HomeMy WebLinkAbout2006-178 WORK AUTHORIZATION DIRECTIVE No. 2005-027 WIP No. 472- 169000-06537 8-INCH MASTER PLAN FORCE MAIN DATE OF ISSUANCE : JUNE 6, 2006 EFFECTIVE DATE : JUNE 6, 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies CONTRACT : WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 7033 February 15 2005 PROJECT: Construct about 2000 feet of 8" PVC and 300 feet of HDPE water main on lit Street SW from 43rd Avenue to 27"' Avenue COUNTY UTILITY PROJECT NO. : UCP #2823 CONTRACTOR' S PROJECT NO. : N/A COUNTY W.I.P. No . N/A You are directed to proceed promptly with the following work: Description : Construct about 2000 feet of 8" PVC AND 300 feet of HDPE water main on lsr Street SW from 43`d Avenue to 27"' Avenue. Method of determining Contract Price : ❑X Unit Prices : Bid Items as established pursuant to Bid No. 7033, and awarded by the Board of County Commissioners on February 15 , 2005 to The Danella Companies ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $34,460 .60 Estimated Contract Time: 30 days Total Estimated Labor Costs = $34,460 . 60 ACCEPTED /� RECO ENDE /J APPROVED : By: � �//��/ By: Danella Companies, Inc. ENGINEERChairman, B_ C - - Date: Date : S ✓ / �,� 0� Date: _ May -23',- 2006 �' ' � J - - Arthur R . Neuberger Attachment 3 F:AUti l itiesVUTILITY - ENO INEERINGAProjccts - UhIity Construction PermitsVIRC - 8-inch Master Planned Force Main on 1st Street SWAA - Work Authorizalior No. 2005-027. Attachment 3.doe 9 WORK AUTHORIZATION DIRECTIVE No. 2005-027 WIP No. 472-169000-06537 8-INCH MASTER PLAN FORCE MAIN DATE OF ISSUANCE : JUNE 6, 2006 EFFECTIVE DATE : JUNE 65 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies CONTRACT : WAFER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACTBID NO 7033 February 15 2005 PROJECT: Construct about 2000 feet of 8" PVC and 300 feet of HDPE water main on I ` Street SW from 43`d Avenue to 2711i Avenue COUNTY UTILITY PROJECT NO . : UCP #2823 CONTRACTOR ' S PROJECT NO. : N/A COUNTY W.I . P. No . N/A You are directed to proceed promptly with the following work: Description : Construct about 2000 feet of 8" PVC AND 300 feet of HDPE water main on 1 ST Street SW from 43'd Avenue to 271' Avenue. Method of determining Contract Price : O Unit Prices: Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County Commissioners on February 15, 2005 to The Danella Companies ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below : Estimated Labor Cost = $345460 . 60 Estimated Contract Time: 30 days Total Estimated Labor Costs = $ 34,460 .60ij r� 0 ? ACCEPTCIV RECOt ENDS APl?20VED : 4 . 4 Danella Companies, Inc. ENGINEER 6hair` ian , B , C �6 ` py Date : .` Mi,yi�23 , 2006 Date : S Date : / � � � • Arthur C. Neuberger Attachment 3 1':A [ti litiesAUI'ILITY - GNGIN 81i.R I NGAProjects - Utility Construction PcrmksV1RC - 9-inch Masicr Planned Poree Main on I st sit eel S W\t1 - Work Anth01'19ation No. 2005-027, Attachment 3 . doc9 f Indian River County Department of Utilities COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Project: IRC - Proposed 8" Master Planned Force Main on 1st Street SW from 43rd Avenue to 27th Avenue )escription: WIP #472-169000- UCP #2823 12-May-06 I LABOR COSTS MATERIAL COSTS Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material Item No. Descri rtion uantits D7easure Price Price Price Price 77 Mobilization 1 1 4% 1 ,300.40 78 Demobilization I 1 % 325 . 10 79 Maintenance of Traffic 1 1 1 % 1 1 325 . 