HomeMy WebLinkAbout2006-395 ORIGINAL aoa6 - 395 _ T 000001 IA Document G701 - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 018 OWNER: El New County Administration Building DATE: November 14, 2006 ARCHITECT: Lying Between the Main Relief Canal to the North, the Lateral D Canal on the CONTRACTOR: Sounth and East and 20th Avenue to the West FIELD: ❑ TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 800 N. '.Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - Orlando, Florida 32803 Construction Manager at Risk THE CONTRACT IS CHANGED AS FOLLOWS: (include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Reference Description Amount COR 066 Add conduit and wiring and revise Fire Alarm to accommodate Sequence $62,064 of Operations for Smoke Evacuation System in the Lobby/Atrium areas of Buildings l and 2 per engineering drawings dated 5/ 18/2006 and 5/ 19/2006. Also revise Door Hardware for Automatic sliding Glass Doors and Entrance Doors to permit Fire Code required opening sequence as part of the Smoke Evacuation System. The acceptance of this change item will not change the GMP, but will decrease the Owner' s Contingency by $62,064. The original Guaranteed Maximum Price was $ 33,086,442.00 The net change by previously authorized Change Orders $ (6,028,590.00) The Guaranteed Maximum Price prior to this Change Order was $ 27,057,852.00 The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0.00 The new Guaranteed Maximum Price including this Change Order will be $ 27,057,852.00 The Contract Time will be .increased by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is January 21 , 2007. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by bath the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County Commissioners ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 609 17th Street, Vero Beach, Florida 1840 25th Street, Vero Beach,Florlda 32960 32960 ADDR SS r ADORE ADDRESS 71 . K. "Wa CP—OA) BY (Signature) BY (Signatur (Signata ) Anthony Donadio Louis Fiore s ph A. Baird, County Administrator (Typed n40446 me) (Typed name) ( _ ped name d //L,&tbrh) DATE I DATE DATE AIA Document WNW — 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. A""' This AIA'' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa current, or any 1 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent p Ible under the I document was produced by AIA software at 17:31 :35 on 11 /07/2006 under Order No. 1000250302_1 which expires on 7/25/20 an 's not for resal User Notes: 12914) Rev i a -Mecommended for Approval : Steve Blum. Project Manaser Thomas W. Frame, CenerallServices Director anon Town. Budget Director