Loading...
HomeMy WebLinkAbout2005-302 Nook � � J • I WORK AUTHORIZATION DIRECTIVE No. 2005-008 5 G' IRC — Schumann Dr. Force Main Replacement Project from Bailey Drive to Caprol lane DATE OF ISSUANCE : July 19 , 2005 EFFECTIVE DATE : July 19 , 2005 OWNER: Indian River County CONTRACTOR: The Danella Companies Inc CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID NO . 7033 , AWARDED March 15 2005 PROJECT : Replace 3 " Force Main on Schumann Drive with 4" HDPE Directional Drill COUNTY UTILITY PROJECT NO . : UCP #2627 CONTRACTOR ' S PROJECT NO . : N/A COUNTY W . I.P . No . 471 - 169000 R&R Fund You are directed to proceed promptly with the following work: Description: The construction of 4" HDPE force main and any necessary restoration to replace existing Transite force main and reconnect existing single service . Purpose of Work Authorization Directive : To replace force main that has been shown to be unreliable and subject to multiple failures . Attachments : (List documents supporting work) Method of determining Contract Price : x❑ Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County Commissioners on March 15 , 2005 to The Danella Companies, Inc . ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $ 80,252 . 60 Estimated Contract Time : 30 days Total Estimated Labor Costs= $ 80,252 . 60 ACCEPT RECOMMENDED : � flVED : B By. �GG!Z`�� 13 By: The Da la Companies Gordon E. Spar , P . E . ,tTmas S`. Lowther ; 1 ' ', CH TMAN Labor Contractor Environmental Engineer ... UI k Date : 6 � L9 . o a` Date : 6 DaYe': 00 .7 { 1 E " 1 � Attachment 3 C :\DOCUME— I \NFIDUC—I \LOCALS—I \Temp\notes6030C8\789011 I .doc9