Loading...
HomeMy WebLinkAbout2006-307 WIDENING OF 43RD AVENUE 0 U 6 OSLO ROAD TO 8t" STREET l WORK ORDER NO. 1 TO THE PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT BETWEEN ARCADIS G&M INC, AND INDIAN RIVER COUNTY, FLORIDA. This AGREEMENT, entered into this 12th day of September ?006, by and behveen INDIAN RIVER COUNTY, a political subdivision of the State of Florida, hereinafter referred to as the COUNTY, and ARCADIS G&M, INC., Vero Beach, Florida, hereinafter referred to as the ENGINEER, "SECTION I - PROJECT LIMITS AND DESCRIPTION" Consultant services are required for the preparation of road design plans; permit applications and utility relocation plans associated with the construction of the widening of 43 `d Avenue from Oslo Road to Glendale Boulevard . The improvements consist of the following: Expansion of 43rd Avenue from south of Oslo Road to Glendale Boulevard to a four lane divided roadway section within an 80 foot to 150 foot wide right of way. Improvements to the south approach of the intersection of 43rd Avenue and Oslo Road will be provider. The project will begin approximately 1000 feet south of Oslo Road The total length of the project is approximately 11, 640 linear feet or 2. 20 miles. The proposed typical section will be based on the constrained right of way optional typical sections currently being reviewed by Indian River County for 43rd Avenue. Where the existing right of way is wider than 80 feet, the typical section will transition to provide for additional median width and additional buffer between back of curb and sidewalk Landscape and lighting plans will be prepared for the project. The landscaping plans will detail median plantings and irrigation. It is anticipated that the lighting will be located within the median.Mast arm traffic signals will be designed at the following locations: • 43rd Avenue & Oslo Road • 43rd Avenue & 54h Street SW • 43rd Avenue & Is` Street SW • 43rd Avenue & 4hStreet • 43rd Avenue & 8`h Street ARCADIS will attend a public workshop meeting for the project. Display boards will be prepared for use during the public workshop. The display boards will consist of colored typical sections and a plan of the project superimposed on an aerial photo. The structural engineering plans for the bridges carrying 5`h Street SW over the IRFWCD lateral canal and 43rd Avenue over the South Relief Canal will be modified to match the proposed roadway plans. SECTION II - COUNTY OBLIGATIONS The COUNTY agrees to provide (in a timely manner) the following material , data, or services as required in connection with the work to be performed under this Agreement; all of which information the ENGINEER may use and reasonably rely upon: Page 1 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc A. Provide the ENGINEER with a copy of all previously conducted studies, geotechnical investigations, preliminary data or reports available, existing location surveys, topographic surveys, and related documents. B. Provide the ENGINEER with all available drawings, and other documents in the possession of the COUNTY pertinent to the project. C. The COUNTY shall be responsible for acquiring all right-of-ways, easements and other rights in land as necessary to complete the project. D . The COUNTY shall make provisions for the ENGINEER to enter upon public and private property as required for the ENGINEER to perform his services. E. The COUNTY will promptly execute all permit applications and provide application fees necessary to expedite the acquisition of any local, state or federal permits made necessary by the project. F. The COUNTY shall provide all abstracts of title for each parcel necessary for the construction. The ENGINEER agrees to perform professional roadway design and related services in connection with the project as required and set forth in the following: SECTION III - SCOPE OF SERVICES A. General I . The ENGINEER will endeavor not to duplicate any previous work done on the project. After issuance of written authorization to proceed, the ENGINEER shall consult with the COUNTY to clarify and define the COUNTY'S requirements for the project and review all available data. 2. The ENGINEER will attend conferences with the COUNTY and its representatives upon reasonable request. 