Loading...
HomeMy WebLinkAbout2006-124 \ WORK ORDER NUMBER IRDN# 1 r� FOR INDIAN RIVER DRIVE SIDEWALK NORTH IRC PROJECT # 02022 JoZ� This Work Order No . IRDN# 1 is entered into as of this 11 th day of Apri 1 , 2006, pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of March 15 , 2005 ("Agreement"), by and between Indian River County, a political subdivision of the State of Florida ("COUNTY") and G . K. Environmental, Inc . ("CONSULTANT") . The COUNTY has selected the CONSULTANT to perform the professional services set forth on Exhibit "A," attached to this Work Order and made part hereof by this reference . The professional services will be performed by the CONSULTANT for the fee schedule set forth in Exhibit "A," attached to this Work Order and made a part hereof by this reference. The CONSULTANT will perform the professional services within the timeframe more particularly set for in Exhibit "A," attached to the Work Order and made a part hereof by this reference, all in accordance with the terms and provisions set forth in the Agreement . Pursuant to paragraph IA of the Agreement, nothing . contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above . CONSULTANT BOARD OF COUNTY COMMISIONERS G. K . Environmental, Inc. OF INDIAN RIVER COUNTY ,I B B CGd Y g *Uul�z�XQ"' ArthuriR Neuberger;-:Cha an BCC Appr`ove'd April 11- 9 _;2006 C ttest : J. Bartler k of Co rt -' Ij h l .k By; �r--,r.. ; +alis. ` . :. . . . • Deputy Clerk ':AIIID * - ' Approved : seph A.1 Baird, County Administrator Approve as t orm n al ufficiency : M rion E . Fell , Assistant County Attorney FAEngineering\Capital Projects\0202-Indian River Drive Sidewalk-North\0202 Agenda Item Work Order No. IRDN# I - 03-23-06doc.doc l G . K. ENVIRONMENTAL INC. "Providing Common Ground Solutions". 155 McKee Lane GEORGE R. KULCZYCKI , C. E.S. , C .E. I . Vero Beach, FL 32960 - President l Principle Ecologist . Maich 15 , 2006 Ms. Michelle . A. .Gentile, C .E.T. Civil Engineer Indian River County 184025th Street Vero Beach, Florida 32960-3365 RE: PROPOSAL / CONTRACT Improvements on Indian River Drive / Sebastian Sidewalk Construction - 1 .5t Miles Along Indian River Lagoon COUNTY. PROJECT 40202 Dear Michelle, This letter is in response to the requested proposal for the above referenced project in Indian River County, Florida, for environmental services as generally required _ for State and Federal Environmental Resource / Individual Permits . G. . K, Environmental, Inc. (GKE) will be pleased to provide this, service with tasks completed under this contract and which are briefly outlined below: SCOPE OF SERVICES TASK I — Wetland Delineation $ 1 ,850.00 TASK. I : GKE will locate / flag State and Federal regulatory wetlands in accordance with Florida Administrative Code (F.A.C.) 62-340 and the Army Corps of Engineers (ACOE) Wetland Delineation Manual / Technical Report• Y- 87- 1 . Delineated wetlands will be field located on a 1 " - 200' scale county blue-line aerial or submitted survey drawing and included in a written report of findings . Wetlands will be assessed per current Federal regulations and current guidelines regarding isolation from Federal waters. TASK II - Agency Verification of Wetland Delineation $ 1 ,200.00 (not to exceed without prior authorization) TASK II : GKE will coordinate on site inspections with State and Federal regulatory officials to verify jurisdictional wetland lines / locations. Federal . Office (772) 567-9129 E-mail grk@steds.org Fax ( 772) 567-6245 Printed an Recycled Paper ®�� H .. 1 B IT " �•" . verification of wetlandline often coincides with State . ver`ification. If written agency verification is required, the client will provide. GKE 5 copies' of certified survey of GKE verified flag locations for transmittal to agencies for approval. TASK III — Mitigation Plan 16 hours - $ 1,760.00 (not to exceedmithout prior authorization) TASK III : GKE will meet with client and permit agency staff to discuss .mitigation " options and inspect potential mitigation sites for compatibility and prepare a draft mitigation plan, based ,upon the ecological values of wetland , impacts. TASK IV - Wetland Assessment - UMAM / WRAP 10 hours - $ 1,100.00 (not to exceed without prior authorization) , TASK IV : GKE will conduct a Wetland Rapid Assessment Procedure (WRAP) and/or a Uniform Mitigation Assessment Method (UMAM) of the wetlands located within the boundaries of the project site. WRAP/UMAM determine