installation Guarantee or incorporation in the Work , conform to the information given in the Contract Documents A . CONTRACTOR warrants and guarantees to and be compatible with the design concept of OWNER , ENGINEER, and ENGINEER's Consultants the completed Project as a functioning whole as that all Work will be in accordance with the Contract indicated by the Contract Documents . Documents and will not be defective . CONTRACTOR's warranty and guarantee hereunder 2 . ENGINEER's review and approval excludes defects or damage caused by: will not extend to means , methods , techniques , sequences , or procedures of construction 1 . abuse , modification , or improper (except where a particular means , method , maintenance or operation by persons other technique , sequence , or procedure of con- than CONTRACTOR, Subcontractors , struction is specifically and expressly called for Suppliers , or any other individual or entity for by the Contract Documents ) or to safety whom CONTRACTOR is responsible ; or precautions or programs incident thereto . The review and approval of a separate item as such 2 . normal wear and tear under normal will not indicate approval of the assembly in usage . which the item functions . B . CONTRACTOR's obligation to perform and 3 . ENGINEER' s review and approval of complete the Work in accordance with the Contract Shop Drawings or . Samples shall not relieve Documents shall be absolute . None of the following CONTRACTOR from responsibility for any will constitute an acceptance of Work that is not in variation from the requirements of the Contract accordance with the Contract Documents or a release Documents unless CONTRACTOR has in of CONTRACTOR's obligation to perform the Work in writing called ENGINEER' s attention to each accordance with the Contract Documents : such variation at the time of each submittal as required by paragraph 6 . 17 . D . 3 and ENGI - 1 . observations by ENGINEER ; NEER has given written approval of each such variation by specific written notation thereof 2 . recommendation by ENGINEER or incorporated in or accompanying the Shop payment by OWNER of any progress or final Drawing or Sample approval ; nor will any payment; approval by ENGINEER relieve CON - TRACTOR from responsibility for complying 3 . the issuance of a certificate of Sub- with the requirements of paragraph 6 . 17 . D . 1 . stantial Completion by ENGINEER or any payment related thereto by OWNER ; F . Resubmittal Procedures 4 . use or occupancy of the Work or any 1 . CONTRACTOR shall make correc- part thereof by OWNER; tions required by ENGINEER and shall return the required number of corrected copies of 5 . any acceptance by OWNER or any Shop Drawings and submit as required new failure to do so ; Samples for review and approval . CON - TRACTOR shall direct specific attention in 6 . any review and approval of a Shop writing to revisions other than the corrections Drawing or Sample submittal or the issuance of called for by ENGINEER on previous a notice of acceptability by ENGINEER; submittals . 7 . any inspection , test, or approval by 6 . 18 Continuing the Work others ; or A . CONTRACTOR shall carry on the Work and 8 . any correction of defective Work by adhere to the progress schedule during all disputes or OWNER . disagreements with OWNER . No Work shall be delayed or postponed pending resolution of any 6 . 20 Indemnification disputes or disagreements , except as permitted by paragraph 15 . 04 or as OWNER and CONTRACTOR A. To the fullest extent permitted by Laws and may otherwise agree in writing . Regulations , CONTRACTOR shall indemnify and hold 00700 - General Conditions REV 04-07.doc 00700 - 25 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc harmless OWNER , ENGINEER , ENGINEER' s opinions , reports , surveys , Change Orders , Consultants , and the officers , directors , partners , designs , or Specifications ; or employees , agents , and . other consultants and subcontractors of each and any of them from and 2 . giving directions or instructions , or against all claims , costs , losses , and damages failing to give them , if that is the primary cause ( including but not limited to all fees and charges of of the injury or damage . engineers , architects , attorneys , and other professionals and all court or arbitration or other dispute resolution costs ) arising out of or relating to ARTICLE 7 - OTHER WORK the performance of the Work , provided that any such claim , cost , loss , or damage : 7 . 01 Related Work at Site 1 . is attributable to bodily injury, sickness , disease , or death , or to injury to or A . OWNER may perform other work related to destruction of tangible property (other than the the Project at the Site by OWNER' s employees , or let Work itself) , including the loss of use resulting other direct contracts therefor, or have other work therefrom ; and performed by utility owners . If such other work is not noted in the Contract Documents , then : 2 . is caused in whole or in part by any negligent act or omission of CONTRACTOR , 1 . written notice thereof will be given to any Subcontractor , any Supplier, or any CONTRACTOR prior to starting any such other individual or entity directly or indirectly work ; and employed by any of them to perform any of the Work or anyone for whose acts any of them 2 . if OWNER and CONTRACTOR are may be liable , regardless of whether or not unable to agree on entitlement to or on the caused in part by any negligence or omission of amount or extent , if any, of any adjustment in an individual or entity indemnified hereunder or the Contract Price or Contract Times that whether liability is imposed upon such indemni- should be allowed as a result of such other fied party by Laws and Regulations regardless work , a Claim may be made therefor as of the negligence of any such individual or provided in paragraph 10 . 05 . entity. B . CONTRACTOR shall afford each other B . In any and all claims against OWNER or contractor who is a party to such a direct contract and ENGINEER or any of their respective consultants , each utility owner (and OWNER, if OWNER is per- agents , officers , directors , partners , or employees by forming the other work with OWNER' s employees ) any employee (or the survivor or personal proper and safe access to the Site and a reasonable representative of such employee) of CONTRACTOR , opportunity for the introduction and storage of any Subcontractor, any Supplier , or any individual or materials and equipment and the execution of such entity directly or indirectly employed by any of them to other work and shall properly coordinate the Work with perform any of the Work , or anyone for whose acts theirs . Unless otherwise provided in the Contract any of them may be liable , the indemnification Documents , CONTRACTOR shall do all cutting , obligation under paragraph 6 . 20 .A shall not be limited fitting , and patching of the Work that may be required in any way by any limitation on the amount or type of to properly connect or otherwise make its several damages , compensation , or benefits payable by or for parts come together and properly integrate with such CONTRACTOR or any such Subcontractor , Supplier, other work . CONTRACTOR shall not endanger any or other individual or entity under workers ' compen - work of others by cutting , excavating , or otherwise sation acts , disability benefit acts , or other employee altering their work and will only cut or alter their work benefit acts . with the written consent of ENGINEER and the others whose work will be affected . The duties and C . The indemnification obligations of CON - responsibilities of CONTRACTOR under this TRACTOR under paragraph 6 . 20 .A shall not extend to paragraph are for the benefit of such utility owners and the liability of ENGINEER and ENGINEER' s other contractors to the extent that there are Consultants or to the officers , directors , partners , comparable provisions for the benefit of employees , agents , and other consultants and CONTRACTOR in said direct contracts between subcontractors of each and any of them arising out of: OWNER and such utility owners and other contractors . 1 . the preparation or approval of, or the failure to prepare or approve , maps , Drawings , 00700 - General Conditions REV 04-07.doc 00700 - 26 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc C . If the proper execution or results of any part of 8 . 03 Furnish Data CONTRACTOR' s Work depends upon work per- formed by others under this Article 7 , CONTRACTOR A. OWNER shall promptly furnish the data shall inspect such other work and promptly report to required of OWNER under the Contract Documents . ENGINEER in writing any delays , defects , or deficien- cies in such other work that render it unavailable or 8 . 04 Pay Promptly When Due unsuitable for the proper execution and results of CONTRACTOR' s Work . CONTRACTOR' s failure to A . OWNER shall make payments to CONTRAC- so report will constitute an acceptance of such other TOR promptly when they are due as provided in work as fit and proper for integration with paragraphs 14 . 02 . 0 and 14 . 07 . C . CONTRACTOR' s Work except for latent defects and deficiencies in such other work . 8 . 05 Lands and Easements; Reports and Tests 7 . 02 Coordination A . OWNER' s duties in respect of providing lands and easements and providing engineering surveys to A. If OWNER intends to contract with others for establish reference points are set forth in paragraphs the performance of other work on the Project at the 4 . 01 and 4 . 05 . Paragraph 4 . 02 refers to OWNER's Site , the following will be set forth in Supplementary identifying and making available to CONTRACTOR Conditions : copies of reports of explorations and tests of subsurface conditions and drawings of physical 1 . the individual or entity who will have conditions in or relating to existing . surface or authority and responsibility for coordination of subsurface structures at or contiguous to the Site that the activities among the various contractors will have been utilized by ENGINEER in preparing the be identified ; Contract Documents . 2 . the specific matters to be covered by 8 . 06 Insurance such authority and responsibility will be itemized ; and A. OWNER's responsibilities , if any, in respect to purchasing and maintaining liability and property insur- 3 . the extent of such authority and ance are set forth in Article 5 . responsibilities will be provided . 8 . 07 Change Orders B . Unless otherwise provided in the Supplementary Conditions , OWNER shall have sole A . OWNER is obligated to execute Change authority and responsibility for such coordination . Orders as indicated in paragraph 10 . 03 . 8 . 08 Inspections, Tests, and Approvals ARTICLE 8 - OWNER' S RESPONSIBILITIES A . OWNER' s responsibility in respect to certain inspections , tests , and approvals is set forth in 8 . 01 Communications to Contractor paragraph 13 . 03 . 8 . A . Except as otherwise provided in these 8 . 09 Limitations on OWNER 's Responsibilities General Conditions , OWNER shall issue all communi- cations to CONTRACTOR through ENGINEER . A . The OWNER shall not supervise , direct, or have control or authority over, nor be responsible for, 8 . 02 Replacement of ENGINEER CONTRACTOR' s means , methods , techniques , se- quences , or procedures of construction , or the safety A . In case of termination of the employment of precautions and programs incident thereto , or for any ENGINEER, OWNER shall appoint an engineer to failure of CONTRACTOR to comply with Laws and whom CONTRACTOR makes no reasonable Regulations applicable to the performance of the objection , whose status under the Contract Work . OWNER will not be responsible for Documents shall be that of the former ENGINEER . CONTRACTOR's failure to perform the Work in accordance with the Contract Documents . 00700 - General Conditions REV 04-07.doc 00700 - 27 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc 8 . 10 Undisclosed Hazardous Environmental of ENGINEER's visits or observations of Condition CONTRACTOR's Work ENGINEER will not supervise , direct, control , or have authority over or be A . OWNER' s responsibility in respect to an responsible for CONTRACTOR's means , methods , undisclosed Hazardous Environmental Condition is techniques , sequences , or procedures of construction , set forth in paragraph 4 . 06 . or the safety precautions and programs incident thereto , or for any failure of CONTRACTOR to comply 8 . 11 Evidence of Financial Arrangements with Laws and Regulations applicable to the performance of the Work . A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that 9 . 03 Project Representative financial arrangements have been made to satisfy OWNER's obligations under the Contract Documents , A . If OWNER and ENGINEER agree, ENGI - OWNER' s responsibility in respect thereof will be as NEER will furnish a Resident Project Representative set forth in the Supplementary Conditions . to assist ENGINEER in providing more extensive observation of the Work . The responsibilities and authority and limitations thereon of any such Resident ARTICLE 9 - ENGINEER' S STATUS DURING Project Representative and assistants will be as CONSTRUCTION provided in paragraph 9 . 10 and in the Supplementary Conditions . If OWNER designates another represen- tative or agent to represent OWNER at the Site who is 9 . 01 OWNER 'S Representative not ENGINEER' s Consultant , agent or employee , the responsibilities and authority and limitations thereon of A . ENGINEER will be OWNER's representative such other individual or entity will be as provided in the during the construction period . The duties and Supplementary Conditions . responsibilities and the limitations of authority of ENGINEER as OWNER 9s representative during 9 . 04 Clarifications and Interpretations construction are set forth in the Contract Documents and will not be changed without written consent of A . ENGINEER will issue with reasonable OWNER and ENGINEER . promptness such written clarifications or interpreta - tions of the requirements of the Contract Documents 9 . 02 Visits to Site as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably A. ENGINEER will make visits to the Site at inferable from the Contract Documents . Such written intervals appropriate to the various stages of construc- clarifications and interpretations will be binding on tion as ENGINEER deems necessary in order to OWNER and CONTRACTOR . If OWNER and CON - observe as an experienced and qualified design TRACTOR are unable to agree on entitlement to or on j, professional the progress that has been made and the the amount or extent , if any, of any adjustment in the quality of the various aspects of CONTRACTOR' s Contract Price or Contract Times , or both , that should executed Work . Based on information obtained be allowed as a result of a written clarification or during such visits and observations , ENGINEER , for interpretation , a Claim may be made therefor as the benefit of OWNER , will determine , in general , if provided in paragraph 10 . 05 . the Work is proceeding in accordance with the Con - tract Documents . ENGINEER will not be required to 9 . 05 Authorized Variations in Work make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work . A . ENGINEER may authorize minor variations in ENGINEER' s efforts will be directed toward providing the Work from the requirements of the Contract for OWNER a greater degree of confidence that the Documents which do not involve an adjustment in the completed Work will conform generally to the Contract Contract Price or the Contract Times and are compati- Documents . On the basis of such visits and ble with the design concept of the completed Project observations , ENGINEER will keep OWNER informed as a functioning whole as indicated by the Contract of the progress of the Work and will endeavor to guard Documents . These may be accomplished by a Field OWNER against defective Work . Order and will be binding on OWNER and also on CONTRACTOR , who shall perform the Work involved B . ENGINEER' s visits and observations are promptly . If OWNER and CONTRACTOR are unable subject to all the limitations on ENGINEER' s authority to agree on entitlement to or on the amount or extent , and responsibility set forth in paragraph 9 . 10 , and if any, of any adjustment in the Contract Price or particularly, but without limitation , during or as a result Contract Times , or both , as a result of a Field Order , 00700 - General Conditions REV 04-07.doc 00700 - 28 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc a Claim may be made therefor as provided in accordance with the provisions of paragraph 10 . 05 , paragraph 10 . 05 . with a request for a formal decision . 9 . 06 Rejecting Defective Work B . When functioning as interpreter and judge under this paragraph 9 . 09 , ENGINEER will not show A . ENGINEER will have authority to disapprove partiality to OWNER or CONTRACTOR and will not or reject Work which ENGINEER believes to be be liable in connection with any interpretation or defective , or that ENGINEER believes will not produce decision rendered in good faith in such capacity. The a completed Project that conforms to the Contract rendering of a decision by ENGINEER pursuant to this Documents or that will prejudice the integrity of the paragraph 9 . 09 with respect to any such Claim , design concept of the completed Project as a dispute , or other matter ( except any which have been functioning whole as indicated by the Contract waived by the making or acceptance of final payment Documents . ENGINEER will also have authority to as provided in paragraph 14 . 07) will be a condition require special inspection or testing of the Work as precedent to any exercise by OWNER or provided in paragraph 13 . 04 , whether or not the Work CONTRACTOR of such rights or remedies as either is fabricated , installed , or completed . _ may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such Claim , 9 . 07 Shop Drawings, Change Orders and dispute , or other matter. Payments 9 . 10 Limitations on ENGINEER 's Authority and A . In connection with ENGINEER' s authority as Responsibilities to Shop Drawings and Samples , see paragraph 6 . 17 . A . Neither ENGINEER' s authority or respon- B . In connection with ENGINEER' s authority as sibility under this Article 9 or under any other provision to Change Orders , see Articles 10 , 11 , and 12 . of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not C . In connection with ENGINEER' s authority as exercise such authority or responsibility or the to Applications for Payment , see Article 14 . undertaking , exercise , or performance of any authority or responsibility by ENGINEER shall create , impose , 9 . 08 Determinations for Unit Price Work or give rise to any duty in contract, tort , or otherwise owed by ENGINEER to CONTRACTOR , any Subcon- A . ENGINEER will determine the actual quanti - tractor, any Supplier , any other individual or entity, or ties and classifications of Unit Price Work performed to any surety for or employee or agent of any of them . by CONTRACTOR . ENGINEER will review with CONTRACTOR the ENGINEER' s preliminary B . ENGINEER will not supervise , direct, control , determinations on such matters before rendering a or have authority over or be responsible for written decision thereon ( by recommendation of an CONTRACTOR' s means , methods , techniques , se- Application for Payment or otherwise) . ENGINEER' s quences , or procedures of construction , or the safety written decision thereon will be final and binding precautions and programs incident thereto , or for any (except as modified by ENGINEER to reflect changed failure of CONTRACTOR to comply with Laws and factual conditions or more accurate data ) upon Regulations applicable to the performance of the OWNER and CONTRACTOR, subject to the Work . ENGINEER will not be responsible for provisions of paragraph 10 . 05 . CONTRACTOR' s failure to perform the Work in accordance with the Contract Documents . 9 . 09 Decisions on Requirements of Contract Documents and Acceptability of Work C . ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any A . ENGINEER will be the initial interpreter of the Subcontractor , any Supplier, or of any other individual requirements of the Contract Documents and judge of or entity performing any of the Work . the acceptability of the Work thereunder . Claims , disputes and other matters relating to the acceptability D . ENGINEER' s review of the final Application of the Work , the quantities and classifications of Unit for Payment and accompanying documentation and all Price Work , the interpretation of the requirements of maintenance and operating instructions , schedules , the Contract Documents pertaining to the guarantees , Bonds , certificates of inspection , tests performance of the Work , and Claims seeking and approvals , and other documentation required to changes in the Contract Price or Contract Times will be delivered by paragraph 14 . 07 .A will only be to be referred initially to ENGINEER in writing , in determine generally that their content complies with the requirements of, and in the case of certificates of 00700 - General Conditions REV 04-07 .doc 00700 - 29 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc inspections , tests , and approvals that the results 2 . changes in the Contract Price or certified indicate compliance with , the Contract Contract Times which are agreed to by the Documents . parties , including any undisputed sum or amount of time for Work actually performed in E . The limitations upon authority and responsibil - accordance with a Work Change Directive ; and ity set forth in this paragraph 9 . 10 shall also apply to ENGINEER' s Consultants , Resident Project Repre- 3 . changes in the Contract Price or sentative , and assistants . Contract Times which embody the substance of any written decision rendered by ENGINEER ARTICLE 10 - CHANGES IN THE WORK ; CLAIMS pursuant to paragraph 10 . 05 ; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in 10 . 01 Authorized Changes in the Work accordance with the provisions of the Contract Documents and applicable Laws and Regula- A . Without invalidating the Agreement and tions , but during any such appeal , without notice to any surety, OWNER may, at any time CONTRACTOR shall carry on the Work and or from time to time , order additions , deletions , or adhere to the progress schedule as provided in revisions in the Work by a Written Amendment , a paragraph 6 . 18 .A . Change Order , or a Work Change Directive . Upon receipt of any such document , CONTRACTOR shall 10 . 04 Notification to Surety promptly proceed with the Work involved which will be performed under the applicable conditions of the A . If notice of any change affecting the general Contract Documents ( except as otherwise specifically scope of the Work or the provisions " of the Contract provided ) . Documents ( including , but not limited to , Contract Price or Contract Times ) is required by the provisions B . If OWNER and CONTRACTOR are unable to of any Bond to be given to a surety, the giving of any agree on entitlement to , or on the amount or extent , if such notice will be CONTRACTOR's responsibility. any, of an adjustment in the Contract Price or Contract The amount of each applicable Bond will be adjusted Times , or both , that should be allowed as a result of a to reflect the effect of any such change . Work Change Directive , a Claim may be made therefor as provided in paragraph 10 . 05 . 10 . 02 Unauthorized Changes in the Work A . CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended , modified , or supplemented as provided in paragraph 3 . 04 , except in the case of an emergency as provided in paragraph 6 . 16 or in the case of uncovering Work as provided in paragraph 13 . 04 . B . 10 . 03 Execution of Change Orders A . OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGI - NEER (or Written Amendments ) covering : 1 . changes in the Work which are : ( i ) ordered by OWNER pursuant to paragraph 10 . 01 .A , ( ii ) required because of acceptance of defective Work under paragraph 13 . 08 . A or OWNER' s correction of defective Work under paragraph 13 . 09 , or ( iii ) agreed to by the parties ; 00700 - General Conditions REV 04-07 .doc 00700 - 30 FAEngineenng\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 10 . 05 Claims and Disputes C . If ENGINEER does not render a formal A. Notice : Written notice stating the general decision in writing within the time stated in paragraph nature of each Claim , dispute, or other matter shall be 10 . 05 . 13 , a decision denying the Claim in its entirety delivered by the claimant to ENGINEER and the other shall be deemed to have been issued 31 days after party to the Contract promptly ( but in no event later receipt of the last submittal of the claimant or the last than 30 days ) after the start of the event giving rise submittal of the opposing party, if any. thereto . Notice of the amount or extent of the Claim , dispute , or other matter with supporting data shall be D . No Claim for an adjustment in Contract Price delivered to the ENGINEER and the other party to the or Contract Times (or Milestones ) will be valid if not Contract within 60 days after the start of such event submitted in accordance with this paragraph 10 . 05 . ( unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of such Claim , dispute , or other matter) . A Claim for ARTICLE 11 - COST OF THE WORK ; CASH an adjustment in Contract Price shall be prepared in ALLOWANCES ; UNIT PRICE WORK accordance with the provisions of paragraph 12 . 01 . B . A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of 11 . 01 Cost of the Work paragraph 12 . 02 . 15 . Each Claim shall be accom - panied by claimant's written statement that the adjust- A . Costs Included: The term Cost of the Work ment claimed is the entire adjustment to which the means the sum of all costs necessarily incurred and claimant believes it is entitled as a result of said event . paid by CONTRACTOR in the proper performance of The opposing party shall submit any response to the Work . When the value of any Work covered by a ENGINEER and the claimant within 30 days after Change Order or when a Claim for an adjustment in receipt of the claimant' s last submittal ( unless Contract Price is determined on the basis of Cost of ENGINEER allows additional time ) . the Work , the costs to be reimbursed to CONTRACTOR will be only those additional or B . ENGINEER 's Decision: ENGINEER will incremental costs required because of the change in render a formal decision in writing within 30 days after the Work or because of the event giving rise to the receipt of the last submittal of the claimant or the last Claim . Except as otherwise may be agreed to in submittal of the opposing party, if any. ENGINEER's writing by OWNER , such costs shall be in amounts no written decision on such Claim , dispute , or other higher than those prevailing in the locality of the matter will be final and binding upon OWNER and Project, shall include only the following items , and CONTRACTOR unless : shall not include any of the costs itemized in para - graph 11 . 01 . 13 . 1 . an appeal from ENGINEER 's decision is taken within the time limits and in 1 . Payroll costs for employees in the accordance with the dispute resolution direct employ of CONTRACTOR in the perfor- procedures set forth in Article 16 ; or mance of the Work under schedules of job classifications agreed upon by OWNER and 2 . if no such dispute resolution CONTRACTOR . Such employees shall include procedures have been set forth in Article 16 , a without limitation superintendents , foremen , written notice of intention to appeal from and other personnel employed full time at the ENGINEER's written decision is delivered by Site . Payroll costs for employees not employed OWNER or CONTRACTOR to the other and to full time on the Work shall be apportioned on ENGINEER within 30 days after the date of the basis of their time spent on the Work . such decision , and a formal proceeding is Payroll costs shall include , but not be limited to , instituted by the appealing party in a forum of salaries and wages plus the cost of fringe competent jurisdiction within 60 days after the benefits , which shall include social security date of such decision or within 60 days after contributions , unemployment , excise , and Substantial Completion , whichever is later payroll taxes , workers ' compensation , health ( unless otherwise agreed in writing by OWNER and retirement benefits , bonuses , sick leave , and CONTRACTOR ) , to exercise such rights or vacation and holiday pay applicable thereto . remedies as the appealing party may have with The expenses of performing Work outside of respect to such Claim , dispute , or other matter regular working hours , on Saturday, Sunday, or in accordance with applicable Laws and legal holidays , shall be included in the above to Regulations . the extent authorized by OWNER . 00700 - General Conditions REV 04-07.doc 00700 - 31 F1Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 2 . Cost of all materials and equipment in accordance with rental agreements approved furnished and incorporated in the Work , includ - by OWNER with the advice of ENGINEER, and ing costs of transportation and storage thereof, the costs of transportation , loading , unloading , and Suppliers ' field services required in assembly, dismantling , and removal thereof. connection therewith . All cash discounts shall All such costs shall be in accordance with the accrue to CONTRACTOR unless OWNER terms of said rental agreements . The rental of deposits funds with CONTRACTOR with which any such equipment, machinery, or parts shall to make payments , in which case the cash cease when the use thereof is no longer discounts shall accrue to OWNER . All trade necessary for the Work . discounts , rebates and refunds and returns from sale of surplus materials and equipment d . Sales , consumer, use , and other shall accrue to OWNER , and CONTRACTOR similar taxes related to the Work , and for which shall make provisions so that they may be CONTRACTOR is liable , imposed by Laws and obtained . Regulations . 