3 . In order to accomplish the work described under this Agreement in the time frames and conditions set forth in this Agreement, the ENGINEER will observe the following requirements : a. The ENGINEER will complete his work on the project within the time allowed by maintaining an adequate staff of registered engineers, draftsmen, and other employees on the work at all times. b. The ENGINEER will design the project in such a manner as to be in conformance with all applicable federal, state and local laws. C. The ENGINEER will prepare all necessary sketches and completed application forts to accompany the COUNTY'S applications for required federal, state, or local permits . d. The ENGINEER will cooperate with the COUNTY in order that all phases of the work may be properly scheduled and coordinated. Page 2 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc e. The ENGINEER will send a complete preliminary set of construction plans to any city, county, state or federal regulatory agency, including the St. John's Water Management District (SJRWMD) and the Indian River Farms Water Control District (IRFWCD), from which a permit or other approval is required prior to final approval of the design by the Director of the Public Works Department, and will coordinate the project design with all applicable agencies. f The ENGINEER will contact all known utility companies having installations in the immediate vicinity of the proposed work and consider relocation of utilities, if necessary. The ENGINEER will provide the COUNTY with necessary information relative to required utility adjustments, relocations and installations and will show all existing utilities on the final design plans . Design modifications to existing COUNTY utility lines, if necessary, may be negotiated by a separate agreement with the County Utility Department, or the County Utilities Department may design modifications with Utility Department Staff or other consultants. g. The ENGINEER shall report the status of this project to the Director of the Public Works Department upon request and hold all drawings, calculations and related work open to the inspection of the Director or his authorized agent at any time, upon reasonable request. h. The ENGINEER shall prepare all right-of-way maps, parcel sketches and legal descriptions. Parcel sketches and legal descriptions will be on a unit price cost per parcel as ordered by the COUNTY. 4. The ENGINEER will furnish copies of the drawings, specifications and contract documents as required by the COUNTY for materials suppliers, federal, state and local agencies from whom approval of the project must be obtained. Upon bidding of the construction contract, the ENGINEER will furnish to the COUNTY 11 " x 17" originals of the drawings and copies of the specifications for the COUNTY to copy for prospective bidders. Additional copies beyond those identified will be provided at cost. All original documents, survey notes, field books, tracings, and the like including all items furnished to the ENGINEER by the COUNTY pursuant to this Agreement, are and shall remain the property of the COUNTY. 5 . The drawings prepared by the ENGINEER will be of sufficient detail to permit the actual location of the proposed improvements . Negotiation for all land rights shall be accomplished by the COUNTY, unless the COUNTY requests the ENGINEER to perform these services in a subsequent amendment to this Agreement. In this event, the ENGINEER shall be compensated for such additional services in accordance with Section VI of this Agreement. Page 3 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc 6. The ENGINEER acknowledges that preparation of applicable permits for the COUNTY'S submittal through governmental regulatory agencies is included within the scope of basic compensation for this Agreement. Any additional work required by regulatory agencies pursuant to regulations established after the date of this Agreement shall be an additional service and the COUNTY shall compensate the ENGINEER in accordance with SECTION VI - Additional Work, of this Agreement and in accordance with the fee schedule in this Agreement, as approved by the COUNTY prior to commencement of any work performed. 7. If following execution of this Agreement the COUNTY proposes to construct the improvements in a revised phased manner which requires the preparation of plans or the need to obtain or modify permits previously obtained, the ENGINEER will be compensated for this effort in accordance with the approved fee schedule in a subsequent Amendment to this Agreement. No such additional work shall be initiated unless approved by the Indian River County Board of County Commissioners. 8 . Compensation to the ENGINEER for basic services shall be in accordance with Section V — Compensation, of this Agreement, as mutually agreed upon by the ENGINEER and COUNTY. B . Design Survey The ENGINEER shall provide design survey services necessary to support and facilitate contemplated design and permitting activities associated with this project. ARCADIS has performed afield survey of 43rd Avenue from south of 6rh Place SW to north of Vineyard Lane SW. Additional field survey work will be provided as follows: A field location and topographic survey of 43rd Avenue from Oslo Road to 6th Place SW and from Vineyard Lane SW to Glendale Boulevard will be performed. The field survey work previously obtained for the section of 43rd Avenue from 6`h Place SW to Vineyard Lane SW will be supplemented so that the location and topographic survey will extend 50 feet outside of the existing right of way of 43rd Avenue. All buildings and structures located within 50 feet of the right of way will be located, and finished floor elevations of the structures will be obtained. The location of known underground utilities that may be in conflict with the proposed project will be field located to verify the horizontal and vertical location of the utilities. 