THIRD AMENDMENT TO THE AGREEMENT BETWEEN
THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
AND INDIAN RIVER COUNTY
FOR THE STORMWATER MANAGEMENT COST-SHARING PROGRAM
THIS AMENDMENT is entered into this 23rd day of November , 2004 , by and between
the GOVERNING BOARD of the ST. JOHNS RIVER WATER MANAGEMENT DISTRICT ("the
District") , whose mailing address is 4049 Reid Street , Palatka, Florida 32177 and INDIAN RIVER
COUNTY ( "County"), whose address is 1840 25th Street, Vero Beach , Florida 32960-3365 .
WHEREAS , the District and County entered into Agreement 99H235 on April 6, 1999 , to assist
County in the implementation of two stormwater management projects (Gifford Area and Roseland Area
Projects) and amended the Agreement on August 1 , 2000 (Amendment # 1 ) , September 18 , 2001
(Amendment #2) , and March 28 , 2003 (Change Order # 1 ) ; and
WHEREAS , the District and County desire to modify the Agreement.
NOW, THEREFORE, in consideration of the mutual covenants contained herein and for other good
and valuable consideration , the District and County hereby agree to the following amendments :
1 . Item 3. The District shall : Paragraph B shall be deleted and replaced with the following :
"B . Obligate moneys to fund a portion of the stormwater management projects in an amount not
to exceed $50,000, or 13 % of the total cost of the Gifford Project; and an amount not to
exceed $210,000, or 33 % of the total cost of the East Roseland Project. If upon completion
of all the tasks identified for reimbursement, the County ' s actual expenditure for the task(s)
identified for reimbursement is less than originally projected in the Project Budget for the
Gifford Project (Exhibit A, attached to original contract) and as projected in the Revised
Project Budget for the East Roseland Project (Exhibit B4 , attached hereto) , the District' s
obligation shall be reduced proportionately . "
2 . Item 4. The County shall : Paragraph B shall be deleted and replaced with the following :
"B . Obligate moneys to fund these two stormwater management projects . County shall provide
a minimum amount of 87 % of the funding for the Gifford Project ; and a minimum amount
of 67 % of the funding for the Roseland Project, and agrees to provide funding for any other
costs above the amount budgeted , if any , required to complete these projects . "
3 . Item 7. This paragraph shall be deleted and replaced with the following revised paragraph :
"This Agreement shall commence upon execution and shall terminate upon satisfactory completion
of the stormwater management projects and subsequent cost reimbursement to County ; or July 30,
2005 , whichever comes first. Work eligible for reimbursement must have started after March 1 ,
1999 . "
The District and County agree that all other terms and conditions of the original Agreement are
hereby ratified and continue in full force and effect.
Page 1 of 5
Contract #99H235
Amendment #3
IN WITNESS WHEREOF, the parties hereto have duly executed this Amendment on the date set
forth above .
ST . JOHNS RIVER WATER INDIAN RIVER COUNTY
MAN MENT DISTRICT
B BY
Kirby B . Green II , xecutiv Director Arthur R . IVe ger , Cha rma
Typed Name and Title
Date : Date : Novemh . r 23 , 2QQ4
APPROVED BY THE OFFICE
F NERAL COUNSEL
Attest : Jo K . Mori , w,
i ,N
B
Stanley J . Niego, Sr. Assistant General Counsel Typed Na WW tTille
Deputy Clerk
PROVE
CfqntyAd ' nistrator
AP OVER AS TO FORM
LE AL SUFFICIE Y
RIAN E .
ASSISTANT COUNTY ATTORNEY
Page 2 of 5
Contract #99H235
Amendment #3
EXHIBIT ` 11 4" — REVISED STATEMENT OF WORK
INDIAN RIVER COUNTY
EAST ROSELAND AREA STORMWATER IMPROVEMENT PROJECT
I. Introduction
The project will construct a stormwater detention pond (control water surface area = 1 . 51
acres , more or less ) , install enlarged culverts , and construct stormwater conveyance swales to
relieve flooding and reduce pollutant loading to the St . Sebastian River and the Indian River
Lagoon (IRL) . The drainage improvements will also enhance the existing natural drainage
system , which includes approximately 9 . 7 acres of wetlands .
II. Objectives
The East Roseland Area Stormwater Improvement Project will provide flood control and
stormwater quality treatment for an 80 . 3 - acre watershed of Roseland lying east of the Florida
East Coast Railroad , west of commercial development abutting the west right- of-way of U . S .