3 . Payments made by CONTRACTOR e . Deposits lost for causes other than to Subcontractors for Work performed by negligence of CONTRACTOR , any Sub- Subcontractors . If required by OWNER , CON - contractor , or anyone directly or indirectly TRACTOR shall obtain competitive bids from employed by any of them or for whose acts any subcontractors acceptable to OWNER and of them may be liable , and royalty payments CONTRACTOR and shall deliver such bids to and fees for permits and licenses . OWNER , who will then determine , with the advice of ENGINEER, which bids , if any, will be f. Losses and damages (and related acceptable . If any subcontract provides that the expenses ) caused by damage to the Work , not Subcontractor is to be paid on the basis of Cost compensated by insurance or otherwise , sus- of the Work plus a fee , the Subcontractor' s tained by CONTRACTOR in connection with Cost of the Work and fee shall be determined the performance of the Work (except losses in the same manner as CONTRACTOR' s Cost and damages within the deductible amounts of of the Work and fee as provided in this para- property insurance established in accordance graph 11 . 01 . with paragraph 5 . 06 . D ) , provided such losses and damages have resulted from causes other 4 . Costs of special consultants than the negligence of CONTRACTOR, any ( including but not limited to engineers , Subcontractor, or anyone directly or indirectly architects , testing laboratories , surveyors , employed by any of them or for whose acts any attorneys , and accountants ) employed for of them may be liable . Such losses shall services specifically related to the Work . include settlements made with the written consent and approval of OWNER . No such 5 . Supplemental costs including the losses , damages , and expenses shall be following : included in the Cost of the Work for the purpose of determining CONTRACTOR' s fee . a . The proportion of necessary trans- portation , travel , and subsistence expenses of g . The cost of utilities , fuel , and sanitary CONTRACTOR's employees incurred in dis- facilities at the Site . charge of duties connected with the Work . h . Minor expenses such as telegrams , b . Cost , including transportation and long distance telephone calls , telephone service maintenance , of all materials , supplies , equip- at the Site , expressage , and similar petty cash ment , machinery, appliances , office , and items in connection with the Work . temporary facilities at the Site , and hand tools not owned by the workers , which are consumed i . When the Cost of the Work is used to in the performance of the Work , and cost , less determine the value of a Change Order or of a market value , of such items used but not con- Claim , the cost of premiums for additional sumed which remain the property of CON - Bonds and insurance required because of the TRACTOR . changes in the Work or caused by the event giving rise to the Claim . C . Rentals of all construction equip- ment and machinery, and the parts thereof j . When all the Work is performed on the whether rented from CONTRACTOR or others basis of cost- plus , the costs of premiums for all 00700 - General Conditions REV 04-07 .doc 00700 - 32 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00700 - General Conditions REV 04-07 .doc Bonds and insurance CONTRACTOR is D . Documentation: Whenever the Cost of the required by the Contract Documents to Work for any purpose is to be determined pursuant to purchase and maintain . paragraphs 11 . 01 . A and 11 . 01 . 13 , CONTRACTOR will establish and maintain records thereof in accordance B . Costs Excluded: The term Cost of the Work with generally accepted accounting practices and shall not include any of the following items : submit in a form acceptable to ENGINEER an itemized cost breakdown together with supporting 1 . Payroll costs and other compensation data . of CONTRACTOR' s officers , executives , princi- pals ( oflpartnerships and sole proprietorships ) , 11 . 02 Cash Allowances general managers , engineers , architects , estimators , attorneys , auditors , accountants , A . It is understood that CONTRACTOR has in- purchasing and contracting agents , expediters , cluded in the Contract Price all allowances so named timekeepers , clerks , and other personnel in the Contract Documents and shall cause the Work employed by CONTRACTOR , whether at the so covered to be performed for such sums as may be Site or in CONTRACTOR's principal or branch acceptable to OWNER and ENGINEER . office for general administration of the Work CONTRACTOR agrees that : and not specifically included in the agreed upon schedule of job classifications referred to in 1 . the allowances include the cost to paragraph 11 . 01 . A . 1 or specifically covered by CONTRACTOR ( less any applicable trade paragraph 11 . 01 .A . 4 , all of which are to be discounts ) of materials and equipment required considered administrative costs covered by the by the allowances to be delivered at the Site , CONTRACTOR ' s fee . and all applicable taxes ; and 2 . Expenses of CONTRACTOR' s princi- 2 . CONTRACTOR's costs for unloading pal and branch offices other than and handling on the Site , labor, installation CONTRACTOR's office at the Site . costs , overhead , profit, and other expenses contemplated for the allowances have been 3 . Any part of CONTRACTOR' s capital included in the Contract Price and not in the expenses , including interest on allowances , and no demand for additional CONTRACTOR' s capital employed for the payment on account of any of the foregoing will Work and charges against CONTRACTOR for be valid . delinquent payments . B . Prior to final payment , an appropriate Change 4 . Costs due to the negligence of CON - Order will be issued as recommended by ENGINEER TRACTOR , any Subcontractor, or anyone to reflect actual amounts due CONTRACTOR on directly or indirectly employed by any of them or account of Work covered by allowances , and the Con - for whose acts any of them may be liable , tract Price shall be correspondingly adjusted . including but not limited to , the correction of defective Work , disposal of materials or 11 . 03 Unit Price Work equipment wrongly supplied , and making good any damage to property. A . Where the Contract Documents provide that all or part of the Work is to be Unit Price Work , initially 5 . Other overhead or general expense the Contract Price will be deemed to include for all costs of any kind and the costs of any item not Unit Price Work an amount equal to the sum of the specifically and expressly included in unit price for each separately identified item of Unit paragraphs 11 . 01 .A and 11 . 01 . 13 . Price Work times the estimated quantity of each item as indicated in the Agreement . The estimated C . CONTRACTOR 's Fee: When all the Work is quantities of items of Unit Price Work are not guaran- performed on the basis of cost-plus , CONTRACTOR' s teed and are solely for the purpose of comparison of fee shall be determined as set forth in the Agreement . Bids and determining an initial Contract Price . Deter- When the value of any Work covered by a Change minations of the actual quantities and classifications of Order or when a Claim for an adjustment in Contract Unit Price Work performed by CONTRACTOR will be Price is determined on the basis of Cost of the Work, made by ENGINEER subject to the provisions of CONTRACTOR's fee shall be determined as set forth paragraph 9 . 08 . in paragraph 12 . 01 . C . B . Each unit price will be deemed to include an amount considered by CONTRACTOR to be ade- 00700 - General Conditions REV 04-07 .doc 00700 - 33 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc quate to cover CONTRACTOR' s overhead and profit Documents and agreement to a lump sum is for each separately identified item . not reached under paragraph 12 . 01 . B . 2 , on the basis of the Cost of the Work (determined as C . OWNER or CONTRACTOR may make a provided in paragraph 11 . 01 ) plus a Claim for an adjustment in the Contract Price in accor- CONTRACTOR' s fee for overhead and profit dance with paragraph 10 . 05 if: I (determined as provided in paragraph 12 . 01 . C) . 1 . the quantity of any item of Unit Price C . CONTRACTOR 's Fee : The Work performed by CONTRACTOR differs CONTRACTOR' s fee for overhead and profit shall be materially and significantly from the estimated determined as follows : quantity of such item indicated in the Agreement; and 1 . a mutually acceptable fixed fee ; or 2 . there is no corresponding adjustment 2 . if a fixed fee is not agreed upon , then with respect any other item of Work ; and a fee based on the following percentages of the various portions of the Cost of the Work : 3 . if CONTRACTOR believes that CONTRACTOR is entitled to an increase in a . for costs incurred under para- Contract Price as a result of having incurred graphs 11 . 01 . A . 1 and 11 . 01 . A . 2 , the additional expense or OWNER believes that CONTRACTOR' S fee shall be 15 percent ; OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to b . for costs incurred under paragraph the amount of any such increase or decrease . 11 . 01 .A . 3 , the CONTRACTOR's fee shall be five percent ; ARTICLE 12 - CHANGE OF CONTRACT PRICE ; c . where one or more tiers of subcon- CHANGE OF CONTRACT TIMES tracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon , the intent of paragraph 12 . 01 . C . 2 . a is that 12 . 01 Change of Contract Price the Subcontractor who actually performs the Work , at whatever tier , will be paid a fee A . The Contract Price may only be changed by a of 15 percent of the costs incurred by such Change Order or by a Written Amendment . Any Subcontractor under paragraphs 11 . 01 .A . 1 Claim for an adjustment in the Contract Price shall be and 11 . 01 .A . 2 and that any higher tier based on written notice submitted by the party making Subcontractor and CONTRACTOR will the Claim to the ENGINEER and the other party to the each be paid a fee of five percent of the Contract in accordance with the provisions of para- amount paid to the next lower tier Subcon- graph 10 . 05 . tractor ; B . The value of any Work covered by a Change d . no fee shall be payable on the Order or of any Claim for an adjustment in the basis of costs itemized under paragraphs Contract Price will be determined as follows : 11 . 01 .A . 4 , 11 . 01 . A . 5 , and 11 . 01 . 6 ; 1 . where the Work involved is covered e . the amount of credit to be allowed by unit prices contained in the Contract by CONTRACTOR to OWNER for any Documents , by application of such unit prices to change which results in a net decrease in the quantities of the items involved (subject to cost will be the amount of the actual net the provisions of paragraph 11 . 03 ) ; or decrease in cost plus a deduction in CONTRACTOR' s fee by an amount equal 2 . where the Work involved is not cov- to five percent of such net decrease ; and ered by unit prices contained in the Contract Documents , by a mutually agreed lump sum f . when both additions and credits are (which may include an allowance for overhead involved in any one change , the adjustment and profit not necessarily in accordance with in CONTRACTOR's fee shall be computed paragraph 12 . 01 . C . 2 ) ; or on the basis of the net change in accordance with paragraphs 12 . 01 . C . 2 . a 3 . where the Work involved is not cov- through 12 . 01 . C . 2 . e , inclusive . ered by unit prices contained in the Contract 00700 - General Conditions REV 04-07.doc 00700 - 34 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00700 - General Conditions REV 04-07.doc 12 . 02 Change of Contract Times surety for or employee or agent of any of them , for A. The Contract Times ( or Milestones ) may only damages arising out of or resulting from : be changed by a Change Order or by a Written 1 . delays caused by or within the control Amendment . Any Claim for an adjustment in the of CONTRACTOR; or Contract Times (or Milestones ) shall be based on written notice submitted by the party making the claim 2 . delays beyond the control of both to the ENGINEER and the other party to the Contract OWNER and CONTRACTOR including but not in accordance with the provisions of paragraph 10 . 05 . limited to fires , floods , epidemics , abnormal weather conditions , acts of God , or acts or B . Any adjustment of the Contract Times ( or neglect by utility owners or other contractors Milestones ) covered by a Change Order or of any . performing other work as contemplated by Claim for an adjustment in the Contract Times ( or Article 7 . Milestones ) will be determined in accordance with the . provisions of this Article 12 . B . Nothing in this paragraph 12 . 06 bars a change in Contract Price pursuant to this Article 12 to 12 . 03 Delays Beyond CONTRACTOR 's Control compensate CONTRACTOR due to delay, interference , , or disruption directly attributable to A . Where CONTRACTOR is prevented from actions or inactions of OWNER or anyone for whom completing any part of the Work within the Contract OWNER is responsible . Times (or Milestones ) due to delay beyond the control of CONTRACTOR , the Contract Times (or Milestones ) will be extended in an amount equal to the ARTICLE 13 - TESTS AND INSPECTIONS ; time lost due to such delay if a Claim is made therefor CORRECTION , REMOVAL OR ACCEPTANCE OF as provided in paragraph 12 . 02 .A . Delays beyond the DEFECTIVE WORK control of CONTRACTOR shall include , but not be limited to , acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other 13 . 01 Notice of Defects work as contemplated by Article 7 , fires , floods , epidemics , abnormal weather conditions , or acts of A . Prompt notice of all defective Work of which God . OWNER or ENGINEER has actual knowledge will be given to CONTRACTOR . All defective Work may be 12 . 04 Delays Within CONTRACTOR 's Control rejected , corrected , or accepted as provided in this Article 13 . A . The Contract Times (or Milestones ) will not be extended due to delays within the control of 13 . 02 Access to Work CONTRACTOR . Delays attributable to and within the control of a Subcontractor or Supplier shall be A . OWNER, ENGINEER, ENGINEER' s Con - deemed to be delays within the control of CONTRAC- sultants , other representatives and personnel of TOR . OWNER , independent testing laboratories , and governmental agencies with jurisdictional interests will 12 . 05 Delays Beyond OWNER 's and have access to the Site and the Work at reasonable CONTRACTOR 's Control times for their observation , inspecting , and testing . CONTRACTOR shall provide them proper and safe A. Where CONTRACTOR is prevented from conditions for such access and advise them of completing any part of the Work within the Contract CONTRACTOR' s Site safety procedures and Times (or Milestones ) due to delay beyond the control programs so that they may comply therewith as of both OWNER and CONTRACTOR, an extension of applicable . the Contract Times ( or Milestones ) in an amount equal to the time lost due to such delay shall be 13 . 03 Tests and Inspections CONTRACTOR's sole and exclusive remedy for such delay . A . CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required 12 . 06 Delay Damages inspections , tests , or approvals and shall cooperate with inspection and testing personnel to facilitate A. In no event shall OWNER or ENGINEER be required inspections or tests . liable to CONTRACTOR , any Subcontractor, any Supplier, or any other person or organization , or to any 00700 - General Conditions REV 04-07.doc 00700 - 35 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc B . OWNER .. shall em ley and pal flar`El services of an independent testing laboraKred' ly o B . If ENGINEER considers it necessary or perform all inspections , tests , or approvals re eadvisable that covered Work be observed by ENGI - the Contract Documents except : NEER or inspected or tested by others , CONTRAC- TOR , at ENGINEER' s request, shall uncover, expose , 1 . for inspections , to or approvals or otherwise make available for observation , inspec- covered by paragraphs 1 3 . 0 and 13 . 03 . D tion , or testing as ENGINEER may require , that below; portion of the Work in question , furnishing all neces- sary labor , material , and equipment . If it is found that 2 . that cos incurred in connection with such Work is defective , CONTRACTOR shall pay all tests or insp ions conducted pursuant to Claims , costs , losses , and damages ( including but not paragraph . 04 . B shall be paid as provided in limited to all fees and charges of engineers , architects , said par raph 13 . 04 . 6 ; and attorneys , and other professionals and all court or arbitration or other dispute resolution costs ) arising out as otherwise specifically provided in of or relating to such uncovering , exposure , observa- tion , inspection , and testing , and of satisfactory replacement or reconstruction ( including but not C . If Laws or Regulations of any public body limited to all costs of repair or replacement of work of having jurisdiction require any Work (or part thereof) others ) ; and OWNER shall be entitled to an specifically to be inspected , tested , or approved by an appropriate decrease in the Contract Price . If the employee or other representative of such public body, parties are unable to agree as to the amount thereof, CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in arranging and obtaining such inspections , tests , or paragraph 10 . 05 . If, however , such Work is not found approvals , pay all costs in connection therewith , and to be defective , CONTRACTOR shall be allowed an furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the tion or approval . Contract Times ( or Milestones ) , or both , directly attributable to such uncovering , exposure , D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement, and arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to agree as to connection with any inspections , tests , or approvals the amount or extent thereof, CONTRACTOR may required for OWNER Is and ENGINEER's acceptance make a Claim therefor as provided in paragraph of materials or equipment to be incorporated in the 10 . 05 . Work ; or acceptance of materials , mix designs , or equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work CONTRACTOR' s purchase thereof for incorporation in the Work . Such inspections , tests , or approvals shall be performed by organizations acceptable to fails to supply sufficient skilled workers or itable OWNER and ENGINEER . materials or equipment , or fails to perform e Work in such a way that the completed Wor ill conform to E . If any Work ( or the work of others ) that is to the Contract Documents , OWNE may order CON - be inspected , tested , or approved is covered by CON - TRACTOR to stop the Work r any portion thereof, TRACTOR without written concurrence of ENGI - until the cause for such der has been eliminated ; NEER , it must, if requested by ENGINEER, be uncov- however , this right of NER to stop the Work shall ered for observation . not give rise to duty on the part of OWNER to exercise this 4 t for the benefit of CONTRACTOR , F . Uncovering Work as provided in paragraph any Sub tractor , any Supplier, any other individual 13 . 03 . E shall be at CONTRACTOR' s expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR' s intention to cover the same and ENGINEER has not acted with reasonable prompt- ness in response to such notice . 13 . 04 Uncovering Work A . If any Work is covered contrary to the written request of ENGINEER , it must, if requested by ENGI - NEER , be uncovered for ENGINEER' s observation and replaced at CONTRACTOR' s expense . 00700 - General Conditions REV 04-07 .doc 00700 - 36 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00700 - General Conditions REV 04-07 .doc 13 . 06 Correction or Removal of Defective Work C . Where defective Work (and damage to other Work resulting therefrom ) has been corrected or A . CONTRACTOR shall correct all defective removed and replaced under this paragraph 13 . 07 , Work , whether or not fabricated , installed , or the correction period hereunder with respect to such completed , or, if the Work has been rejected by ENGI - Work will be extended for an additional period of one NEER , remove it from the Project and replace it with year after such correction or removal and replacement Work that is not defective . CONTRACTOR shall pay has been satisfactorily completed . all Claims , costs , losses , and damages ( including but not limited to all fees and charges of engineers , D . CONTRACTOR' s obligations under this architects , attorneys , and other professionals and all paragraph 13 . 07 are in addition to any other obligation court or arbitration or other dispute resolution costs ) or warranty. The provisions of this paragraph 13 . 07 arising out of or relating to such correction or removal shall not be construed as a substitute for or a waiver ( including but not limited to all costs of repair or of the provisions of any applicable statute of limitation replacement of work of others ) . or repose . 13 . 07 Correction Period 13 . 08 Acceptance of Defective Work A . If within one year after the date of Substantial A . If, instead of requiring correction or removal Completion or such longer period of time as may be and replacement of defective Work, OWNER ( and , prescribed by Laws or Regulations or by the terms of prior to ENGINEER Is recommendation of final pay- any applicable special guarantee required by the ment, ENGINEER) prefers to accept it , OWNER may Contract Documents or by any specific provision of the do so . CONTRACTOR shall pay all Claims , costs , Contract Documents , any Work is found to be losses , and damages ( including but not limited to all defective , or if the repair of any damages to the land fees and charges of engineers , architects , attorneys , or areas made available for CONTRACTOR's use by and other professionals and all court or arbitration or OWNER or permitted by Laws and Regulations as other dispute resolution costs ) attributable to contemplated in paragraph 6 . 11 .A is found to be OWNER' s evaluation of and determination to accept defective , CONTRACTOR shall promptly, without cost such defective Work (such costs to be approved by to OWNER and in accordance with OWNER' s written ENGINEER as to reasonableness ) and the diminished instructions : ( i ) repair such defective land or areas , or value of the Work to the extent not otherwise paid by ( ii ) correct such defective Work or, if the defective CONTRACTOR pursuant to this sentence . If any Work has been rejected by OWNER, remove it from such acceptance occurs prior to ENGINEER's recom - the Project and replace it with Work that is not mendation of final payment , a Change Order will be defective , and ( iii ) satisfactorily correct or repair or issued incorporating the necessary revisions in the remove and replace any damage to other Work , to the Contract Documents with respect to the Work, and work of others or other land or areas resulting there- OWNER shall be entitled to an appropriate decrease from . If CONTRACTOR does not promptly comply in the Contract Price , reflecting the diminished value of with the terms of such instructions , or in an Work so accepted . If the parties are unable to agree emergency where delay would cause serious risk of as to the amount thereof, OWNER may make a Claim loss or damage , OWNER may have the defective therefor as provided in paragraph 10 . 05 . If the Work corrected or repaired or may have the rejected acceptance occurs after such recommendation , an Work removed and replaced , and all Claims , costs , appropriate amount will be paid by CONTRACTOR to losses , and damages ( including but not limited to all OWNER . fees and charges of engineers , architects , attorneys , and other professionals and all court or arbitration or 13 . 09 OWNER May Correct Defective Work other dispute resolution costs ) arising out of or relating to such correction or repair or such removal and A . If CONTRACTOR fails within a reasonable replacement ( including but not limited to all costs of time after written notice from ENGINEER to correct repair or replacement of work of others ) will be paid by defective Work or to remove and replace rejected CONTRACTOR . Work as required by ENGINEER in accordance with paragraph 13 . 06 .A, or if CONTRACTOR fails to B . In special circumstances where a particular perform the Work in accordance with the Contract item of equipment is placed in continuous service Documents , or if CONTRACTOR fails to comply with before Substantial Completion of all the Work , the any other provision of the Contract Documents , correction period for that item may start to run from an OWNER may, after seven days written notice to earlier date if so provided in the Specifications or by CONTRACTOR, correct and remedy any such Written Amendment . deficiency. 00700 - General Conditions REV 04-07.doc 00700 - 37 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc B . In exercising the rights and remedies under 14 . 02 Progress Payments this paragraph , OWNER shall proceed expeditiously . In connection with such corrective and remedial A . Applications for Payments action , OWNER may exclude CONTRACTOR from all or part of the Site , take possession of all or part of the 1 . At least 20 days before the date Work and suspend CONTRACTOR' s services related established for each progress payment ( but not thereto , take possession of CONTRACTOR' s tools , more often than once a month ) , appliances , construction equipment and machinery at CONTRACTOR shall submit to ENGINEER for the Site , and incorporate in the Work all materials and review an Application for Payment filled out and equipment stored at the Site or for which OWNER has signed by CONTRACTOR covering the Work paid CONTRACTOR but which are stored elsewhere . completed as of the date of the Application and CONTRACTOR shall allow OWNER , OWNER Is accompanied by such supporting representatives , agents and employees , OWNER's documentation as is required by the Contract other contractors , and ENGINEER and ENGINEER' s Documents . If payment is requested on the Consultants access to the Site to enable OWNER to basis of materials and equipment not exercise the rights and remedies under this incorporated in the Work but delivered and paragraph . suitably stored at the Site or at another location agreed to in writing , the Application for Payment C . All Claims , costs , losses , and damages . shall also be accompanied by a bill of sale , ( including but not limited to all fees and charges of invoice , or other documentation warranting that engineers , architects , attorneys , and other OWNER has received the materials and equip- professionals and all court or arbitration or other ment free and clear of all Liens and evidence dispute resolution costs ) incurred or sustained by that the materials and equipment are covered OWNER in exercising the rights and remedies under by appropriate property insurance or other this paragraph 13 . 09 will be charged against CON - arrangements to protect OWNER' s interest TRACTOR, and a Change Order will be issued therein , all of which must be satisfactory to incorporating the necessary revisions in the Contract OWNER . Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the 2 . Beginning with the second Contract Price . If the parties are unable to agree as to Application for Payment , each Application shall the amount of the adjustment , OWNER may make a include an affidavit of CONTRACTOR stating Claim therefor as provided in paragraph 10 . 05 . Such that all previous progress payments received claims , costs , losses and damages will include but not on account of the Work have been applied on be limited to all costs of repair , or replacement of work account to discharge CONTRACTOR' s of others destroyed or damaged by correction , legitimate obligations associated with prior removal , or replacement of CONTRACTOR' s Applications for Payment . defective Work . 3 . The amount of retainage with respect D . CONTRACTOR shall not be allowed an to progress payments will be as stipulated in extension of the Contract Times (or Milestones ) the Agreement . because of any delay in the performance of the Work attributable to the exercise by OWNER of OWNER' s B . Review of Applications rights and remedies under this paragraph 13 . 09 . 1 . ENGINEER will , within 10 days after receipt of each Application for Payment, either ARTICLE 14 - PAYMENTS TO CONTRACTOR AND indicate in writing a recommendation of COMPLETION payment and present the Application to OWNER or return the Application to CONTRACTOR indicating in writing 14 . 01 Schedule of Values ENGINEER' s reasons for refusing to recommend payment . In the latter case , LON - A. The schedule of values established as provid - TRACTOR may make the necessary ed in paragraph 2 . 07 .A will serve as the basis for corrections and resubmit the Application . progress payments and will be incorporated into a form of Application for Payment acceptable to ENGI - 2 . ENGINEER's recommendation of NEER . Progress payments on account of Unit Price any payment requested in an Application for Work will be based on the number of units completed . Payment will constitute a representation by ENGINEER to OWNER , based on 00700 - General Conditions REV 04-07 .doc 00700 - 38 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc ENGINEER's observations on the Site of the make any examination to ascertain how or for executed Work as an experienced and qualified what purposes CONTRACTOR has used the design professional and on ENGINEER's moneys paid on account of the Contract Price , review of the Application for Payment and the or to determine that title to any of the Work , accompanying data and schedules , that to the materials , or equipment has passed to best of ENGINEER' s knowledge , information OWNER free and clear of any Liens . and belief: 5 . ENGINEER may refuse to recom - a . the Work has progressed to the point mend the whole or any part of any payment if, indicated ; in ENGINEER 's opinion , it would be incorrect to make the representations to OWNER referred b . the quality of the Work is generally in to in paragraph 14 . 