HomeMy WebLinkAbout2007-391 WORK AUTHORIZATION DIRECTIVES, 067 - 3 y
No. 2007-013 l
VISTA ROYAL FIRE HYDRANT REPLACEMENT PROJECT
DATE OF ISSUANCE: November 2007 EFFECTIVE DATE: November 2007
OWNER: Indian River County
CONTRACTOR: Underyround Utilities, Inc .
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT /
EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO 2007026 Febrtrary
6, 2007
PROJECT: Replace deteriorated fire hydrants that are classified as unusable
COUNTY UTILITY PROJECT NO.: UCP #3021 CONTRACTOR' S PROJECT NO. : N/A
COUNTY W.LP. No. 471 - 169000-08501 .
You are directed to proceed promptly with the following work:
Description:
Replace 30 fire hydrants and gate valves at the direction of Utilities Operations personnel
Method of determining Contract Price:
❑X Unit Prices: Bid Items as established pursuant to Bid No 2007026, and awarded by the Board of
County Commissioners on February 6, 2007 to Underground Utilities, Inc.
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $ 107,764. 80 Estimated Contract Time: 60 da s
Total Estimated Labor Costs = $ 107,764.80
ACCEPTED: RE4ENG
ED- APPROV�v
BY � Y B
Underground Utilities, Inc. INEER
4thairman,
BCCC. Wheeler,
Date: /� - 3/ - O7 07 Date:
Dar-IJISID-7
Attachment 3
C:\Documents and Settings\George FrenchTocal Settings\Temporary Intemet Fi1es\Content.IE5\02SCBMT3\A - Work Authorization No. 2007-
013 Attachment (1).doc9
Q
C
0 >
M
s
G c I TA GA
'N
4th PI
4th St _
VISTA VILLAS
2nd Ln
2nd St
1st St
t
a v >>
t � r
N
GRAND ROYALE '
z
s
VIST R I E
SW 3rd St C
N
�L S
C >
rn SW 4th PI - f
o
SW 5th St
SW 5th PI mai
a
Forest Park Dr .e: B Forest park Dr
SW 7th PI ATTA HMENT I
rm
INDIAN RIA'i R ( OIIN-1Y hiclkdra Okay - f1 1
VIS1AROA AlI & PIA 's IAIION 0 HieHydrant Replace ASAP 13-11 -
IIRIS I-IYDR \ Ni R [ III-A( I ' Nil NI PROJP( "h 9 1iia ] INdl mt Rcplacc I ucal ) carfl8.-PY - 141 1 -
Indian River County Department of Utilities
COS"r ESTIMATE
Project IRC - Vista Royal Fire Hydrant Replacement Project
Cost Estimate for Work Authorization No. 2007-013 to Underground Utilities, Inc.
UCP 41021, WIP 4471-169000.08501
22-0et-0]
Bid Item Estimatd eUnit of Unit Total Labor Unit Total Labor Maeriel u"h Mnenel
Item No Description issississisuami Measure Price A' Price A" Price B"" Price B'. Pritt Prue
63 Mobilization. Demobilization, MOT 0.043 768.00 O.U] 904925
Olc Install 6" PVC Water Main 500 LF U400.004,000,
,000.00 7.00 3,500.00 53,68 1 ,840.08
09 Install M1 Restraint Fittings 5 TON ,000.00 I ,fifi500 8.125.00 $2,50000 12500.00
Its Install Dl Wet Ta w,' GV&D6" Xfi" and Ta Mein 32 F.A .800.00 1 ,000.00 32,000.00 51,065.05 34081 .60
I ]c Install 6" Gate Valve & Box 10 EA ,000.00 435.00 4,}5000 8541 .82 5,418.20
19b Install FireHdrant Assembl w/6" Gmc Valve & Tec 32 Ea 8,400.00 2,00000 64,00000 $205662 65,811 .94
22 Test Holec'Potholcs b0 EA .000.00 220.00 13,200.00
2]b Bacterial Sam le/ra$en to Lab I"ur Testin 12 EA 1 ,500.00 200.00 2,400.00 $184.69 2,21628
59a LawneROW Restoration To soil & Bahia Sud) ]50 SY ,500.00 2,00 1,500.00 $2.50 1 ,97500
Subtotal Labor Cost $94,200.00 129,2]5.00
Subtotal Labor Cost with Item 63 g97,968.o0 I}8,12415
Total Matcrnals
23142.92
IRCDUS Porte Account 0. 10 89796.80 13 932,43
Total Labor Coo $ 109,764.80 153 156.68
TOTAL ESTIMATED COSI $231 ,507.72 $275,899.60
TOTAL F,STIMA"rED LABOR COST $107,764.80 $152,156.68
• Undei9round Utilities , xnc .
,• Denko Coniarn ion Cars
Attachment 2