1 . Establish a project wide Horizontal Control Network for within the DESIGN LIMITS. 2 . Establishment of a project wide Vertical Control Network within the DESIGN LIMITS. All elevations will be referenced to NGVD 1929 datum. 3 . Field establishment and monumentation of survey baselines to control future construction. A field survey will be performed throughout the project limits to establish the existing conditions in the field The feeld survey will include. Page 4 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc A. Establishment of a survey baseline tied to the state plane coordinate system. B. Set permanent benchmarks tied to the national geodetic vertical control system. C. Obtain survey cross sections at 100 foot stations to establish the existing vertical conditions at the project site. On 43rd Ave., the cross-sections shall extend across the right-of-way a minimum distance offtfty (50)feet beyond the right of way lines. On side streets, the cross-sections shall extend across the right-of-way a minimum offifty (50 ) outside the existing right-of-way. D. To establish the existing profile of the43rd canal and all sublateral canals, obtain survey cross sections at 500 foot stations between side streets and at 50 ' either side of the centerline of all proposed bridges. E. Obtain as-built conditions of all drainage structures at the project site. F Determine existing right of way lines. G. Locate by data collection method, above ground improvements per checklist provide by ARCADIS, including location and description of existing striping. 4 . Improvements within the DESIGN LIMITS will include above ground visible improvements such as existing buildings, pavement location, curbing, utilities (above ground locations only), drainage facilities (above and below ground), trees, driveways, sidewalks, fences, walls, signage and guardrails within the right-of-way and twenty-five (25 ') feet outside the right-of-way. 5 . Final output will be in the form of a digital AutoCAD, release 20001 DWG file. All surveying will conform to the minimum technical standards set forth by the Florida Board of Professional Land Surveyors in Chapter 61G17-6, Florida Administrative Code, pursuant to Section 472.027, Florida Statutes. 6. Research and analysis of existing right of way information (to include Abstracts or Title Searches as provided by COUNTY ) field location of existing right of way monumentation and determination of the location and extent of existing right of way in the vicinity of the project location. 7. Right-of-Way maps being done under separate contract with ARCADIS . Sketch and legal descriptions of proposed right of way takings will be prepared as directed by Indian River County. C. Geotechnical Investi ation 1 . Soil borings will be provided for the roadway and mast arm signal design. Sixty (60) six (6) foot deep auger borings will be performed. Two (2) borehole permeability tests will be obtained for use in the drainage design. Soil borings will be obtained at each intersection for the mast arm signal design, Soil borings will be provided for the roadway and mast arm signal design. Sixty (60) six (6) foot deep auger borings will be performed. Two (2) borehole permeability tests will be obtained for use in the drainage design. Soil borings will be obtained at each intersection for the mast arm signal design. Page 5 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Streef,43rd Avenue Arcadis Agrement 8-29-06.doe D. Design Plans Design plans shall be prepared to include : The following plan sheets will be prepared: 1. Cover Sheet 2. Typical Sections 3. Summary of Quantities & General Notes 4. Horizontal & Vertical Control Sheet 5. Details 6. Plan and Profile Sheets (1 " = 40') with Aerial images obtained via 43'd Avenue right- of-way map under separate contract 7. Cross Sections 8. Signage & Pavement Marking Plans 9. Signalization Plans 10. Bridge Plans Il. Plateau Intersection Plan & Details 12. Summary of Drainage Structures Sheets 13. Drainage Maps 14. NPDES Storm water Pollution Protection Plans 15. Quantity Computation Book The plans will be prepared based upon English units. The following items are NOT included.- 1. ncluded:1. Drainage Structure Sheets 2. Geometric Computation Book 3. Utility Relocation Plans The following additional data shall be utilized for development of the plans. 