02 . 13 . 2 . ENGINEER may accordance with the Contract Documents also refuse to recommend any such payment (subject to an evaluation of the Work as a or, because of subsequently discovered functioning whole prior to or upon evidence or the results of subsequent Substantial Completion , to the results of any inspections or tests , revise or revoke any such subsequent tests called for in the Contract payment recommendation previously made , to Documents , to a final determination of such extent as may be necessary in quantities and classifications for Unit Price ENGINEER's opinion to protect OWNER from Work under paragraph 9 . 08 , and to any loss because : other qualifications stated in the recommendation ) ; and a . the Work is defective , or completed Work has been damaged , requiring c . The conditions precedent to correction or replacement ; CONTRACTOR' s being entitled to such payment appear to have been fulfilled in so b . the Contract Price has been reduced far as it is ENGINEER' s responsibility to by Written Amendment or Change Orders ; observe the Work . c . OWNER has been required to correct 3 . By recommending any such defective Work or complete Work in accor- payment ENGINEER will not thereby be dance with paragraph 13 . 09 ; or deemed to have represented that : ( i ) inspec- tions made to check the quality or the quantity of the Work as it has been performed have the occurr o the events erer- been exhaustive , extended to every aspect of parAnFaph 15 . 02 .A . the Work in progress , or involved detailed inspections of the Work beyond the responsi - C . Payment Becomes Due bilities specifically assigned to ENGINEER in the Contract Documents ; or ( ii ) that there may not be other matters or issues between the Application for Payment to O with parties that might entitle CONTRACTOR to be ENGINEER's recommen n , the amount paid additionally by OWNER or entitle OWNER recommended wit sect to the provisions of to withhold payment to CONTRACTOR . paragrap 2 . D ) become due , and when ,1,6@ be paid h, Q�AINIER t GQN1TRAr!TQR 4 . Neither ENGINEER's review of CONTRACTOR' s Work for the purposes of D . Reduction in Payment recommending payments nor ENGINEER's recommendation of any payment, including final 1 . OWNER may refuse to make payment, will impose responsibility on payment of the full amount recommended by ENGINEER to supervise , direct , or control the ENGINEER because : Work or for the means , methods , techniques , sequences , or procedures of construction , or a . claims have been made against the safety precautions and programs incident OWNER on account of CONTRACTOR' s thereto , or for CONTRACTOR' s failure to performance or furnishing of the Work; comply with Laws and Regulations applicable to CONTRACTOR' s performance of the Work . b . Liens have been filed in connection Additionally, said review or recommendation will with the Work , except where not impose responsibility on ENGINEER to CONTRACTOR has delivered a specific 00700 - General Conditions REV 04-07.doc 00700 - 39 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07.doc Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens ; c . there are other items entitling OWN - ER to a set-off against the amount recommended ; or d . OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14 . 02 . B . 5 . a through 14 . 02 . B . 5 . c or paragraph 15 . 02 .A . 2 . If OWNER refuses to make payment of the full amount recommended by ENGINEER , OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR any amount remaining after deduction of the amount so withheld . OWNER shall promptly pay CONTRACTOR the amount so withheld , or any adjustment thereto agreed to by OWNER and CONTRACTOR , when CONTRACTOR corrects to OWNER' s satisfaction the reasons for such action . 3 . If it is subsequently determined that OWNER' s refusal of payment was not justified , the amount wrongfully withheld shall be treated as an amount due as determined by paragraph 14 . 02 . C . 1 . 14 . 03 CONTRACTOR 's Warranty of Title A . CONTRACTOR warrants and guarantees that title to all Work , materials , and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens . 00700 - General Conditions REV 04-07.doc 00700 - 40 F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc TRACTOR reasonable access to complete or correct 14 . 04 Substantial Completion items on the tentative list . A . When CONTRACTOR considers the entire 14 . 05 Partial Utilization Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the A. Use by OWNER at OWNER's option of any entire Work is substantially complete ( except for items substantially completed part of the Work which has specifically listed by CONTRACTOR as incomplete) specifically been identified in the Contract Documents , and request that ENGINEER issue a certificate of or which OWNER, ENGINEER, and CONTRACTOR Substantial Completion . Promptly thereafter, agree constitutes a separately functioning and usable OWNER , CONTRACTOR, and ENGINEER shall part of the Work that can be used by OWNER for its make an inspection of the Work to determine the intended purpose without significant interference with status of completion . If ENGINEER does not consider CONTRACTOR' s performance of the remainder of the Work substantially complete , ENGINEER will the Work , may be accomplished prior to Substantial notify CONTRACTOR in writing giving the reasons Completion of all the Work subject to the following therefore . If ENGINEER Gensiders the %Nerkr conditions . SUbgtaRtially GOMPlete , ENGINEER will prepare and 1 . OWNER at any time may request CONTRACTOR in writing to permit OWNER to GOMPletiOR . There shall be attaGhed t9 the GertifiGate use any such part of the Work which OWNER a tentative list of items to be GOMpleted OF GGFF8GtGG1 believes to be ready for its intended use and substantially complete . If CONTRACTOR agrees that such part of the Work is substantially complete , CONTRACTOR will certify to OWNER and ENGINEER that such G9 % idQring 66IGh ebjestiens , ENGINEER -GeeslUdes part of the Work is substantially complete and request ENGINEER to issue a certificate of ENGINEER vi�:ill �Atithin 14 days after lsubmilBSOOR of the Substantial Completion for that part of the tA OWNER Retify CONTRACTOR Work . CONTRACTOR at any time may notify OWNER and ENGINEER in writing that GORE nr_�tiv^ n ef- 9WN € Rs eb7estiens , € NrlNl€€-R CONTRACTOR considers any such part of the Work ready for its intended use and substan - ENGINEER will within said 14 days exerOute ;and, tially complete and request ENGINEER to issue deliver to QlAiNER and CONTRACTOR a defiRitive a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER , CONTRACTOR, and ENGINEER shall make as ENGINEER believes justified afteF GeR6ideFatiGn Of an inspection of that part of the Work to determine its status of completion . If of the tentative GEIFtifiGat8 Of CompletioR ENGINEER does not consider that part of the .F= N _ . ,l . . . ; .. deliver + OWNER and r� nnlTpnG Work to be substantially complete , ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If OWNER and CONTRACTOR with FeSpeGt t9 6eGYFitYT ENGINEER considers that part of the Work to , be substantially complete , the provisions of paragraph 14 . 04 will apply with respect to Rd guarantees lJnless—OWN € R and certification of Substantial Completion of that GONTRACT-OR agree otherwise OR writing and so part of the Work and the division of iRfOFM ENGINEER iRir•+• n PFOOF +„ ENGINEER' responsibility in respect thereof and access thereto . s aforesaid reGGRqFn8Rdat4GR Well be 2 . No occupancy or separate operation paymeRt- of part of the Work may occur prior to compliance with the requirements of paragraph B . OWNER shall have the right to exclude 5 . 10 regarding property insurance . CONTRACTOR from the Site after the date of Substantial Completion , but OWNER shall allow CON - 00700 - General Conditions REV 04-07.doc 00700 - 41 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 14 . 06 Final Inspection B . Review of Application and Acceptance A. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is 1 . If, on the basis of ENGINEER's complete , ENGINEER will promptly make a final observation of the Work during construction inspection with OWNER and CONTRACTOR and will and final inspection , and ENGINEER 7s review notify CONTRACTOR in writing of all particulars in of the final Application for Payment and which this inspection reveals that the Work is accompanying documentation as required by incomplete or defective . CONTRACTOR shall the Contract Documents , ENGINEER is immediately take such measures as are necessary to satisfied that the Work has been completed complete such Work or remedy such deficiencies . and CONTRACTOR' s other obligations under the Contract Documents have been fulfilled , 14 . 07 Final Payment ENGINEER will , within ten days after receipt of the final Application for Payment , indicate in A . Application for Payment writing ENGINEER' s recommendation of payment and present the Application for 1 . After CONTRACTOR has , in the Payment to OWNER for payment . At the same opinion of ENGINEER , satisfactorily completed time ENGINEER will also give written notice to all corrections identified during the final OWNER and CONTRACTOR that the Work is inspection and has delivered , in accordance acceptable subject to the provisions of with the Contract Documents , all maintenance paragraph 14 . 09 . Otherwise , ENGINEER will and operating instructions , schedules , guaran - return the Application for Payment to tees , Bonds , certificates or other evidence of CONTRACTOR , indicating in writing the insurance certificates of inspection , marked-up reasons for refusing to recommend final record documents (as provided in paragraph payment , in which case CONTRACTOR shall 6 . 12 ) , and other documents , CONTRACTOR make the necessary corrections and resubmit may make application for final payment follow- the Application for Payment . ing the procedure for progress payments . C . Payment Becomes Due 2 . The final Application for Payment shall be accompanied (except as previously 1 . Thirty days after the presentation to delivered ) by: ( i ) all documentation called for in OWNER of the Application for Payment and the Contract Documents , including but not accompanying documentation , the amount limited to the evidence of insurance required by recommended by ENGINEER will become due subparagraph 5 . 04 . 13 . 7 ; ( ii ) consent of the and , when due , will be paid by OWNER to surety, if any, to final payment ; and ( iii ) CONTRACTOR . complete and legally effective releases or waivers ( satisfactory to OWNER) of all Lien 14 . 08 Final Completion Delayed rights arising out of or Liens filed in connection with the Work . A . If, through no fault of CONTRACTOR , final completion of the Work is significantly delayed , and if 3 . In lieu of the releases or waivers of ENGINEER so confirms , OWNER shall , upon receipt Liens specified in paragraph 14 . 07 .A . 2 and as of CONTRACTOR' s final Application for Payment and approved by OWNER , CONTRACTOR may recommendation of ENGINEER, and without terminat- furnish receipts or releases in full and an ing the Agreement, make payment of the balance due affidavit of CONTRACTOR that : ( i ) the releases for that portion of the Work fully completed and and receipts include all labor , services , accepted . If the remaining balance to be held by material , and equipment for which a Lien could OWNER for Work not fully completed or corrected is be filed ; and ( ii ) all payrolls , material and less than the retainage stipulated in the Agreement, equipment bills , and other indebtedness and if Bonds have been furnished as required in connected with the Work for which OWNER or paragraph 5 . 01 , the written consent of the surety to OWNER's property might in any way be the payment of the balance due for that portion of the responsible have been paid or otherwise satis- Work fully completed and accepted shall be submitted fied . If any Subcontractor or Supplier fails to by CONTRACTOR to ENGINEER with the Application furnish such a release or receipt in full , CON- for such payment . Such payment shall be made TRACTOR may furnish a Bond or other under the terms and conditions governing final collateral satisfactory to OWNER to indemnify payment , except that it shall not constitute a waiver of OWNER against any Lien . Claims . 00700 - General Conditions REV 04-07 .doc 00700 - 42 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00700 - General Conditions REV 04-07 .doc 14 . 09 Waiver of Claims 3 . CONTRACTOR 's disregard of the authority of ENGINEER ; or A . The making and acceptance of final payment 4 . CONTRACTOR 's violation in any will constitute : substantial way of any provisions of the 1 . a waiver of all Claims by OWNER Contract Documents . against CONTRACTOR, except Claims arising B . If one or more of the events identified in from unsettled Liens , from defective Work paragraph 15 . 02 . A occur, OWNER may, after giving appearing after final inspection pursuant to CONTRACTOR ( and the surety, if any) seven days paragraph 14 . 06 , from failure to comply with the written notice , terminate the services of Contract Documents or the terms of any special CONTRACTOR , exclude CONTRACTOR from the guarantees specified therein , or from Site , and take possession of the Work and of all CONTRACTOR ' s continuing obligations under CONTRACTOR ' s tools , appliances , construction the Contract Documents ; and equipment, and machinery at the Site , and use the same to the full extent they could be used by 2 . a waiver of all Claims by CONTRAC - CONTRACTOR (without liability to CONTRACTOR for TOR against OWNER other than those trespass or conversion ) , incorporate in the Work all previously made in writing which are still materials and equipment stored at the Site or for unsettled . which OWNER has paid CONTRACTOR but which are stored elsewhere , and finish the Work as OWNER may deem expedient. In such case , CONTRACTOR ARTICLE 15 - SUSPENSION OF WORK AND shall not be entitled to receive any further payment TERMINATION until the Work is finished . If the unpaid balance of the Contract Price exceeds all claims , costs , losses , and damages ( including but not limited to all fees and 15 . 01 OWNER May Suspend Work charges of engineers , architects , attorneys , and other professionals and all court or arbitration or other A . At any time and without cause , OWNER may dispute resolution costs ) sustained by OWNER arising suspend the Work or any portion thereof for a period out of or relating to completing the Work , such excess of not more than 90 consecutive days by notice in will be paid to CONTRACTOR . If such claims , costs , writing to CONTRACTOR and ENGINEER which will losses , and damages exceed such unpaid balance , fix the date on which Work will be resumed . CON - CONTRACTOR shall pay the difference to OWNER . TRACTOR shall resume the Work on the date so Such claims , costs , losses , and damages incurred by fixed . CONTRACTOR shall be allowed an adjustment OWNER will be reviewed by ENGINEER as to their in the Contract Price or an extension of the Contract reasonableness and , when so approved by Times , or both , directly attributable to any such ENGINEER , incorporated in a Change Order . When suspension if CONTRACTOR makes a Claim therefor exercising any rights or remedies under this as provided in paragraph 10 . 05 . paragraph OWNER shall not be required to obtain the lowest price for the Work performed . 15 . 02 OWNER May Terminate for Cause C . Where CONTRACTOR ' s services have been A . The occurrence of any one or more of the so terminated by OWNER , the termination will not . following events will justify termination for cause : affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter 1 . CONTRACTOR' s persistent failure accrue . Any retention or payment of moneys due to perform the Work in accordance with the CONTRACTOR by OWNER will not release CON - Contract Documents ( including , but not limited TRACTOR from liability . to , failure to supply sufficient skilled workers or suitable materials or equipment or failure to 15 . 03 OWNER May Terminate For Convenience adhere to the progress schedule established under paragraph 2 . 07 as adjusted from time to A . Upon seven days written notice to CON - time pursuant to paragraph 6 . 04) ; TRACTOR and ENGINEER , OWNER may, without cause and without prejudice to any other right or 2 . CONTRACTOR ' s disregard of Laws remedy of OWNER , elect to terminate the Contract . or Regulations of any public body having In such case , CONTRACTOR shall be paid (without jurisdiction ; duplication of any items ) : 00700 - General Conditions REV 04-07. doc 00700 - 43 F:\Engineering\Special Projects\Eagle Trace Phase 2\Contract Documents\Eagle Trace Subdivision Phase II\00700 - General Conditions REV 04-07.doc 1 . for completed and acceptable Work or Contract Times or otherwise for expenses or executed in accordance with the Contract damage directly attributable to CONTRACTOR ' s Documents prior to the effective date of stopping the Work as permitted by this paragraph . termination , including fair and reasonable sums for overhead and profit on such Work ; ARTICLE 16 - DISPUTE RESOLUTION 2 . for expenses sustained prior to the effective date of termination in performing - services and furnishing labor , materials , or 16 . 01 Methods and Procedures equipment as required by the Contract Documents in connection with uncompleted A . Dispute resolution methods and procedures , if Work , plus fair and reasonable sums for any, shall be as set forth in the Supplementary overhead and profit on such expenses ; Conditions . If no method and procedure has been set forth , and subject to the provisions of paragraphs 9 . 09 3 . for all claims , costs , losses , and and 10 . 05 , OWNER and CONTRACTOR may damages ( including but not limited to all fees exercise such rights or remedies as either may and charges of engineers , architects , attorneys , otherwise have under the Contract Documents or by and other professionals and all court or Laws or Regulations in respect of any dispute . arbitration or other dispute resolution costs ) in - curred in settlement of terminated contracts with Subcontractors , Suppliers , and others ; and ARTICLE 17 - MISCELLANEOUS 4 . for reasonable expenses directly attributable to termination . 17 . 01 Giving Notice B . CONTRACTOR shall not be paid on account A . Whenever any provision of the Contract of loss of anticipated profits or revenue or other eco - Documents requires the giving of written notice , it will nomic loss arising out of or resulting from such be deemed to have been validly given if delivered in termination . person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended , 15 . 04 CONTRACTOR May Stop Work or or if delivered at or sent by registered or certified mail , Terminate postage prepaid , to the last business address known A . If, through no act or fault of CONTRACTOR, to the giver of the notice . the Work is suspended for more than 90 consecutive 17 . 02 Computation of Times days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any A . When any period of time is referred to in the Application for Payment within 30 days after it is Contract Documents by days , it will be computed to submitted , or OWNER fails for 30 days to pay CON - exclude the first and include the last day of such TRACTOR any sum finally determined to be due , then period . If the last day of any such period falls on a CONTRACTOR may, upon seven days written notice Saturday or Sunday or on a day made a legal holiday to OWNER and ENGINEER , and provided OWNER by the law of the applicable jurisdiction , such day will or ENGINEER do not remedy such suspension or be omitted from the computation . failure within that time , terminate the Contract and recover from OWNER payment on the same terms as 17 . 03 Cumulative Remedies provided in paragraph 15 . 03 . In lieu of terminating the Contract and without prejudice to any other right or A . The duties grid obligations imposed by these remedy , if ENGINEER has failed to act on an General Conditions and the rights and remedies avail - Application for Payment within 30 days after it is able hereunder to the parties hereto are in addition to , submitted , or OWNER has failed for 30 days to pay and are not to be construed in any way as a limitation CONTRACTOR any sum finally determined to be due , of, any rights and remedies available to any or all of CONTRACTOR may, seven days after written notice them which are otherwise imposed or available by to OWNER and ENGINEER , stop the Work until Laws or Regulations , by special warranty or payment is made of all such amounts due guarantee , or by other provisions of the Contract CONTRACTOR , including interest thereon . The Documents , and the provisions of this paragraph will provisions of this paragraph 15 . 04 are not intended to be as effective as if repeated specifically in the preclude CONTRACTOR from making a Claim under Contract Documents in connection with each paragraph 10 . 05 for an adjustment in Contract Price 00700 - General Conditions REV 04-07 .doc 00700 - 44 FAEngineering\Special Projects\Eagle Trace Phase 21%Contract Documents\Eagle Trace Subdivision Phase II\00700 - General Conditions REV 04-07.doc particular duty, obligation , right, and remedy to which they apply . 17 . 04 Survival of Obligations A . All representations , indemnifications , warran- ties , and guarantees made in , required by, or given in accordance with the Contract Documents , as well as all continuing obligations indicated in the Contract Documents , will survive final payment, completion , and acceptance of the Work or termination or comple- tion of the Agreement. 17 . 05 Controlling Law A . This Contract is to be governed by the law of the state in which the Project is located . 00700 - 45 00700 - General Conditions REV 04-07,doc F :\Engineering\Special Projects\Eagle Trace Phase Monlrect Documents\Eagle Trace Subdivision Phase 11\00700 - General Conditions REV 04-07.doc SECTION 00800 - SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS Article Title Article Number Introduction SC - 1 . 00 Defined Terms SC — 1 . 01 Before Starting Construction SC —2 . 05 Preconstruction Conference SC — 2 . 06 Coordination of Plans , Specifications , and Special Provisions SC — 3 . 06 Performance , Payment and Other Bonds SC — 5 . 01 Certificates of Insurance SC — 5 . 03 CONTRACTOR ' S Liability Insurance SC — 5 . 04 OWNER' s Liability Insurance SC — 5 . 05 Property Insurance SC — 5 . 06 Waiver of Rights SC — 5 . 07 Receipt and Application of Insurance Proceeds SC — 5 . 08 Labor ; Working Hours SC — 6 . 02 Concerning Subcontractors , Suppliers and Others SC — 6 . 06 Permits SC — 6 . 08 Taxes SC — 6 . 10 Test and Inspections SC — 13 . 03 OWNER May Stop the Work SC — 13 . 05 Progress Payments SC — 14 . 02 Mediation SC — 16 . 02 Miscellaneous SC — 17 . 00 00800-i 00800 - Supplementary Conditions REV 04-07 . doc 00800 iF:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07 .doc SECTION 00800 = SUPPLEMENTARY CONDITIONS TO THE GENERAL CONDITIONS SC - 1 . 00 Introduction These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract ( No . 1910 -8 , 1996 Edition ) and other provisions of the Contract Documents as indicated below . All provisions , which are not so amended or supplemented , remain in full force and effect . The terms used in these Supplementary Conditions will have the meanings indicated in the General Conditions . SC - 1 . 01 Defined Terms SC - 1 . 01 . A . 20 Not Used SC -2 . 05 Before Starting Construction SC - 2 . 05 . C . Delete paragraph GC 2. 05. 0 in its entirety and insert the following paragraph in its place : C . Evidence of Insurance : CONTRACTOR shall not commence work under this Contract until he has obtained all insurance required under Article 5 and such insurance has been delivered to the OWNER and approved by the OWNER , nor shall the CONTRACTOR allow any Subcontractor to commence work on his subcontract until all similar insurance required of the Subcontractor has been so obtained and approved . All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting , removing or replacing defective Work in accordance with Article 13 . SC -2 . 06 Preconstruction Conference SC -2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its place : A . Immediately after awarding the contract , but before the CONTRACTOR begins work , the Engineer will call a preconstruction conference at a place the ENGINEER designates to establish an understanding among the parties as to the work and to discuss schedules referred to in paragraph 2 . 05 . 13 , procedures for handling Shop Drawings and other submittals , and maintaining required records . Utility companies and others as appropriate will be requested to attend to discuss and coordinate work . SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions SC -3 . 06 Add the following new paragraphs immediately after paragraph GC- 3. 05: SC -3 . 06 Coordination of Plans, Specifications, and Special Provisions A . In case of discrepancy , the governing order of the documents shall be as follows : 1 . Written Interpretations 2 Addenda 3 . Specifications 4 . Supplementary Conditions to the General Conditions 5 . General Conditions 6 . Approved Shop Drawings 7 . Drawings 8 . Referenced Standards . 00800- 1 00800 - Supplementary Conditions REV 04 -07 . doc 00800 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07.doc 0 B . Written/computed dimensions shall govern over scaled dimensions . SC -5 . 01 Performance , Payment and Other Bonds SC-5 . 01 . A . Delete paragraph GC- 5. 01 . A in its entirety and insert the following paragraphs in its place : A . Within ten ( 10 ) days of receipt of the Contract Documents for execution , the CONTRACTOR shall furnish a Performance Bond in an amount equal to 100 % of the Contract Price and a Payment Bond in an amount equal to 100 % of the Contract Price . 1 . The CONTRACTOR shall provide two separate bonds . A combined Payment and Performance Bond for 100 % of the Contract Price is not an acceptable substitute . 2 . In lieu of the Performance and Payment Bonds , the CONTRACTOR may furnish an alternative form of security in the form of cash , money order , certified check , cashier' s check , irrevocable letter of credit or a security as listed in Part II of F . S . Chapter 625 . Any such alternative form of security shall be for the same purpose , and be for the same amount and subject to the same conditions as those applicable to the bond otherwise required . The determination of the value of an alternative form of security shall be made by the OWNER . 3 . Such Bonds shall continue in effect for one ( 1 ) year after acceptance of the Work by the OWNER . 4 , The CONTRACTOR shall record , the Payment Bond and the Performance Bond with the Public Record Section of the Indian River County Courthouse located at 2000 16th Avenue , Vero Beach , Florida 32960 . The recorded bonds shall be forwarded to the Indian River County Purchasing Division on or before the seventh day after they are recorded . The CONTRACTOR shall pay all costs . SC -5 . 03 Certificates of Insurance SC -5 . 03 Delete the second sentence of paragraph GC- 5. 03 in its entirety. SC -5 . 04 CONTRACTOR' s Liability Insurance SC - 5 . 04 Add the following new paragraphs immediately after paragraph GC- 5. 04. 8: C . The limits of liability for the insurance required by paragraph 5 . 04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations : 1 . Worker' s Compensation : To meet statutory limits in compliance with the Worker' s Compensation Law of Florida . This policy must include Employer Liability with a limit $ 100 , 000 for each accident , $ 500 , 000 disease ( policy limit ) and $ 100 , 000 disease ( each employee ) . Such policy shall include a waiver of subrogation as against OWNER and ENGINEER on account of injury sustained by an employee ( s ) of the CONTRACTOR . 2 . Commercial General Liability : Coverage shall provide minimum limits of liability of $ 1 , 000 , 000 per occurrence Combined Single Limit for Bodily Injury and Property Damage . This shall include coverage for : a . Premises/Operations b . Products/Completed Operations 00800-2 00800 - Supplementary Conditions REV 04-07 . doc 00800 2F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07.doc C . Contractual Liability d . Independent Contractors e . Explosion f. Collapse g . Underground . 3 . Business Auto Liability : Coverage shall provide minimum limits of liability of $ 1 , 000 , 000 per occurrence Combined Single Limit for Bodily Injury and Property Damage . This shall include coverage for: a . Owner Autos b . Hired Autos C , Non - Owned Autos . 4 . CONTRACTOR' s "All Risk" Insurance : CONTRACTOR shall secure Builders ' Risk "All Risk" insurance at his expense and provide properly completed and executed " Certificates of Insurance and Insurance Endorsement" forms in the exact wording and format presented in these Contract Documents before starting work . 5 . Special Requirements : a . Ten ( 10 ) days prior to the commencement of any work under this Contract , certificates of insurance and endorsement forms in the exact wording and format as presented in these Contract Documents will be provided to the OWNER ' s Risk Manager for review and approval . b . " Indian River County Florida " will be named as "Additional Insured " on both the General Liability , Auto Liability and Builder' s Risk " All Risk" Insurance . C . The OWNER will be given thirty ( 30 ) days notice prior to cancellation or modification of any stipulated insurance . Such notification will be in writing by registered mail , return receipt requested and addressed to the OWNER ' s Risk Manager . d . An appropriate " Indemnification " clause shall be made a provision of the Contract ( see paragraph 6 . 