HomeMy WebLinkAbout2003-130 ORIGINAL Rev. 10/00 Public Cli © 1 �b PROFESSIONAL SERVICE AGREEMENT ADDENDUM Addendum No . 3 THIS ADDENDUM to the AGREEMENT, made and entered into November 13 , 2001 by and between Post, Buckley, Schuh & Jernigan , Inc. ( PBS&J ) and the Client identified herein , provides for the Additional Services described under Item 1 of this Agreement. CLIENT: Indian River County, Florida PROJECT NUMBER : SHORT TITLE OF MAIN CONTRACT: Continuing Consulting Services for Wastewater Treatment Plants SHORT TITLE OF ADDENDUM : South Regional WWTF Odor Control Improvements 1 . DESCRIPTION OF ADDITIONAL PROFESSIONAL SERVICES TO BE PROVIDED BY PBS &J ( If additional pages are necessary , they are identified as Attachment A) : See Attachment A 2 . THE COMPENSATION TO BE PAID PBS &J for providing the requested services shall be ( If additional pages are necessary , they are identified as Attachment B ) : ❑ Direct personnel expense plus a surcharge of plus reimbursable costs . ❑ A Lump-Sum charge of $ , plus out-of-pocket expenses . ❑✓ Unit Cost/Time Charges identified in Attachment B , plus reimbursable costs . ❑ In accordance with the provisions for additional services compensation set forth in the aforementioned Agreement. ❑ Other - See Attachment B IN WITNESS WHEREOF , this Addendum is accepted on the later date written below, subject to the terms and conditions above stated , and the aforementioned Agreement. CLIENT: POST , BUCKLEY, & INC . SIGNED : SIGNED : TYPED NAME : ac TYPED NA Robert A. Morr ; P. E . , DEE TITLE : _ Chairman TITLE : Vi ePesident DATE : DATE : Signatures C O Idi; r t}drr �op9 of - 498) t CokAg Tient; Copy 3 - PBSU Accounting Attest : J . K . Barton , Clerk INDIAN RIVER COUNTY r BXenneth ounty Co ssioners B Deputy Clerk B R . Macht , Chairman Approved : BCC approval date 06 - 03 - 2003 ames E . Cha dler County Administrator Approved as to form and legal su ienc z ;445r, zefz4l ;l ari r f= Fell Assistant County Attorney a t ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES I . PROJECT DESCRIPTION The objective of this project is to implement certain odor control improvements at the Indian River County ( IRC ) South WWTF . The basis for odor control improvements at the South WWTF will be indirect inference from the Central WWTF Odor Control Study and engineering judgment by IRC staff and PBS&J , absent any site specific testing for concentrations of mass emissions of odor compounds . PBS &J did conduct a site visit of both the South WWTF in April 2002 to observe the areas of potential odor emissions . For the purposes of preparing a scope of work , schedule and budget for this project , it is assumed that the design and permitting will be performed concurrently with , and in addition to , the Central WWTF and Regional Sludge Facility ( RSF ) project and that construction of odor improvements at the Central WWTF , RSF & the South WWTF will be performed via a single construction contract . II . SCOPE OF SERVICES The specific services and tasks to be provided by PBS &J are described as follows : Task 1 - Consultation with IRC Staff for County Implementation of Certain Odor Improvements Certain odor improvements are to be implemented via quotes from existing County contractors to IRC staff. PBS &J will support this effort by providing telephone consultation , periodic site visits , sketches , abbreviated technical specifications , and other technical support as detailed in the following tasks . It is understood from IRC staff that the following improvements described in PBS &J 's Odor Control Study have already been completed (or will be completed by IRC staff) and do not require further assistance from PBS&J : 0 Addition of gaskets on the headworks structure for the South WWTF CAF/bw/C:\Documents and Settings\ct7137\Loca1 Settings\Temporary Internet Files\OLK9F\ATTACHMENT A TO South WWTF Scope 3-25-03.doc Last Revised 5/4/2003 9: 04 AM 1 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) Task 1 . 