HomeMy WebLinkAbout2009-211 a /11 /
AMENDMENT 5
FINAL DESIGN AND PLANS PREPARATION FOR
CR 510 from CR 512 to east of 75"' Court
This is an amendment to the existing Final Design and Plans Preparation services agreement
(AGREEMENT) , dated November 17 , 2005 , by and between INDIAN RIVER COUNTY , hereinafter
referred to as the COUNTY , and STANLEY CONSULTANTS , INC . , hereinafter referred to as the
ENGINEER. This amendment addresses changes in Section III — Scope of Services, Section IV — Time for
Completion , and Section V - Compensation" of the AGREEMENT .
Amendment Description
SECTION I - not applicable
SECTION II — not applicable
SECTION III - SCOPE OF SERVICES is being modified to incorporate the following :
The ENGINEER and Betsy Lindsay, Inc agree to perform professional roadway design and related survey
services in connection with the project as required and set forth in the following :
A . SURVEY (Betsy Lindsay, Inc . )
The right of way file prepared by Burdette and Associates will be the basis for all survey
work
performed in this scope of work . All Burdette and Associates work will be accepted as correct. One
day of survey work will be completed to randomly sample the Burdette work . The scope does not
include field survey to support the preparation of any sketch and legal descriptions, or Temporary
Construction Easement (TCE) sketches .
1 . Prepare Temporary Construction Easement (TCE) exhibit sketches
Prepare a sketch illustrating each temporary construction easement . The sketch will illustrate the
proposed right of way, the baseline of survey, and the TCE with dimensions . There are approximately
ten TCE ' s requiring separate sketches . Each sketch will be prepared at a lump-sum cost of $ 110 per
sketch . The remaining TCE ' s will be illustrated on the sketch and legal descriptions for additional
right-of--way acquisition to be prepared by Betsy Lindsay, Inc .
2 , Prepare Legal Descriptions and Sketches
Prepare a sketch and legal description for each parcel to be acquired as right-of-way and drainage
ponds , and prepare sketch and legal descriptions for drainage easements and access easements . There
are fifteen right-of-way acquisition parcels, two drainage pond sites , nine drainage easements , and
two access easements . All TCE ' s adjoining the descriptions being prepared will be illustrated with
dimensions . No legal description will be prepared for the TCE ' s . The fee for each sketch and legal
description will be a lump-sum fee of $400 . 00 per legal description . (9 parcels along CR 510
+ 5
parcels along 89"' Street + 1 parcel for canal realignment + 2 ponds + 9 Drainage Easements +
2
access easements = 28 total sketch and legal descriptions .) Please note that each sketch and
legal
description will be prepared one time based on the information supplied . If there is a
change in
ownership , or the size, shape or location of any parcel, additional fees will be required .
We will
submit each sketch and legal description in a dwf format for review . Any review comments will be
addressed, and the final deliverable of the legal sketches and descriptions will be two signed
and
sealed copies , one PDF and the AutoCAD file .
3 . Finalize Right-of-Wasps
Finalize the right of way maps based on the Burdette and Associates Microstation CAD files on an
hourly basis not to exceed $4 , 300 . The right of way map will be submitted in a dwf format for review .
CR 510 Amendment 5 Pagel of 4 8/3 /2009
The final deliverable will be one set of Mylars , a PDF and the CADD file .
4 . Locate Wetland Flays
Locate wetland flags for up to 4, 000 lineal feet of wetlands . This task should be done within
fifty
hours by a two- man field crew. The wetland lines will be input into Microstation and a CADD file
and surveyors report will be furnished to the ENGINEER . One day of a GPS field crew
will be
allocated to locate a random selection of Burdette control points and found monuments . This item
will be billed on an hourly basis not to exceed $ 8 , 200 .
5 . Review Title Information
Review the title information for three parcels . Modify the map to reflect the title information .
This
item will be billed on an hourly basis not to exceed $ 800 .