20 of the General Conditions ) . e . It is the responsibility of the CONTRACTOR to insure that all subcontractors comply with all insurance requirements . f. It should be remembered that these are minimum requirements , which are subject to modification in response to high hazard operation . g . Insured must be authorized to do business and have an agent for service of process in Florida and have an AAA policyholder' s rating and financial rating of a least Class XI in accordance with the most current Best' s Rating , D . Additional Insureds : 1 . In addition to " Indian River County , Florida , " the following individuals or entities shall be listed as " additional insureds" on the CONTRACTOR ' s liability insurance policies : a . NONE b . C . SC -5 . 05 OWNER ' s Liability Insurance SC -5 . 05 Delete paragraph GC- 5. 05. A in its entirety. 00800-3 00800 - Supplementary Conditions REV 04-07 . doc 00800 3F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07 .doc SC -5 . 06 Property Insurance SC -5 . 06 Delete paragraphs GC-5. 06. A , B, and C in their entirety and insert the following paragraphs in their place : A . CONTRACTOR shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof. This insurance shall : 1 . include the interests of OWNER , CONTRACTOR , Subcontractors , ENGINEER , ENGINEER' s Consultants and any other individuals or entities identified in the Supplementary Conditions , and the officers , directors , partners , employees , agents and other consultants and subcontractors of any of them each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured ; 2 . be written on a Builder' s Risk "All Risk" or open peril or special causes of loss policy form that shall at least include insurance for physical loss and damage to the Work , temporary buildings , falsework , and materials and equipment in transit and shall insure against at least the following perils or causes of loss : fire , lightning , extended coverage , theft , vandalism and malicious mischief, earthquake , collapse , debris removal , demolition occasioned by enforcement of Laws and Regulations , water damage , and such other perils or causes of loss as may be specifically required by the Supplementary Conditions . 3 . include expenses incurred in the repair or replacement of any insured property ( including but not limited to fees and charges of engineers and architects ) ; 4 . cover materials and equipment stored at the Site or at another location that was agreed to in writing by OWNER prior to being incorporated in the Work , provided that such materials and equipment have been included in an Application for Payment recommended by ENGINEER ; and 5 . allow for partial utilization of the Work by OWNER ; 6 . include testing and startup ; and 7 . be maintained in effect until final payment is made unless otherwise agreed to in writing by OWNER , CONTRACTOR and ENGINEER with 30 days written notice to each other additional insured to whom a certificate of insurance has been issued . B . CONTRACTOR shall be responsible for any deductible or self-insured retention . C . The policies of insurance required to be purchased and maintained by CONTRACTOR in accordance with this paragraph SC -5 . 06 shall comply with the requirements of paragraph 5 . 06 . 0 of the General Conditions . SC-5 . 06 . E Delete paragraph GC-5. 06. E in its entirety and insert the following in its place : E . Additional Insureds : 1 . The following individuals or entities shall be listed as " additional insureds" on the CONTRACTOR ' s property insurance policies : a . Indian River County , Florida b . NONE C . 00800-4 00800 - Supplementary Conditions REV 04-07 . doc 00800 4F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07 .doc SC -5 . 07 Waiver of Rights SC-5 . 07 Delete GC- 5. 07 (paragraphs A , B, and C) in its entirety. SC -5 . 08 Receipt and Application of Insurance Proceeds SC-5 . 08 Delete GC- 5. 08 (paragraphs A and B) in its entirety. SC -5 . 09 Acceptance of Bonds and Insurance ; Option to Replace SC-5. 09 Delete GC- 5. 09 (paragraph A) in its entirety. SC -6 . 02 Labor ; Working Hours SC-6 . 02 . 13 . Add the following paragraphs immediately after paragraph GC- 6. 02. 8: 1 . Regular working hours are defined as Monday through Friday , excluding Indian River County Holidays , from 7 a . m . to 5 p . m . 2 . Indian River County Holidays are : New Year' s Day , Good Friday , Memorial Day , Independence Day , Labor Day , Veterans Day , Thanksgiving Day , Friday after Thanksgiving , Christmas Eve and Christmas Day . Working on these days will _ not be permitted without prior written permission and approval from the Engineer . 3 . The CONTRACTOR shall receive no additional compensation for overtime work , i . e . , work in excess of eight hours in any one calendar day or 40 hours in any one calendar week , even though such overtime work may be required under emergency conditions and may be ordered by the ENGINEER in writing . 4 . All costs of inspection and testing performed during overtime work by the CONTRACTOR , which is allowed solely for the convenience of the CONTRACTOR , shall be borne by the CONTRACTOR , and a credit given to the OWNER to deduct the costs of all such inspection and testing from any payments otherwise due the CONTRACTOR . 5 . All costs of OWNER ' s employees and costs of ENGINEER' s Consultant resulting from overtime work by the CONTRACTOR , which is allowed solely for the convenience of the CONTRACTOR , shall be borne by the CONTRACTOR , and a credit given to OWNER to deduct all such costs from any payments otherwise due the CONTRACTOR . 6 . No work shall commence before 7 a . m . or continue after 7 p . m . except in case of emergency upon specific permission of the ENGINEER . SC -6 . 06 Concerning Subcontractors , Suppliers , and Others SC-6 . 06 . C . Add the following sentence at the end of paragraph GC-6. 06. C: OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity , to the extent practicable , information about amounts paid to CONTRACTOR on account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity . SC -6 . 08 Permits SC- 6 . 08 Add the following paragraph immediately after paragraph GC- 6. 08. A : B . The CONTRACTOR shall be familiar with all permit requirements during construction and shall be responsible for complying with these requirements . The cost of this effort shall be included in the pay item in 00800-5 00800 - Supplementary Conditions REV 04-07 .doc 00800 5FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07.doc which the work is most closely associated with . SC -6 . 10 Taxes SC - 6 . 10 . A Delete paragraph GC- 6. 10. A in its entirety and insert the following in its place : OWNER qualifies for state and local sales tax exemption in the purchase of all material and equipment . SC - 13 . 03 Test and Inspections SC- 13 . 03 . B . Delete paragraph GC- 13. 03. 6 in its entirety, and insert the following sentences in its place : B . OWNER shall employ and pay for the services of an independent testing laboratory to perform all initial inspections , tests , or approvals required by the Contract Documents except those inspections , tests , or approvals listed immediately below . Subsequent inspections , tests , or approvals required after initial failing inspections , tests , or approvals shall be paid for by the CONTRACTOR by backcharge to subsequent applications for payment . The CONTRACTOR shall arrange , obtain , and pay for the following inspections , tests , or approvals : 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D below ; 2 . costs incurred in connection with tests or inspections conducted pursuant to paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04 . 13 ; 3 . tests otherwise specifically provided in the Contract Documents . 13 . 05 OWNER May Stop the Work SC- 13 . 05 . A . Delete paragraph GC- 13. 05. A in its entirety and insert the following paragraph in its place : A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment , or fails to comply with permit requirements , or fails to comply with the technical specifications , or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents , OWNER may order CONTRACTOR to stop the Work , or any portion thereof, until the cause for such order has been eliminated ; however, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR , any Subcontractor, any Supplier, any other individual or entity , or any surety for, or employee or agent of any of them . 14 . 02 Progress Payments SC - 14 . 02 . B . 5 . Delete paragraph GC- 14 . 02. B. 5. d in its entirety and insert the following paragraph in its place : d . ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraph 15 . 02 . A ; or 00800-6 00800 - Supplementary Conditions REV 04-07 . doc 00800 6F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07.doc SC - 14 . 02 . 13 . 5 . Add the following sentences at the end of paragraph GC- 14. 02. B. 5: e . OWNER has been required to pay ENGINEER or ENGINEER ' s Consultant additional compensation because of CONTRACTOR delays or rejection of defective Work ; or f. OWNER has been required to pay an independent testing laboratory for subsequent inspections , tests , or approvals taken after initial failing inspections , tests , or approvals . SC- 14 . 02 . C . 1 . Delete paragraph GC- 14 . 02. C. 1 in its entirety and insert the following paragraph in its place : C . Payment Becomes Due 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local Government Prompt Payment Act . SC - 14 . 04A . After the third sentence in paragraph GC- 14 . 04A of the General Conditions, delete the remainder of paragraph 14 . 04A in its entirety and replace with the following: " If Engineer considers the Work substantially complete , Engineer will prepare and deliver to Owner a tentative certificate of Substantial Completion that shall fix the date of Substantial Completion . In accordance with the provisions of Florida Statutes section 208 . 735 ( 7 ) ( x ) ( 2005 ) , upon receipt of the tentative certificate of Substantial Completion from Engineer , the Owner , the Engineer , and the Contractor shall conduct a walk-through inspection of the Project to document a list of any items required to render the Work on the Project complete , satisfactory , and acceptable under this Agreement ( herein the " Statutory List" ) . The Statutory List shall be reduced to writing and circulated among the Owner , the Engineer , and the Contractor by the Owner or the Engineer within 30 calendar days after substantial completion . The Owner and Contractor acknowledge and agree that : 1 ) the failure to include any corrective work , or pending items that are not yet completed , on the Statutory List does not alter the responsibility of the Contractor to complete all of the Work under this Agreement ; 2 ) upon completion of all items on the Statutory List , the Contractor may submit a pay request for all remaining retainage except as otherwise set forth in this Agreement ; and 3 ) any and all items that require correction under this Agreement and that are identified after the preparation of the Statutory List remain the obligation of the Contractor to complete to the Owner' s satisfaction under this Agreement . After receipt of the Statutory List by the Contractor , the Contractor acknowledges and agrees that it will diligently proceed to complete all items on the Statutory List and schedule a final walk-through in anticipation of final completion on the Project . " SC - 14 . 0413 Add the following new paragraph immediately after paragraph GC 14 . 04B : C . At the time of delivery of the tentative certificate of Substantial Completion , Engineer will deliver to Owner and Contractor a written recommendation as to division of responsibilities pending final payment between Owner and Contractor with respect to security , operation , safety , and protection of the Work , maintenance , heat , utilities , insurance , and warranties and guarantees . 00800-7 00800 - Supplementary Conditions REV 04-07 . doc 00800 7F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07 .doc SC - 16 DISPUTE RESOLUTION SC - 16 . 02 Mediation SC - 16 Add the following new paragraph immediately after paragraph GC- 16. 01 . SC- 16 . 02 Mediation A . OWNER and CONTRACTOR agree that they shall submit any and all unsettled Claims or counterclaims , disputes , or other matters in question between them arising out of or relating to the Contract Documents or the breach thereof, to mediation by a certified mediator of the 19t" Judicial Circuit in Indian River County unless delay in initiating arbitration would irrevocably prejudice one of the parties . The mediator of any dispute submitted to mediation under this agreement shall not serve as arbitrator of such dispute unless otherwise agreed . SC - 17 Miscellaneous Add the following new paragraphs immediately after paragraph GC 17. 05: SC - 17 . 06 . Liens A . This project is a " Public Works " under Chapter 255 , Florida Statutes . No merchant ' s liens may be filed against the OWNER . Any claimant may apply to the OWNER for a copy of this Contract . The claimant shall have a right of action against the CONTRACTOR for the amount due him . Such action shall not involve the OWNER in any expense . Claims against the CONTRACTOR are subject to timely prior notice to the CONTRACTOR as specified in Florida Statutes Section 255 . 05 . The CONTRACTOR shall insert the following paragraph in all subcontracts hereunder : " Notice : Claims for labor , materials and supplies are not assessable against Indian River County and are subject to proper prior notice to ( CONTRACTOR ' S Name ) and to ( CONTRACTOR Surety Company Name ) , pursuant to Chapter 255 of the Florida Statutes . This paragraph shall be inserted in every sub: subcontract hereunder . " The payment due under the Contract shall be paid by the OWNER to the CONTRACTOR only after the CONTRACTOR has furnished the OWNER with an affidavit stating that all persons , firms or corporations who are defined in Section 713 . 01 , Florida Statutes , who have furnished labor or materials , employed directly or indirectly in the Work , have been paid in full . The OWNER may rely on said affidavit at face value . The CONTRACTOR does hereby release , remiss and quit-claim any and all rights he may enjoy perfecting any lien or any other type of statutory common law or equitable lien against the job . + + END OF SUPPLEMENTARY CONDITIONS + + 00800-8 00800 - Supplementary Conditions REV 04-07 . doc 00800 8FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00800 - Supplementary Conditions REV 04-07 .doc SECTION 00942 - Change Order Form No . DATE OF ISSUANCE : EFFECTIVE DATE : OWNER : Indian River County CONTRACTOR Contract : Project : OWNER' s Contract No . ENGINEER' s Contract No . ENGINEER You are directed to make the following changes in the Contract Documents : Description : Reason for Change Order : Attachments : ( List documents supporting change ) CHANGE IN CONTRACT PRICE : CHANGE IN CONTRACT TIMES Description Amount Description Time Original Contract Price $ Original Contract Time : ( days or dates ) Substantial Completion : Final Completion : Net Increase ( Decrease ) from $ Net change from previous Change previous Change Orders No . Orders No . to ( days ) to Substantial Completion : Final Completion : Eincrease rice prior to this $ Contract Time prior to this Change rder : Order : ( days or dates ) Substantial Completion : Final Completion : ( decrease ) of this $ Net increase ( decrease ) this rder : Change Order : (days or dates ) Substantial Completion : Final Com letion : rice with all approved $ Contract Time with all approved Change Orders : Change Orders : ( days or dates ) Substantial Completion : Final Completion : ACCEPTED : RECOMMENDED : APPROVED : By. By : By : CONTRACTOR ( Signature ) ENGINEER ( Signature ) OWNER (Signature ) Date : Date : Date : 00942 - Change Order Form REV 04-07 .doc 00942 - 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00942 - Change Order Form REV 04-07 .doc Rev, 05/01 SECTION 00946 - Field Order Form Field Change No . : DATE OF ISSUANCE : EFFECTIVE DATE : OWNER : Indian River County CONTRACTOR Contract : Project : OWNER' s Contract No . ENGINEER ' s Contract No . ENGINEER : Field Activity Description : Reason for Change : Recommended Disposition : Field Operations Officer / Engineer ( Signature ) Date Disposition : Contractor' s Onsite Supervisor ( Signature ) Date Distribution : Field Operations Officer Others as Required : On - site Supervisor Project File * * END OF SECTION 00946 - Field Order Form REV 04-07 . doc FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00946 - Field Order Form REV 04-07 .doc SECTION 00948 - Work Change Directive No . EFFECTIVE DATE : DATE OF ISSUANCE : OWNER : Indian River County CONTRACTOR : Contract : Project : OWNER' s Contract No . ENGINEER' s Contract No . ENGINEER : You are directed to proceed promptly with the following changes : Description : Purpose of Work Change Directive : Attachments : ( List documents supporting change ) If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents . Method of determining change in Method of determining change in Contract Prices : Contract Times F� Unit Prices F ] Contractor' s Records F� Lump Sum j] Engineer' s Records II Other : II Other : II By Change Order : [l By Change Order : Estimated increase ( decrease ) in Contract Price : Estimated increase ( decrease ) in Contract Times : $ Substantial Completion : days ; Ready for Final Completion : days . If the change involves an increase , the estimated If the change involves an increase , the estimated amount is not to be exceeded without further time is not to be exceeded without further authorization . authorization . RECOMMENDED : AUTHORIZED : By : By : ENGINEER (Authorized Signature ) OWNER (Authorized Signature ) Date : Date : * * END OF SECTION F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\00948 - Work Change Directive REV 04-07 .doc 012JAVISION 1 GENERAL REQUIREMENTS F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\DIVISION 1 Cover Sheet. docCreated by Jill Williams DIVISION 1 GENERAL REQUIREMENTS TITLE SECTION NO . SPECIAL PROVISIONS 01009 FORCE ACCOUNT 01024 FIELD ENGINEERING AND LAYOUT 01050 REFERENCE STANDARDS 01091 GENERAL QUALITY CONTROL 01215 SUBMITTAL OF SHOP DRAWINGS , PRODUCT DATA AND SAMPLES 01340 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01520 PROTECTION OF THE WORK AND PROPERTY 01541 ACCESS ROADS , PARKINGS AREAS AND USE OF PUBLIC STREETS 01550 TRANSPORTATION AND HANDLING OF MATERIALS 01610 AND EQUIPMENT STORAGE OF MATERIAL AND EQUIPMENT 01611 SUBSTITUTIONS 01630 SITE CLEANUP AND RESTORATION 01710 RECORD DOCUMENTS 01720 F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\DIVISION 1 GENERAL REQUIREMENTS .doc SECTION 01009 SPECIAL PROVISIONS 1 . 1 GENERAL A . Visits to the construction site may be made by representatives of permitting or governing bodies . Submit details of all instructions from the above to the ENGINEER immediately . The Work will not be accepted by the OWNER until final acceptance has been received from the various Regulatory Agencies having jurisdiction . B . Furnish sufficient labor , construction equipment and materials , and work such hours , including night shifts and overtime operations , as may be necessary to insure the prosecution of the work in accordance with the approved progress schedule . If , in the opinion of the ENGINEER , the CONTRACTOR falls behind the progress schedule , take such steps as may be necessary to improve progress , all without additional cost to the OWNER . The ENGINEER shall be compensated for his overtime services in accordance with the Supplementary Conditions , SC - 6 . 02 . C . In addition to these Specifications all work must comply with the requirements of the local governing agency , St . Johns River Water Management District , Department of Environmental Protection , Corps of Engineers , Indian River Farms Water Control District , and all other applicable State or Federal agencies ' specifications and permits. In the event of a conflict , the more stringent specification or requirement shall govern . D . Before performing any work outside the designated limits of the work site , secure any necessary permits and authorization from the applicable owner , or verify in writing that such has been previously obtained . Follow all requirements of any said permits or authorization . Give the ENGINEER and appropriate owner ten ( 10 ) days minimum notice before commencing construction operations outside the designated limits of the work site . ** End of Section ** 01009- 1 01009-Special Provisions FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01009 - Special Provisions .doc SECTION 01024 FORCE ACCOUNT 1 . 1 General CONTRACTOR shall furnish all labor , materials , equipment and incidentals necessary to perform additional work not covered on the Contract Drawings , The Force Account is intended as a contingency for unforeseen work . 1_2 PAYMENT A . Lump sum amount for Force Account work is included in the bid schedule . The value of Force Account work will be determined in accordance with Article 12 of the General Conditions . + + END OF SECTION + + 01024- 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01024 - Force Account. doc SECTION 01050 FIELD ENGINEERING AND LAYOUT 1 . 1 GENERAL A . The CONTRACTOR will furnish all construction staking for the project . All staking from control will be under the supervision of a Florida Registered Land Surveyor . B . Develop and make all detail surveys and measurements needed for construction including but not limited to , slope stakes , batter boards , piling layouts and all other working lines , elevations and cut sheets . C . Keep a transit and leveling instrument on the site at all times and a skilled instrument man available whenever necessary for layout of the Work . D . Provide all material required for benchmarks , control points , batter boards , grade stakes , and other items . E . Be solely responsible for all locations , dimensions and levels . No data other than written orders of the ENGINEER shall justify departure from the dimensions and levels required by the Drawings . F . Safeguard all points , stakes , grademarks , monuments and benchmarks made or established on the Work , and reestablish same , if disturbed . Rectify all Work improperly installed because of not maintaining , not protecting or removing without authorization such established points , stakes , marks and monuments . G . When requested by the ENGINEER , provide such facilities and assistance as may be necessary for the ENGINEER to check line and grade points placed by the CONTRACTOR . Do no excavation or embankment work until all cross-sectioning necessary for determining pay quantities has been completed and checked by the ENGINEER . H . The cost of performing engineering and layout work described above shall be included in the contract unit prices for the various items of work to which it is incidental . No separate payment will be made for surveying or engineering . 1 . 2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR A . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the accuracy of all survey and existing site information as indicated in the Contract Documents . Immediately notify the ENGINEER upon discovery of any errors , inaccuracies or omissions in the survey data . The commencing of any of the work by the CONTRACTOR shall be held as the CONTRACTOR Is acceptance that all survey or existing site information is correct and accurate , without any reasonably inferable errors , inaccuracies or omissions . 1050 - 1 01050 Field Engineering FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01050 - Field Engineering .doc B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , reference points and property corners and will be responsible for any mistake or loss of time caused by their unnecessary loss or disturbance . If the loss or disturbance of the stakes or marks cause a delay in the Work , the CONTRACTOR shall have no claim for damages or extension of time . Control stakes , benchmarks , reference points and property corners disturbed by the CONTRACTOR' s work shall be replaced by a Florida Registered Land Surveyor and Mapper , at the CONTRACTOR' s expense . In the event the Owner must provide the services of the Florida Registered Surveyor and Mapper to perform this replacement work , the cost of the surveying services will be deducted from any sums due the CONTRACTOR for the work performed under this Contract . C . All survey work shall be performed under the guidance and direction of a Florida Registered Surveyor and Mapper . D . All survey work for Record Drawings shall be performed by a Florida Registered Surveyor and Mapper . 1 . 3 STATION BOARDS A . CONTRACTOR shall erect and maintain white/ black standard FDOT station markers every 100 feet . + + END OF SECTION + + 1050-2 01050 Field Engineering FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01050 - Field Engineering .doc SECTION 01091 REFERENCE STANDARDS 1 . 1 GENERAL A . Whenever reference is made to the furnishing of materials or testing thereof to conform to the standards of any technical society , organization or body , it shall be construed to mean the latest standard , code , specification or tentative specification adopted and published at the date of advertisement for bids , unless noted otherwise in the Technical Specifications or on the Drawings . When a reference standard is specified , comply with requirements and recommendations stated in that standard , except when they are modified by the Contract Documents , or when applicable laws , ordinances , rules , regulations or codes establish stricter standards . The list of specifications presented in Paragraph B is hereby made a part of the Contract , the same as if repeated herein in full . B . Reference to a technical society , organization , or body may be made in the Specifications by abbreviations , in accordance with the following list : AASHTO The American Association of State Highway and Transportation Officials ACI American Concrete Institute AGA American Gas Association AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute ASCE American Society of Civil Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWWA American Water Works Association AWS American Welding Society FED . SPEC . Federal Specifications 01091 - 1 01091 Reference Standards FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01091 - Reference Standards . doc CRSI Concrete Reinforcing Steel Institute FDEP/ DEP Florida Department of Environmental Protection DNR Department of Natural Resources NCPI National Clay Pipe Institute NEMA National Electrical Manufacturers Association NEC National Electric Code NSPE National Society of Professional Engineers OSHA Occupational Safety and Health Administration PCI Prestressed Concrete Institute FDOT/ DOT Florida Department of Transportation U . L . , Inc . Underwriter' s Laboratories , Inc . SSPC Steel Structures Painting Council SJRWMD St . Johns River Water Management District C . When no reference is made to a code , standard or specification , the standard specifications of ASTM , FDOT , or ANSI shall govern . D . In the event of a conflict between the specifications prepared by the ENGINEER and the above referenced specifications and standards , or any other regulatory specification or standard , the more stringent requirement prevails . + + END OF SECTION + + 01091 -2 01091 Reference Standards FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01091 - Reference Standards .doc SECTION 01215 GENERAL QUALITY CONTROL 1 . 1 DESCRIPTION OF REQUIREMENTS A . Definitions : Specific quality control requirements for the work are indicated throughout the Contract Documents . The requirements of this section are primarily related to the performance of the work beyond the furnishing of manufactured products . The term " Quality Control " includes , but is not necessarily limited to , inspection and testing and associated requirements . This section does not specify or modify the OWNER and ENGINEER duties relating to quality review and Contract surveillance . 1 . 2 RESPONSIBILITY FOR INSPECTIONS AND TESTS A . Residual OWNER Responsibility : The OWNER may employ and pay for the services of independent testing laboratories to perform those required inspections and tests . B . CONTRACTORS General Responsibility : No failure of test agencies , whether engaged by the OWNER or CONTRACTOR , to perform adequate inspections of tests or to properly analyze or report results , shall relieve the CONTRACTOR of responsibility for the fulfillment of the requirements of the Contract Documents . It is recognized that the required inspection and testing program is intended to assist the CONTRACTOR , OWNER , ENGINEER , and governing authorities in the nominal determination of probable compliance with requirements for certain crucial elements of work . The program is not intended to limit the CONTRACTOR in his regular quality control program , as needed for general assurance of compliance . 1 . 3 QUALITY ASSURANCE A . General Workmanship Standards : It is a requirement that each category of tradesman or installer performing the work be pre = qualified , to the extent of being familiar with the applicable and recognized quality standards for his category of work , and being capable of workmanship complying with those standards . 1 . 