HomeMy WebLinkAbout2007-202 COST ESTIMATE WATER MAIN CONFLICT WITH 15" RCP STORM SEWER MOVES" WATER MAIN ON THE NORTH SIDE OF 12th STREET TO AVOID CONFLICT W/ DRAINACECULVERT 6/5/2007, UCP #2967 UCI' #Account Number AE R 0 Item No. Bid Item Estimated Unit of Unit Total Unit Total 'TOTAL Descri tion Vuantil Measure Price Price Price Price COST 3 IIx+ 71 , 77 Mobilization, Demobilization & MOT 4.00% % ofConslr. $253.00 $253.00 U6c Install 8" H . DPE (SDR I in open-cut Trench Method) Water Main 40 LF 974 389.60 $50.00 $2,000.00 $2,389.60 17d Install 8" GV&B East ofOtTsel 1 EA 83190 838.90 $400.00 $400.00 $ 1,23890 ] Sc Install & Remove 8" Line stop & Res[ain Exist Main 2 EA 1, 141 .56 21283. 12 .$ 1 , 100.00 $2,200.00 $4,483. 12 7 Fittin s 0. 10 TONS 3,800.00 350.00 $4,000.00 $400.00 $750.00 29b Install 2" Pe Water Main For Temporary By'-pass 50.00 LF 1 .50 75.00 $6.00 $300.00 $375.00 241 Install Tem orar 2" Blow-ofP For BY-PASS 2 FA 465.W 930.00 $200.00 $400.00 $ 1 ,330.00 22 In tall S 2 F.A 0.00 $ 15090 $300.00 $300.00 28 Install Sam le Points I EA 205.22 205.22 $200.00 $200.00 $405.22 2'1 Obtain RacL Sample I EA. 0.00 8125.00 $ 125 .00 $ 125.00 Total Materials $5,071 .84 SubTolal $6,325.00 11 ,649.84 Labor Subtotal $6,578.00 G2 Record Drawings $ 1 ,000.00 'Iota] Labor $7,578.00 TOTAL CONST. COST 512,649.84 Attachment 1 N o v o - (File] Page 1 N \. WORK AUTHORIZATION DIRECTIVE No, 2007-008 12THSTREET EAST OF 6"H AVENUE — RESOLVE CONFLICT BETWEEN 8" WATER MAIN AND 15" STORM SEWER DATE OF ISSUANCE: July 2007 EFFECTIVE DATE:July 2007 OWNER: Indian River County CONTRACTOR: Undereround Utilities, Inc. CONTRACT: WATER SEWER AND RECLAIM WATER LINE REPLACEMENT I EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 Feb to 6 2007 PROJECT: Resolve conflict between 8" water main and 15" RCP storm drain COUNTY UTILITY PROJECT NO.: UCP #2967 CONTRACTOR'S PROJECT NO. : N/A COUNTY W.I.P. No. 4712353604469902532. You are directed to proceed promptly with the following work: Description: Construct about 40 LF of 8" HDPE water main in trench under 15" storm sewer Method of determining Contract Price: 0 Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of County Commissioners on February 6, 2007 to Underground Utilities, Inc. ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $7,578.00 Estimated Contract 30 days Time: Total Estimated Labor Costs = $7,578.00 ACCEPTED: RECOMMENDED. AhPROVEI� i By: �l�« a T.t..ss' By: �-- �T l - )L . ` By: Underground Utilities, Inc. ENGINEER Gary eeler,' GORDON E . SPARKS, P. E : Chaff an, BCq Date: l/ - l/ -D7 y j Date: Attachment 2 C-xomuments and Settine %Cre a F=ch\De ktmNA - Work Authmizatinn Nn. 2007-017 12th Street mnflictdmo