SUBSURFACE SOIL EXPLORATION
AND GEOTECHNICAL ENGINEERING EVALUAjuQI� OVED BY
a(
16th for ArrStreet Bridge at 74th Avenue
IRC Project No . 9920B FEB 1 3 2007
WORK ORDER NO . 1 ( Engineering Division ) BOARD OF COUNTY
FOR COMMISSION
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534
WITH
ARDAMAN & ASSOCIATES , INC .
All services performed under this contract shall be supervised and certified by a licensed
Professional Engineer ( PE) registered with the State of Florida and staff employed directly with
your firm .
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Scope of
Services dated January 16, 2007 and shall comply with Standards enumerated in the
RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO
0534 WITH ARDAMAN & ASSOCIATES . INC . Effective Date: October 1 , 2006 .
Minimum Specification Requirements as follows:
• Initial site visit, layout of boring locations and coordination of fieldwork.
• Mobilization/demobilization of drilling equipment.
• Standard penetration test borings.
• Laboratory testing of subsurface soils.
Preparation and issuance of engineering reports presenting the test
results for the bridge design .
All work shall also comply with the current Florida Minimum Technical Standards.
COMPENSATION .
The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for
services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A"
Fee Schedule and Man Hours.
ETrigineering\Capital Projects\9920-B-Box Culvert in Canal at 16th St & 74th Ave\9920 Ardatnan WON 01 02-02-07.doc
Page 2 oft
Work Order #1
16TH Street Bridge at 74th Avenue
A Not-to-Exceed Amount of: $4, 724 . 00 to be paid on a unit price basis for actual work
performed in accordance with the schedule of services and fees set forth in Exhibit A of
RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO.
0534 WITH ARDAMAN & ASSOCIATES . INC . Effective Date : October 1 , 2006 .
TIME FOR COMPLETION
This Work Order No. 1 shall run concurrently with the construction work for the
16th Street Bridge at 74th Avenue
IRC Project No . 99208
IN WITNESS HEREOF the parties hereto have executed these presents
This 13th day of February , 2007 .
OWNER ARDAMAN & ASSOCIATES, INC.
BOARD OF COUNTY COMMSIONERS
INDIANAIVER COUNTY, FLORIDA
(Signature
' Ui §atrniau - DabJ. ZM!aeI�.. .Or_r9",ana er
(Printed name Fn4l title) (Pr ed name nd title) 1
App .#o4I1byBCC 02 / 13 /07
ATTEST : �1
Jeffrey K. Barton, Clerk of Circuit Court Witnessed by:
� 1 � ✓ � /jCts�z- �
Deputy Clerk (Printed name)
Appr ve as to Fon and "' I I����oJi1 ncy:
IV William G. Col s II, Cb0nty Attorney —�
n
seph A. Baird, County Administrator
F:\EngineeringlCapital Projects19920-B-Box Culvert in Canal at 16th St & 74th Ave\9920 Ardaman W0401 02-02-07.doe
IN Ardaman & Associates , Inc .
W00% January 16 , 2007
Proposal File No. 07-64-3135
4? Y j� Y F� ` lid ` � ti Ri a
Indian River CountyL Oe
"
Board of County Commissioners
Engineering Division
1840 25" Street
Vero Beach , Florida 32960-3365
Attention : Ms . Michelle A . Gentile
Subject : Proposal for Subsurface Soil Exploration and
Geotechnical Engineering Evaluation
16`hStreet Bridge at 74th Avenue
Indian River County, Florida
Ladies and Gentlemen :
As requested , we are pleased to present the following proposal for conducting a subsurface soil
exploration and geotechnical engineering evaluation for the subject project. This proposal presents
our approach to the project which was discussed with your project structural engineer, Bridge
Design Associates , Inc. and includes an estimate of field exploration and laboratory testing
quantities as well as geotechnical engineering services needed for the evaluation of the data
obtained and preparation of a report .
We understand that the project will consist of replacing the existing 16" Street bridge crossing over
Rangeline Canal with a new bridge supported on prestressed concrete piles .
The following summarizes our proposed scope of work and associated fees for conducting the
subject exploration .
FIELD EXPLORATION
As requested , our field program will include conducting two Standard Penetration Test ( SPT)
borings , one at each end of the proposed bridge over Rangeline Canal to a depth of 60 feet. The
borings may be completed to shallower (or deeper) depths depending on the soil conditions
encountered during the performance of the borings . The SPT borings will be drilled using a
procedure similar to the Standard Penetration Test outlined in ASTM D- 1586 . The borings will be
sampled at 18-inch or 24-inch intervals to 10 feet deep and at 5-foot intervals below 10 feet. Each
sample will be removed from the sampler in the field and then examined and visually classified by
our crew chief. Representative portions will be sealed and packaged for transportation to our
laboratory for further analysis as required . Water level observations will be made in the boreholes
during the drilling operation .
EX
10
T
Indian River County -2-
Proposal File No. 07-64-3135
We recommend that the project surveyor locate our borings horizontally and vertically ( i . e . ,
determine the elevation of the ground surface at the boring locations ) . This information will
increase the accuracy of the data obtained .
LABORATORY TESTING
Routine laboratory visual classification will be performed along with specific classification tests
deemed necessary (i . e . , sieve analysis , Atterberg limits and organic contents ).
ENGINEERING ANALYSIS AND REPORT
Engineering analysis of all data obtained will be made to evaluate general subsurface conditions
and to develop geotechnical engineering recommendations to guide site preparation and
foundation design criteria for the bridge . For our analysis, we will require specific loading
conditions for the bridge . Our recommendations as discussed above , together with all the data
developed during the exploration will be submitted in a written report upon conclusion of the
exploration .
COST ESTIMATE
The costs associated with the aforementioned tasks are presented below. Unit rates were obtained
from the continuing services contract between Indian River County and Ardaman and Associates ,
Inc. If subsurface conditions are encountered during our field explorations that necessitate
advancing the SPT borings to greater depths , the client understands and agrees to pay the
additional drilling cost of $ 13. 25 per foot .
1 . Initial Site Visit, Layout of Boring Locations ,
Coordination of Field Work:
Senior Project Engineer - 1 hour @ $ 98 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . $ 98 .00
Project Engineer - 2 hours @ $ 85 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . $ 170 . 00
Senior Field Technician - 4 hours @ $ 48 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . $ 192 . 00
2 . Mobilization/Demobilization of Drilling Equipment
1 Mobilization @ $ 175 .00/Mob . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . $ 175.00
3 . Standard Penetration Test Borings :
(2 borings to 60 feet)
50 feet of borehole at depths
less than 25 feet @ $ 11 . 00/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . $ 550 .00
50 feet of borehole at depths
26 to 50 feet @ $ 12 .00/foot . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . .
. . . . . . . . . . . . . . $ 600 . 00
20 feet of borehole at depths
51 to 75 feet @ $ 13 .25/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . $ 265.00
Ardaman & Associates , Inc.
— _
Wits
Indian River County 3-
Proposal File No . 07-64-3135
4. Laboratory Testing Program :
Percent Fines Analysis - 6 tests @ $ 30 .00/test . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . $ 180 .00
Atterberg Limits - 2 tests @ $ 80 . 00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . $ 160.00
Sieve Analysis - 6 tests @ $ 65 . 00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . $ 390 .00
Organic Content tests - 2 tests @ $ 30 .00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . $ 60 .00
Moisture Content tests - 8 tests @ $ 15 . 00/test . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . $ 120 .00
5 . Engineering Services :
Senior Project Engineer - 3 hours @ $ 98 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. $ 294 . 00
Project Engineer - 14 hours @ $ 85.00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . $ 1 , 190 . 00
CAD/Draftsman Services - 4 hours @ $ 40 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . .
. $ 160. 00
Clerical/Secretarial Services - 3 hours @ $ 40 . 00/hour . . . . . . . . . . . . . . . . . . . . . . I . .
. $ 120 .00
Total Project Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . $ 4, 724. 00
TERMS AND CONDITIONS
This proposal is subject to the following terms and conditions : ( 1 ) access to boring locations is to
be readily available to our truck-mounted drilling equipment , (2 ) the proposed number of borings
and the boring depths will be adequate , (3) undisturbed samples and consolidation tests on fine
grained soils are not budgeted into the total cost and (4 ) Andaman & Associates can not take
responsibility for damages to underground structures and/or services ; their locations are to be
provided by the client prior to commencement of the field work.
CLOSURE
We appreciate the opportunity to submit this proposal and look forward to working with you on this
project. If this proposal meets with your approval , please indicate your acceptance by signing and
returning the attached Proposal/Project Acceptance sheet or by issuing the purchase order that
will be assigned to this project . Please call if you have any questions or require additional
information .
Best Regards ,
ARDAAMMAAN� &/ASSOCIATES, INC .
Will B . Cornelius ll , E . I . Da J . Zrall ck , P . E .
Assistant Project Engineer Bran M ager
WBC II/DJZ/dd