4 PRODUCT DELIVERY- STORAGE- HANDLING Handle , store and protect materials and products , including fabricated components , by methods and means which will prevent damage , deterioration and losses ( and resulting delays ) , thereby ensuring highest quality results as the performance of the work 01215- 1 01215 General Quality Control FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01215 - General Quality. doc SECTION 01215 GENERAL QUALITY CONTROL 1 . 1 DESCRIPTION OF REQUIREMENTS A . Definitions : Specific quality control requirements for the work are indicated throughout the Contract Documents . The requirements of this section are primarily related to the performance of the work beyond the furnishing of manufactured products . The term " Quality Control " includes , but is not necessarily limited to , inspection and testing and associated requirements . This section does not specify or modify the OWNER and ENGINEER duties relating to quality review and Contract surveillance . 1 . 2 RESPONSIBILITY FOR INSPECTIONS AND TESTS A . Residual OWNER Responsibility : The OWNER may employ and pay for the services of independent testing laboratories to perform those required inspections and tests . B . CONTRACTORS General Responsibility : No failure of test agencies , whether engaged by the OWNER or CONTRACTOR , to perform adequate inspections of tests or to properly analyze or report results , shall relieve the CONTRACTOR of responsibility for the fulfillment of the requirements of the Contract Documents . It is recognized that the required inspection and testing program is intended to assist the CONTRACTOR , OWNER , ENGINEER , and governing authorities in the nominal determination of probable compliance with requirements for certain crucial elements of work . The program is not intended to limit the CONTRACTOR in his regular quality control program , as needed for general assurance of compliance . 1 . 3 QUALITY ASSURANCE A . General Workmanship Standards : It is a requirement that each category of tradesman or installer performing the work be pre- qualified , to the extent of being familiar with the applicable and recognized quality standards for his category of work , and being capable of workmanship complying with those standards . 1 . 4 PRODUCT DELIVERY- STORAGE- HANDLING Handle , store and protect materials and products , including fabricated components , by methods and means which will prevent damage , deterioration and losses ( and resulting delays ) , thereby ensuring highest quality results as the performance of the work 01215- 1 01215 General Quality Control FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01215 - General Quality. doc progresses . Control delivery schedules so as to minimize unnecessary long -term storage at the project site prior to installation . 1 . 5 PROJECT PHOTOGRAPHS /VIDEOS A . The CONTRACTOR shall make provisions , at his expense , for video tapes of all work areas just prior to construction , and for unusual conditions during construction . The videos shall show pertinent physical features along the line of construction . The purpose of the videos is to determine any damage to private or public property during construction . B . Pre- Construction Video : 1 . Contractor shall provide the Owner with a video record and one copy of the existing conditions prior to construction . This video shall be a standard VHS cassette format , and shall be narrated . 2 . The video shall include , but not be limited to , the following items shown in a clear manner : a) All existing features within the right- of-way . b) All existing features within the temporary construction easement . c) All existing features within permanent easements . d) All existing features adjacent to any construction . 3 . Detail of the video shall be such that the following examples shall be clear and visible : a) Cracks in walls . b) Condition of fencing . c) Condition of planted areas and types of vegetation . d) Condition of sodded areas . e) Conditions of sprinkler systems and associated controls and wiring . f) Condition of signs . g) Conditions of lighting and associated wiring . h) Significant detail of any pre - existing damages physical features shall be i shown . The coverage of the video should include the limits of effects of the use of vibratory rollers . i ) This video record shall be presented to the Owner within 30 days of the Notice to Proceed . A copy shall be kept in the Contractor' s field office . j ) Payment — No additional payment will be made for this work . + + END OF SECTION + + 01215-2 01215 General Quality Control FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01215 - General Quality . doc SECTION 01340 SUBMITTAL OF SHOP DRAWINGS , PRODUCT DATA AND SAMPLES 1 . 1 SCOPE A . Submit shop drawings , product data and samples as required by or inferred by the Drawings and Specifications . Submittals shall conform to the requirements of Article 6 . 17 of the General Conditions , Section 00700 , and as described in this Section . 1 . 2 SHOP DRAWINGS A . Shop drawings are original drawings , prepared by the CONTRACTOR , a subcontractor , supplier , or distributor , which illustrate some portion of the work ; showing fabrication , layout , setting , or erection details . Shop drawings are further defined in Article 6 . 17 , Section 00700 . B . Shop drawings shall be prepared by a qualified detailer and shall be identified by reference to sheet and detail numbers on the Contract Drawings . 1 . 3 PRODUCT DATA A . Product data are manufacturer' s standard schematic drawings and manufacturer' s catalog sheets , brochures , diagrams , schedules , performance charts , illustrations , and other standard descriptive data . Product data are further defined in Article 6 . 17 , Section 00700 . B . Modify standard drawings to delete information which is not applicable to the project and supplement them to provide additional information applicable to the project . C . Clearly mark catalog sheets , brochures , etc . , to identify pertinent materials , products , or models . 1 . 4 SAMPLES Samples are physical examples to illustrate materials , equipment , or workmanship and to establish standards by which work is to be evaluated . Samples are further defined in Article 6 . 17 , Section 00700 . 01340 - Submittal of Shop Drawings . doc 01340- 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01340 - Submittal of Shop Drawings .doc 1 . 5 CONTRACTOR' S RESPONSIBILITIES FOR SUBMITTAL OF SHOP DRAWINGS , PRODUCT DATA AND SAMPLES A . The CONTRACTOR ' s responsibilities for submittal of shop drawings , product data , and samples are set forth in paragraph 6 . 17 of the General Conditions and as further explained herein . B . Prior to submission , thoroughly check shop drawings , product data , and samples for completeness and for compliance with the Contract Documents , verify all dimensions and field conditions , and coordinate the shop drawings with the requirements for other related work . Also review each shop drawing before submitting it to the ENGINEER to determine that it is acceptable in terms of the means , methods , techniques , sequences and operations of construction , safety precautions and programs incidental thereto , all of which are the CONTRACTOR' s responsibility . 1 . It is CONTRACTOR' S responsibility to review submittals made by his suppliers and Subcontractors before transmitting them to ENGINEER to assure proper coordination of the Work and to determine that each submittal is in accordance with its desires and that there is sufficient information about materials and equipment for ENGINEER to determine compliance with the Contract Documents , 2 . Incomplete or inadequate submittals will be returned for revision without review . C . The CONTRACTOR Ss responsibility for errors and omissions in submittals is not relieved by the ENGINEER ' s review of submittals . The i CONTRACTOR shall approve the shop drawings based on his in -the -field measurements , prior to submittal to the ENGINEER for his review . D . Notify the ENGINEER , in writing at the time of submission , of deviations in submittals from the requirements of the Contract Documents . The CONTRACTOR' s responsibility for deviations in submittals from the requirements of the Contract Documents is not relieved by the ENGINEER' s review of submittals , unless the ENGINEER gives written acceptance of specific deviations . 01340 - Submittal of Shop Drawings . doc 01340-2 F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01340 - Submittal of Shop Drawings . doc E . Begin no work , which requires submittals until return of submittals with the ENGINEER' s stamp and initials or signature indicating the submittal has been reviewed . 1 . 6 SUBMITTAL REQUIREMENTS AND ENGINEER' S REVIEW FOR SHOP DRAWINGS PRODUCT DATA AND SAMPLES A . Submit to : Indian River County Jack Jolly , P . E . Engineering Division 1801 27th Street Vero Beach , FL 32960 B . A letter of transmittal shall accompany each submittal . If data for more than one Section of the Specifications is submitted , a separate transmittal letter shall accompany the data submitted for each Section . C . At the beginning of each letter of transmittal , provide a reference heading indicating the following : 1 . OWNER' S Name 2 . Project Name 3 , Contract Number 4 . Transmittal Number 5 . Section Number D . All submittals shall have a title block with complete identifying information satisfactory to the ENGINEER . The following is a sample Submittal Form that the CONTRACTOR may use : [The remainder of this page has been left blank intentionally] 0 01340 - Submittal of Shop Drawings . doc 01340-3 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01340 - Submittal of Shop Drawings.doc CONTRACTOR SUBMITTALS SUBMITTAL NO . Contractor : Date Sent to County No . Copies Sent to County ❑ Original Submittal ❑ Re - Submittal ❑ Shop Drawing ❑ Cut Sheet ❑ Other Description : Sub - Contractor : Remarks : * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Reviewing Agency : (As checked below ) Date Received Date Returned No , Copies Ret' d F-1 I R C Engineering Div . ❑ I R C Utilities Services Remarks : IRC Engineering Division Date Rec' d from Contractor Date Ret' d to Contractor 1801 27th Street No . Copies Ret' d Vero Beach , FI , 32960 Remarks : Distribution of Copies : IRC Engineering Division Office File Field Office File 01340 - Submittaf of Shop Drawings . doc 01340-4 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01340 - Submittal of Shop Drawings . doc E . All submittals shall bear the stamp of approval and signature of CONTRACTOR as evidence that they have been reviewed by CONTRACTOR . Submittals without this stamp of approval will not be reviewed by the ENGINEER and will be returned to CONTRACTOR . F . Assign a number to each submittal starting with No . 1 and thence numbered consecutively . Identify resubmittals by the original submittal number followed by the suffix " A" for the first resubmittal , the suffix " B " for the second resubmittal , etc . G . Initially submit to ENGINEER a minimum of six ( 6 ) copies of all submittals that are on 11 - inch by 17 - inch or smaller sheets ( no less than 8 1 /2 - inch x 11 - inch ) , and one unfolded sepia and 2 prints made from that sepia for all submittals on sheets larger than 11 - inch by 17 - inch . H . After ENGINEER completes his review , Shop Drawings will be marked with one of the following notations : 1 . Approved 2 . Approved as Corrected 3 . Approved as Corrected - Resubmit 4 . Revise and Resubmit 5 , Not Approved I . If a submittal is acceptable , it will be marked " Approved " or "Approved as Corrected " . Three ( 3 ) prints or copies of the submittal will be returned to CONTRACTOR . J . Upon return of a submittal marked "Approved " or "Approved as Corrected " , CONTRACTOR may order , ship or fabricate the materials included on the submittal , provided it is in accordance with the corrections indicated . K . If a Shop Drawing marked " Approved as Corrected " has extensive corrections or corrections affecting other drawings or Work , ENGINEER may require that CONTRACTOR make the corrections indicated thereon and resubmit the Shop Drawings for record purposes . Such drawings will have the notation , " Approved as Corrected - Resubmit . " L . If a submittal is unacceptable , three ( 3 ) copies will be returned to CONTRACTOR with one of the following notations : 1 . " Revise and Resubmit" 2 . " Not Approved " 01340 - Submittal of Shop Drawings . doc 01340-5 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01340 - Submittal of Shop Drawings .doc M . Upon return of a submittal marked " Revise and Resubmit" , make the corrections indicated and repeat the initial approval procedure . The " Not Approved " notation is used to indicate material or equipment that is not acceptable . Upon return of a submittal so marked , repeat the initial approval procedure utilizing acceptable material or equipment . N . Any related Work performed or equipment installed without an "Approved " or "Approved as Corrected " Shop Drawing will be at the sole responsibility of the CONTRACTOR . O . Submit Shop Drawings well in advance of the need for the material or equipment for construction and with ample allowance for the time required to make delivery of material or equipment after data covering such is approved . CONTRACTOR shall assume the risk for all materials or equipment which is fabricated or delivered prior to the approval of Shop Drawings . Materials or equipment will not be included in periodic progress payments until approval thereof has been obtained in the specified manner . P . ENGINEER will review and process all submittals promptly , but a reasonable time should be allowed for this , for the Shop Drawings being revised and resubmitted , and for time required to return the approved Shop Drawings to CONTRACTOR . Q . Furnish required submittals with complete information and accuracy in order to achieve required approval of an item within three submittals . All costs to ENGINEER involved with subsequent submittals of Shop Drawings , Samples or other items requiring approval , will be back- charged to CONTRACTOR in accordance with the General Conditions and the Supplementary Conditions . If the CONTRACTOR requests a substitution for a previously approved item , all of ENGINEER ' S costs in the reviewing and approval of the substitution will be back- charged to CONTRACTOR unless the need for such substitution is beyond the control of CONTRACTOR . + + END OF SECTION + + 01340 - Submittal of Shop Drawings . doc 01340-6 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01340 - Submittal of Shop Drawings .doc SECTION 01520 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 1 . 1 SCOPE A . Provide all construction equipment and facilities and temporary controls required to satisfactorily complete the work represented on the Drawings and described in the Specifications . 1 . 2 RESPONSIBILITY A . All construction facilities and temporary controls remain the property of the Contractor establishing them and shall be maintained in a safe and useful condition until removed from the construction site . B . All false work , scaffolding , ladders , hoistways , braces , pumps , roadways , sheeting , forms , barricades , drains , flumes , and the like , any of which may be needed in construction of any part of the work and which are not herein described or specified in detail , must be furnished , maintained and removed by the CONTRACTOR , who is responsible for the safety and efficiency of such work and for any damage that may result from their failure or from their improper construction , maintenance or operation . C . In accepting the Contract , the CONTRACTOR assumes full responsibility for the sufficiency and safety of all hoists , cranes , temporary structures or work and for any damage which may result from their failure or their improper construction , maintenance or operation and will indemnify and save harmless the OWNER and ENGINEER from all claims , suits or actions and damages or costs of every description arising by reason of failure to comply with the above provision . 1 . 3 TEMPORARY UTILITIES AND SERVICES A . TEMPORARY WATER 1 . Provide a temporary water service as required for all construction purposes and pay for all water used . 2 . Furnish potable drinking water in suitable dispensers and with cups for use of all employees at the job . 3 . Provide all temporary piping , hoses , etc . , required to transport water to the point of usage by all trades . 4 . When temporary water service is no longer required , remove all temporary water lines . 01520- 1 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01520 - Construction Facilities . doc B . TEMPORARY SANITARY FACILITIES 1 . Provide temporary toilet facilities separate from the job office . Maintain these during the entire period of construction under this Contract for the use of all construction personnel on the job . Provide enough chemical toilets to conveniently serve the needs of all personnel . Properly seclude toilet facilities from public observation . 2 . Chemical toilets and their maintenance shall meet the requirements of State and local health regulations and ordinances . Immediately correct any facilities or maintenance methods failing to meet these requirements . Upon completion of work , remove the facilities from the premises . 1 . 4 SECURITY Full time watchmen will not be specifically required as a part of the Contract , but the CONTRACTOR shall provide inspection of work area daily and shall take whatever measures are necessary to protect the safety of the public , workmen , and materials , and provide for the security of the site , both day and night . 1 . 5 TEMPORARY CONTROLS Take all necessary precautions to control dust and mud associated with the work of this Contract . In dry weather , spray dusty areas daily with water in order to control dust . Take necessary steps to prevent the tracking of mud onto adjacent streets and highways . 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES Remove the various temporary facilities , services , and controls and legally dispose of them as soon as the work is complete . The areas of the site used for temporary facilities shall be properly reconditioned and restored to a condition acceptable to the OWNER . + + END OF SECTION + + 01520-2 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01520 - Construction Facilities . doc SECTION 01541 PROTECTION OF THE WORK AND PROPERTY 1 . 1 GENERAL A . CONTRACTOR shall be responsible for taking all precautions , providing all programs , and taking all actions necessary to protect the Work and all public and private property and facilities from damage as specified in the General Conditions and herein . B . In order to prevent damage , injury or loss , CONTRACTOR' S actions shall include , but not be limited to , the following : 1 . Store apparatus , materials , supplies , and equipment in an orderly , safe manner that will not unduly interfere with the progress of the Work or the Work of any other Contractor or utility service company . 2 . Provide suitable storage facilities for all materials , which are subject to injury by exposure to weather , theft , breakage , or otherwise . 3 . Place upon the Work or any part thereof, only such loads as are consistent with the safety of that portion of the Work . 4 . Clean up frequently all refuse , rubbish , scrap materials , and debris caused by construction operations , so that at all times , the site of the Work presents a safe , orderly , and workmanlike appearance . 5 . Provide barricades and guard rails around openings , for scaffolding , for temporary stairs and ramps , around excavations , elevated walkways and other hazardous areas . C . Except after written consent from proper parties , do not enter or occupy privately-owned land with men , tools , materials or equipment , except on easements provided herein . D . Assume full responsibility for the preservation of all public and private property or facility on or adjacent to the site . If any direct or indirect damage is done by or on account of any act , omission , neglect or misconduct in the execution of the Work by the CONTRACTOR , it shall be restored by the CONTRACTOR , at its expense , to a condition equal to or better than that existing before the damage was done . 1 . 2 BARRICADES AND WARNING SIGNALS Where Work is performed on or adjacent to any roadway , right- of-way , or public place , provide barricades , fences , lights , warning signs , danger signals , and watchmen , and take other precautionary measures for the protection of persons or property and of the Work . Paint barricades so they are visible at night . From sunset to sunrise , furnish and maintain at least one light at each barricade . Erect sufficient barricades to keep vehicles from being driven on or into Work under construction . Furnish watchmen in sufficient numbers to protect the Work . CONTRACTOR' s responsibility for the maintenance of barricades , signs , lights , and for providing watchmen shall continue until OWNER accepts the Project . 01541 - 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property. doc 1 . 3 TREE AND PLANT PROTECTION A . Protect existing trees , shrubs and plants on or adjacent to the site that are shown or designated to remain in place against unnecessary cutting , breaking or skinning of trunk , branches , bark or roots . B . Do not store or park materials or equipment within the drip line . C . Install temporary fences or barricades to protect trees and plants in areas subject to traffic . D . Fires shall not be permitted under or adjacent to trees and plants . E . Within the limits of the Work , water trees and plants that are to remain , in order to maintain their health during construction operations . F . Cover all exposed roots with burlap and keep it continuously wet . Cover all exposed roots with earth as soon as possible . Protect root systems from mechanical damage and damage by erosion , flooding , run - off or noxious materials in solution . G . If branches or trunks are damaged , prune branches immediately and protect the cut or damaged areas with emulsified asphalt compounded specifically for horticultural use . H . Remove all damaged trees and plants that die or suffer permanent injury and replace them with a specimen of equal or better quality . I . Coordinate Work in this Section with requirements of other sections herein . 1 . 4 PROTECTION OF IRRIGATION The CONTRACTOR shall be responsible for maintaining in good condition all irrigation systems within the easements , which could be damaged by construction activities . The CONTRACTOR shall repair any irrigation systems damaged by construction activities within two ( 2 ) days . 1 . 5 PROTECTION OF EXISTING STRUCTURES A . Underground Structures : 1 . Underground structures are defined to include , but not be limited to , all sewer , water , gas , and other piping , and manholes , chambers , electrical conduits , tunnels and other existing subsurface work located within or adjacent to the limits of the Work . 2 . All underground structures known to ENGINEER except service connections for water , sewer , electric , and telephone are shown . This information is shown for the assistance of CONTRACTOR in accordance with the best information available , but is not guaranteed to be correct or complete . The existing utilities shown on the Contract 01541 -2 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property .doc Drawings are located according to the information available to the ENGINEER at the time the Drawings were prepared and have not been independently verified by the OWNER or the ENGINEER . Guarantee is not made that all existing underground utilities are shown or that the locations of those shown are accurate . The locations shown are for bidding purposes only . Finding the actual location of any existing utilities is the CONTRACTOR' s responsibility and shall be done before it commences any work in the vicinity . Furthermore , the CONTRACTOR shall be fully responsible for any and all damages , which might be occasioned by the CONTRACTOR' s failure to exactly locate and preserve any and all underground utilities . The OWNER or ENGINEER will assume no liability for any damages sustained or costs incurred because of the CONTRACTOR Is operations in the vicinity of existing utilities or structures , nor for temporary bracing and shoring of same . If it is necessary to shore , brace , or swing a utility , contact the utility company or department affected and obtain their permission regarding the method to use for such work . 3 . Contact the various utility companies which may have buried or aerial utilities within or near the construction area before commencing work. Provide 48 hours minimum notice to all utility companies prior to begin - ning construction . 4 . Schedule and execute all work involving existing utilities in order to minimize necessary interruption of services . Whenever such interruption is necessary for completion of the work , notify the ENGINEER and the appropriate utility at least 48 hours in advance . Perform all work to repair/ restore utility service to the satisfaction of the appropriate utility . Include all costs related to service maintenance , interruption , and restoration in the appropriate line item in the Contract . 5 . Where it is necessary to temporarily interrupt house or business services , the CONTRACTOR shall notify the owner or occupant , both before the interruption ( 24 - hour minimum ) , and again immediately before service is resumed . Before disconnecting and pipes or cables , the CONTRACTOR shall obtain permission from their owner , or shall make suitable arrangement for their disconnection by their owner . 6 . Explore ahead of trenching and excavation work and uncover all obstructing underground structures sufficiently to determine their location , to prevent damage to them and to prevent interruption of the services which such structures provide . If CONTRACTOR damages an underground structure , restore it to .original condition at CONTRACTOR' s expense . 7 . Necessary changes in the location of the Work may be made by ENGINEER , to avoid unanticipated underground structures . 8 . If permanent relocation of an underground structure or other subsurface facility is required and is not otherwise provided for in the Contract Documents , ENGINEER will direct CONTRACTOR in writing to perform the Work , which shall be paid for under the provisions of Article 11 of the General Conditions . 01541 -3 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property .doc B . Surface Structures : 1 . Surface structures are defined as structures or facilities above the ground surface . Included with such structures are their foundations and any extension below the surface . Surface structures include , but are not limited to , buildings , tanks , walls , bridges , roads , dams , channels , open drainage , piping , poles , wires , posts , signs , markers , curbs , walks and all other facilities that are visible above the ground surface . C . Protection of Underground and Surface Structures : 1 . Sustain in their places and protect from direct or indirect injury , all underground and surface structures located within or adjacent to the limits of the Work . Such sustaining and supporting shall be done carefully , and as required by the party owning or controlling such structure . Before proceeding with the work of sustaining and supporting such structure , satisfy the ENGINEER that the methods and procedures to be used have been approved by the party owning same . 2 . Assume all risks attending the presence or proximity of all underground and surface structures within or adjacent to the limits of the Work . CONTRACTOR shall be responsible for all damage and expense for direct or indirect injury caused by its Work to any structure . CONTRACTOR shall repair immediately all damage caused by his work , to the satisfaction of the OWNER of the damaged structure . D . All other existing surface facilities , including but not limited to , guard rails , posts , guard cables , signs , poles , markers , and curbs which are temporarily removed to facilitate installation of the Work shall be replaced and restored to their original condition at CONTRACTOR' S expense . 1 . 6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES A . The CONTRACTOR shall be responsible for and make good all damage to pavement beyond the limits of this Contract , buildings , telephone or other cables , water pipes , sanitary pipes , or other structures which may be encountered , whether or not shown on the Drawings . B . Information shown on the Drawings as to the location of existing utilities has been prepared from the most reliable data available to the Engineer . This information is not guaranteed , however , and it shall be this CONTRACTOR ' s responsibility to determine the location , character and depth of any existing utilities . He shall assist the utility companies , by every means possible to determine said locations . Extreme caution shall be exercised to eliminate any possibility of any damage to utilities resulting from his activities . 01541 -4 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property. doc 1 . 7 ADJUSTMENTS OF UTILITY CASTINGS , COVERS AND BOXES A . All existing utility castings , including valve boxes , junction boxes , manholes , pull boxes , inlets and similar structures in the areas of construction that are to remain in service shall be adjusted by the CONTRACTOR to bring them flush with the surface of the finished work . B . The CONTRACTOR shall coordinate the utilities to ensure proper construction sequencing . CONTRACTOR shall make available survey reference markers to the various utility companies . + + END OF SECTION + + 01541 -5 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property. doc SECTION 01550 ACCESS ROADS , PARKING AREAS AND USE OF PUBLIC STREETS 1 . 