10 04c Install 8" HDPE Horiz. Directional Drill 300 LF 1 $2200 6,600.00 $14.99 4,497.00 06 Install MRJD1 Fittings 2 Tons $ 1 ,665.00 3 ,330.00 $3,500 7,000.00 31f Install 8" PVC Force Main 2,000 LF $6.50 13,000.00 10.44 20,880.00 13d Tap 10" Main for Installation of Assembly I EA $700.00 700.00 nb Install Wet Tap Assembly 10" X 8" 1 EA $900.00 900.00 1 ,788.30 1 ,788 .30 17d Install 8" GV&B 2 EA. $420.00 840.00 716. 10 1 ,432.20 23 Potholes 6 EA. $200.00 11200.00 73a Topsoil & Sod 2.200 SY $2.70 5,940.00 2. 17 4,774.00 Subtotal Subtotal Sewer System Labor 32,510.00 Subtotal Sewer System Labor, Mob., Subtotal 34 Demob. ,460.60 SubTotal Labor Cost 1 $34,460.601 SubTotal Mater. Cost 1 $40,371 .50 TOTAL. PROJECT COST $74,832. 10 Attachment 2 f Indian River County Department of Utilities COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Project: IRC - Proposed 8" Master Planned Force Main on 1st Street SW from 43rd Avenue to 27th Avenue )escription: WIP #472-169000- UCP #2823 12-May-06 I LABOR COSTS MATERIAL COSTS Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material Item No. Descri rtion uantits D7easure Price Price Price Price 77 Mobilization 1 1 4% 1 ,300.40 78 Demobilization I 1 % 325 . 10 79 Maintenance of Traffic 1 1 1 % 1 1 325 . 10 04c Install 8" HDPE Horiz. Directional Drill 300 LF 1 $2200 6,600.00 $14.99 4,497.00 06 Install MRJD1 Fittings 2 Tons $ 1 ,665.00 3 ,330.00 $3,500 7,000.00 31f Install 8" PVC Force Main 2,000 LF $6.50 13,000.00 10.44 20,880.00 13d Tap 10" Main for Installation of Assembly I EA $700.00 700.00 nb Install Wet Tap Assembly 10" X 8" 1 EA $900.00 900.00 1 ,788.30 1 ,788 .30 17d Install 8" GV&B 2 EA. $420.00 840.00 716. 10 1 ,432.20 23 Potholes 6 EA. $200.00 11200.00 73a Topsoil & Sod 2.200 SY $2.70 5,940.00 2. 17 4,774.00 Subtotal Subtotal Sewer System Labor 32,510.00 Subtotal Sewer System Labor, Mob., Subtotal 34 Demob. ,460.60 SubTotal Labor Cost 1 $34,460.601 SubTotal Mater. Cost 1 $40,371 .50 TOTAL. PROJECT COST $74,832. 10 Attachment 2 PI PROPOSED 4' FORCE MAIN (BY OTHERS) Do INR 135 r F CC MA Est STREET W EXIT TING 8' 127 F ra CTE' MG 0 CE MAIN EX STING 4' MA ED CE IN ATTs4CF111AE1mT 1 � J PI PROPOSED 4' FORCE MAIN (BY OTHERS) Do INR 135 r F CC MA Est STREET W EXIT TING 8' 127 F ra CTE' MG 0 CE MAIN EX STING 4' MA ED CE IN ATTs4CF111AE1mT 1 � J WORK AUTHORIZATION DIRECTIVE No. 2005-027 WIP No. 472-169000-06537 8-INCH MASTER PLAN FORCE MAIN DATE OF ISSUANCE : JUNE 6, 2006 EFFECTIVE DATE : JUNE 65 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies CONTRACT : WAFER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACTBID NO 7033 February 15 2005 PROJECT: Construct about 2000 feet of 8" PVC and 300 feet of HDPE water main on I ` Street SW from 43`d Avenue to 2711i Avenue COUNTY UTILITY PROJECT NO . : UCP #2823 CONTRACTOR ' S PROJECT NO. : N/A COUNTY W.I . P. No . N/A You are directed to proceed promptly with the following work: Description : Construct about 2000 feet of 8" PVC AND 300 feet of HDPE water main on 1 ST Street SW from 43'd Avenue to 271' Avenue. Method of determining Contract Price : O Unit Prices: Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County Commissioners on February 15, 2005 to The Danella Companies ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below : Estimated Labor Cost = $345460 . 60 Estimated Contract Time: 30 days Total Estimated Labor Costs = $ 34,460 .60ij r� 0 ? ACCEPTCIV RECOt ENDS APl?20VED : 4 . 4 Danella Companies, Inc. ENGINEER 6hair` ian , B , C �6 ` py Date : .` Mi,yi�23 , 2006 Date : S Date : / � � � • Arthur C. Neuberger Attachment 3 1':A [ti litiesAUI'ILITY - GNGIN 81i.R I NGAProjects - Utility Construction PcrmksV1RC - 9-inch Masicr Planned Poree Main on I st sit eel S W\t1 - Work Anth01'19ation No. 2005-027, Attachment 3 . doc9