1 . Scale: The design plans sheets will be drawn at a scale of 1 " = 40'. 2 . All plan sheets shall be 11 " x 17". 3 . The design plans will be submitted to the COUNTY for review at the 30%, 90% and 100% stages of design. Permit application submittals will be made subsequent to the 90% plan set submittal approval by the COUNTY. E. Computation Book The 100% submittal shall include a computation book with quantity calculations for all pay items. F. Drainage Plans 1 . Drainage Parameters: ARCADIS will design a pipe and inlet drainage system for the project. ARCADIS will perform storm water drainage hydrologic and hydraulic calculations to determine the pipe sizing, water quality treatment, and storm water attenuation requirements within the project limits. Offsite storm water ponds may be required for the project. ARCADIS will analyze alternative measures for water quality treatment and attenuation. Tile alternative measures will be reviewed with Indian River County. Preparation of final plans for storm water ponds is not included in this agreement, but will be incorporated into the project through an addendum once the final drainage requirements are determined. Page 6 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc Perform drainage investigations and analysis necessary to prepare a design, which will drain the project in accordance with the COUNTY, IRFWCD and SJRWMD design criteria. 2. Environmental Permits: The ENGINEER shall prepare stormwater and wetland permit applications for the St. Johns River Water Management District, IRFWCD, FDEP and US Environmental Protection requirements for submittal by the COUNTY. This will consist of all required evaluation, design, coordination, and follow-up work necessary to support permit applications. The COUNTY will review the pemut applications as necessary. The ENGINEER shall assemble and be responsible for the final submittal. The ENGINEER shall prepare permit sketches for submission by the COUNTY to Florida Department of Environmental Protection, U.S. Army Corps of Engineers, IRFWCD and St. Johns River Water Management District for Dredge and Fill activities, if necessary. The ENGINEER shall submit all permit sketches on 8" x 11 " sheets. Sketches shall be neatly scaled, signed and sealed, and reproducible. Permit application packages will be prepared and submitted to the following agencies: • SJRWMD — drainage permit • IRFWCD — drainage permit 3 . Utilities : Utility coordination with the various Utility Companies and/or agencies shall be by the ENGINEER and identified conflicts addressed. The ENGINEER will be prepared, at additional hourly rates, to survey the project site to locate and determine depth of underground utilities, in coordination with the Utility Companies. G. Construction Phase Assistance Construction Phase Assistance is not included in this agreement, but will be provided by the Engineer if requested by the County. The scope and fees for this work will be negotiated at a later date. H. Certification 1 . The ENGINEER will provide certification to IRFWCD, St. Johns River Water Management District and all other required Federal, State, and local permitting agencies based on As-Built drawings provided by the Contractor's licensed surveyor and information provided by the COUNTY. Page 7 of 16 F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc I. The Roadway set of plans shall consist of the following : 30% 600vo 90016 10006 Cover Sheet X X X Typical Sections X X X Summary of Quantities and General Notes X X Summary of Drainage Structures Sheets X X X Details X X Plan and Profile Sheets (40 scale) X X X Cross Sections at 100 ft interval X X X Landscape Plans X X X Signage & Pavement Marking Plans (100 scale) X X X Signalization Plans X X X Bridge Plans X X X Intersection Plan & Details X X X Drainage Maps X X X NPDES Plans X X Stormwater Pollution Prevention Plans (S WPPP) X X Computation Book X Construction Cost Estimate and Quantities X X X X "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of Probable Construction Cost for the project shall be eighteen ( 18 ) months from the date of execution of this AGREEMENT . Once permits are received, 100% design drawings shall be completed 90 days thereafter. Page 8 of 16 G:\Adrnit \Alarketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc "SECTION V — COMPENSATION" is being modified to incorporate the following: The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this Agreement fees in accordance with the following: A. Professional Services Fee 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows: The following is a summary of costs: Total Compensation Roadway Plans (ARCADIS)................................................................................. $191,550. 