WORK AUTHORIZATION DIRECTIVE 77 S
No. 2005-022 SOD qq
IRC — THE SQUIRE WATER MAIN EXTENSION ACROSS 58r" AVENUE AT 33 "D STREET
DATE OF ISSUANCE: Februarv, 2006 EFFECTIVE DATE : February, 2006
OWNER: Indian River County
CONTRACTOR: The Danella Companies, Inc .
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT, BID NO. 7033
PROJECT: IRC — The Squire Subdivision 6" Water Main Tie-In Across 58'h Avenue at 33°I Street
COUNTY UTILITY PROJECT NO . : UCP # 2535 CONTRACTOR' S PROJECT NO. : N/A
You are directed to proceed promptly with the following work:
Description :
Install about 80 LF of 6" HDPE Directional Drill water pipe across 58'h Avenue at 33 'a Street; tie into
existing 8" PVC Pipe at SW comer with 8" X 6" Wet Tap Assembly with 6" GV&B; install 6" GV&B
on NE corner at end of pipe .
Purpose of Work Authorization Directive :
The installation of the 6" HDPE water main will allow the Contractor for The Squire Subdivision Water
Assessment to complete his project.
Attachments : (List documents supporting work)
Exhibit 1 Cost Estimate
Method of determining Contract Price:
❑x Unit Prices : Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County
Commissioners on February 15 , 2005 to The Danella Companies .
❑ Lump Sum
❑ Cost of the Work:
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $47693 .95 Estimated Contract 14 days
Time:
Total Estimated Labor Costs = $4,693 .95 !_
ACCE - E i REC ME DE : APPROVED :%
By' Bye -
DANEL A ENGFNEEV CHAIRMA
COMPANIES Arthur R . Neuberger
Date : Date : Date : Fahruary 14 , 2005
Exhibit 2
F WnIities\UTILITY - ENG INEERINGAProjects - Assess ment ProjectsV'] If I' SQUIRE SUBDIVISION (UCP #2535)AAA - Work Authorization
No 2005-022 Exhibit 2Aoc
d)
Indian River Counp Department at Utilities
COST ESTIYLV'E
Project: IRC - The Squire Subdivision 6" Water Main The-In on 58th Avenue at 33rd Street be Directional Drill
UCP #2535
30-.Ian-06
Rid Item Estimated Unit ofUnit Total Labor station, unit Anso is 'lois]
Item No Description antih' Measure
easu Price Price Price Price Price
63 Mobilization I 1 0.04 i $177. 14
64 Demobilization I 0.01 $44.28
65 Maintenance of Traffic I 1 0.01 1 1 $44.28
041, Install 6" DUPE Directional Dell Pipe 80 LP 18.00 $ 1 ,440.00 8,90 371200
Ole Install 6" PVC Water Main 20LP 560 $ 112.00 5.71 $ 114.20
12a Install 8" Xis' SS Wet Ta Assemblyw/ 6" GV&D I HA 500.00 $500.00 1,053.99 $ 1 ,05399
L36 Tap 8" AC Main I EA 650.00 $650.00
17c Install 6 ' NRS Gate Valve I FA 250.00 $250.00 477.70 $477.70
6 Finnish & Install DIP Firings 0.25 TONS 1 ,665.00 $416.25 3,500.00 $875,00
13 Potholes 2 EA 200.00 $400.00
53 ROW Grading 100 SY 1 .00 $ 100.00
56A Sao Cut, Remove and Dispose ofAshalt 2 Ton 2500 550.00
60 Install Caquina Dass Replacement over Trench 10 S 19.00 $ 190.00 10.50 $ 105.00
see Install Asphaltic Cement, Type S-3 1 2 1 Tan 1 160,001 $320.00 41.00 $94.00
School Water Facilities Labor $4,428.25
'r oral Water Facilities Labor $4,693.951 1
Total Materials I $T431 .89
Total Labor and Materials Cost Estimate $8,125.84
'101AL ES'I'IMA I'ED COST $8,125,84