Highway 1 , and between 81st Avenue and 79th Avenue , in Section 21 of the Fleming Grant
in Indian River County . The project lies within the South Central IRL Drainage Basin , St .
Johns River Water Management District Planning Unit 10E ( 16 & 17) . (Reference :
SJRWMD Technical Publication SJ97 - 1 . )
This basin experiences frequent flooding due to filling of low areas and inadequate culvert
capacity as a result of development over the past several years . When a large rain event
occurs , a natural drainage slough fills with stormwater runoff, impeding upstream drainage
and causing streets to flood . Nuisance flooding and road access problems due to flooding are
common .
The project includes the construction of a stormwater detention pond (control water surface
area = 65 ,760 sf = 1 . 51 acres , more or less ) , installation of enlarged culverts , and
construction of stormwater conveyance swales .
III . Scope
The project ' s goal is to relieve flooding and reduce pollutant loadings to the St . Sebastian
River and the IRL . The IRL downstream of this project is exhibiting signs that water quality
problems are developing . These signs include reductions in seagrass density and coverage ,
and increasing closures of shellfish harvesting areas or reclassification of shellfish . The
creation of additional flood storage in the wet detention pond will improve the quality of
discharge water into the St . Sebastian River via the approximately 1 , 100 foot long natural
slough . This will result in improved water quality through reduced loadings of solids ,
sediments , organic matter, and nutrients into the St . Sebastian River and the IRL .
Page 3 of 5
n
Contract #99H235
Amendment #3
The project promotes flood protection and demonstrates Best Management Practices (BMPs )
by utilizing wet detention and erosion protection . The project is included as part of the
Indian River County 2020 Comprehensive Plan and has been requested by the Roseland
Property Owner ' s Association .
The design phase is complete , the project has been bid , and Indian River County has awarded
the construction contract . Indian River County owns the property on which the stormwater
detention pond will be constructed .
Estimated Pollutant Load Reduction :
The estimated average annual TSS (total suspended solids) pollutant load reduction is +51 % .
There will be no increase in peak discharge rates for either the mean annual or 25 - year/24 -
hour storm events for the Roseland area .
South Lake
Drainage Basins No . 4C , 8 , 9 , 10 , 11 , 12 , and 14 areas = 80 . 3 acres
Assume 80 % treatment based on 1 inch over drainage area .
80 . 3 acres x 1 inch x 1 foot/ 12 inches = 6 . 69 ac -ft
Actual treatment Volume (between EL . 15 and 17 . 0) :
( [ (65 , 760 sf + 118 , 800 sf)/2] x I acre/43 , 560 sf) x 2 . 0 = 4 . 24 ac - ft
Estimated Actual Treatment Efficiency :
80 % x 4 . 24/6 . 69 = 51 %
IV . Task Identification , Timeframes and Deliverables
Task 1 — Conceptual Design Complete
Milestone : Completion of conceptual design
Deliverable : Conceptual design plans
Task 1 A — Wetlands Mapping Complete
Milestone : Completion of wetland boundary surveys
Deliverable : Aerial map with jurisdictional wetland boundaries
Task 1 B — Final Design Complete
Milestone : Completion of 100 % project design
Deliverable : Final construction project design plans
Task 2 — Land Acquisition Complete
Milestone : Purchase of project detention area
Deliverable : Deed of the property to the County
Task 3 — Construction Dec . 2004 — April 2005
Milestone : Completion of project and final
acceptance by County
Deliverable : Completed and operational stormwater
detention and treatment system .
Task 4 — Monitoring May — July 2005
Milestone : Monitoring of influent stormwater and
effluent exiting the detention pond
Deliverable : Water quality data for a minimum of three (3 ) measurable rainfall events
Page 4 of 5
Contract #99H235
Amendment #3
V. Project Budget
PROJECT TASKS FUNDING SOURCE
INDIAN
RIVER SJRWMD TOTAL
COUNTY
Task 1 — Conceptual Design $20 ,000 0 $20 ,000
A . Task — Wetlands Mapping $ 18 , 000 0 $ 18 ,000
B . Task — Final Design $46 , 236 $ 1000 $ 56 , 236
Task 2 — Land Acquisition $ 135 ,000 0 $ 135 ,000
Task 3 — Construction $ 198 , 810 $ 185 ,000 $ 383 , 810
Task 4 — Monitoring 0 $ 15 ,000 $ 15 , 000
TOTAL PROJECT COST $418 ,046 $210 ,000 L $ 628,046
Page 5 of 5