00 Signal Plans (ARCADIS) ........................................................................................ $53, 000. 00 Signing and Pavement Marking Plans (ARCADIS) ............................................. $12, 900. 00 Utility Coordination(ARCADIS)............................................................................... $1, 600. 00 Permitting (ARCADIS).............................................................................................. $3, 950. 00 Design Survey (ARCADIS) ..................................................................................... $47,464. 00 Landscapingand Irrigation Plans ......................................................................... $28,560. 00 (Wayne Villavaso Landscape Architecture) BridgePlans ............................................................................................................. $23,510. 52 (Bridge Design Associates) Geotechnical Engineering....................................................................................... $42,578. 00 (Tierra) LightingPlans .......................................................................................................... $25, 000. 00 (Techno Engineering) PublicWorkshop ........................................................................................................ $4,480. 00 TOTAL PROFESSIONAL SERVICES .............................................................. $434,592. 52 ALLOWANCES Utility Locating Services (Ground Hound) ............................................................ $17, 000. 00 (40 test holes @$375. 00 per hole and 5 days of MOT @ $350/day) Sketch and Legal Descriptions (ARCADIS) .......................................................... $20, 000. 00 ($375. 00 per parcel) Page 9 of 16 F Tublic Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06 .doc SECTION VI - ADDITIONAL WORK In the event changes are requested by the COUNTY to the contract plans after said plans have been approved and accepted by the COUNTY and upon the issuance of a work order for said additional work by the Director of the Public Works Department, said additional work may commence in accordance with the fee schedule included in the work order. SECTION VII - PARTIAL PAYMENTS The COUNTY shall make monthly partial payments to the ENGINEER based upon a percent complete of lump sum components and actual effort on hourly components as identified in this Agreement. Payment shall be made pursuant to the Florida Prompt Payment Act, Florida Statute 218 . 70 et seq. SECTION VIII - EXTRA WORK In the event extra work is necessary by the ENGINEER due to a change in scope of the project, such work shall be the subject of a supplemental Work Order approved by the Board of County Commissioners. The work shall be completed in accordance with the following rate schedule: Project Engineer Manager................................................................... $140. 00 ProjectEngineer..................................................................................... $115. 00 SeniorCARD Operator............................................................................ $ 75. 00 SurveyProject Manager......................................................................... $110. 00 ProfessionalSurveyor............................................................................... $90. 00 SurveyCADD Tech .................................................................................. $65. 00 3 Man Field Crew................................................................................... $135. 00 SECTION IX - RIGHT OF DECISIONS All services shall be performed by the ENGINEER to the satisfaction of the Director of the Public Works Department who shall decide all questions, difficulties, and disputes of whatever nature which may arise under or by reason of this Agreement and according to the prosecution and fulfillment of the service hereunder, and the character, quality, amount and value thereof, and the Director's decision upon all claims questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. The Director of the Public Works Department shall review adjustments of compensation and contract time because of any major changes in the work that might become necessary or be deemed desirable as the work progresses. In the event that the ENGINEER does not concur in the judgment of the Director of the Public Works Department as to any decisions made by him he shall present his written objections to the County Administrator; and the Public Works Director and the ENGINEER shall abide by the decision of the County Administrator of Indian River County, unless the decision is clearly arbitrary or unreasonable. Page 10 of 16 F:\Public Works\Capital Projects43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06 . doc SECTION X - OWNERSHIP AND REUSE OF DOCUMENTS A. Ownership All