1 - Headworks Scrubber Process Improvements The South WWTF utilizes a chemical scrubber to control odor emissions from the headworks process . Certain improvements to the operation and control of these scrubber processes may further improve scrubber efficiency . IRC staff will self perform all such improvements to the headworks scrubber system . PBS &J will provide sketches and other consultation to IRC staff in support of this effort up to a budget limit of 8 hours . Task 1 .2 - South WWTF Caustic Soda and Sodium Hypochlorite Storage and Feed Facilities IRC staff will procure the caustic soda and sodium hypochlorite feed systems for the South WWTF aerobic digester scrubber system to be installed by one of the County's existing contractors . PBS&J will provide sketches and other technical assistance to IRC staff up to a budget limit of 84 hours . Task 2 - Final Design IRC staff intends that certain odor control improvements be bid and constructed by a general contractor under the same construction contract as that for the Central WWTF & RSF odor improvements . PBS &J will prepare the contract documents to supplement those prepared under the Central WWTF & RSF odor control improvement project as detailed in the following tasks . For budgeting purposes , the following is a list of anticipated construction plans to be included in this final design effort : G - 1 South WWTF Site Plan C- 1 South WWTF Grading and Drainage S- 1 Structural Plans , Sections and Details M- 1 South WWTF Anoxic Basin Cover Plan , Sections and Details M -2 South WWTF Anoxic Basin Duct and Biofilter Plan , Sections and Details M-3 South WWTF Aerobic Digester Cover Plan , Sections and Details M-4 South WWTF Aerobic Digester Scrubber System Plan , Sections and Details M-5 South WWTF Aerobic Digester Sections and Details M-6 South WWTF Aerobic Digester Sections and Details CAF/bw/C:\Documents and Settings\ct7137\Loca1 Settings\Temporary Internet Files\OLK9F\ATTACHMENT A TO South WWTF Scope 3-25-03. doc Last Revised 5/4/2003 9:04 AM 2 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) HVAC- 1 South WWTF Screening Dumpster Area Ventilation Plan , Sections and Detail E- 1 South WWTF Electrical Site Plan E-2 South WWTF Single Line Diagram E-3 South WWTF Biofilter Electrical Plan and Details E -4 South WWTF Aerobic Digester Scrubber Electrical Plan E-5 South WWTF Aerobic Digester Electrical Details E-6 South WWTF MCP Layout I - 1 South WWTF MCP PLC Input Schematic Diagram Task 2 . 1 - Construction Plans - South WWTF Anoxic Basin Covers and Odor Control PBS&J will prepare construction plan sheets for the addition of aluminum or fiberglass covers for the South WWTF anoxic basins . PBS &J will prepare construction plan sheets for the addition of a modular biofilter and associated duct, blower, electrical and controls , for the covered anoxic basins . Task 2 .2 - Construction Plans - Improved Ventilation for Screenings Dumpster Area - South WWTF PBS &J will prepare construction plan sheets for improvements to the ventilation system at the South WWTF screenings dumpster area such that the doors can remain closed . The improvements will include duct that will be routed to the anoxic basin biofilter. Task 2 . 3 - Construction Plans for South WWTF Aerobic Digester covers and Scrubber System PBS &J will prepare construction plan sheets for the addition of aluminum or fiberglass covers and associated odor control scrubber. Absent any site-specific odor emission data , IRC and PBS &J agree that the basis of scrubber design shall be a two-stage chemical scrubber with caustic and sodium hypochlorite used for both stages . Construction plans will include a concrete foundation for the scrubber system and electrical and instrumentation drawings . PBS &J will provide technical support to IRC staff to self perform installation of the caustic soda and sodium hypochlorite storage and feed systems as described in Task 1 . 2 . Task 2 . 4 - Specifications PBS &J will prepare additional technical specifications related to the project and will incorporate County standard "front-end " ( Division 0- 1 ) specifications . CAF/bw/C:\Documents and Settings\cf7137\Loca1 Swings\Temporary Internet Files\OLK9FWTTACHMENT A TO South WWTF Scope 3-25-03.doc Last Revised 5/4/2003 9:04 AM 3 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) Task 2 . 5 = Cost Estimating PBS &J will prepare estimates of probable construction cost to be submitted with the 60 % , 90 % and bid documents . Task 2 . 6 - County Reviews PBS &J will include up to 5 sets of progress contract documents at approximately the 60 % and 90 % levels of completion in the review sets for the Central WWTF & RSF Odor improvement project . Task 3 = Geotechnical Evaluation The scope of the work will include drilling two (2 ) Standard Penetration Test ( SPT) borings in general accordance with ASTM D 1586 . One boring will be near the proposed biofilter and one will be at the location of the proposed South WWTF aerobic digester scrubber. Task 4 = Permitting PBS &J will prepare a permit application on behalf of IRC staff for a County building permit for the South WWTF site . PBS &J has also budgeted to respond to one request for additional information . Task 5 = Bidding Phase Services Task 5 . 