HomeMy WebLinkAbout2007-202 COST ESTIMATE
WATER MAIN CONFLICT WITH 15" RCP STORM SEWER
MOVES" WATER MAIN ON THE NORTH SIDE OF 12th STREET TO AVOID CONFLICT W/ DRAINACECULVERT
6/5/2007, UCP #2967
UCI' #Account Number AE R 0
Item No. Bid Item Estimated Unit of Unit Total Unit Total 'TOTAL
Descri tion Vuantil Measure Price Price Price Price COST
3 IIx+ 71 ,
77 Mobilization, Demobilization & MOT 4.00% % ofConslr. $253.00 $253.00
U6c Install 8" H .
DPE (SDR I in open-cut Trench Method) Water Main 40 LF 974 389.60 $50.00 $2,000.00 $2,389.60
17d Install 8" GV&B East ofOtTsel 1 EA 83190 838.90 $400.00 $400.00 $ 1,23890
] Sc Install & Remove 8" Line stop & Res[ain Exist Main 2 EA 1, 141 .56 21283. 12 .$ 1 , 100.00 $2,200.00 $4,483. 12
7 Fittin s 0. 10 TONS 3,800.00 350.00 $4,000.00 $400.00 $750.00
29b Install 2" Pe Water Main For Temporary By'-pass 50.00 LF 1 .50 75.00 $6.00 $300.00 $375.00
241 Install Tem orar 2" Blow-ofP For BY-PASS 2 FA 465.W 930.00 $200.00 $400.00 $ 1 ,330.00
22 In tall S 2 F.A 0.00 $ 15090 $300.00 $300.00
28 Install Sam le Points I EA 205.22 205.22 $200.00 $200.00 $405.22
2'1 Obtain RacL Sample I EA. 0.00 8125.00 $ 125 .00 $ 125.00
Total Materials $5,071 .84 SubTolal $6,325.00 11 ,649.84
Labor Subtotal $6,578.00
G2 Record Drawings $ 1 ,000.00
'Iota] Labor $7,578.00
TOTAL CONST. COST 512,649.84
Attachment 1
N o
v
o -
(File] Page 1 N \.
WORK AUTHORIZATION DIRECTIVE
No, 2007-008
12THSTREET EAST OF 6"H AVENUE — RESOLVE CONFLICT BETWEEN 8" WATER MAIN AND 15"
STORM SEWER
DATE OF ISSUANCE: July 2007 EFFECTIVE DATE:July 2007
OWNER: Indian River County
CONTRACTOR: Undereround Utilities, Inc.
CONTRACT: WATER SEWER AND RECLAIM WATER LINE REPLACEMENT I EXTENSIONS AND
MISCELLANEOUS LABOR CONTRACT BID NO 2007026 Feb to 6 2007
PROJECT: Resolve conflict between 8" water main and 15" RCP storm drain
COUNTY UTILITY PROJECT NO.: UCP #2967 CONTRACTOR'S PROJECT NO. : N/A
COUNTY W.I.P. No. 4712353604469902532.
You are directed to proceed promptly with the following work:
Description:
Construct about 40 LF of 8" HDPE water main in trench under 15" storm sewer
Method of determining Contract Price:
0 Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of County
Commissioners on February 6, 2007 to Underground Utilities, Inc.
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $7,578.00 Estimated Contract 30 days
Time:
Total Estimated Labor Costs = $7,578.00
ACCEPTED: RECOMMENDED. AhPROVEI� i
By: �l�« a T.t..ss' By: �-- �T l - )L . ` By:
Underground Utilities, Inc. ENGINEER Gary eeler,'
GORDON E . SPARKS, P. E : Chaff an, BCq
Date: l/ - l/ -D7 y j
Date: