Loading...
HomeMy WebLinkAbout2006-049 A - ly - o & WORK AUTHORIZATION DIRECTIVE 77 S No. 2005-022 SOD qq IRC — THE SQUIRE WATER MAIN EXTENSION ACROSS 58r" AVENUE AT 33 "D STREET DATE OF ISSUANCE: Februarv, 2006 EFFECTIVE DATE : February, 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies, Inc . CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT, BID NO. 7033 PROJECT: IRC — The Squire Subdivision 6" Water Main Tie-In Across 58'h Avenue at 33°I Street COUNTY UTILITY PROJECT NO . : UCP # 2535 CONTRACTOR' S PROJECT NO. : N/A You are directed to proceed promptly with the following work: Description : Install about 80 LF of 6" HDPE Directional Drill water pipe across 58'h Avenue at 33 'a Street; tie into existing 8" PVC Pipe at SW comer with 8" X 6" Wet Tap Assembly with 6" GV&B; install 6" GV&B on NE corner at end of pipe . Purpose of Work Authorization Directive : The installation of the 6" HDPE water main will allow the Contractor for The Squire Subdivision Water Assessment to complete his project. Attachments : (List documents supporting work) Exhibit 1 Cost Estimate Method of determining Contract Price: ❑x Unit Prices : Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County Commissioners on February 15 , 2005 to The Danella Companies . ❑ Lump Sum ❑ Cost of the Work: The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $47693 .95 Estimated Contract 14 days Time: Total Estimated Labor Costs = $4,693 .95 !_ ACCE - E i REC ME DE : APPROVED :% By' Bye - DANEL A ENGFNEEV CHAIRMA COMPANIES Arthur R . Neuberger Date : Date : Date : Fahruary 14 , 2005 Exhibit 2 F WnIities\UTILITY - ENG INEERINGAProjects - Assess ment ProjectsV'] If I' SQUIRE SUBDIVISION (UCP #2535)AAA - Work Authorization No 2005-022 Exhibit 2Aoc d) Indian River Counp Department at Utilities COST ESTIYLV'E Project: IRC - The Squire Subdivision 6" Water Main The-In on 58th Avenue at 33rd Street be Directional Drill UCP #2535 30-.Ian-06 Rid Item Estimated Unit ofUnit Total Labor station, unit Anso is 'lois] Item No Description antih' Measure easu Price Price Price Price Price 63 Mobilization I 1 0.04 i $177. 14 64 Demobilization I 0.01 $44.28 65 Maintenance of Traffic I 1 0.01 1 1 $44.28 041, Install 6" DUPE Directional Dell Pipe 80 LP 18.00 $ 1 ,440.00 8,90 371200 Ole Install 6" PVC Water Main 20LP 560 $ 112.00 5.71 $ 114.20 12a Install 8" Xis' SS Wet Ta Assemblyw/ 6" GV&D I HA 500.00 $500.00 1,053.99 $ 1 ,05399 L36 Tap 8" AC Main I EA 650.00 $650.00 17c Install 6 ' NRS Gate Valve I FA 250.00 $250.00 477.70 $477.70 6 Finnish & Install DIP Firings 0.25 TONS 1 ,665.00 $416.25 3,500.00 $875,00 13 Potholes 2 EA 200.00 $400.00 53 ROW Grading 100 SY 1 .00 $ 100.00 56A Sao Cut, Remove and Dispose ofAshalt 2 Ton 2500 550.00 60 Install Caquina Dass Replacement over Trench 10 S 19.00 $ 190.00 10.50 $ 105.00 see Install Asphaltic Cement, Type S-3 1 2 1 Tan 1 160,001 $320.00 41.00 $94.00 School Water Facilities Labor $4,428.25 'r oral Water Facilities Labor $4,693.951 1 Total Materials I $T431 .89 Total Labor and Materials Cost Estimate $8,125.84 '101AL ES'I'IMA I'ED COST $8,125,84 Exhibit 1 0 � N Q � o