WORK AUTHORIZATION DIRECTIVE
No. 2005-005
IRC — Schumann Dr. & Empress Ave. Utility Canal Crossings Replacement Project
DATE OF ISSUANCE : July 19 , 2005 EFFECTIVE DATE : July 19 , 2005
OWNER: Indian River County
CONTRACTOR: The Danella Companies Inc
CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO , 7033 , AWARDED
March 15 2005
PROJECT : Replace Water and Force Main Bridge Canal Crossings with HDPE Directional Drill
COUNTY UTILITY PROJECT NO . : UCP #2434 CONTRACTOR ' S PROJECT NO . : N/A
COUNTY W .I.P . No . 471 - 169000 -05502 R&R Fund
You are directed to proceed promptly with the following work:
Description:
The construction of HDPE water main and force main canal crossings, filling, flushing, disinfecting, testing, and any
necessary restoration to place the systems into County service
Purpose of Work Authorization Directive :
To replace above ground aerial bridge crossings that have become deteriated and subject to failure
Attachments : (List documents supporting work)
(Construction Plans showing extent of work are on file in the Utilities Department)
Method of determining Contract Price :
❑x Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County
Commissioners on March 15 , 2005 to The Danella Companies, Inc .
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $90,532 .48 Estimated Contract Time : 30 days
Total Estimated Labor Costs= $905532 ,48
ACCEPT RECO ENDED : A OWED : • '
y
By: By:
The nella Compa Gordon E . Spark , P . E. ° .1e nnaS . ,Lodwther ; 1'
Labor Contractor Environmental Engineer :. COO TY, rCHAIRMAN
r
Date : G •Z . O S� Date : / ` O f Date : 0 9 10•6 / 05
Attachment 2
C :\DOCUME— I \NFIDUC-1 \LOCALS— I \Tcmp\notes6030CKWork Authorization No. 2005-005 Attachment 2 .doc9