1 GENERAL A . Provide all temporary construction roads , walks and parking areas required during construction and for use of emergency vehicles . Design and maintain temporary roads and parking areas so they are fully usable in all weather conditions . B . Prevent interference with traffic and the OWNER' s operations on existing roads . Indemnify and save harmless the OWNER from any expenses caused by CONTRACTOR' s operations over these roads . C . Roadways damaged by CONTRACTOR shall be restored to their original condition by the CONTRACTOR subject to approval of the OWNER or ENGINEER . D . Remove temporary roads , walks and parking areas prior to final acceptance and return the ground to its original condition , unless otherwise required by the Contract Documents . 1 . 2 USE OF PUBLIC STREETS The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic . Any earth or other excavated material spilled from trucks shall be removed immediately by the CONTRACTOR and the streets cleaned to the satisfaction of the Owner . 1 . 3 USE OF PUBLIC STREETS FOR HAUL ROADS A . Prior to construction , the CONTRACTOR shall designate all proposed haul roads to be used during the life of the project . Any earth or other materials spilled from trucks shall be removed by the CONTRACTOR and streets cleaned to the satisfaction of the Owner . He further shall be responsible for repairs to any damages caused by his operations , prior to final payment . 01550 Access Roads 01550- 1 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01550 - Access Roads . doc B . All trucks carrying earth shall be covered while moving with an appropriate tarpaulin . Should trucks hauling earth fail to cover their loads , the CONTRACTOR will be given two ( 2 ) written warnings , after which the CONTRACTOR shall pay a fine of $ 50 per uncovered truck to the Owner when invoked by the Owner to Owner' s Engineer . All cleanup shall be the responsibility of the CONTRACTOR . C . All trucks/ moving equipment shall have backup warning horns in proper working order while on the job site . + + END OF SECTION + + 01550 Access Roads 01550-2 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01550 - Access Roads . doc SECTION 01610 TRANSPORATION AND HANDLING OF MATERIALS AND EQUIPMENT 1 . 1 GENERAL A . Make all arrangements for transportation , delivery and handling of equipment and materials required for prosecution and completion of the Work . B . Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to the site only during regular working hours . Shipments shall be addressed and consigned to the proper party giving name of Project , street number and city . Shipments shall not be delivered to OWNER except where otherwise directed . C . If necessary to move stored materials and equipment during construction , CONTRACTOR shall move or cause to be moved materials and equipment without any additional compensation . 1 . 2 DELIVERY A . Arrange deliveries of products in accord with construction schedules and in ample time to facilitate inspection prior to installation . B . Coordinate deliveries to avoid conflict with Work and conditions at site and to accommodate the following : 1 . Work of other contractors , or OWNER . 2 . Limitations of storage space . 3 . Availability of equipment and personnel for handling products . 4 . OWNER' S use of premises . C . Do not have products delivered to project site until related Shop Drawings have been approved by the ENGINEER . D . Do not have products delivered to site until required storage facilities have been provided . E . Have products delivered to site in manufacturer' s original , unopened , labeled containers . Keep ENGINEER informed of delivery of all equipment to be incorporated in the Work . 01610- 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01610 - Transportation and Handling of Materials and Equipment. doc F . Partial deliveries of component parts of equipment shall be clearly marked to identify the equipment , to permit easy accumulation of parts , and to facilitate assembly . G . Immediately on delivery , inspect shipment to assure : 1 . Product complies with requirements of Contract Documents and reviewed submittals . 2 . Quantities are correct . 3 . Containers and packages are intact , labels are legible . 4 . Products are properly protected and undamaged . 1 . 3 PRODUCT HANDLING A . Provide equipment and personnel necessary to handle products , including those provided by OWNER , by methods to prevent soiling or damage to products or packaging . B . Provide additional protection during handling as necessary to prevent scraping , marring or otherwise damaging products or surrounding surfaces . C . Handle products by methods to prevent bending or overstressing . D . Lift heavy components only at designated lifting points . E . Materials and equipment shall at all times be handled in a safe manner and as recommended by manufacturer or supplier so that no damage will occur to them . Do not drop , roll or skid products off delivery vehicles . Hand carry or use suitable materials handling equipment . + + END OF SECTION + + 01610-2 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01610 - Transportation and Handling of Materials and Equipment. doc SECTION 01611 STORAGE OF MATERIAL AND EQUIPMENT 1 . 1 GENERAL A . Store and protect materials and equipment in accordance with manufacturer' s recommendations and requirements of Specifications . B . Make all arrangements and provisions necessary for the storage of materials and equipment . Place all excavated materials , construction equipment , and materials and equipment to be incorporated into the Work , so as not to injure any part of the Work or existing facilities , and so that free access can be had at all times to all parts of the Work and to all public utility installations in the vicinity of the Work . Keep materials and equipment neatly and compactly stored in locations that will cause a minimum of inconvenience to other contractors , public travel , adjoining owners , tenants and occupants . Arrange storage in a manner to provide easy access for inspection . C . Areas available on the construction site for storage of material and equipment shall be as shown or approved by the ENGINEER . D . Store materials and equipment which are to become the property of the OWNER to facilitate their inspection and insure preservation of the quality and fitness of the Work , including proper protection against damage by extreme temperatures and moisture . E . Do not use lawns , grass plots or other private property for storage purposes without written permission of the OWNER or other person in possession or control of such premises . F . CONTRACTOR shall be fully responsible for loss or damage to stored materials and equipment . G . Do not open manufacturers containers until time of installation unless recommended by the manufacturer or otherwise specified . H . When appropriate store materials on wood blocking so there is no contact with the ground . + + END OF SECTION + + 01611 - 1 01611 —Storage of Material F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01611 - Storage of Materials . doc SECTION 01630 SUBSTITUTIONS 1 . 1 GENERAL A . Requests for review of a substitution shall conform to the requirements of Article 6 . 05 , " Substitutes and Or- Equals , " of the General Conditions , and shall contain complete data substantiating compliance of the proposed substitution with the Contract Documents . 1 . 2 CONTRACTOR' S OPTIONS A . For materials or equipment ( hereinafter products ) specified only by reference standard , select product meeting that standard by any manufacturer , fabricator , supplier or. distributor ( hereinafter manufacturer ) . To the maximum extent possible , provide products of the same generic kind from a single source . B .. For products specified by . naming several products or manufacturers , select any one of the products or manufacturers named which complies with Specifications . C . For products specified by naming one or more products or manufacturers and stating " or equivalent , " submit a request for a substitution for any product or manufacturer which is not specifically named . D . For products specified by naming only one product or manufacturer and followed by words indicating that no substitution is permitted , there is no option and no substitution will be allowed . E . Where more than one choice is available as a CONTRACTOR' s option , select product which is compatible with other products already selected or specified . 1 . 3 SUBSTITUTIONS A . During a period of 15 days after date of commencement of Contract Time , ENGINEER will consider written requests from CONTRACTOR for substitu - tion of products or manufacturers , and construction methods ( if specified ) . 1 . After end of specified period , requests will be considered only in case of unavailability of product or other conditions beyond control of CONTRACTOR . B . Submit 5 copies of Request for Substitution . Submit a separate request for each substitution . In addition to requirements set forth in Article 6 . 05 of General Conditions , include in the request the following : 1 . For products or manufacturers : a . Product identification , including manufacturer' s name and address . 01630- 1 01630 Substitutions FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 Substitutions . doc b . Manufacturer' s literature with product description , performance and test data , and reference standards . c . Samples , if appropriate . d . Name and address of similar projects on which product was used , and date of installation . 2 . For construction methods ( if specified ) : a . Detailed description of proposed method . b . Drawings illustrating method . 3 . Such other data as the ENGINEER may require to establish that the proposed substitution is equal to the product , manufacturer or method specified . C . In making Request for Substitution , CONTRACTOR represents that : 1 . CONTRACTOR has investigated proposed substitution , and determined that it is equal to or superior in all respects to the product , manufacturer or method specified . 2 . CONTRACTOR will provide the same or better guarantees or warranties for proposed substitution as for product , manufacturer , or method specified . 3 . CONTRACTOR waives all claims for additional costs or extension of time related to a proposed substitution that subsequently may become apparent . D . A proposed substitution will not be accepted if: 1 . Acceptance will require changes in the design concept or a substantial revision of the Contract Documents , 2 . It will delay completion of the Work , or the work of other contractors . 3 . It is indicated or implied on a Shop Drawing and is not accompanied by a formal Request for Substitution from CONTRACTOR . E . If the ENGINEER determines that a proposed substitute is not equal to that specified , furnish the product , manufacturer , or method specified at no additional cost to OWNER . . F . Approval of a substitution will not relieve CONTRACTOR from the requirement for submission of Shop Drawings as set forth in the Contract Documents . G . The procedure for review by Engineer will include the following : 1 . Requests for review of substitute items of material and equipment will not be accepted by Engineer from anyone other than CONTRACTOR . 2 . Upon receipt of an application for review of a substitution , Engineer will determine whether the review will be more extensive than a normal shop drawing review for the specified item . - 3 . If the substitution will not require a more extensive review , Engineer will proceed with the review without additional cost to CONTRACTOR . 01630-2 01630 Substitutions FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 Substitutions . doc 4 . If the substitution requires a more extensive review , Engineer will proceed with the review only after CONTRACTOR has agreed to reimburse Owner for the review cost . 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR ' s expense additional data about the proposed substitute . H . Any redesign of structural members shall be performed by , and the plans signed and sealed by , a Professional Engineer registered in the State of Florida . The redesign shall be at the CONTRACTOR ' s expense . Any redesign will require an extensive review by the Engineer . The CONTRACTOR must agree to reimburse the Owner for the review cost prior to the Owner' s Engineer proceeding with the design review . The ENGINEER' s hourly rate for review is $ 125 per hour . The ENGINEER ' s estimated cost of review shall be provided to the CONTRACTOR prior to proceeding with the review to allow the CONTRACTOR the opportunity to rescind the request . I . Engineer will be allowed a reasonable time within which to evaluate each proposed substitution . Engineer will be the sole judge of acceptability and shall have the right to deny use of any proposed substitution . The CONTRACTOR shall not order , install , or utilize any substitution without either an executed Change Order or Engineer' s notation on the reviewed shop drawing . Owner may require CONTRACTOR to furnish at CONTRACTOR ' s expense a special manufacturer' s performance guarantee ( s ) or other surety with respect to any substitute and an indemnification by the CONTRACTOR . ENGINEER will record time required by Engineer and Engineer' s consultants in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract Documents occasioned thereby . Whether or not a proposed substitute is sued , CONTRACTOR shall reimburse Owner for the charges of Engineer and Engineer' s consultants for evaluating each proposed substitute . J . Substitute materials or equipment may be proposed for acceptance in accordance with this Section . In the event that substitute materials or equipment are used and are less costly than the originally specified material or equipment , than the net difference in cost shall benefit the Owner and CONTRACTOR in equal proportions . This cost difference shall not be reduced by any failure of the CONTRACTOR to base his bid on the named materials or equipment . + + END OF SECTION + + 01630-3 01630 Substitutions FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01630 Substitutions .doc SECTION 01710 SITE CLEANUP AND RESTORATION 1 . 1 SCOPE Furnish all labor , equipment , appliances , and materials required or necessary to clean up and restore the site after the construction is completed . 1 . 2 REQUIREMENTS A . During the progress of the project , keep the work and the adjacent areas affected thereby in a neat and orderly condition . Remove all rubbish , surplus materials , and unused construction equipment . Repair all damage so that the public and property owners will be inconvenienced as little as possible . B . Provide onsite containers for the collection of waste materials , debris , and rubbish and empty such containers in a legal manner when they become full . C . Where material or debris has been deposited in watercourses , ditches , gutters , drains , or catch - basins as a result of the CONTRACTOR 's operations , such material or debris shall be entirely removed and satisfactorily disposed of during the progress of the work , and the ditches , channels , drains , etc . , shall be kept clean and open at all times . D . Before the completion of the project , unless otherwise especially directed or permitted in writing : 1 . Tear down and remove all temporary buildings and structures ; 2 . Remove all temporary works , tools , and machinery , or other construction equipment furnished ; 3 . Remove all rubbish from any grounds occupied ; and 4 . Leave the roads , all parts of the premises , and adjacent property affected by construction operations , in a neat and satisfactory condition . E . Restore or replace any public or private property damaged by construction work , equipment , or employees , to a condition at least equal to that existing immediately prior to the beginning of the operations . To this end , the CONTRACTOR shall restore all highway , roadside , and landscaping work within any right-of-way , platted or prescriptive . Acceptable materials , equipment , and methods shall be used for such restoration . F . Thoroughly clean all materials and equipment installed and on completion of the work , deliver the facilities undamaged and in fresh and new- appearing condition . 01710 Site Cleanup 01710- 1 R\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01710 - Site Cleanup .doc G . It is the intent of the Specifications to place the responsibility on the CONTRACTOR to restore to their original condition all items disturbed , destroyed , or damaged during construction . Particular attention will be placed on restoration of canals to equal or better condition than prior to construction . H . When finished surfaces require cleaning with cleaning materials , use only those cleaning materials which will not create hazards to health or property and which will not damage the surfaces . Use cleaning materials only on those surfaces recommended by the manufacturer . Follow the manufacturer' s directions and recommendations at all times . I . Keep the amount of dust produced during construction activities to a minimum . At CONTRACTOR ' s expense , spray water or other dust control agents over the areas , which are producing the dust . Schedule construction operations so that dust and other contaminants will not fall on wet or newly coated surfaces . 1 . 3 SITE CLEANUP AND RESTORATION Prior to final completion , the OWNER , ENGINEER , INDIAN RIVER FARMS WATER CONTROL DISTRICT , and CONTRACTOR shall review the site with regards to site cleanup and restoration . Clean and /or restore all items determined to be unsatisfactory by the OWNER or ENGINEER , at no additional expense . + + END OF SECTION + + 01710 Site Cleanup 01710-2 F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01710 - Site Cleanup .doc SECTION 01720 RECORD DOCUMENTS 1 . 1 GENERAL A . Maintain and provide the ENGINEER with record documents as specified below , except where otherwise specified or modified in Divisions 1 - 17 or the Supplementary Conditions . B . Maintenance of Documents : 1 . Maintain complete sets of record documents in CONTRACTOR' s field office in clean , dry , legible condition . " Record Documents " include but are not limited to : Drawings ( including Contract Drawings , Record Drawings , and electronic files of Record Drawings ) , Specifications , Addenda , approved Shop Drawings , samples , photographs , Change Orders , other modifications of Contract Documents , test records , survey data , Field Orders , and all other documents pertinent to CONTRACTOR ' S Work . 2 . Provide files and racks for proper storage and easy access . File in accordance with filing format of Construction Specification Institute ( CSI ) . 3 . Make documents available at all times for inspection by ENGINEER and OWNER . 4 . Do not use record documents for any other purpose and do not remove them from the field office . C . Recording : 1 . Label each document " PROJECT RECORD " in 2 - inch high printed letters . 2 . Keep record documents current . 3 . Do not permanently conceal any Work until required information has been recorded . 1 . 2 RECORD DRAWINGS A . During the entire construction operation , maintain records of all deviations from the Drawings and Specifications and prepare therefrom , " Record Drawings " showing correctly and accurately , all changes and deviations from the work made during construction , to reflect the work as it was actually constructed . B . Mark whichever drawing is most capable of showing the constructed condition fully and accurately ; however , where shop drawings are used for mark- up , record a cross - reference at the corresponding location on the contract drawings . Mark- up new information that is recognized to be of importance to the OWNER but was not shown on either the contract drawings or shop drawings . Give particular attention to concealed work that would be difficult to measure and record at a later date . Note related change order numbers where applicable . C . Organize record drawing sheets into manageable sets , bind with durable paper cover sheets , and print suitable titles , date and other identification on the cover of each set . Include the following minimum information , as applicable : 01720 - Record Documents . doc 01720 - 1 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01720 - Record Documents.doc Rev. 05/01 a . Depths of various elements of foundation in relation to datum . b . Horizontal and vertical location of underground utilities and appurtenances referenced to permanent surface improvements . c . Location of internal utilities and appurtenances concealed in construction referenced to visible and accessible features of structure . d . Field changes of dimensions and details . e . Changes . made by Change Order or Field Order . f. Details not on the original Drawings . g . Information to be shown for potable water mains reuse water mains , and sanitary force mains shall include the location of valves , tees , bends and crosses dimensioned to the baseline survey , including the station and offset . Elevations at top of pipe shall be provided every 200 feet and ' at locations where design elevations were shown on the plans . For situations where the pipeline is being adjusted to avoid conflicts with other utilities ( less than 100 ' in total length ) , then elevations shall be provided at the beginning of the deflection ( i . e . the first bend ) , middle of the deflection ( i . e , the point where the conflict would have occurred with the utility ) , and the end of the deflection ( i . e . the last bend ) . h . Information to be shown for gravity sanitary sewer mains shall include top of grate and invert elevations at all manholes . i . Information to be shown for drainage culverts shall include all culvert inverts , inlet grate and bottom elevations . j . Information to be shown for drainage swales shall include swale beginning and end bottom elevations , and highs and lows along top of bank . k . Information to be shown for outfalls shall include all pipe inverts , weir box elevations , weir elevation , and sizes . I . Information to be shown for retention ponds shall include perimeter elevations , grade breaks , and depths . Also , calculate the pond surface areas and storage volumes at the control water surface elevation and at the overflow elevation . m . Information to be shown for roadways shall include elevation of Point of Vertical Intersection ( PVI ) at the Profile Grade Line ( PGL ) , edge of pavement elevations at curb inlets , centerline of roadway elevations at 200 foot intervals , and stations and offsets for all structures . 1 . 3 CERTIFICATION OF PROJECT RECORD DRAWINGS A . OWNER will supply CONTRACTOR with Project Drawings in AutoCAD Release 14 format on compact disc or 3 . 5 " floppy discs . Input Record Drawing information onto the AutoCAD files and return the files to the OWNER . B . CONTRACTOR and CONTRACTOR' s surveyor will each certify as to the accuracy of the Record Drawings and submit six ( 6 ) sets to the OWNER . The following certifications shall appear on each sheet of the Record Drawings : 01720 - Record Documents . doc 01720 - 2 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01720 - Record Documents.doc Rev. 05/01 CONTRACTOR ' S CERTIFICATION AS TO ACCURACY OF RECORD DRAWINGS : I HEREBY CERTIFY that to the best of my knowledge and belief, these Project Record Drawings are complete and accurate and correctly represent the constructed Work for this project . Contractor : Date : Contractor' s License Number : SURVEYOR ' S CERTIFICATION AS TO ACCURACY OF RECORD DRAWINGS : I HEREBY CERTIFY that to the best of my knowledge and belief, the land surveying information shown on these Project Record Drawings is complete and correctly represents the constructed Work for this project . I FURTHER CERTIFY that this survey work was performed by me personally or performed by individuals under my direct control and supervision . I ALSO CERTIFY that all the survey work for these Project Record Drawings meets all state laws and regulations regarding Land Surveyors and Mappers . Professional Surveyor and Mapper : Printed Name : Date : ( SEAL ) License Number : 1 . 4 SPECIFICATIONS AND ADDENDA A . Legibly mark up each Section to record : a . Manufacturer , trade name , catalog number , and supplier of each product and item of equipment actually installed . b . Changes made by Change Order or Field Order . c . Other matters not originally specified . 1 . 5 SUBMITTAL OF RECORD DOCUMENTS A . Deliver record documents to OWNER . Final payment will not be made until ENGINEER receives satisfactory record documents . B . Accompany submittal with transmittal letter containing : a . Date . b . Project title and number . c . CONTRACTOR' S name and address . d . Title and number of each record document . e . Certification that each document as submitted is complete and accurate . f. Signature of CONTRACTOR , or his authorized representative . 01720 - Record Documents . doc 01720 - 3 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01720 - Record Documents .doc Rev. 05/01 1 . 6 RESPONSIBILITY FOR ACCURACY OF RECORD DOCUMENTS A . The CONTRACTOR will be held responsible for the accuracy of Record Document data and shall bear all costs incurred by the OWNER as a result of incorrect data furnished by the CONTRACTOR that is contained in the Record Documents . * * END OF SECTION 0 01720 - Record Documents . doc 01720 - 4 FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\01720 - ,Record Documents.doc Rev. 05/01 DAVISION TECHNICAL PROVISIONS F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\DIVISION 2 Cover Sheet.docCreated by Jill Williams DIVISION 2 TECHNICAL PROVISIONS Section No . Title STANDARD SPECIFICATIONS 101 MOBILIZATION 102 MAINTENANCE OF TRAFFIC 104 EROSION AND WATER POLLUTION CONTROL 110 CLEARING AND GRUBBING 120 GRADING , EXCAVATION AND FILL 334 SUPERPAVE ASPHALTIC CONCRETE 520 CONCRETE CURB 522 CONCRETE SIDEWALK 527 DETECTABLE WARNINGS ON WALKING SURFACES 575 SODDING UT WATER AND SEWER UTILITIES IR IRRIGATION BUF LANDSCAPE INSTALLATION F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\DIVISION 2 TECHNICAL PROVISIONS Table of Contents .doc TECHNICAL PROVISIONS STANDARD SPECIFICATIONS All work of this Contract shall conform to the applicable technical specifications of Florida Department of Transportation Standard Specifications for Road and Bridge Construction , 2004 , and Supplements thereto as noted in the Special Provisions and addenda thereto , except as modified and supplemented hereinafter . Reference to Article numbers herein - after apply to the FDOT Standard Specifications , and reference in FDOT Standard Specifications to Department shall be taken as the Owner or its appointed Representative . Wherever the Specifications , Supplementals , etc . may refer to the " Owner" , " Department " , " State of Florida Department of Transportation " , or words relating to offices of State Government , such words shall be taken as meaning Owner or Indian River County , Florida . Wherever the word Resident Engineer appears , it shall be taken to mean an authorized representative of the Owner' s Engineer on the Project ( Resident Construction Inspector ) who will act as an agent for Indian River County , assigned to observe the progress quantity and quality of the work . 101 . MOBILIZATION Perform preparatory work and operations in mobilizing for beginning work on the project , including , but not limited to , those operations necessary for the movement of personnel , equipment , supplies , and incidentals to the project site and for the establishment of temporary offices , buildings , safety equipment and first aid supplies , and sanitary and other facilities . Include the costs of bonds and any required insurance and any other preconstruction expense necessary for the start of the work , excluding the cost of construction materials . Payment shall be made under : Item No . 101 - 1 Mobilization Lump Sum 102 . MAINTENANCE OF TRAFFIC A . General : Work under this section consists of maintaining traffic within the limits of the project for the duration of construction in accordance with the U . S . Department of Transportation ' s Manual On Uniform Traffic Control Devices ( MUTCD ) 2000 Edition , FDOT Index 600 Series and FDOT Standard Specification Section 102 . The purpose of the Traffic Control Plan is to depict the concept of feasible construction sequencing and maintenance of traffic . The Contractor may submit to the Engineer an alternate plan for review and approval , one week prior to the preconstruction conference . The Traffic Control Plan indicates typical signing , marking and barricade locations and types . Additional details are found in the MUTCD , FDOT Index ( 600 Series ) and Standard Specifications . The Contractor shall install only new TCP signs and shall be Engineer grade . FAEngineering\Special Projects\ Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc - 1 - B . Compensation : All compensation for maintenance of traffic including barricades (Type II ) , Barricades (Type III ) , Temporary Pavement , Off- Duty Police or Sheriff Deputy , Concrete Barrier (Temporary ) and vertical panels boards , shall be lump sum . This shall include all items and services necessary for the safe maintenance of traffic within the project limits . This shall include , but not be limited to , flaggers , construction and advisory signing , detours , temporary retaining systems , embankment , base material , asphaltic concrete , striping , cones , maintenance of pavement , asphaltic concrete curb , stormwater removal , temporary drainage structures and pipe , pumps , commercial material for driveway maintenance , flashing arrow boards , high intensity flashing lights , removable and temporary pavement markings , and temporary reflective pavement markers , temporary pavement , for maintenance of traffic . C . Non - Compliance : Should the Owner or Engineer determine that traffic within the project is not being maintained in accordance with the approved traffic control plan or presents a public safety concern , the contractor shall have until the end of the working day , in which notification is given , to take action to modify the maintenance of traffic . Should the contractor fail to make such modification the Owner shall have the option to fine the Contractor $400 per day until remedied . D . Payment shall be made under : Item No . 