HomeMy WebLinkAbout2005-302 Nook
� � J • I
WORK AUTHORIZATION DIRECTIVE
No. 2005-008 5 G'
IRC — Schumann Dr. Force Main Replacement Project from Bailey Drive to Caprol lane
DATE OF ISSUANCE : July 19 , 2005 EFFECTIVE DATE : July 19 , 2005
OWNER: Indian River County
CONTRACTOR: The Danella Companies Inc
CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO . 7033 , AWARDED
March 15 2005
PROJECT : Replace 3 " Force Main on Schumann Drive with 4" HDPE Directional Drill
COUNTY UTILITY PROJECT NO . : UCP #2627 CONTRACTOR ' S PROJECT NO . : N/A
COUNTY W . I.P . No . 471 - 169000 R&R Fund
You are directed to proceed promptly with the following work:
Description:
The construction of 4" HDPE force main and any necessary restoration to replace existing Transite force main and
reconnect existing single service .
Purpose of Work Authorization Directive :
To replace force main that has been shown to be unreliable and subject to multiple failures .
Attachments : (List documents supporting work)
Method of determining Contract Price :
x❑ Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County
Commissioners on March 15 , 2005 to The Danella Companies, Inc .
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $ 80,252 . 60 Estimated Contract Time : 30 days
Total Estimated Labor Costs= $ 80,252 . 60
ACCEPT RECOMMENDED : � flVED :
B By. �GG!Z`�� 13
By:
The Da la Companies Gordon E. Spar , P . E . ,tTmas S`. Lowther
; 1 ' ', CH TMAN
Labor Contractor Environmental Engineer ... UI
k
Date : 6 � L9 . o a` Date : 6 DaYe': 00 .7 { 1 E " 1 �
Attachment 3
C :\DOCUME— I \NFIDUC—I \LOCALS—I \Temp\notes6030C8\789011 I .doc9