1 - Document Distribution and Pre-Bid Meeting A reproducible copy of the final construction Contract Documents will be provided to IRC staff to be included with the Central WWTF & RSF Odor project . IRC staff will make all necessary copies and will distribute same to all bidders without assistance from PBS &J . Task 6 = Construction Services General Once authorized by IRC staff, PBS&J will proceed with the construction phase services described below by specific tasks to supplement the effort already budgeted for the Central CAF/bw/C:\Documents and Settings\ct7137\Loca1 Swings\Temporary Intemet Files\OLKWATTACHMENT A TO South WWTF Scope 3-25-03.doc Last Revised 5/4/2003 9:04 AM 4 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) WWTF & RSF odor project . . It is anticipated that the construction period will not exceed 8 months . The County will provide inspection services during construction and PBS&J is entitled to rely on such services without independent review. The County within the limits of applicable law and without waiver of any defenses or claims will be responsible for its agents or employees performing any of the work of the project . PBS&J shall not be responsible for construction means , methods , techniques , sequences or procedures , or for safety precautions and programs in connection with the work , and shall not be responsible for the County or Contractor(s ) failure to carry out the work in accordance with the Plans and Specifications . Task 6 . 1 = Construction Administration PBS &J will participate in additional construction administration activities such as telephone conversations , communication with key project personnel , etc . , up to the budget limit of 16 hours . Task 6 .2 = Shop Drawing Review PBS&J shall review additional shop drawings , up to two times per submittal , for general conformance with the Plans and Specifications up to a maximum of 54 hours . Task 6 . 3 = interpretations and Clarifications PBS &J shall provide additional clarifications and interpretations of the Plans and Specifications as requested up to a budget limit of 40 hours . Task 6 .4 - Record Drawings PBS&J shall prepare one reproducible set of additional record drawings for the County based solely on information provided by the Contractor. Task 6 . 5 - Start Up , Testing and Training Assistance PBS &J will provide additional PLC programming for the facilities constructed via this project up to a budget limit of 24 hours . CAF/bw/C:\Documents and Settings\cf7137\Loca1 Settings\Temporary Internet Fi1es\OLK9F\ATTACHMENT A TO South W WTF Scope 3-25-03.doc Last Revised 5/4/2003 9: 04 AM 5 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) III . SCHEDULE Task 1 - Consultation with IRC Staff for County Implementation of Certain Odor Control Improvements PBS &J will complete the services described in Task 1 concurrent with IRC staff implementation of the subject improvements . Task 2 - Final Design 1 ) The 60 % contract documents and associated estimate of probable construction cost will be completed within 90 days of Notice to Proceed and receipt of all requested information from IRC staff. 2 ) The 90 % contract documents and associated estimate of probable construction cost will be completed within 60 days of receipt of written County comments on the 60 % design . 3 ) The bid documents and associated estimate of probable construction cost will be completed within 45 days of receipt of written County comments on the 90 % design documents . Task 3 - Geotechnical Evaluation The geotechnical services for the project as described in Task 3 will be completed within 60 days of receipt of the Engineer's Notice to Proceed and County approval of the proposed boring locations . Task 4 — Permitting PBS&J ' s permitting services will be completed concurrent with the completion of final design bid documents described in Task 2 . Task 5 - Bidding Phase Services PBS &J ' S bidding phase services will be completed concurrent with the County's project bidding period . CAF/bw/C:\Documents and Settings\cf7l37\Local Settings\Temporary Intemet Files\OLK9FATTACHMENT A TO South W WTF Scope 3-25-03.doc Last Revised 5/4/2003 9:04 AM 6 ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) Task 6 - Construction Phase Services 1 ) Construction Administration , Shop Drawing Submittal Reviews , Periodic Site Visits , Materials Testing , and Interpretations and Clarifications : Construction Administration , Shop Drawing Submittal Reviews , Periodic Site Visits , Materials Testing , and Interpretations or Clarifications of the Plans and Specifications will be completed concurrently with the Contractor's construction effort . The construction shall be initiated within 90 days of design completion and shall not exceed an 8-month construction period . 