102- 1 Maintenance of Traffic - Lump Sum 104 . EROSION AND WATER POLLUTION CONTROL PART 1 — GENERAL 1 . 1 SCOPE A . This Section covers erosion control and the treatment of dewatering water and stormwater runoff from the construction site and work area . The pollution control measures shall prevent turbid or otherwise polluted waters from being discharged from the construction site or work area , to undeveloped portions of the site or off- site . B . The OWNER considers pollution from dewatering water and stormwater runoff from a construction site or work area to be a very serious offense . The CONTRACTOR is solely responsible for preventing pollution caused by dewatering water and stormwater runoff from the construction site or work area . C . The pollution control measures specified herein represent minimum standards to be adhered to by the CONTRACTOR throughout the Project' s construction . The OWNER reserves the right to require the CONTRACTOR to employ additional pollution control measures , when in the sole opinion of the OWNER , they are warranted . If site specific conditions require additional erosion and stormwater pollution control measures during any phase of F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc - 2 - construction or operation to prevent erosion or to control sediment or other pollution , beyond those specified in the Drawings or herein , implement additional best management practices as necessary , in accordance with Chapter 4 , " Best Management Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment Control Inspector' s Manual . D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this Section . Alternatively , the OWNER may halt the CONTRACTOR ' s operations until the CONTRACTOR is in full compliance with this Section . If the OWNER halts the CONTRACTOR ' s work as a result of its failure to comply with this Section , the Construction Contract time clock will continue to run . E . In addition to these Specifications , comply with Chapter 4 , " Best Management Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment Control Inspector' s Manual . If there is a conflict between the referenced Chapter 4 and these Specifications , the more stringent requirement shall prevail . 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR A . There are existing permits for this project . Per paragraph SC - 6 . 08 . 13 of the Supplementary Conditions , the CONTRACTOR shall apply for , obtain , and pay for all other required permits and licenses . This may include but not be limited to : 1 . Long -term or short-term dewatering permit as required by the St . Johns River Water Management District ( SJRWMD ) . Contact SJRWMD at ( 321 ) 984 -4940 to determine which permit is required and the associated statutory requirements ; and 2 . The State of Florida Generic Permit for Stormwater Discharge From Large and Small Construction Activities . Contact the Florida Department of Environmental Protection ( FDEP ) at ( 866 ) 336 -6312 ( toll free ) or ( 850 ) 245 - 7522 or www . dep . state . fl . us/water/stormwater/ npdes/ B . Provide copies of all permits to the OWNER and ENGINEER and comply with all conditions contained in all permits at no extra cost to the OWNER . If there is a conflict between any permit requirement and these Specifications , the more stringent specification or requirement shall govern . 1 . 3 GENERAL A . Do not begin any other construction work until the pollution control and treatment system has been constructed in accordance with approved plans and approved for use by the OWNER and applicable permitting authorities . B . From time to time , the OWNER or ENGINEER will inspect the pollution control and treatment system and may take effluent samples for analysis by a testing laboratory selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER determines that the pollution control and treatment F1Engineering\Special Projects\ Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc . 3 - system is not in compliance with the approved system , the OWNER or ENGINEER will shut the portion of the project down that is not in compliance , and it shall remain shut-down until the pollution control and treatment system is properly constructed or repaired , and complies with the approved pollution control and treatment system plans and specifications . C . Schedule construction to minimize erosion and stormwater runoff from the construction site . Implement erosion control measures on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased , but in no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently ceased . D . Inspect each pollution control system at least once per day . Clean and maintain each pollution control system as required by its manufacturer or the OWNER , until the system is no longer needed . If a water quality violation occurs , immediately cease all work contributing to the water quality violation and correct the problem . E . Discharge shall not violate State or local water quality standards in the receiving waters , nor cause injury to the public health or to public or private property , nor to the Work completed or in progress . The receiving point for water from construction operations shall be • approved by the applicable regulatory agency and the ENGINEER . F . Promptly repair all damage at no cost to the OWNER . 1 . 4 SUBMITTALS A . Shop Drawings : Submit shop drawings of the proposed pollution control and treatment systems in accordance with Article 6 . 17 of the General Conditions . 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS REQUIRED FOR DESIGN INSTALLATION AND MAINTENANCE A . Site- specific design of the erosion and stormwater pollution control system , and installation and maintenance of all erosion and stormwater pollution control devices , shall be by a State certified erosion control specialty subcontractor who specializes in the design , installation , and maintenance of such devices . After installation , this subcontractor shall maintain the erosion and stormwater pollution control devices until the devices are no longer necessary . ( Note : The CONTRACTOR may install and maintain the erosion and stormwater pollution control system under the direction of the State certified erosion control specialty subcontractor . ) Before beginning construction , submit to the ENGINEER for review , a Stormwater Pollution Prevention Plan , prepared by the State certified erosion control subcontractor . The CONTRACTOR shall complete the certification provided at the end of this Section and it shall be a part of the Stormwater Pollution Prevention Plan . F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611 A & 0001 - Technical Provisions . doc . 4 - 1 . 6 " POLLUTION " AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED A . Except as may be defined otherwise in paragraphs 1 . 6 . 13 , 1 . 6 . C , and 1 . 6 . D , " pollution " is the presence in off- site waters of any substances , contaminants , or manmade or human - induced impairment of waters or alteration of the chemical , physical , biological , or radiological integrity of water in quantities or at levels which are or may be potentially harmful or injurious to human health or welfare , animal or plant life , or property . Pollutants to be removed include but are not limited to , sediment and suspended solids , solid and sanitary wastes , phosphorus , nitrogen , pesticides , oil and grease , concrete truck washout , construction chemicals , and construction debris . B . When the Discharge is Directly Into an Existing Water Body , Pollution Occurs When . . . An existing water body ( including ditches and canals ) is defined to be polluted by the CONTRACTOR ' s operations when at any time , the turbidity of the water immediately downstream of the CONTRACTOR ' s discharge point( s ) is 29 nephelometric turbidity units ( NTUs ) higher than the turbidity of the background water upstream of the discharge point ( s ) . [ See Fla . Administrative Code 62 - 302 . 530 ] The ENGINEER or OWNER shall determine the locations where the turbidity is measured . C . When the Discharge is not Directly Into an Existing Water Body , Pollution Occurs When . . . In some instances , dewatering water or stormwater runoff from the construction site or work area may reach a water body indirectly , such as after traveling through pipes or by overland flow . Before construction commences , the OWNER or ENGINEER will measure background levels of total suspended solids ( TSS ) and turbidity , in the immediate vicinity of the discharge water' s ultimate discharge point into the receiving water body . If the discharge water' s TSS and turbidity measurements exceed these pre - construction background values by 29 NTUs for turbidity , then the discharge from the CONTRACTOR ' s operations is defined to be polluted . D . Pollution Always Occurs When . . . The discharge is defined to be polluted whenever any of the following is present in the discharge water : ( 1 ) Hazardous waste or hazardous materials in any quantity , ( 2 ) Any petroleum product or by- product in any quantity , ( 3 ) Any chemical in any quantity , or ( 4 ) Concentrated pollutants . E . Above paragraphs 1 . 6 . 13 , 1 . 6 . C , and 1 . 6 . D do not in any way , limit the types of conditions in which pollution may be determined to occur . 1 . 7 PENALTIES FOR NONCOMPLIANCE WITH THIS SECTION A . In addition to the OWNER ' s other remedies listed herein , if the CONTRACTOR fails to comply with this Section and erosion or pollution is caused by dewatering water or stormwater runoff from the construction site , FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc . 5 - the OWNER will report the violations to the Indian River County Code Enforcement Board , SJRWMD , Indian River Farms Water Control District ( or other F . S . Chapter 298 Drainage District , as appropriate ) , and other pertinent regulatory or enforcement agencies . PART 2 MATERIALS AND INSTALLATION 2 . 1 GENERAL A . Staked Silt Fences : 1 . General : Use silt fences to control runoff from the construction site where the soil has been disturbed . 2 . Installation : Install per the manufacture ' s recommendations and as specified herein . In general , install the silt fence in a manner that allows it to stop the water long enough for the sediment to settle while the water passes through the silt fence fabric . All supporting posts shall be on the down -slope side of the fencing . Place the bottom of the fabric 6 - inches minimum , under compacted soil to prevent the flow of sediment underneath the fence . Otherwise , install in accordance with FDOT Index No . 102 . 3 . Removal : Contractor is responsible for removal of silt screens . 4 . Product : All material shall be new and unused . Use FDOT Type IV silt fences where large sediment loads are anticipated , where slopes are 1 : 2 ( vertical : horizontal ) or steeper , or as directed by the ENGINEER ; otherwise use FDOT Type III silt fence . ( a ) For FDOT Type III Silt Fence - ACF Environmental , Catalog No . 360800000 , Florida DOT Silt Fence . U . S . Sieve = 30 , tensile strength = 120 pounds . The heavy-duty filter fabric shall be pre- attached to 48 - inch long stakes on 6-foot centers . ( 1 - 800 -448 - 3636 ) . ( b ) For FDOT Type IV Silt Fence , modify the above Catalog No . 360800000 to comply with FDOT Index No . 102 . ( c ) Or equivalent . B . Turbidity Barriers : 1 . General : Use turbidity barriers to control sediment contamination of rivers , lakes , ponds , canals , etc . 2 . Installation : Install per the manufacturer' s recommendations and per FDOT Index No . 103 unless directed otherwise by the ENGINEER . 3 , Removal : Contractor is responsible for disposal of turbidity barriers . 4 . Product : All material shall be new and unused . The turbidity barrier shall be a pervious barrier and the fabric color shall be yellow . a . Parker Systems , Inc . ( 1 - 866 -472 - 7537 ) , model Type I . b . Or equivalent . C . Sedimentation Control From Dewatering or Pumping Operations Using Filter Bags : 1 . Remove silt , sediment , and other particles from dewatering or pumping applications using a filter bag . The bag shall be manufactured using a polypropylene non -woven geotextile and sewn by a double- needle machine , using a high strength nylon thread . The F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\961 1 A & 0001 - Technical Provisions . doc - 6 - bag shall have a fill spout large enough to accommodate a 4 - inch pump discharge hose . Straps shall be attached to the bag to secure the hose and prevent pumped water from escaping without being filtered . 2 . Installation : Install in accordance with the manufacturer' s specifications . Use as many filter bags as required , at no additional cost to the OWNER . Dispose of the bags offsite , at no cost to the OWNER . If the bags are placed on aggregate to facilitate filtration efficiency , do not use limerock aggregate . 3 . Product : The filter bag shall be supplied with lifting straps . a . " DIRTBAG 53 or 55 as applicable , " supplied by ACF Environmental , Inc . ( 1 - 800 -448 - 3636 ) . b . " DANDY DEWATERING BAG " supplied by Dandy Products , Inc . ( 1 - 800 - 591 -2284 ) . C . Or equivalent . D . Curb Inlet Protection : 1 . Filter stormwater before it enters curb inlets . 2 . Installation : Install in accordance with the manufacturer ' s specifications . Use as many of the specified filtration devices as required , at no additional cost to the OWNER . 3 . Removal : The filtration devices shall be removed from the property by the Contractor upon completion of the project . 4 . Product : All materials shall be new and unused . The length of the curb inlet filtration device shall be at least 2 -feet longer than the curb inlet opening . 1 . a . " GUTTERBUDDY , " supplied by ACF Environmental , Inc . ( 1 - 800 -448- 3636 ) . b . Or equivalent . E . Catch Basin Protection : 1 . Filter stormwater before it enters catch basins ( drop inlets ) . The " sack" shall be manufactured from woven polypropylene geotextile and sewn by a double - needle machine , using a high strength nylon thread . The sack shall be manufactured to fit the opening of the catch basin or drop inlet and it shall have the following features : two dump straps attached at the bottom to facilitate emptying ; lifting loops , as an integral part of the system to be used to lift the sack from the basin ; and a yellow restraint chord approximately halfway up the sack to keep the sides away from the catch basin walls . The yellow restraint chord shall also serve as a visual means of indicating when the sack should be emptied . 2 . Installation : Install in each catch basin in accordance with the manufacturer' s specifications . Use as many of the specified filtration devices as required , at no additional cost to the OWNER . 3 . Removal : The Contractor will be responsible for removal of all filtration devices . 4 . Product : All materials shall be new and unused . a . " SILTSACK" ( regular flow ) , supplied by ACF Environmental , FAEngineering\Special Projects\ Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc . 7 - Inc . ( 1 - 800 -448 - 3636 ) . b . " FloGuard + PLUS , " supplied by Kristar Enterprises , Inc . ( 1 - 800 - 579 - 8819 ) . C . Or equivalent . F . Construction Site Egress Driveways : Minimize the transport of sediment and soil from the construction site or work area by vehicle wheels . Construct a crushed rock driving surface at the vehicle exit point( s ) . Provide an area large enough to remove the sediment and soil from vehicle wheels before the vehicle leaves the construction site or work area . Provide wash - down stations as required to wash vehicle tires and retain all washwater on - site . G . Rock and Stone for Erosion Control and Pollution Control and Treatment . 1 . Crushed Limerock : Crushed limerock shall not be used under any circumstance . 2 . Acceptable Material : FDOT #4 non - calcareous aggregate ( usually granite ) , washed and meeting the requirements of FDOT Standard Specifications for Road and Bridge Construction , Section 901 . H . Hay Bales : Hay bales shall not be used . PART 3 EXECUTION A . Design , construct , and maintain the pollution control and treatment system to minimize erosion and capture and remove pollutants from the construction site and from all other areas disturbed by construction activities . PART 4 COMPENSATION A . All payment for the above items shall be made under : Item No . 104 - 13 — Staked Silt Fence — Per Linear Foot [The remainder of this page was left blank intentionally] FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . cloc - 8 - CONTRACTOR ' s CERTIFICATION REGARDING EROSION CONTROL AND TREATMENT OF DEWATERING WATER AND STORMWATER FROM THE CONSTRUCTION SITE ( TO BE MADE A PART OF THE STORMWATER POLLUTION PREVENTION PLAN ) STATE OF COUNTY OF Personally before me the undersigned officer , authorized by the laws of said state to administer oaths , comes , who on oath says : That he or she is the CONTRACTOR with whom Indian River County , Florida , a political subdivision of said state , did on the day of , 20 , enter into a contract for the performance of certain work , more particularly described as follows : THE ENCLAVE SUBDIVISION INDIAN RIVER COUNTY PROJECT #0816 UNDER PENALTY OF PERJURY , affiant further says that he or she understands and shall comply with , the terms and conditions of the following : 1 . The State of Florida Generic Permit for Stormwater Discharge From Large and Small Construction Activities , 2 . The Stormwater Pollution Prevention Plan , 3 . Section 104 of the Specifications - Erosion Control and Treatment of Dewatering Water and Stormwater From the Construction Site , 4 . The St . Johns River Water Management District permit , and 5 . All Codes and Ordinances of Indian River County . ( Corporate Seal ) ( Contractor ) By : Subscribed and sworn to before me this day of 20 Notary Public State of Florida at Large My Commission expires : FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc . 9 - 110 . CLEARING AND GRUBBING A Payment for Clearing and Grubbing shall include compensation for : the removal and disposal of concrete , sidewalks , curbing , abandoned utilities ( including pipes , cables , conduit and structures ) , existing walls , riprap , various types of fences , septic tanks , drain fields , pump stations , motor boxes , pumps , irrigation apparatus , base material , trimming of trees and shrubs , drainage structures , pipe , backfilling the removal excavations , plus all other items necessary to be removed to construct the project . All non - salvageable materials removed shall remain property of the Contractor unless otherwise directed by the Engineer or Owner . All unwanted materials shall be removed and suitably disposed of by the Contractor outside the project limits . Any salvage value received from the removed materials shall be reflected in the Contractor' s proposal . B . Clear and grub within the entire limits of the right- of-way except in specific areas designated by the Engineer to remain for aesthetic purposes . Also clear and grub all existing exotics on the project eastern burm . C . Existing and temporary asphaltic pavement and excess subsoil shall be disposed of outside the project by the Contractor , at a location and in a manner approved by the Engineer . D . Removal of existing pavement includes all removal and disposal of the asphalt within the limit shown on the plans . E . Payment shall be made under : Item No . 110 - 1 Clearing and Grubbing — Lump Sum ITEM NO . 120 — GRADING , EXCAVATION AND FILL The work specified in this item shall conform to Section 120 of the Florida Department of Transportation Specifications for Road and Bridge Construction . ( Latest Edition ) This item shall include all excavation of whatever kind , including subsoil , if necessary , for the roadway , drainage channels , removal of existing pavement , structures and any other work normally included in Section 120 - 7 . Also included is all work necessary to construct all necessary fills , including compaction of same , normally included in Section 120 - 8 and 102 - 9 . Grading of swales and the construction of all earthwork necessary to achieve the final elevations , lines , grades and contours shown on the plans shall be included in this item . No other additional payment will be made for any earthwork , grading or excavation . Item of Payment Payment for the work specified in this item shall be made under : Bid Item No . 120 - 6 FILL Cubic Yard Bid Item No . 120 - 1 Excavation , Regular Cubic Yard . F :\ Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc . 10 - 334 . SUPERPAVE ASPHALTIC CONCRETE A . The work specified in this item shall conform to Section 334- 1 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction ( Latest Edition ) , Included in this payment will be tack coat , pavement removal , necessary base repair , and bituminous materials ( Plant Mix ) . No separate payment will be made for bituminous materials . No additional payment will be made for asphalt thickness in excess of the specified thickness B . Payment shall be made under : Item No . 334 . 7 — SP - 9- 5 Asphaltic Concrete ( 1 " ) - Per Square Yard . 520 . CONCRETE CURB 520 - 1 Description . Construct portland cement concrete curb and gutter and any other types of concrete curb not specified in other Sections . 520-2 Materials , 520 -2 . 1 Concrete : Use Class I concrete meeting the requirements of Section 347 . 520-2 . 2 Reinforcement : For all steel reinforcement required by the plans , meet the requirements of Section 415 . 520-2 . 3 Joint Materials : Meet the requirements of Section 932 . 520 - 3 Forms . 520 - 3 . 1 Form Materials : Construct forms for this work of either wood or metal . Provide forms that are straight , free from warp or bends , and of sufficient strength , when staked , to resist the pressure of the concrete without deviation from line and grade . For all items constructed on a radius , use flexible forms . 520 - 3 . 2 Depth of Forms : Ensure that forms have a depth equal to the plan dimensions for the depth of concrete being deposited against them . 520-3 . 3 Machine Placement : The Contractor may place these items by machine methods with the approval of the Engineer provided that the Contractor consistently produces an acceptable finished product , true to line , grade , and cross section . 520-4 Excavation . Excavate to the required depth , and compact the foundation material upon which these items are to be placed as specified in 120 - 9 . 520- 5 Placing Concrete . Place the concrete in the forms , and tamp and spade it to prevent honeycombing , and until the top of the structure can be floated smooth and the edges rounded to the radius shown in the plans . 520 - 6 Joints . 520-6 . 1 Contraction Joints : Except for machine placed items , the Contractor may form joints by using dummy joints ( either formed or sawed ) or by using sheet metal P :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave. doc\961 I & 0001 - Technical Provisions. doc . 11 - templates . If using sheet metal templates , ensure that they are of the dimensions , and are set to the lines , shown in the plans . Hold templates firmly while placing the concrete . Leave templates in place until the concrete has set sufficiently to hold its shape , but remove them while the forms are still in place . Saw contraction joints , for machine placed items , unless the Engineer approves an alternate method . Saw the joints as soon as the concrete has hardened to the degree that excessive raveling will not occur and before uncontrolled shrinkage cracking begins . Space contraction joints at intervals of 10 feet [3 m ] except where closure requires a lesser interval , but do not allow any section to be less than 4 feet [ 1 . 2 m ] in length . 520 - 6 . 2 Expansion Joints : Construct expansion joints at all inlets , at all radius points , and at other locations indicated in the plans . Locate them at intervals of 500 feet [ 150 m ] between other expansion joints or ends of a run . Ensure that the joint is 1 /2 inch [ 13 mm ] in width . 520 - 7 Finishing . 520 - 7 . 1 Repair of Minor Defects : Remove the forms within 24 hours after placing the concrete , and then fill minor defects with mortar composed of one part portland cement and two parts fine aggregate . The Engineer will not allow plastering on the face of the curb . Remove and replace any rejected curb , curb and gutter , or valley gutter without additional compensation . 520 - 7 . 2 Final Finish : Finish all exposed surfaces while the concrete is still green . In general , the Engineer will only require a brush finish . For any surface areas , however , which are too rough or where other surface defects make additional finishing necessary , the Engineer may require the Contractor to rub the curb to a smooth surface with a soft brick or wood block , using water liberally . Also , if necessary to provide a suitable surface , the Engineer may require the Contractor to rub further , using thin grout or mortar . 520 - 8 Curing . 520 - 8 . 1 General : Continuously cure the concrete for a period of at least 72 hours . Commence curing after completely finishing and as soon as the concrete has hardened sufficiently to permit application of the curing material without marring the surface . Immediately replace any curing material removed or damaged during the 72 hour period . After removing the forms , cure the surfaces exposed by placing a berm of moist earth against them or by any of the methods described below , for the remainder of the 72 hour curing period . 520 - 8 . 2 Wet Burlap Method : Place burlap , as specified in 925 - 1 , over the entire exposed surface of the concrete , with sufficient extension beyond each side to ensure complete coverage . Overlap adjacent strips a minimum of 6 inches [ 150 mm ] . Hold the burlap securely in place such that it will be in continuous contact with the concrete at all times , and do not allow any earth between the burlap surfaces at laps or between the burlap and the concrete . Saturate the burlap with water before placing it , and keep it thoroughly wet throughout the curing period . 520 - 8 . 3 Membrane Curing Compound Method : Apply clear membrane curing compound or white pigmented curing compound , as specified in 925 - 2 , by a hand sprayer meeting the requirements of 350 - 3 . 10 , in a single coat continuous film at a uniform coverage of at least 200 square feet per gallon [0 . 2 L/ M2] , Immediately recoat any cracks , checks , or other defects appearing in the coating . Thoroughly agitate the curing compound in the drum prior to application , and during application as necessary FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\961 lA & 0001 - Technical Provisions.doc . 12 - to prevent settlement of the pigment . 520 - 8 . 4 Polyethylene Sheeting Method : Place polyethylene sheeting , as specified in 925 - 3 , over the entire exposed surface of the concrete , with sufficient extension beyond each side to ensure complete coverage . Overlap adjacent strips a minimum of 6 inches [ 150 mm ] . Hold the sheeting securely in place and in continuous contact with the concrete at all times . 520 - 9 Backfilling and Compaction . After the concrete has set sufficiently , but not later than three days after pouring , refill the spaces in front and back of the curb to the required elevation with suitable material . Place and thoroughly compact the material in layers not thicker than 6 inches [ 150 mm ] . 520 - 10 Surface Requirements . Test the gutter section of curb and gutter with a 10 foot [3 . 048 m ] straightedge laid parallel to the centerline of the roadway and while the concrete is still plastic . Perform straightedging along the edge of the gutter adjacent to the pavement or along other lines on the gutter cross - section , as directed by the Engineer . Immediately correct irregularities in excess of 1 /4 inch [6 mm ] . 520 - 11 Method of Measurement . For curb , the quantity to be paid will be plan quantity , in feet , measured along the centerline of the completed and accepted curb . 520 - 12 Basis of Payment 520 - 12 . 1 Payment Items : Payment will be made under : Item No . 520 - 1 Concrete Curb Modified Miami - per linear foot 523 . CONCRETE SIDEWALK A . The work specified in this item shall conform to Section 522 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction ( latest edition ) . B . Payment shall be made under : Item No . 523 — Concrete Sidewalk — Per Square Yard 527 , DETECTABLE WARNINGS ON WALKING SURFACES A . The work specified in this item shall conform to Section 527 of the Florida Department of Transportation Standard Specifications for Road and Bridge on Construction ( latest edition ) . B . Payment shall be made under : Item No . 527 - 1 . 1 Detectable Warnings on Walking Surfaces — Each . 575 . SODDING A . Description : Sod for the project shall be of the variety that is common to the area and of a variety approved by the Engineer . Where sodding an area in which previously had established grass the new sod shall be of the same variety as existing ( Argentina Bahia or St . Augustine ) . This work FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\961 IA & 0001 - Technical Provisions . doc - 13 - shall also include mowing in accordance with Section 104-7 . 2 ( Page 129 ) , to be mowed at 6 " height with a mulching mower . B . Work Included : Scope of Work : The work specified in this section consists of the establishing of a stand of grass , within the project , right- of-way , easements , and other areas indicated on the Drawings , by furnishing and placing grass sod . Also ihcluded are fertilizing , watering and maintenance as required to assure a healthy stand of grass . Fertilize in accordance with the sod supplier' s recommendations . C . Guarantee : All sodded areas shall be guaranteed for three months after date of final acceptance . Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a square ) indication of probable non survival or lack of health and vigor , or which do not exhibit the characteristics to meet specifications , shall be replaced within two weeks of notice from Owner or Engineer . All replacement sod shall be furnished / installed at no additional cost to the Owner and shall be guaranteed for three months . All replacement shall meet original specifications . The Contractor shall notify the Owner and Engineer ten days prior to the end of the guarantee period and such guarantee shall be extended until notification is received . At the end of the guarantee period , all sod that is dead or in unsatisfactory growth shall be replaced within two weeks . D . Fertilizer : Commercial fertilizers shall comply with the state fertilizer laws . The numerical designations for fertilizer indicate the minimum percentages ( respectively ) of ( 1 ) total nitrogen , ( 2 ) available phosphoric acid and ( 3 ) water- soluble potash contained in the fertilizer . The chemical designation of the fertilizer shall be 16-4 - 8 . Fertilizer shall include iron , minor nutrients and trace elements . At least 50 percent of the nitrogen shall be derived from organic sources . At least 50 percent of the phosphoric acid shall be from normal super phosphate or an equivalent source which will provide a minimum of two units of sulfur . The amount of sulfur shall be indicated on the quantitative analysis card attached to each bag or other container . Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet . E . Preparation of Ground : The area over which the sod is to be placed shall be scarified or loosened to a depth and then raked smooth and free from debris . Where the soil is sufficiently loose and clean , the Owner , at his discretion , may authorize the elimination of ground preparation . F . Application of Fertilizer : Before applying fertilizer , the soil pH shall be brought to a range of 6 . 0 - 7 . 0 . Fertilize in accordance with sod supplier' s recommendations . Contractor shall apply applications as per manufacturer' s specification . All tickets from bags shall be handed over to the County Inspector . R\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611 A & 0001 - Technical Provisions.doc - 14 - On steep slopes , where the use of a machine for spreading or mixing is not practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed with the soil to a depth of approximately 2 inches . G . Placing Sod : The sod shall be placed on the prepared surface , with edges in close contact and shall be firmly and smoothly embedded by light tamping with appropriate tools . Where sodding is used in drainage ditches , the setting of the pieces shall be staggered so as to avoid a continuous seam along the line of flow . Along the edges of such staggered areas , the offsets of individual strips shall not exceed 6 inches . In order to prevent erosion caused by vertical edges at the outer limits , the outer pieces of sod shall be tamped so as to produce a featheredge effect . Where sodding is placed abutting paved shoulder , the contractor is to ensure that the finished sod elevation is 1 '/2 " below paved shoulder . On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . Sodding shall not be performed when weather and soil conditions are , in the Engineer' s opinion , unsuitable for proper results . Sod shall be placed around all structures , equipment pads , etc . H . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , as determined by the Engineer , for optimum results . After being placed , the sod shall be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . Thereafter , the Contractor shall apply water as needed until the sod roots and starts to grow for a minimum of 60 days ( or until final acceptance , whichever is latest ) . I . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a satisfactory condition until final acceptance of the project . Such maintenance shall include repairing of any damaged areas and replacing areas in which the establishment of the grass stand does not appear to be developing satisfactorily . Replanting or repair necessary due to the Contractor' s negligence , carelessness or failure to provide routine maintenance shall be at the Contractor' s expense . The Contractor shall maintain the sodded area up to the final acceptance date as directed by the Engineer . Grass height shall not exceed 6 " without mowing . J . Article 575- 5 ( Page 669 ) . The first two paragraphs under this Article are deleted and the following substituted : The contract unit price for sodding shall include the costs of sod , fertilizer ( 2 applications ) , mowing , disposal of clippings , water , tools , equipment , labor and all other incidentals necessary . FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\961 IA & 0001 - Technical Provisions . doc . 1 S - K . Payment shall be made under : Item No . 575- 1 Sod - Per Square Foot ITEM #UT WATER AND SEWER UTILITIES A . Water Utilities The water utilities for this project shall be constructed per the " Indian River County Technical Specifications " , latest edition . This document can be purchased from Indian River County Utilities . Relocation of existing fire hydrants shall include the cost of all pipe , fittings , thrust blocks , retaining rods , trenching grading , and incidental items associated with relocation . B . Sewer Utilities The sewer utilities for this project shall be constructed per the " Indian River County Technical Specifications " , latest edition . This document can be purchased from Indian River County Utilities . C . Restrained Joints All exposed bolts , nuts & washers shall be 304 stainless steel . D . Earthwork and Backfill Compaction - All fill must be compacted by hand tamping from under the pipe up to the center- line . Backfill shall be compacted in 6 " lifts up to the surface to achieve a minimum compaction of 98 percent of maximum density in roadways and shoulders and 95 percent in easements , in accordance with AASATO T- 180 and D - 2167 . E . Ductile Iron Pipe and Fittings 1 , General All buried ductile iron pipe shall be manufactured in accordance with AWWA Specification C - 151 and shall be Class 52 minimum . All exposed ductile iron pipe shall be Class 53 minimum . 2 . Fittings All underground fittings shall be either bell and spigot , or mechanical joint . Mechanical joints shall conform to AWWA specification C110 (ANSI 21 . 10 - 87 ) , or latest revision . All exposed aboveground fittings shall be flanged joint . 3 . Bell and Spigot Connections Joints in bell and spigot pipe shall be push - on , mechanical , or restrained joints in accordance with AWWA Standard C - 111 (ANSI 21 . 11 - 85 ) , or latest revision . Mechanical joint pipe set-screw type retainer glands will not be permitted . 4 . Flanged Connections Flanged pipe with screwed - on flanges shall be furnished with long hubs , and the flanges shall be screwed on the threaded end of the pipe in the shop , and the face of the flange and end of pipe refaced R\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave. doc\9611A & 0001 - Technical Provisions .doc 16 together . There shall be no leakage through the pipe threads and the flanges shall be designed to prevent corrosion of the threads from outside . The back of the hub shall be caulked where the hub threads joint with the pipe . F . Disinfecting Potable Water Pipelines Before being placed in service , all potable water pipelines shall be chlorinated in accordance with the latest edition of AWWA C - 651 , Standard Procedure for Disinfecting Water Mains " , except that the use of tablets is strictly prohibited . The procedure shall be approved by the Engineer . The location of the chlorination and sampling points will be as specified by the Florida Department of Environmental Protection , Water Distribution System Permit . Taps for chlorination and sampling shall be uncovered and backfilled by the Contractor , as required . G . Payment Shall Be Made Under : Item No . UT 1 Utility Pole Relocation - Each Item No . UT 2 Manhole Adjustment - Each FA \Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\9611A & 0001 - Technical Provisions . doc - 17 - SECTION IR IRRIGATION ITEM MR . IRRIGATION SYSTEM PART I — GENERAL 1 . DESCRIPTION OF WORK .A . Work included : 1 . The work under this section includes furnishing and installing materials to construct an automatic irrigation system and maintaining that system until final completion and acceptance , but not less than 30 days from date of installation , and any other work as called for on the plans and in these specifications . 2 . The extent of landscape irrigation system is shown on the drawings . Completion of this work shall mean full and exact compliance and conformity with the provisions expressed or implied in the drawings , schedules and specifications . Irrigation installer is not relieved of his responsibility to provide proper irrigation coverage by providing full and exact compliance with the drawings and specifications . If field conditions or other unforeseen factors warrant that design modifications are necessary , irrigation installer shall notify Engineer immediately . 2 . RELATED WORK A . Electrical service to pump and controller shall be provided , in compliance with N . E . C . requirements . B . Site work ( rough grading ) . C . Landscaping ( see landscape specifications ) . 3 . QUALITY ASSURANCE A . Landscape irrigation system installation shall only be performed by a firm that is regularly engaged full time in the installation of underground landscape irrigation systems . ( Crews shall be controlled and directed by a foreman who is thoroughly familiar with the type of materials being installed and the manufacturer' s recommended methods of installation , and is well versed in reading blueprints . ) B . Design modifications may be made only as necessary to meet field conditions and only as acceptable to Engineer . Piping shown on plans is diagrammatically routed for clarity — route to avoid conflict with specimen plants and adjust as necessary to accommodate landscape construction . F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00205 - Lan 1 cape & Irrigation Specifications for Contract2 .doc C . Contractor shall be responsible for verification at the site of all conditions and dimensions shown on the plans prior to commencement of work . D . CODES AND STANDARDS : Work shall comply with the American Society for Testing and Materials (ASTM ) and National Electrical Code , E . REQUIREMENTS OF REGULATORY AGENCIES_ Work shall comply with codes , ordinances , and regulations of all governing authorities . F . WATER TESTING : Contractor shall test the salt content ( chlorides and t . d . $ ) of the irrigation well . 4 . PRODUCT HANDLING : The Contractor shall protect all materials and work against injury from any cause and shall provide and maintain all necessary safeguards for the protection of the public . He shall be liable for any damage or injury to person or property which may occur as a result of his negligence in the prosecution of the work . 5 . JOB CONDITIONS A . EXISTING CONDITIONS 1 , Inspection : Contractor must examine the areas and conditions under which landscape irrigation system is to be installed and notify the Engineer in writing of conditions detrimental to the proper and timely completion of the work . Do not proceed with the work until unsatisfactory conditions have been corrected . Contractor shall fully acquaint himself with related planting , electrical , paving , site and utilities work to preclude any misunderstanding and to facilitate a trouble -free installation at the site . 2 . Should any objectionable materials such as old concrete , bricks or other debris be encountered during the installation operation , they shall be removed from the site by the Contractor . B . SCHEDULING 1 . Crossing under paved areas as indicated , shall be installed by the Contractor . Crossings shall be installed prior to compaction of subgrade . 2 . Irrigation installation shall not begin until rough grades have been established . 3 . Contractor shall be responsible for coordinating his work with all other parties involved with the job , and shall coordinate the supply of electrical power to the timing device ( controller) . 6 . UTILITIES A Prior to excavation , verify in the field the location and depth of all new and existing utilities and take proper precautions not to damage or disturb such utilities . F:\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00205 - Landscape & Irrigation Specifications for Contract2 .doc 2 B . Repair to original condition , new and existing utilities and other work damaged by Contractor' s construction . C . In the case of damages of the irrigation system caused by others , the cost of repairing the work shall be paid by the party causing said damage . 7 . SUBMITTALS A . After completion of piping installation , Contractor shall furnish the Owner' s representative a reproducible " as built" drawing showing all sprinkler heads , valves , and pipelines to reasonable scale , and provide a minimum of two dimensions taken from fixed obvious objects to each automatic control valve , and quick coupling valve . The Contractor shall also furnish a drawing showing a graphic representation of sprinkler zones . B . Instruction sheets and parts lists covering all operating equipment shall be bound into a folder and furnished to the Owner' s representative in two ( 2 ) copies . The Owner reserves the right to withhold 10 % of the contract amount until the " as built" drawings and instructions and parts lists folders are received . C . Submit salt ( chlorides and t . d . s . ) test results for irrigation well water . 8 . GUARANTEE A . Guarantee workmanship for a period of one year after date of final acceptance . In addition , see to the fulfillment of all manufacturer' s warranties . B . The Contractor shall provide the Owner with a written guarantee stating everything to be covered and any special conditions involved . PART 2 — PRODUCTS 1 . MATERIALS : Materials and equipment shall be new and shall operate at the manufacturer' s published capacities . A . PIPE : Comply with the following unless otherwise indicated : All PVC pipe shall be 160 PSI , Polyvinyl Chloride ( PVC 1120 ) ASTM - D2241 , Type 1 , NSF approved . B . CROSSINGS : Comply with the following : All crossings under paved areas for water and conduit lines shall be Schedule 40 PVC , ASTM - D1785 . C . PIPE FITTINGS : Comply with the following : For PVC plastic pipe , ASTM - D2466 socket fittings with ASTM -A2564 solvent cement . F : \Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00205 - Lan3 cape & Irrigation Specifications for Contract2 .doc D . SPRINKLER HEADS : Sprinkler heads shall be of the type shown on the drawings . Filter screens shall be included with all spray heads . E . RISERS AND SWING JOINTS : 1 . Risers and swing joints shall be as detailed on the drawings . 2 . Risers for shrub heads shall be Schedule 40 PVC pipe . 3 . PVC Flex connections : Shall be Ag - Products heavy walled flexible PVC pipe or equal . Average length of each connection is referred to on the drawings . Special flex cement shall be utilized for making these connections . F . REMOTE CONTROL VALVES : Valves shall be as specified on the drawings . Use Teflon tape only on threaded connections . G . VALVE BOXES : Valve boxes shall be Ametek VP - 10 or approved equal . Install flush with finish grade as indicated on drawing . H . CONTROL WIRING : All wiring to automatic circuit valves shall be OF- 14 direct burial wire of a different color than the black and white wires used on the 115 volt A . C . power . Wiring from the controller to the valves shall be installed in same trench as the mainline where possible . All splices shall be made with Rain Bird snap -tite connectors , or approved equal . All wire shall be furnished in minimum 2 , 500 ' reels and spliced only at valve or tee locations . I . CONTROLLER : Controller shall be as specified on the drawings . J . PUMP : Shall be a centrifugal , high head type as specified on the drawings . K . STRAINER : Shall be by Vu Flo , or approved equal . PART 3 — EXECUTION 1 . GENERAL : The Contractor shall be responsible for full and complete coverage of all irrigated areas and shall make any necessary adjustments at no additional cost to the Owner . 2 . INSTALLATION A . EXCAVATING AND TRENCHING : 1 . Perform all excavations as required for the installation of the work included under this section , including shoring of earth banks to prevent cave - ins . Restore all surfaces , existing underground F : \Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Docmnents\The Enclave.doc\00205 - Landscape & Irrigation Specifications for Contract2 .doc 4 installations , etc . , damaged or cut as a result of the excavations to their original conditions . 2 . Trenches shall be made wide enough to allow a minimum of 2 inches between parallel pipe lines . The minimum vertical clearance between lines crossing at angles greater than 45 degrees is 1 inch . Trenches for pipe lines shall be made of sufficient depth to provide the minimum cover from finish grade as follows : a ) 16 in . minimum cover over main lines . b ) 16 in . minimum cover over control wires . c ) 12 in . minimum cover over lateral lines to heads . 3 . Where possible , install pipe adjacent to curbs or paving to minimize interference with plants and their roots . Coordinate with landscape installer regarding proposed plant material locations . 4 . Keep trenches free of obstruction and debris that could tend to damage pipe and control wires . Remove excess soil from the site and leave grade as it was prior to sprinkler system installation . Piping shall be routed around shrubs , trees and other permanent obstacles . B . PIPELINE ASSEMBLY 1 . Install plastic pipe as recommended by the manufacturer and provide for expansion and contraction . Cut plastic pipe square . Remove burrs at cut ends prior to installation so that a smooth unobstructed flow will be obtained . 2 . Install remote control valves at locations no closer than 12 inches to walk edges , buildings and walls . Plastic pipe and fittings shall be solvent welded using solvents and methods as recommended by manufacturer of the pipe , except where screwed connections are required . Pipe and fittings shall be thoroughly cleaned of dirt , dust and moisture before applying solvent with a nonsynthetic bristle brush . Care should be taken not to use an excess amount of solvent , thereby causing a burr or obstruction to form on the inside of the pipe . Allow the joints to set at least 24 hours before applying pressure on PVC pipe . Do not use PVC cement which has begun to gel . Do not attempt to make pipe connections during inclement weather conditions . C . SPRINKLER HEADS : Large gear-driven rotary type shall be installed so that the top is slightly above finish grade . If finish grade has not been established , set the top four inches above grade and lower when finish grade has been achieved . Sprinklers on risers shall be set at elevations so that there is no interruption of the stream from the sprinkler nozzle caused by plant material during the first growing season ( 1 year from date of installation ) . Heads along curbs and walks shall be set flush to within 1 /8 inch and two to four inches away from curb or walk . Adjust heads having an adjustment stem , for the proper radius and throw for the area involved . FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00205 - Landjscape & Irrigation Specifications for Contract2.doc D . CONTROL WIRES : Shall be installed in a neat and orderly fashion underneath the main and lateral pipes , if possible . Ten - inch loops shall be provided at each valve where control wires are connected . All wires passing under existing or future paving , construction , etc . , shall be encased in plastic pipe as specified , extending at least twelve inches beyond edges of paving or construction . E . TESTING : All main lines shall be hydrostatically tested in the presence of the Owner' s representative at a pressure of 40 psi for a period of time not less than four (4 ) hours , should any leaks be found , they shall be repaired . The line shall then be retested until satisfactory . All lateral lines downstream from the remote control valves shall be visually inspected for leaks , should any be found , they shall be repaired . The line shall then be retested until satisfactory . F . BACKFILL AND COMPACTING : After system is approved or sections thereof, backfill excavations and trenches with clean soil , free of rubbish . Backfill for all trenches , regardless of the type of pipe covered shall be compacted to a minimum 90 % of its maximum density (AASHTO T- 180 ) . Dress off all areas to finish grades . G . PUMP ENCLOSURE : 1 . Pump house shall be allied fiberglass model FPH 4 x 4 or approved equal onto 4 " thick concrete slab . 2 . Provide adequate interior space for maintenance . Approx . size : 4 ' x 4 ' x 3 ' tall . Increase size if required by size of pump and pressure tank . 3 . Submit shop drawings for review prior to constructing . H . FINAL ADJUSTMENT : Balance and adjust the irrigation system components for efficient , proper operation . This includes controller synchronization as well as individual settings of control stations . 3 . INSTRUCTIONS : A . LABELS 1 . Number each zone valve box on underside of valve box cover with a black waterproof marker for reference . Numbers shall match the zone numbers on the drawings . 2 . Number each zone valve control wire at the controller with a waterproof marker and tags . Numbers shall match the zone numbers on the drawings . B . MAINTENANCE 1 . Maintain the irrigation system until final acceptance of the work . Maintenance shall include work , materials and replacements necessary to insure a complete properly operating system . F :\Engineering\Special Proj ects\Enc lave Subdivision\Contract Documents\Contract Documents\The Enclave. doc\00205 - Landscape & Irrigation Specifications for Contract2 .doc 6 2 . It will be the Owner' s responsibility to maintain the system in working order during the guarantee period , performing necessary minor maintenance , keeping grass from obstructing the sprinkler heads and preventing vandalism and damage during the landscape maintenance operation . 4 . CLEANING : The Contractor shall at all times keep the premises ( grounds and pavements ) free form accumulations of waste material or rubbish caused by his employees or work . 5 . PAYMENTS : Shall be made under : item No . IR 1 Irrigation System - Lump Sum . F: ' Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave. doc\00205 - Land cape & Irrigation Specifications for Contract2.doc SECTION BUF LANDSCAPE INSTALLATION ITEM # BUF . LANDSCAPE INSTALLATION A . Install , establish and maintain landscaping of the types and at the locations shown on the plans . B . Only use nursery grown plant materials purchased from Florida based Nurseryman Stock that comply with all required inspection , grading standards and plant regulations in accordance with the latest edition of the Florida Department of Agriculture ' s " Grades and Standards for Nursery Plants . " Unless otherwise specified , minimum grade for all plants is Florida No . 1 or better . All plants must be specified size and grade at the time of delivery to the site and the minimum grade maintained throughout the project construction period and plant establishment period . Use only plants that are true to type and species and insure that the plants not specifically covered by Florida Department of Agriculture ' s " Grades and Standards for Nursery Plants ' conform in type and species with the standards and designations in general acceptance by Florida nurseries . Prior to planting , furnish certification to the Engineer that all plant materials have been purchased from Florida based Nurseryman Stock . A minimum of two plants of each species on each shipment must be shipped with tags stating the botanical nomenclature and common name of the plant . Should discrepancies between botanical nomenclature and common name arise , the botanical name will take precedence . Move nursery stock in accordance with all federal and state regulations and accompany each shipment with the required inspection certificates for filing with the Engineer . All watering shall meet the requirements of Section 983 . The use of cypress mulch on the project is prohibited . C . All materials must be available for inspection before installation and will be subject to approval or rejection . Mark proposed planting beds and individual location of trees as shown in the Contract Documents for Engineer' s review , prior to excavation or planting . The Engineer may request to review all construction and maintenance practices before the start of landscaping operations . FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\00209 - Eagle Trace Landscape Specifications. doe I Make no changes to the layout , materials or any variations of plant materials from the Contract Documents without the Engineer' s written approval . All planting holes and beds must drain sufficiently prior to installing any plants . Immediately notify the Engineer of drainage or percolation problems before plant installation . For installation of the plants as identified in the Contract Documents , comply with the requirements of the Design Standards , Index No . 544 . Personnel performing these services are under the sole responsibility and supervision of the Contractor and must be competent , experienced and skilled in all aspects of the required landscape installation and establishment practices . D . Begin maintenance of all plants immediately after each planting . Keep all plants watered , fertilized , mulched , pruned and staked and guyed as to assure specified minimum grade of Florida No . 1 throughout the duration of the project construction period and establishment period . During the establishment period , keep the individual planting locations and planting beds free of litter and undesirable vegetation . Ensure that the plants are maintained so that they are healthy , vigorous and undamaged throughout the duration of the project construction period and establishment period . For the duration of the establishment period , operate and maintain in good operating condition , all components of any irrigation system installed in compliance with the Contract Documents . During the establishment period , replace any plants that fall below specified minimum grade . Use replacement plants of the same species , size and planting medium as the plant being replaced and as specified in the Contract Documents . E . Certify monthly to the Owner that the plants have been installed and are being maintained per the Contract Documents . A Registered Landscape Architect acting as the Contractor' s Landscape Quality Control representative will oversee the establishment period . The Contractor' s Landscape Quality Control representative must perform quarterly inspections of planting areas and submit findings in report form to the County . Information to be included in the inspection report from the Contractor' s Quality Control representative must include as a minimum the following : Date of inspection Description of project FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave. doc\00209 - Eagle Trace Landscape Specifications.doc 2 Location of inspection Weather conditions Condition of plants- identify by species , location and number of plants that no longer meet the specified minimum Condition of planting beds ( including mulching , mowing , weeding , fertilizing , watering and staking and guying ( if applicable ) Other comments Signature and seal of Contractor' s Landscape QC representative Submit the certified inspection report to the Owner within seven calendar days after the inspection is performed . Any corrections to the inspection report must be completed and resubmitted within three calendar days after notification by the Owner of a need for corrections . Any deficiencies noted on the inspection report must be corrected within ten days of notification from the County . Periodic random verifications may be performed by the County to ensure the quality of the plants and correctness of the Certified Landscape inspection report . F . Remove from the jobsite any surplus excavated material from plant holes unless otherwise directed by the Owner . Surplus is defined as material not needed after installation of plants per Contract Documents . Upon commencement of the plant installation , remove daily all landscape installation debris from the landscape locations described in the Contract Documents . Remove all excess staking and guying materials from the jobsite . G . The Contractor shall be responsible for the proper maintenance , survival and condition of all plants for a period of one year after final acceptance by the Owner . The Engineer may conduct interim inspections of all landscape items during the plant establishment period , as well as the end of the plant establishment period . The Contractor will be responsible for replacing , at no cost to the Owner , all plants found not to meet the minimum specifications within ten days after each inspection . Prior to the end of the establishment period , remove all staking and guying from the project . H . Payment shall be made under : Item No , BUF . 1 Canopy Tree Per EA Item No . BUF 2 Understory Tree Per EA Item No . BUF 3 Shrub Per EA + + END OF SECTION + + R\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.doc\00209 - Eagle Trace Landscape Specifications .doc 3