Statement of Work
This Statement of Work ("SOW") outlines the responsibilities, deliverables and acceptance criteria
for the services that NEC Unified Solutions, Inc. ( 'NEC") will perform for Indian River County
("Customer) as described in the Project Summary below.
1 . Project Summary
Install new Power System in new County Admin Building
2. Project Scheduling
This project is scheduled to star TBD, with the anticipated Cutover Date of TBD. The project shall
be deemed complete when NEC has completed the services as described in Section 1 above and
the system is functioning substantially in accordance with manufacturer's published specifications
for the newly purchased functionality ("Cutover Date").
3. Assumptions and limitations
This Statement of Work and the rates/price are based on the following key assumptions
("Assumptions°). Parties agree that any changes in the Assumptions may result in an adjustment
in the rates/prioe.
3. 1 . The terms and conditions of the SOW and the Agreement prevail regardless of
any conflicting terms on the Purchase Order, other correspondence and any and
all verbal communications. All Purchase Orders shall be approved and accepted
by NEC in their Dallas office.
3.2. Delays caused by lack of completed site preparation or failure to meet any
responsibilities as specified on the part of the Customer will be billed at NEC's
time and materials rates plus expenses. Any additional costs incurred by the
Customer as a result of delays shall be the sole responsibility of the Customer.
3. 3. The Customer is responsible for any facility issues that may arise (i.e. bad or
incorrect cabling, not meeting cable plant, environmental or power specifications,
lack of rack space, etc.) and will correct any issues as quickly as possible. The
Customer may contract with NEC for resolution of these issues.
3.4. Unless purchased through NEC, the Customer is responsible for ordering and
verifying availability of any required Telco circuits.
3.5. Customer will schedule and inform users of any required systems outage.
3.6. NEC requires a minimum lead-time of fourteen ( 14) calendar days from
Customer's execution of the SOW to begin work. NEC will make commercially
reasonable efforts to meet the requested installation date.
NEC Unified solutions, Inc. Ropnetary and Confidenfial 2 of 6
1003954 v.1 5/31/2007
NEC NEC Unified Solutions, Inc.
Services not covered under this SOW:
3.7. Support or replacement of Product that is altered, modified , mishandled ,
destroyed, or damaged by natural causes or damaged due to a negligent or
willful act or omission by Customer or use by Customer other than as specified in
the applicable NEC or manufacturer-supplied documentation.
3.8. Services, software, or hardware required for software or hardware problem
resolution resulting from third-party products or unforeseen circumstances.
3.9. Any additional network audit, network assessment, network design, consulting,
and/or training services that are offered under a separate Statement of Work.
4, Pricing
In consideration for the equipment and services specified in the attached Equipment and/or
Services lists, Customer shall remit the total sale price of $8,966,85 plus applicable sales tax.
Payment shall be due as indicated in the following payment schedule:
Equipment:
• 100% of the Equipment price is due upon delivery of the equipment required for
Cutover to the site specified by Customer 6177.76
Services:
• 100% of the Service Price ($2,779.09) is due as follows:
0 50% of the Service Price due upon execution of this SOW ($ 1 ,389. 551
0 50% of the Service Price due upon acceptance of project ($1 ,389. 551
Unless otherwise agreed to by the parties in writing, the above payments shall be due on a per
system, per site, per event basis. All change orders shall be invoiced upon Cutover. Prices
stated in this SOW are effective for 30 days from the date specified below in the footer. THE
ABOVE SALE PRICE EXCLUDES SALES TAX. SALES TAX (IF APPLICABLE) WILL BE
INVOICED IN ADDITION TO THE SALE PRICE.
NEC Unified Solutions, Inc. Proprietary and Confidential 3 of 6
1003954 v.1 5131/2007
NEC NEC Unified Solutions, Inc.
5. Pricing Documents
A012308 PRS48-1G90MA50CCB5R 1 1 $6, 177. 761
6. Completion of Services
Upon completion of all work, NEC shall submit to the customer a Services Completion Checklist
(see Appendix A) for their review and signature. Customer shall ensure that the proper personnel
are scheduled to review each completed Service or Deliverable upon receipt of this notification .
The assigned Customer personnel shall indicate their acceptance of the Service or Deliverable by
signing the Services Completion Checklist within five (5) days from the presentation of the
completed Service or Deliverable. Services and Deliverables will be deemed accepted if the
assigned Customer representative fails to respond within this five-day period . If a Service or
Deliverable is not complete for any reason, Customer shall provide written notification to NEC .
NEC shall have ten (10) days after the receipt of such notice from the customer to correct the
error, given it is within NEC's scope to do so. Such time period to correct the error may be
extended by mutual consent.
NEC Unified Solutions, Inc. Proprietary and Confidential 4 of 5
1903954 v.1 5/31/2097
NEC NEC Unified Solutions, Inc.
APPENDIX A
1 . Services Completion Checklist - Power System implementation
NEC Unified Solutions will submit this checklist to Indian River County for signature to indicate
acceptance of this installation. The system shall he accepted, for purposes of this SOW, 15 days
after the Cutover Date (the "Acceptance Date"), unless Indian River County gives NEC Unified
Solutions written notice prior to the Acceptance Date detailing how the System does not conform
to the requirements of this SOW.
IMPLEMENTATION TASK COMPLETED?
3. installation of Power System ❑
4. Successful testing of system functionality. ❑
5. Provide a copy of the documentation. ❑
Acceptance Acknowledged:
By:
Printed Name:
Title:
Date:
NEC Unified Solutions, Inc. Proprietary and Confidential 5 of 6
1993954 v, i 5/31/2997
NEC NEC Unified Solutions, Inc.
7. Agreement between Indian River County and NEC
This SOW is governed by, incorporated into, and made part of the Master Purchase Agreement
("MPA") # 101114-S'01_ between NEC Unified Solutions, Inc. ("NEC"), a Nevada Corporation,
at 6555 North State Highway 161 , 8"' Floor, Irving, TX 75039 and Indian River County, having its
principal place of business at 1840 25th Street, Vero Beach, Florida 32960 as of the date last
written below ("Effective Date").
This SOW defines additional provisions for applicable Hardware/Software and/or Services
(°Products") that NEC shall sell and/or license to Indian River County under the terms of the
Master Purchase Agreement ("MPA") and as specifically defined in the related Equipment List,
Services List, Project Quote and/or SOW. The terms of this SOW are limited to the scope of the
related Equipment List, Services List, Project Quote, Schedules and/or SOW's and shall not be
applicable to any other Exhibits, which may be executed and attached to the MPA.
IN WITNESS WHEREOF, the duly authorized representatives of the parties hereto have caused
this SOW to be duly executed.
Indi River Cou ty NEC Uned $olut one, c.
By. By. l� JAL
N e: SosE P� �3 �>e� Name: Cathl Ogle
Ojrector Cruel' Management
Title: 401P 1411-SW72)eTitle:
Date: S3/- O 17 Date:
QQ °3
Q
J
APPROVED AS TO F , o c
AND LEGAL SUFF 1 %v i or^d nitials a��
t Masa
BY
WILLIAM K . DEeRt.
ASSISTANT COUNTY AT -i
NEC Unified Solutions, Inc. Proprietary end Confidential
B of
1803953 v.1 Ml/2007