2 ) Record Drawings : Record Drawings shall be completed within 45 days of receipt of the complete as- built drawings from the Contractor. IV. COMPENSATION Compensation for the engineering services described above shall be on a time charge basis , in accordance with Exhibit " B " , for a not-to-exceed fee of $ 97 , 757 . 00 . V. SERVICES TO BE PROVIDED BY THE COUNTY To support PBS&J 's efforts in this project , the County agrees to provide the following services : • Furnish files , drawings , previous reports , records of construction , underground utility locations , operation and maintenance data , topographic information , permits , pertinent correspondence , and any other information necessary to prosecute the work described herein . • Provide timely advice and guidance regarding County policies and technical preferences . Provide timely comments and review of information provided . The County agrees to assist in completing this project in accordance with the proposed schedule . 0 Provide suitable digital files of site plans , topography , and record drawings for the South WWTF such that supplemental survey services are not required . • Resolve all internal variance in opinion regarding technical preferences or guidance prior to directing PBS &J . CAF/bw/C:\Documents and Settings\ct7137\Loca1 Settings\Temporary Internet Fi1es\OLK9F\ATTACHMENT A TO South WWTF Scope 3-25-03. doc Last Revised 5/4/2003 9:04 AM 7 • ATTACHMENT A INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES SOUTH WASTEWATER TREATMENT FACILITY ODOR CONTROL IMPROVEMENTS SCOPE OF SERVICES (Continued) • Provide all labor, equipment , materials , etc. needed to complete the items to be self performed by IRC staff. • Conduct construction inspection services . • Provide and install an enclosure for the South WWTF screenings dumpster. CAF/bw/C: \Documents and Settings\X137\Local Settings\Temporary Internet Fi1es\OLK9FWTTACHMENT A TO South WWTF Scope 3-25-03.doc Last Revised 5/4/2003 9:04 AM 8 A A 1 , 11 ,11,119,11 B Y PBSBJ p Client: ATTACHMENT B Project Name: Task: Date of Estimate: Multipliers: 3. 10 1 . 10 LABOR COST DETAIL TASK 1.1 TASK 1.2 TASK 2.0 TASK 2.1 Task 2.2 Task L3 Task 2.4 Task 25 Task 3 Task 6.1 Task 6.2 Task 6J Tnk 6.4 Task 65 R•od"rk• Awabk D1p••t•r om•rY d CNP South W WTF Screenings South WWTF CATEGORY Scwbbas Imp ChamkY Faatla plash Moak Coat DaohehnkY Comtructlon Shop RFl16 Record Start Up i TOTAL HOURLY BILLABLE System V•ntllatlon DIpnM •lam Speclfleatlon• Eatlm EvYualbna Adminbtratbn DraM a Ch • Order• Dr • TrYn HOURS RATE LABOR Principal En ineer 4 12 8 2 24 4 4 Pm'ect Director $ 11 ,507 Sr. Engineer IV 4 8 16 8 2 58 $64.00 Sr. En ineerlV Structural 2 16 38 $50.00 $5,890 4 32 18 $52.00 Sr. Engineer IV Electrical 8 $2.902 Sr. En ineerlll HVAC 7.093 28 8 28 8 2 2 8 4 80 $52.00 $44 $52.00 $2,896 Sr. En ineerlll 8 $40.00 Sr. Engineer // 4 40 4 48 8 4 2 8 14 $992 En ineer 11 24 8 60 8 24 150 $32.00 $19,344 Cadd Technician $0 16 12 40 24 180 16 8 124 $25.00 $9,610 Clerical 6 8 2 12 g 8 24 304 $22.00 E$20, 733TOTAL HOURS 6 78 16 122 44 416 32 6 0 16 54 40 24 24 8850 0 $ 18 00 $2'790TOTAL LABORCOS7 $1290 $9,387 $1 ,314 $13,342 $3757 $43040 $3343,756 ITEM Raw Directs Total Directs TransportaIon $150 $150 Per Diem $150 $0 $0 $350 $800 $880 Computer $25 $25 $25 $50 $0 $0 Tele hone/CouriedPosta a $25 $25 $25 $50 $125 $138 Printin a ra hits E ui ment(Misc. $50 $25 $50 $50 $ 175 $ 193 $125 $138 (;ADD Geotechnical Evluauon $0 $48 $36 $120 $72 $540 $0 $0 $ 1 ,500 0 $0 $0 $24 $72 $0 $9$2 $1 ,003 $ 1 , 500 $1 ,650 $0 $0 RAW DIRECT sriA TK $25 $298 $36 $345 $97 $840 $0 $0 $1 ,500 $0 $0 $2q $0 $0 MULTIPLIED DIRECT S/TASK $28 $328 $40 $380 $ 107 $924 $0 $0 $ 1 ,650 $0 $0 $26 $$79 $40 0 RAWMULDIRECTIPLIED COSTS COSTS = $3,637 TOTAL $/TASK $1 ,317 $9,715 $1 ,354 $13,722 $3,864 $43, 964 $3,348 $818 $1 ,650 $2,034 $6,361 $4,478 $11716 1 $3,416 TOTAL FEE _ $977,,757757 South WWTF Odor Control Design 3-25-03 5/4/20039:09 AM