HomeMy WebLinkAbout2008-078WORK AUTHORIZATION DIRECTIVE;
No. 1007-015
SCHUMANN DRIVE E/O KILDARE DRIVE 12" WATER MAIN REPLACEMENTPROJECT
DATE OF ISSUANCE: March 2008
OWNER: Indian River County
CONTRACTOR: Underaround Utilities. Inc
EFFECTIVE DATE: March 2008
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT /
EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 February
6, 2007
PROJECT: Replace 12" DI Water Main Across Waterwav east of Kildare Dr. with Dir. Bore 16" HDPE
COUNTY UTILITY PROJECT NO.: UCP #3045 CONTRACTOR'S PROJECT --NO.:
COUNTY W.I.P. No. 471- 23536-044699-08508
You are directed to proceed promptly with the following work:
Description:
Construct about 340 feet of 12" HDPE directional bore across Waterway east of Kildare Dr.
Method of determining Contract Price:
❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of
County Commissioners on February 6, 2007 to Underground Utilities, Inc.
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost =
$37,081.20
Estimated Contract Time:
60 days
PermitsVRC -
Total Estimated Labor Costs =
$37,081.20
UCP
ACCEPTED:
RECOMMENDED:
B : By;
C� O
Un ergroryn Utilities, Inc. E NEE
Date:
Date:
APPROVED:
!Chalrman
dra LBowden,
, BCC
Date:
March 4, 2009
Attachment 2
FaUtilities`'UTILITY
- ENG INEERINGAProjects-
Utility
Construction
PermitsVRC -
Schumann Drive at Kildare Dr. WM
Replacement
UCP
03045VA
- Work Authorization No. 2007-015
Attachment 2.doc9
C-1 nia Sta
is Dr
Y
JSt
La Playa Ln
91
o
- Project Location
MN
Attachment 2
L`
r
'a
F-
d d
a
�
F
O
w a
a
m
a
�
e
a
o
¢
<
<
¢
a
a
_
u
=
U
G F Z
=
3
a
�
U
'
a C =
z
v
V
-
C
-
i
z