HomeMy WebLinkAbout2003-030 M t' WORK AUTHORIZATION # 7 " WCG,INC. SCOPE OF SERVICES AND SCHEDULE INDIAN RIVER COUNTY UTILITIES DEPARTMENT UTILITY OPERATIONS CENTER Project Understanding Indian River County Utilities (IRCU)has recently purchased 35.80 acres of land, located at the northwest corner of 43rd Avenue and 41 st Street. The County proposes that the site be used for the construction of a Utility Operations Center to include water and wastewater operations and The overall facility is to be designed with a 20-year equipment and an emergency operations center. plan horizon allowing for interim growth, as necessary. Per the County's request, WCG, Inc. is to prepare a Report of the proposed facility and sitace needs, ersonnel, lopment dia improvements. The Report is to includecomplete sltwo (2)econceptual siaplans and rough order of equipment, etc.),conceptual building gram magnitude project costs. Scope of Services The Scope of Services for this project consists of four principal tasks-Project Programming, Conceptual Building Floor Plan, Site Design and Rough Order of Magnitude Project Cost. The following is a summary of the specific scope requirements: Task 100 Project Programming Through meetings(3 minimum)with County Utilities' staff, develop building and site project program that will become the basis for conceptual site plan design. Upon County approval of the Project Program,WCG, Inc. will initiate the conceptual floor plan design. Associated Not-to-Exceed Fee to complete Task 100: $7,500.00 Task 200 Conceptual Building Floor Plan Based upon the approved Project Program, develop a minimum of two(2)conceptual building floor sical relationships of the various building elements in terms of office plans that will describe the phy space,public and County staff circulation,ancillary uses such as break room, restrooms,mechanical space, etc. The plan will be performance driven based of a Conceptual Floor P anve use of space while g iinto consideration future needs. Upon Coun y ection and approval WCG, Inc. will initiate conceptual site design. Associated Not-to-Exceed Fee to complete Task 200: $3,000.00 Task 300 Site Design Based upon the approved Project Program,WCG, Inc. will develop a minimum of two (2) ) sitwill master plans concepts for County review and comment. Following the County's review, plans WORK AUTHORIZATION # 7 WCG,INC. SCOPE OF SERVICES AND SCHEDULE INDIAN RIVER COUNTY UTILITIES DEPARTMENT UTILITY OPERATIONS CENTER Page two be refined accordingly. Upon County approval of the Site Design, WCG, Inc. will develop project cost information. Associated Not-to-Exceed Fee to complete Task 300: $5,000.00 Task 400 Rough Order of Magnitude Cost Based upon the approved Project Program and Conceptual Master Plan(s), WCG, Inc. will develop rough order of magnitude costs for the project. These costs will be for the sole purpose of identifying project costs as a decision-making tool and for County planning purposes. Upon completion of the task, the work will be summarized in a report, for the County's use. Associated Not-to-Exceed Fee to complete Task 400: $2,000.00 Schedule Upon authorization of the County, the project schedule will be as follows unless modified by WCG, Inc. and the County: Project Task From Authorization to Proceed Project Programming 45 Days Building Floor Plan 15 Days Site Design 15 Days Rough Order of Magnitude Project Cost 15 Days Project Assumptions No surveying or geotechnical, or structural work will be required. WCG, Inc. will assume survey documentation is correct. WCG, Inc. may assist in presentations to the Board of County Commissioners or Utilities Advisory Board. Hourly Rates Hourly services, in accordance with the requirements of this contract, shall be reimbursed at the following rates: Administrative Support $ 3 8.00 per Hour CADD Technician $ 5 5.00 per Hour 2 w 4 WORK AUTHORIZATION # 7 WCG,INC. SCOPE OF SERVICES AND SCHEDULE INDIAN RIVER COUNTY UTILITIES DEPARTMENT UTILITY OPERATIONS CENTER Page three Engineering Designer $ 75.00 per hour Architectural Designer $ 75.00 per Hour Managing Architect $115.00 per Hour Managing Engineer $115.00 per Hour Principle in Charge $130.00 per Hour Approvals The project proposal is accepted by the County and WCG, Inc. as witnessed by the following signatures: WCG, Inc. Indian River County 02-04-2003 Dav d L. Date 4neth R. M a c h t Date PreSl nt Chairman Board County Commissioners Attest N/A Atte Date PATRICIA M. RIDGELY Datet--�-o CEPUTY CLERIC Approved by: Indian River Co. Approved Date Ja s E. Chandler, County Administrator AdministrationUtilities Budget A#r ved as to Form and gal Sufficiency Legal Risk Manager my Attorney 3