HomeMy WebLinkAbout2006-066 C Indian River County Department of Ufilifies COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Project IRC - 5th Street SW on Fast Side of Lateral J Canal - 6" Force Main Dir. Drill Under Cnlcert from 5th St. SW )escription: WIP #471-169000-02533 Misc. Sewer Sersice, UCP #2757 24-Jan-06 LABOR COSTS MATERIAL COSTS Bid Bid Item E.a(ian Unit oI Labor Unit Total Labor Item No. Description Nfatend Unit Total Material uan fity Measure Price Price Price Price n Mobilization I 4% 439.40 78 Demobilization 1 1 % 109.85 79 Maintenance of Traffic I 1 % 109.55 o4b Install 8 " HDPE Flonz. Directional Drill 240 LF 522.00 5.280.00S16.99- 06 Install MRJDI Fittin s - 4,077.60 B L00 Tons 31 ,665 .00 1 ,665.00 S4,500 4,500.00 31e Install 6" PVC Force Main 40 LF $6.00 240.00 136 Tap 6" Main for Installation of Assembl 2 4.56 182'40 Y EA $600.00 1 ,200.00 na Install Wet Ta Assembly 6"X &D 2 EA 5900.00 1 ,800.00 23 Potholes 1 ,044.39 2.088 .78 4 EA . S200.00 800.00 Subtotal Subtotal Sewer System Labor 10,985 .00 Subtotal Subtotal Sewer System Labor, Mob., Demob. 11 ,644. 10 SubTotal Labor Cost $ 11 ,644. 10 SubTotal Mater. Cos[ $101848.78 TOTAL PROJECT COST $22492.88 Attachment A WORK AUTHORIZATION DIRECTIVE No. 2005-021 — 51h Street SW on East Side of Lateral J Canal 6" Force Main Under Culvert DATE OF ISSUANCE: February, 2006 EFFECTIVE DATE : February, 2006 OWNER: Indian River County CONTRACTOR: The Danella Companies, Inc . CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 Awarded 03 / 15/05 PROJECT 5 °i Street SW at Lateral J Canal 6" Dir. Drill under Culver from east side COUNTY UTILITY PROJECT NO . : UCP #2757 CONTRACTOR' S PROJECT NO. : N/A COUNTY WIP No . 471 - 169000-02533 Misc . Sewer Service You are directed to proceed promptly with the following work: Description: Please install about 240 LF of 8" HDPE Directional Drill force main and about 40 LF of 6" PVC force main as necessary adjacent to existing 6" PVC force main along Lateral J Canal under an existing 36" CMP Culvert that will be replaced with a 54" CMP Culvert. The depth of the culvert is about 18 feet from the surface and the Lateral Canal is about 20 feet deep. The directional drill should be about 30 feet deep under the culvert to allow for rising when pulled so that it will be about 5 feet under the existing culvert, per the 1RFWCD . Purpose of Work Change Directive: To allow replacement of 36" CMP Culvert Method of determining Contract Price: O Unit Prices: Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County Commissioners on March 15 , 2005 to The Danella Companies, Inc. ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contin g enc and Contract Time is summarized below: " y I Estimated Labor Cost = $ 11 ,644. 10 Estimated Contract Time: 30da s €` Q'4; ' Total Estimated Labor Co $ 11 1 ] ,644. 10 ti 9 �' P n "la• q y REC MEN D: APPROV);D '�' '\kr ACCEPTED: B B : By: Chair, an c Board No �Cou y Vt The Darrell Companies, Inc. Gordon Spark . E. ` �xr Environ mal E ineer Con ssiollot _ ' S Date: 11'VuYQ= ;'•` _ Date : li !f 6 Date: 02 - 21':'- 06to, o Attachment 6 F:AUtilitiesVU'rlLl i Y - ENGINEERINGAProjects - Utility Construction PeirriesVlRC - 5th St. SW - Lateral .1 8-inch FM Dir. Drill UNder Culver at UCP#2757AA - Work Authorization No. 2005-021 - Attachment ❑ .doc