Loading...
HomeMy WebLinkAbout2004-144 ( - fes - oq ORIGINAL. Board of County Commissioners 0 q q q 1810 25th Street Vero Beach, Florida 32960 Telephone : (772) 5674000 FAX : (772) 778-9391 WORK ORDER NO . 3 (Engineering) FOR PROFESSIONAL SURVEYING SERVICES AGREEMENT FOR ANNUAL SURVEYING AND MAPPING SERVICES , CONTRACT 0390 , 2003 -2004 WITH CARTER ASSOCIATES , INC . Pelican Island Wildlife Refuge Upland Restoration Project Phase 1A IRC Project No . 0435 Specific Purpose/Topographic Survey Southeast Area June 15 , 2004 This Work Order No . 3 (Engineering) is in accordance with the existing AGREEMENT dated September 23 , 2003 between Carter Associates , Inc . (SURVEYOR) and Indian River County ( COUNTY) . This Work Order No . 3 (Engineering) amends the agreement as follows : SECTION I — PROJECT LIMITS : This Work Order No . 3 (Engineering) is for providing all Professional Survey services related to the research, field/office surveying and mapping of the existing Jungle Trail , Grove, River Edge and Upland Hammock area within the Southeast portion of the Pelican Island Wildlife Refuge Upland Restoration Project. SECTION II — SCOPE OF SERVICES , Scope shall consist of supplying all field and office survey related services to complete the mentioned tasks as denoted in attached scope of services supplied by Carter and Associates (Exhibit A) , dated June 85 2004 . The said scope of services shall be followed to accomplish all tasks and results as outlined . Any changes and/or modification of said scope of services shall be pre-approved in writing by the County prior to proceeding . Aquisition of adequate research materials, meetings , consultations , travel , proper communication and/or access to private and public lands (as per Florida Statutes) and safety procedures to complete all tasks , shall be the sole responsibilty of Carter and Associates and are included in this agreement . SECTION III — TIME FOR COMPLETION/SUBMITTALS : All tasks and submittals as outlined shall be completed, in its entirety within 60 calendar days of notice to proceed . A +/- 80 % preliminary survey shall be submitted prior to the above -mentioned 60 calendar days for review and comments . Deliverables shall include but not be limited to 3 (three) certified surveys and 1 (one) electronic ( Cadd) disc in AutoCAD 2001 or less . Said file shall be in state plane coordinate positions and be readily usable as a base map for design purposes . F :\Engineering\Capital Projects\0390-Annual Survey Contracts 2003 -2004\Carter\Pelican Island Upland\0390 Pelican Island upland topo survey Carter WO # 3 , Pr. No. 3002 Eng. 6- 15 -04.doc Pelican Island Carter WO # 3 6- 15-04 Pg 2 of 2 SECTION IV — COMPENSATION : The COUNTY agrees to pay, and the SURVEYOR agrees to accept , a fee for services rendered according to the " Scope of Services " identified in Section II of this Work Order No . 3 (Engineering) , a Lump Sum of $ 11 ,420 . 00 . All invoicing shall be supported with documentation (Man hours) of time and materials spent prior to payments . The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 15th day of Bina 2004 . CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA BOARD OF COUNTY COMMISSIONERS By : By : Caroline D . Ginn , Chair an Title : (�.