HomeMy WebLinkAbout2008-213 (7)SECTION 02752 CONCRETE PAVING PART 1 -GENERAL 1.01 SCOPE A. The work covered under this section shall include, but not necessarily be limited to the construction of a stabilized subgrade and concrete paving upon said subgrade. 1.02 SUBMITTALS A. Shop Drawings - Prior to providing the materials, Contractor shall furnish to the Engineer, for review and approval, five (5) sets of shop drawings for: concrete mix; admixtures; steel reinforcing; and joint sealer. All drawings shall be reviewed, approved and stamped by the Contractor pursuant to the provisions of the General Conditions. 1.03 TESTING AND INSPECTION A. Prior to the placement of any reinforcing steel or concrete, the Engineer and Contractor Representatives shall check the finished subgrade section for line and grade. B. The Contractor shall engage the services and pay for an independent testing laboratory to perform tests for bearing values and density, prior to the placement of any reinforcing steel or concrete. C. The Contractor shall engage the services and pay for an independent testing laboratory to perform concrete cylinder compressive strength tests. PART 2 - MATERIALS 2.01 EQUIPMENT All equipment, materials and personnel necessary for the proper placing, finishing, and curing of the concrete pavement shall be on theproject and in good working condition before the Contractor will be permitted to begin placing concrete. Throughout the construction of the project, the Contractor shall maintain the equipment in good working condition to assure the proper prosecution of the work. At a minimum the following equipment shall provided: A. Chutes, Wheelbarrows, Concrete Pumps — shall be provided where necessary to assure the concrete is properly placed and spread with no undo delays. B. Vibrators - Approved vibrators for consolidating concrete along the faces and corners of forms and adjacent to joints shall be provided. All necessary power sources shall be provided by the Contractor. C. Hand tools - The Contractor shall famish all other equipment, hand tools (shovels, spades, hand trowels, float trowels, etc.) and supplies which are necessary for the proper prosecution of the work. D. Leveling Equipment - Unless otherwise approved by the Engineer in writing, the Contractor shall provide mechanical equipment of either the slip form or form paving type which will 02752 — Concrete Paving 02752-1