HomeMy WebLinkAbout2006-090 WORK AUTHORIZATION DIRECTIVE
Q
No. 2005-023 _- — 0
IRC - LUCILLE BUCKNER WATER SERVICE AT 4350 34TH COURT
DATE OF ISSUANCE : March, 2006 EFFECTIVE DATE : March, 2006
OWNER: Indian River County
CONTRACTOR: The Danella Companies Inc
CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033
PROJECT: IRC - Lucille Buckner Water Service at 4350 34th Court
COUNTY UTILITY PROJECT NO . : UCP # 2788 CONTRACTOR' S PROJECT NO. : N/A
You are directed to proceed promptly with the following work:
Description :
Install about 120 LF of 2" HDPE Directional Drill water pipe under 44t" Street from water main to
customer address, tap main and install water meter box in ROW of 44t" Street.
Purpose of Work Authorization Directive:
The installation of the 2" HDPE water main will allow the customer to be served by County water
Attachments: (List documents supporting work)
Exhibit 1 Cost Estimate
Method of determining Contract Price:
❑X Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County
Commissioners on February 15 , 2005 to The Danella Companies .
❑ Lump Sum
❑ Cost of the Work:
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost = $2,607 .00 Estimated Contract 14 days
Time :
Total Estimated Labor Costs = $2,607 .00
ACCEPTED REC MENDED : � APPROUEIp `
By: B �,,B
DANELLA ENGINEER
COMP NIES a ,
Date: D Date: 3 - ( C/ O � DaYe` l� .D X21 /66
711I' - it 2
F1Uti Iities\UTILITY - rNGINEBRINGAProjects - UtiIIty Construction PeimitsAl - Luci Ile Buckner Water SCMUC Dir. Bore UCP #2788VAA -
Work Authorization No. 2005-023 .doc
.r
Indian River County Department of Utilities
COSIESTIMATE
Project: Lucille Buchner Water Service Installation, 4350341h Court
UCP 02788
9-Mar-06
Rid Rem Estimate ! Unit of Unit 'Total Labor btaterial unit Material Total
Item Nn. Descri tion anfib' Meaft Price Price Price Prim Price
63 Mobilization 1 0.04 $ 10428
64 Demobilization I 0.01 $26.07
65 Maintenance of traffic 1 0.01 $26.09
l5p Install Water Service Lon0 1 PA 300.00 5300.00
41,50
OSa Install 2" HDPE Directional Drill Pipe 120 LP 14.00 $ I ,GB000 L50 $1800180,0
0
23 Install Meter Box 1 EA 100001 $ 100.00
63,50 $63.50
23 Potholes 2 PA 200.00 5300.00
53 ROW Grading 100 SY L00 $ 100.00
73a Lawn Restoration with Sod 10 SY 2.70 $29.00 2. 19 $2190
Subtotal Water labor S2,607.00
'I oral Materials 56"12.96
TOTAL ESTIMATED COST $3,284.96
Exhibit 1