Indian River County Department of Ufilifies
COST ESTIMATE and CONTRACTOR'S BID ITEM LIST
Project IRC - 5th Street SW on Fast Side of Lateral J Canal - 6" Force Main Dir. Drill Under Cnlcert from 5th St. SW
)escription: WIP #471-169000-02533 Misc. Sewer Sersice, UCP #2757
24-Jan-06
LABOR COSTS MATERIAL COSTS
Bid Bid Item E.a(ian Unit oI Labor Unit Total Labor
Item No. Description Nfatend Unit Total Material
uan fity Measure Price Price Price Price
n Mobilization I 4% 439.40
78 Demobilization 1 1 % 109.85
79 Maintenance of Traffic I 1 % 109.55
o4b Install 8 " HDPE Flonz. Directional Drill 240 LF 522.00 5.280.00S16.99-
06 Install MRJDI Fittin s - 4,077.60
B L00 Tons 31 ,665 .00 1 ,665.00 S4,500 4,500.00
31e Install 6" PVC Force Main 40 LF $6.00 240.00
136 Tap 6" Main for Installation of Assembl 2 4.56 182'40
Y EA $600.00 1 ,200.00
na Install Wet Ta Assembly 6"X &D 2 EA 5900.00 1 ,800.00
23 Potholes 1 ,044.39 2.088 .78
4 EA . S200.00 800.00
Subtotal Subtotal Sewer System Labor 10,985 .00
Subtotal Subtotal Sewer System Labor, Mob., Demob. 11 ,644. 10
SubTotal Labor Cost $ 11 ,644. 10 SubTotal Mater. Cos[ $101848.78
TOTAL PROJECT COST $22492.88
Attachment A
WORK AUTHORIZATION DIRECTIVE
No. 2005-021 — 51h Street SW on East Side of Lateral J Canal 6" Force Main Under Culvert
DATE OF ISSUANCE: February, 2006 EFFECTIVE DATE : February, 2006
OWNER: Indian River County
CONTRACTOR: The Danella Companies, Inc .
CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 Awarded 03 / 15/05
PROJECT 5 °i Street SW at Lateral J Canal 6" Dir. Drill under Culver from east side
COUNTY UTILITY PROJECT NO . : UCP #2757 CONTRACTOR' S PROJECT NO. : N/A
COUNTY WIP No . 471 - 169000-02533 Misc . Sewer Service
You are directed to proceed promptly with the following work:
Description:
Please install about 240 LF of 8" HDPE Directional Drill force main and about 40 LF of 6" PVC force main as
necessary adjacent to existing 6" PVC force main along Lateral J Canal under an existing 36" CMP Culvert that will
be replaced with a 54" CMP Culvert. The depth of the culvert is about 18 feet from the surface and the Lateral Canal
is about 20 feet deep. The directional drill should be about 30 feet deep under the culvert to allow for rising when
pulled so that it will be about 5 feet under the existing culvert, per the 1RFWCD .
Purpose of Work Change Directive:
To allow replacement of 36" CMP Culvert
Method of determining Contract Price:
O Unit Prices: Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County
Commissioners on March 15 , 2005 to The Danella Companies, Inc.
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contin g enc and Contract Time is summarized below: " y I
Estimated Labor Cost = $ 11 ,644. 10 Estimated Contract Time: 30da s €` Q'4; '
Total Estimated Labor Co
$ 11
1 ] ,644. 10
ti 9 �' P n "la•
q y
REC MEN D: APPROV);D '�' '\kr
ACCEPTED:
B B :
By: Chair, an c Board No �Cou y Vt
The Darrell Companies, Inc. Gordon Spark . E. ` �xr
Environ mal E ineer Con ssiollot
_ ' S
Date: 11'VuYQ= ;'•` _
Date : li !f 6 Date: 02 - 21':'- 06to, o