Loading...
HomeMy WebLinkAbout2005-303 9 WORK AUTHORIZATION DIRECTIVE No. 2005-005 IRC — Schumann Dr. & Empress Ave. Utility Canal Crossings Replacement Project DATE OF ISSUANCE : July 19 , 2005 EFFECTIVE DATE : July 19 , 2005 OWNER: Indian River County CONTRACTOR: The Danella Companies Inc CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID NO , 7033 , AWARDED March 15 2005 PROJECT : Replace Water and Force Main Bridge Canal Crossings with HDPE Directional Drill COUNTY UTILITY PROJECT NO . : UCP #2434 CONTRACTOR ' S PROJECT NO . : N/A COUNTY W .I.P . No . 471 - 169000 -05502 R&R Fund You are directed to proceed promptly with the following work: Description: The construction of HDPE water main and force main canal crossings, filling, flushing, disinfecting, testing, and any necessary restoration to place the systems into County service Purpose of Work Authorization Directive : To replace above ground aerial bridge crossings that have become deteriated and subject to failure Attachments : (List documents supporting work) (Construction Plans showing extent of work are on file in the Utilities Department) Method of determining Contract Price : ❑x Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County Commissioners on March 15 , 2005 to The Danella Companies, Inc . ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $90,532 .48 Estimated Contract Time : 30 days Total Estimated Labor Costs= $905532 ,48 ACCEPT RECO ENDED : A OWED : • ' y By: By: The nella Compa Gordon E . Spark , P . E. ° .1e nnaS . ,Lodwther ; 1' Labor Contractor Environmental Engineer :. COO TY, rCHAIRMAN r Date : G •Z . O S� Date : / ` O f Date : 0 9 10•6 / 05 Attachment 2 C :\DOCUME— I \NFIDUC-1 \LOCALS— I \Tcmp\notes6030CKWork Authorization No. 2005-005 Attachment 2 .doc9