� Approved b the PP Y BCC : June ' , 2bb4 F4 . Q:W, , Witness d by : Attest : re a , j e " W . _.. of Circuitf By : ri Deputy Clerk r , eountyy Attorney Approved as to Form and Legal Sufficiency Gl�'1 seph aird, County Administrator F :\Engineering\Capital Projects\0390-Annual Survey Contracts 2003 -2004\Carter\Pelican Island Upland\0390 Pelican Island upland topo survey Carter WO # 3 , Pr. No. 3002 Eng. 6- 15-04.doc CARTER ASSOCIATES , INC. CONSULTING ENGINEERS ANIS LAND SURVEYORS 1708 21st STREET MARVIN E. CARTER, P.S .M. VERO BEACH , FLORIDA 32960-3472 DEAN F. LUETHJE, P.E. (FL a NQ 772.562-4191 JOHN H. BLUR1, P.E. 772.562-7180 (FAX) FRANK S . CUCCURESE, P.S.M. DAVID E. LUETHJE, P. S.M. GEORGE SIMONS , P.E. STEVE SNOBERGER, P. E. PATRICK S. WALTHER, P.E. June 8 , 2004 EE BIT A Michael O ' Brien, P . S . M. XHI Indian River County 184.0 25' Street Vero Beach, Florida 32960-3365 RE Pelican Island National Wildlife 1Refuge Upland Restoration : Project- Southeast Area Specific Purpose Survey Soo " Dear Mr. O ' Brien, Carter Associates, Inc. (CAI) is pleased to present this ; proposal for professional surveying and mapping services for the above referenced project. As requested and based on our site visit and discussions we have assemble a scope of services for this project with the associated costs . The following is our proposed scope of services : Scope of Services : 1 . Spot elevations through hammock area (Part of Parcel #313909000000.0200000`1 . 1 - Hammock area/Triangle Parcel) and Parcel #31390900000002000002 . 0 ' — Old Grove Area) . Spot elevations to identify high and low areas as well as existing major drainage features and ground elevations . CAI will attempt to define as much of the drainage features as possible in the hammock area. 2 . Spot elevations of open field area (Old Grove area) adjacent to Jungle Trail including typical cross sections of existing ditches (Parcel #31390900000002000002 . 0) and Jungle Trail to easterly edge of roadway - Cross sections to be observed on +/-200 foot intervals . 3 . Cross sections of rivers edge along Parcel #31390900000002000002 . 0 frontage and proposed "open cut area" — Cross sections on +/-200 foot intervals to establish the Mean High Water (MHW) line as interpolated from DEP and/or previous elevations as shown on record boundary surveys . As discussed, the interpolation for the MHW may have A 1F Sewing Florida Since 1911 S :\P\04-490s\docs\04-490P_PINWR-060804 .doc Pagel of 2 . . 1 changed . It is our understanding that we do not intend on doing a tidal study. We will contact DEP to request an elevation and will explain to them it is for topographic purposes only and is not for a boundary determination on lands that are already state and federally owned. We will also include the location of any berms or changes in grade along the river from Jungle Trail to the Hammock area. CAI will compute and delineate a contour line for the MHW line as well as show the location of the main outline of the vegetation along the rivers edge. 4 . Set three (3 ) onsite benchmarks and control points with state plane coordinates NAD 83 /99 , 5 . Cross sections of the drainage ditch running southwesterly along the westerly edge of the Hammock area (triangle parcel) . Random cross sections to be observed to achieve relative grade and position to the westerly terminus, if obtainable . 6 . Spot elevations of the area to the northwesterly of the Hammock Area to tie in the existing water body and possible drainage structure. 7 . Locate and delineate any wells or outfalls/culverts and/or drainage structures of concern. 8 . Establishing two staff gages on the National Geodetic Vertical Datum of 1929 (NGVD29). Locations to be determined by Michael O 'Brien. Topography to be performed with GPS RTK (accuracy 2 -4 cm + 2ppm) and conventional methodology (Total Station) where RTK is not suitable . Control point elevations will be established using differential leveling techniques . Horizontal Datum will be North American Datum of 1983 , Adjustment of 1999 (NAD 83/99) and Vertical Datum will be National Geodetic Vertical Datum of 1929 (NGVD 1929) . Total Estimated Cost $ 115420. 