6 . Deliverables
The final deliverables include two copies of the signed and sealed legal sketches and descriptions, one
PDF and the AutoCAD file of the legal sketches and descriptions (delivered to the COUNTY) . A
Microstation electronic file will be delivered to the ENGINEER illustrating the completed right-of-
way map .
Be ROADWAY DESIGN ( Stanley Consultants , Inc . )
Roadway design services will include updating the four roadway plan and profile sheets , four
roadway cross section sheets, two signing and pavement marking sheets, quantities and cost estimates
for the following tasks :
1 . Eliminate full median opening and left turn lanes between Station 127+00 and Station
135 +50 .
2 . Design full median opening for Sebastian Park PUD between Station 131 +00 and Station
139+20 ,
3 . Redesign stormwater management system within Basin 5 to conform to geometric revisions
between Stations 127 +00 and 139+20 .
4 . Eliminate right turn lane and entrance side street at Station 179+50 .
5 . Design left turn lane between Station 180+00 and Station 183 + 50 .
6 . Redesign stormwater management system within Basin 7 to conform to geometric revisions
between Stations 179+ 50 and 183 +50 .
C . SIGNING AND PAVEMENT MARKING PLANS (Stanley Consultants, Inc . )
Signing and pavement marking plans will include the following tasks :
1 . Redesign the signing and pavement markings between Station 127 +00 and Station 139+20 .
2 . Redesign the signing and pavement markings between Station 179+ 50 and Station 183 + 50 .
SECTION IV — TIME FOR COMPLETION
Submittal Dates
The final right-of--way mapping and legal descriptions and sketch deliverables shall be completed
within six weeks after notice to proceed . The wetland delineation reports shall be completed three
CR 510 Amendment 5 Page 2 of 4 8/3 /2009
weeks after the wetland flags are located in the field .
SECTION V - COMPENSATION
The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to
this Agreement fees in accordance with the following :
A . Professional Services Fee
The basic compensation mutually agreed upon by the ENGINEER and the COUNTY
is as follows :
Task Description Fee
Survey Lump-Sum Tasks
Prepare TCE exhibit sketches ($ 110 per sketch) $ 11100
Legal Descriptions and Sketches ( $400 per sketch and legal description) $ 11 , 200
Sub Total $ 12 ,300
Survey Hourly Not-to -Exceed Tasks
Finalize Right- of-- Way Maps $4 , 300
Review Title Information (3 parcels) $ 800
Locate Wetland Flags (includes one day of GPS field work) $ 8 ,200
Sub Total $ 139300
Roadway Lump-Sum Tasks
Roadway Plans $ 17 954
Signing and Pavement Marking Plans $ 31911
Sub Total $219865
Amendment 5 Grand Total $ 47 ,465
Any additional survey services will be billed on a time and materials basis .
SECTION VI to XVII - not applicable
CR 510 Amendment 5 Page 3 of 4 8/3 /2009
SECTION XVIII - ENTIRETY OF AGREEMENT
This writing embodies the entire AGREEMENT and understanding between the parties hereto , and
there are no other agreements and understandings, oral or written , with reference to the subject matter hereof
that are not merged herein and superseded hereby .
No alteration, change , or modification of the terms of this Agreement shall be valid unless made in
writing and signed by both parties hereto .
This AGREEMENT, regardless of where executed , shall be governed by and construed according to
the laws of the State of Florida.
IN WITNESS WHEREOF the parties hereto have executed these presents this 1 Rth day of
August , 2009 .
STANLEY CONSULTANTS , INC . INDIAN RIVER COUNTY, FLORIDA
1601 Belvedere Road , Suite 400 East
West Palm Beach , FL 33406
By : By :
Tshaka E . Dennis , P . E . Wesley S . Davis, Chairman
Vice President Board of County Commissioners
WITNESSED BY : Approved by BCC-,Au u sL. 1 .8... , 20_Q�
Attest :
Jeffrey K . Barton , Clerk of Circuit Court
kz�
, B rX .
` County Attorney Deputy Clerk
Approved as to Form and Legal Sufficiency
;- A
seph A . Baird ,
ounty Administrator
CR 510 Amendment 5 Page 4 of 4 8/3 /2009