Loading...
HomeMy WebLinkAbout2006-019WORK AUTHORIZATION DIRECTIVE r No. 2005-018 IRC — SUNTRUST HANK ROSELAND WATER SERVICE DATE OF ISSUANCE: JANUARY 4. 2006 EFFECTIVE DATE: JANUARY 4, 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies Inc CONTRACT: WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO. 7033 PROJECT: IRC- SuntrUSI Bank Roseland Water Service Instillation COUNTY UTILITY PROJECT NO.: UCP # 2754 CONTRACTOR'S PROJECT NO.: N/A You are directed to proceed promptly with the following work Description: Install about 150 LF of 2" I-IDPE Directional Drill water pipe under sidewalk from water main to bank building, tap main and install water meter box in ROW of US 1. Plumber will make final connection to building and disconnect well service. Purpose of Work Authorization Directive: The installation of the 2" HDPE water main will allow the bank to be served by County water as the plumber does not have equipment to make a Tong bore. Attachments: (List documents supporting work) Exhibit I Cost Estimate Method of determining Contract Price: ❑X Unit Prices: Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County Commissioners on February 15, 2005 to The Danella Companies. ❑ Lump Sum ❑ Cost of the Work: The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost= $35027.00 Estimated Contract 14 days Time: Total Estimated Labor Costs = $3,027.00 ACCEPTED: By: DANELLA COMPANIES Date: L—q— REC MMENDFD: 0IPPROVED: , BA" a ENG INEERr^ lrthu R el Berger l- - o rfi irrtlan:P� Dale: n � C:AD000MB—I NFIDUC-1ALOCALS—IV1einpAnoresG030CRVAA - Wurl< A uthorization Nn. 7.005-018.doc 0 F � a 0 F N �, •may •�y o 6W. n v � 1 h'rl ri � Q ` o - o o a _ � � < W r a` � v P c o W `� W W _ `n '� N p N vi vFi V v Fy ti fl OO OO O N 9 � O O O O 00 O - O "'� o U O � _ V+ W O O O_ O C fl ry E Vi 69 W ya FR � .� � � � _ _ c � — L v A � a 0 F .+�' N �, •may •�y o 6W. n v � 1 h'rl ri vi Q ` o - o - _ c o o < W ^�' � v O c o W `� W W � r/� '� vi vFi v Fy ti N 9 � 00 - o U � c o E w N p o _ � _ _ _ c v k7 E n � � D 0 0 c pp o � o ,.., U C i o �� a v v L 4 d V] — � v R �+ 3 G C V_ � U r � ` L L O _ c] Ll � CI F- ( X �] _ W C m � C v � G S p C V ti V� y W �^ N u '� n 'O O O ,h n v � Y i[ � .L .' O V � � L U O: A S_ � o .` n Vim. � � v u r3 _ w y 3 a O v�z � ��, m ro� �, � � �O �p l0 � � N n V�j � �� .+�' F Ll Q W a F W a O E- E N �, •may •�y o �I n a � 1 h'rl ri vi F Ll Q W a F W a O E- E 1. Applicants Name: 2. Builders Name: 3. Location/Street: 4. Subdivision: Total # ERU's: Unit Designation: INDICATE BY CODE Water Sewer INDIAN RIVER COUNTY WATER AND SEWER CONNECTION FEES Suntrust Bank Roseland 13800 US Hwy 1- Sebastian 7/28/2005 Suntrust Bank's FI NA Phone #: 954 765-7172 Marjorie Ramos 13800 US Highway 1 Phone #: Parcel ID #: 30382500000002000003.2 # Residential Units: Commercial Square Footage: Applicable Codes: L) (I.) Indian River County (V.) City of Vero Beach (F.) Franchise Utility (N.) No service is available from any source Associated ERU's 0 0 3359 2 Total: 2 Water Capacity Charges: 2 ERU's Approximately 150 Ft Construction to extend water service to Property@ $1(Directional onal 0 Each Water Service Connection: Drill) (Attached cost prep GS thru Labor Contractor) 1 5/8 Inch @ $400.00 _ 1 Inch @ $460.00 _ 1 1/2 Inch @ $810.00 2 Inch @ $1,020.00 _ Water Deposit: Water Inspection: Meter Installation Property Frontage: 100' Rule 50' Rule Water I ine Extension FeBs: Sewer Capacity Charges: Sewer Lateral: Sewer Deposit: Sewer Inspection: Property Frontage: 100' Rule 50' Rule Sewer Line Extension Fees: Dan Chastain 07/27/05 i q 2 Deps @ $50.00 per ERU 1 Fee @ $25.00 Each 1 5/8 Inch @ $130.00 _ 1 Inch @ $250.00 _ $ 1 1/2 Inch @ $500.00 _ $ 2 Inch @ $630.00 $ 0 100 0 FT@$11.25/FT ERU's @ $27796.00 Each Taps @ $500.00 Each Deps @ $50.00 per ERU = $ Fee @ $25.00 Each 0 100 Total Balance Due: Page 1 0 2,600.00 3,969.30 (Inc above) 100.00 25.00 130.00 n1,/A 6,824.30 J C�/