00 Our estimated time frame to complete this project is 60 calendar days from the notice to proceed. Trusting you find this information to be in order and looking forward to hearing from you in the very near future, I remain, Yours Truly, Carter Associates, Inc. Po � David E . Luethje, P . S .M. S :\P\04490s\docs\04-490P_PINWR-060804. doc Page 2 of 2 Serving Florida Since 1911 CAI Project Data Entry Form Project No . 04490S Date : June 8 , 2004 By : David E . Luethje t' Proposal Stage r" Signed Contract SHEET 1 PROJECT DATA Project Name Pelican Island National Wildlife Refuge Upland Restoration - Southeast Area Project Description Specific Purpose Survey Location (STR) Jungle Trail - Part of Government Lot 2 , Section 9, Township 31 South, Range 39 East CAI - PM David E . Luethje, P . S . M . CLIENT DATA Client Code Client Name Indian River County Address 1840 25th Street Vero beach, Florida 32960-3365 Client PM Michael O'Brien, P . S .M. Invoices to : Indian River County Telephone 567- 8000 ext1386 FAX ESTIMATED FEES Surveying $ 11 , 420 .00 Design & Permitting Construction Services Reimbursables $0 . 00 Total Fees $ 119420.00 cc : Billing File Accounting SAP\04-490s\docs\04490s- IRC 06-08-04 .xls Initial Survey Budget & Task Description Project: Pelican Island National Wildlife Refuge Upland Restoration - Southeast Area Project Project No. 044905 Client Indian River County Date : 6/8/2004 By: David E . Luethje SHEET 2 Project Tasks Title Hourly Rates One Two Three Four Five Six 0 0 0 Sury I (Principal) $ 120 $0 . 00 $0. 00 $0. 00 $0 . 00 $ 0 .00 $0 .00 20 6 2 8 Sury I (Registered) $ 95 $ 15900.00 $570.00 $ 190.00 $760 . 00 $0 . 00 $0 . 00 Sury H $ 85 $0 . 00 $0 . 00 $0. 00 $ 0. 00 $ 0.00 $0 . 00 Survey Crew 4 $ 115 $ 0 . 00 $0. 00 $0 . 00 $0 .00 $0.00 $ 0 . 00 10 Survey Crew 3 $ 105 $0 . 00 $ 1 ,050 . 00 $ 0 . 00 $0 . 00 $0. 00 $0 . 00 Survey Crew 2 $90 $0. 00 $ 0. 00 I $0. 00 $0. 00 $0 . 00 $0 . 00 30 GPS Crew 3/3 $ 140 $0. 00 $49200.00 $0 . 00 $0 .00 $0. 00 $0. 00 0 GPS Crew 3/2 $ 125 $0 . 00 $0 . 00 $ 0 . 00 $ 0 . 00 $0. 00 $0 . 00 GPS Crew 2/2 $ 110 $0 . 00 $0. 00 $0 . 00 $ 0.00 $0 .00 $0 . 00 4 0 6 40 Survey/Cadd Tech $ 55 $220. 00 $0. 00 $330 .00 $23200.00 $0 . 00 $ 0 .00 Word Processing $35 $0 .00 $0 . 00 $0 . 00 $0 .00 $0.00 $ 0. 00 Subconsultants* $0 . 0E7 $ 0. 00 $0.00 $0. 00 $ 0.00 $0 . 00 Direct Expenses* $0.00 $ 0.00 $0. 00 $0. 00 $ 0. 00 $ 0 . 00 Total Hours 24 hr 46 hr 8 hr 48 hr hr hr Total Dollars $29120. 00 $59820.00 1 $ 520.00 $2 ,960 . 00 $0 . 00 $0 .00 41011 VWX One Research/Project Management f $2 , 120 Two Field Recon./Observations $5 , 820 Three Data Review/Processing $520 Four Survey Certificate $25960 Five N/A $0 Six N/A $ 0 I i TOTAL $ 11 ,420 S :\P\04-490s\docs\04-490s- IRC 06-08-04 . xis Reimbursables Project: Pelican Island National Wildlife Refuge Upland Restoration - Southeast Area Project Project No . 044905 Client Indian River County Date : 6/8/2004 By: David E. Luethje SHEET 3 Project Tasks Title Rates One I Two Three Four Five Six Per Mile 0 0 0 i 0 eage $0. 35 $0 . 00 $0 . 00 $0 . 00 $0 . 00 $0.00 $ 0 . 00 Per S .F. 0 lue/Blackline $0 .25 $0 .00 $0 . 00 $0 . 00 $0 . 00 $0 . 00 $0 . 00 Per S .F. 0 Mylar $ 1 . 75 $0 . 00 $0 . 00 $0 . 00 $0 . 00 $0 . 00 $0 . 00 8 1/2 " x 11 " Each 0 B/W Copies $0 . 15 $0.00 $0.00 $0 . 00 $0 . 00 $0. 00 $ 0 . 00 8 1/2 " x 11 " Each Color Copies $0 .35 $0.00 $0 .00 $0 . 00 $0 . 00 $0.00 $0 . 00 Monumentation Cost $0.00 Permit Fees Cost + % 10 Total Dollars 1E $0 .00 1 $0. 00 $0. 00 1 $0.00 1 $0. 00 $ 0 . 00 A R " % INOW 100 One $0 Two $ 0 Three $ 0 Four $0 Five $0 Six $0 TOTAL $0 S :\P\04-490s\docs\04-490s - IRC 06-08-04 . xis