reports, tracings, plans, specifications, field books, survey information, maps, contract documents, and other data developed by the ENGINEER for the purpose of this Agreement shall become the property of the COUNTY and shall be made available by the ENGINEER at any time upon request of the COUNTY. When all work contemplated under this Agreement is complete, all of the above data shall be delivered to the Director of the Public Works Department. B . Reuse of Documents All documents, including but not limited to drawings and specifications, prepared by the ENGINEER pursuant to this Agreement are related exclusively to the services described herein. They are not intended or represented to be suitable for reuse by the COUNTY or others on extensions of this project or on any other project. Any such utilization or adaptation will entitle the ENGINEER to further compensation at rates to be agreed upon by the COUNTY and the ENGINEER. The ENGINEER shall not be held liable for any reuse of the Documents and shall not be held liable for any modifications made to the documents by others. SECTION XI - NOTICES Any notices, reports or other written communications from the ENGINEER to the COUNTY shall be considered delivered when posted by certified mail or delivered in person to the Director of the Public Works Department. Any notices, reports or other communications from the COUNTY to the ENGINEER shall be considered delivered when posted by certified mail to the ENGINEER at the last address left on file with the COUNTY or delivered in person to said ENGINEER or his authorized representative. In person deliveries shall be evident by signed receipts. SECTION XII - TERMINATION The obligation to provide further services under this Agreement may be terminated by either party upon seven (7) days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. The County may, for public convenience, terminate this contract at any time provided 90 days written notice is given to the ENGINEER. In the event of any terminations, the ENGINEER will be paid for all services rendered to the date of termination, all expenses subject to reimbursement hereunder, and other reasonable expenses incurred by the ENGINEER as a result of such termination. SECTION XIII - AUDIT RIGHTS The COUNTY reserves the right to audit the records of the ENGINEER related to this Agreement at any time during the prosecution of the work included herein and for a period of one year after final payment is made. Page 11 of 16 G:\Admin\Marketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc SECTION XIV - SUBLETTING The ENGINEER shall not sublet, assign, or transfer any work under this Agreement without the written consent of the COUNTY. When applicable and upon receipt of such consent in writing, the ENGINEER shall cause the names of the engineering and surveying firms responsible for the major portions of each separate specialty of the work to be inserted on the reports or other data. SECTION XV - WARRANTY The ENGINEER warrants that he has not employed or retained any company or person other than bona fide employee working solely for the ENGINEER or subconsultant to solicit or secure this contract and that he has not paid or agreed to pay any company or person other than a bona fide employee working solely for the ENGINEER any fee, commission, percentage fee, gifts or any other considerations, contingent upon or resulting from the award or making of this contract. For breach violation of this warranty, the COUNTY shall have the right to annul this contract without liability. SECTION XVI - DURATION OF AGREEMENT This Agreement shall remain in full force and effect for a period of four years after the date of execution hereof or until completion of all project phases as specified by the Public Works Director, whichever occurs first, or unless otherwise terminated by mutual consent of the parties hereto or pursuant to Section XII of this AGREEMENT. SECTION XVII - INSURANCE AND INDEMNIFICATION During the performance of the work covered by this AGREEMENT, the ENGINEER shall provide the COUNTY with evidence that the ENGINEER has obtained and maintains the insurance listed below: A. ENGINEER shall procure and maintain for the duration of the AGREEMENT, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the ENGINEER, his agents, representatives, employees, and in accordance with subclause H, subconsultants. The cost of such insurance shall be included in the ENGINEER'S fee. B. Minimum Scope of Insurance I . Worker's Compensation as required by the State of Florida. 2. General Liability $ 1 ,000,000 combined single limit per accident for bodily injury and property damage. COUNTY shall be an additional insured. 3 . Auto Liability $ 1 ,000,000 combined single limit per accident for bodily injury and property damage for owned and non-owned vehicles. 