a numerical value for the ecological functions and ecological . values of the existing wetlands and mitigation site. The WRAP/UMAM score can be . used to determine what type / amount of mitigation will be . required for the project site. The WRAP/UMAM score is based -on vegetation, wildlife usage. hydrology, soils, water quality, success factor; ' and adjacent lands. TASK V - Protected Species 8 hours - $880.00 (not to exceed without prior authorization) TASK V : GKE will complete a detailed protected species survey on the referenced site. GKE ecologist will conduct J a preliminary systematic survey for protected species in accordance with . Florida Fish and Wildlife Conservation Commission (FFWCC) Guidelines. GKE ecologist will record all observations of listed protected species and features that may indicate species presence. Physical features may include, but are not . limited to, tree markings, burrows, tracks, nests; scat, and cavity trees: GKE 'may request that the U. S . , Fish and Wildlife Service (FWS) and the Florida Fish & Wildlife Commission (FFWCC) review their files for the presence' of any listed species that may be present onsite. Page 2 of 4 GKE / Gentile / IRC L Proposal / I.R.Dr. Improvements E TASK VI - Vegetation Survey (FLUCCS) 6 hours - $660.00 TASK VI: GKE will conduct a systematic survey - of vegetation using the Florida Land Use, Cover and Classification System (FLUCCS), A Technical Report. FLUCCS was developed by the State of Florida, Department . of Administration, Division of State Planning, Bureau of Comprehensive Planning, April 1976 . GKE ecologist will base the vegetative community descriptions upon field survey observations, SCS soil maps, and aerial photograph interpretation. . _ TASK VII - Permit Application Submittals 10 hours - $ 1 , 100.00 (not to exceed without prior authorization)' TASK VII : GKE to assist client and client' s engineer and surveyor to complete required field work. / meet / review work with client, review drawings, and permit application completion. The completion of the above tasks will be provided to the client in report form. TASK VIII — Response to Agency Requests for Additional Information (RAI) Estimated $3,000.00 ' (not to exceed without prior authorization)- TASK VIII : , Following agency permit application submittal and agency review, GKE will respond to all environmental questions outlined in agency letters Requesting Additional Information (RAI letters); Not to exceed $3 ,000.00 without prior authorization from Indian River County. GKE . Fees / Compensation Work on TASKS I throuj4h VII outlined above could begin within fifteen ( 15) days of G. K. Environmental, Inc. ' s receipt of Notice to Proceed, design plans, and field staked right-of-way if necessary. Receipt of one ( 1 ) fully executed copy of this contract shall serve as our Notice to Proceed with Tasks I through VIII. ' Invoices will be submitted on a monthly basis at GKE hourly rates. GKE hourly rates (2006) are $ 110. 00 / hour for Principal Ecologist and $30. 00 / hour for administrative / staff assistance. - Work on TASK VIII will begin following agency receipt , of application and receipt of permitting agency requests for additional information. - - - Page of GKE / Gentile / IRC Proposal / I.R.Dr. Improvements 3- 15-06 �qf� The above tasks (I - VIII) are not to exceed $ 11 ,550 .00 without prior authorization from Indian River County: Services Not Included The following services are not included (if required) in this agreement, .but .will be coordinated and reviewed by GKE : 1 ) water quality laboratory analysis 2) surveying / engineering 3) Auto CAD work 4) legal work 5) permit drawings 6) reasonable access to subject site If. the above is acceptable, please sign below and mail or fax a copy to our office. Work will be scheduled upon receipt of signed authorization, Thank you for the opportunity for G. K. Environmental, Inc. to offer our professional services. If you have any questions; please feel free to give ,me :a call . Sincerel � i 1 eorge R. Kul cki, President Principal Ecologist ACCEPTED BY ` , 1 , 145r �4 Anri1 11 7006 '14, Ofientp/ Owfi6 A thorize'd A t nature Date Arr�juf .- (2. . Neuberge i Chairman ?, :#Gi, ys � Pnnted Name - 1840 ,�6t�22et; , Suite N - 158 ' 'Maili'ng'Address , Vero Beach , FL 32960 APPROVED AS TO FOR AND GVAL FI t9 Page 4.of4 - GKE / Gentile / IRC • Proposal / I.R.Dr. Improvements . - 3- 15-06 FXHIRIT. � � � �