Loading...
HomeMy WebLinkAbout2007-240I. Utility Service co . , inc . Water Tank Maintenance Contract Owner : Indian River County Utilities Vero Beach, Florida Tank Size : 750,000 Hydropillar Location : 58th Avenue — Kings Highway Tank Date Prepared : April 23 , 2007 535 Courtney Hodges Blvd. P.O. Box 1350 Perry, Georgia 31069 tel: 478-987-0303 800-223-3695 fax 478-987-2991 www.utiltivservice.cotn Utility Service Ca 1 Y f Y R R 0 R A 1 ( 0 WATER TANK MAINTENANCE CONTRACT This agreement entered into by and between Indian River County Utilities-Vero Beach, Florida hereinafter known as the Owner, and Utility Service Co., Inc. hereinafter known as the Company . The Owner agrees to employ the Company to provide the professional service needed to maintain its 750,000 gallon water storage tank located at 58th Avenue — Kings Highway Tank. This agreement outlines the Company' s responsibility for the care and maintenance of the above described water storage tank. Care and maintenance shall include the following: The Company will annually inspect and service the tank beginning in the year 2007. The tank and tower will be thoroughly inspected to ensure that the structure is in a sound, watertight condition . Biennially, beginning with the first washout/inspection in 2007, the tank will be completely drained and cleaned to remove all mud, silt, and other accumulations that might be harmful to the tank or its contents . This cleaning will utilize high pressure equipment with chemical injection. After cleaning is completed, the interior will be thoroughly inspected and disinfected prior to returning to service. The Company shall furnish specialized services including engineering and inspection services needed to maintain and repair the tank and tower during the term of this contract. These repairs include steel replacement, steel parts, expansion joints, water level indicators, sway rod adjustments, manhole covers/gaskets, and other component parts of the tank or tower. The Company will clean and repaint the interior and/or exterior of the tank at such time as complete repainting is needed. The need for interior painting is to be determined by the thickness of the existing liner and its protective condition. The need for exterior painting is to be determined by the appearance and protective condition of the existing paint . When painting is needed, all products and procedures will be equal to, or exceed the requirements of the Florida Department of Environmental Protection, the American Water Works Association, and the Steel Structures Painting Council as to surface preparation, coating materials, and disinfection. When interior renovation is needed, procedures as outlined in A.W.W .A.-D102 specifications for cleaning and coating of potable water tanks will be followed. Only material approved for use in potable water tanks will be used on any interior surface area. At the time the exterior requires painting, the Company agrees to utilize a coating system which best suits the site conditions, environment, and general location of the tank. The Company will install an anti-climb device on the access ladder to prevent unauthorized persons from climbing the tower. Page l of Copyright 2002, Utility Service Co. , Inc. A lock will be installed on the roof hatch of the tank to prevent any unauthorized entry to the water tank. Keys to the tank will be retained by the Owner and the Company. The Company will provide emergency service to handle any problems with the tank at no additional cost to the Owner. Reasonable travel time must be allowed for the repair unit to reach the tank site. The Company will furnish relief valves, if needed, to install in the water system so the Owner can pump direct and maintain water pressure while the tank is being serviced . The Company will furnish current certificates of insurance coverage to the Owner at the time any work is performed or upon renewal of any policy. The Owner shall have the right to continue this contract for an indefinite period of time providing the annual fee is paid in accordance with the terms of payment. A base fee of $20,352.00 plus all applicable taxes has been established for this tank. See Addendum No. 1 which establishes the annual fee in Year 1 through Year 5 due to upfront renovations. In year 2015 and each third year thereafter, the annual fee will be adjusted to reflect the current cost of service. The adjustments, either up or down, shall be limited to a maximum of 5 % annually. EIt is agreed that future mandated environmental, health, or safety requirements which cause significant changes in the cost of tank maintenance will be just cause for modification of this agreement. The Company is accepting this tank under program based upon existing structure and components . Any modifications to the tank, including antenna installations, shall be approved by Utility Service Co. Inc. prior to implementation and may warrant an increase in the annual fee. This contract does not include the cost for containment or disposal of any hazardous waste materials, nor resolution to operational problems due to cold weather, Acts of God, structural damage due to antenna installations or other attachments for which the tank was not originally designed, or other conditions which are beyond the Owners and Company control . This contract is subject to cancellation by the Owner only if intent to cancel is received by the Company ninety (90) days prior to the anniversary date . Notice of Cancellation is to be delivered by registered mail and signed by the County Administrator for his designee. Unless intent to cancel is received from the Owner, this contract shall automatically renew each year. This Agreement signed this a' 7 day of UTILITY SV CO ., INC . 4 a� tom/ bjr t LS \ i � Q4� , bcc Cha1 rby Andrew T. Smith, Pricing Director p. •• . J tille" title witness witness ctlw seal : 6aYl � � i seal : L unty Adfninistrator PPF OVED AS TO FORM NO AL SUFF . CY Page 2 of 3 may% Copyright 2002 .. Utility Service Co. , Inc. ARW, r Fri , ASSISTANT COUNTY ATTO RNEY i Addenda to Contract Number 750,000 Hvdropillar-Kings Highway Tank, Dated 4-23-07 No. 1 Prior to the first year anniversary, the tank is to be renovated on the exterior. The interior is to be renovated prior to the third year anniversary date. The annual fee in Year 1 through Year 5 is set at $48,489.00. Beginning in Year 6, the annual fee reverts to the established base fee of $20, 352. 00 . No. 2 PAYMENT TERMS : All applicable taxes are the responsibility of the Owner and in addition to the stated costs and fees in this contract. The first annual fee shall be invoiced on or before October 1 , 2007. The annual fee in Year 2 shall be due and payable October 1 , 2008 and each ,year thereafter on October 1 . No. 3 Should Indian River County Utilities-Vero Beach, Florida elect to cancel the contract prior to remitting the first five (5) annual fees, any outstanding balance for work completed shall be due and payable within thirty (30) days of notice to cancel . Owner Utility Servl Co c. by � A� date 0�7 date (o�'a b - 4 7 witless witness The above signatories certify that they are duly authorized to sign this Contract and the Addenda on behalf of the entities represefrted. The Company reserves the right to assign any outstanding receivables from this Contract to its Bank or other Lending Institutions as collateral for any Loans or Lines of Credit. SEAL SEAL C - is jm istrator . PPROVEu AS TO FORM XASSISTANT ALS FF NCY f " . RIA . L COUNTY ATTORNEY Page 3 of 3 Copyright 2002 Utility Service Co., Inc .