4 . Professional Liability Insurance providing coverage for negligent acts, errors, or omissions committed by ENGINEER with a limit of 5500,000 per claim/ annual aggregate. Page 12 of 16 G:`'.Admin`.Marketing\Proposals',.WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06. doc iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillilillillillillillillilliillillillilI C. ENGINEER'S applicable insurance coverage shall be primary. D. All above insurance policies shall be placed with insurers with a Best's rating of no less than A VII. The insurer chosen shall also be licensed to do business in Florida. E. The insurance policies procured, other than professional liability, shall be occurrence forms, not claims made policies. Professional liability shall be on a claims made basis. F. The insurance companies chosen shall provide certificates of insurance prior to signing of contracts to the Indian River County Risk Management Department. G. The insurance companies selected shall send written verification to the Indian River County Risk Management Department that they will provide 30 days written notice to the Indian River County Department of Risk Management of its intent to cancel or terminate said policies of insurance. H. ENGINEER shall either include each subconsultant as insured under its policies or shall furnish separate certificates and endorsements for each subconsultant. All coverages for subconsultants shall be subject to all of the requirements stated herein. I. Notwithstanding the provisions of s.725 .06, if a design professional provides professional services to or for a public agency, the agency may require in a professional services contract with the design professional that the design professional indemnify and hold harmless the agency, and its officers and employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys ' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the design professional and other persons employed or utilized by the design professional in the performance of the contract. Page 13 of 16 G :\Admin\Marketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc SECTION XVIII - ENTIRETY OF AGREEMENT This writing embodies the entire AGREEMENT and understanding between the parties hereto, and there are no other agreements and understandings, oral or written, with reference to the subject matter hereof that are not merged herein and superseded hereby. No alteration, change, or modification of the terms of this Agreement shall be valid unless made in writing and signed by both parties hereto. This AGREEMENT, regardless of where executed, shall be governed by and construed according to the laws of the State of Florida. IN WITNESS WHEREOF the parties hereto have executed these presents this 12th day of September 2006. ARCADIS G & M, INC, INDIAN RIVEM OUNTY, FLORIDA 2081 Vista Parkway West Palm Beach, Fl. 33411 Paul H . Stirm Arthuf 'R TFeuber airm n Board ofCaupty- Cgrt P•issioners WITNESSED BY : Approved by BCC 09 - 12 - 2006 Attest: / Jeffrey K. Barton, Clerk of Circuit Court All l 7 By: County Attorney Deputy Clerk Approved as to Form and Legal Sufficiency aj J srtyn A. gird, Administrator Page 14 of 16 G: \Admin'Marketing'\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc EXHIBIT "A" INDIAN RIVER COUNTY RIGHT OF WAY MAP CHECKLIST All Right-of-way projects shall adhere to Chapter 177 & 472, F. S. and Chapter 61GI7, F.A.C. as minimum and be certified as such. R/W Maps shall be prepared/submitted in the form of a certified Map with all applicable certifications and criteria met. 1 . Cover sheet/Key sheet . 2 . Survey notes and report sheet (As applicable) 3 . Survey Control sheet (As applicable and or necessary) 4 . Subsequent R/W map sheets. 5 . Supply a Box or area for county acceptance and/or certification. 6. Title Box of each sheet must contain : a. County b . State Road Number c . Designed, drawn and checked by (use names or initials) & date d. Scale e. Field Book References f. Sheet Numbers to be in numerical order ( 1 , 2, 3 , 4, etc .) NOT (1 , 1A, 1B, 2, etc.) 7 . Any notes necessary to set out the type and/or purpose of the map shall be shown. 8 . Show pertinent dimensions and bearings in the following fashion as the case may be : a. Plat — (P) b. Computed — (C) c . Field — (F) d. Deed (D) 9. Table of Ownerships shall show : a. Parcel Number b . Owners Name c. Recording Data 10. Show stations and offsets to all Right of Way Breaks. 11 . Show monumented baselines and all references thereto. 12 . Verify that computed distances and bearings are supported by field measurements. 13 . Verify and monument significant elements of Baseline alignment shown. (i .e. curves, bearings and P .I. Stations) 14. Ensure that significant elements of all curves are shown and are correct. Also show curve data on all sheets where they appear. 15 . Begin and End R/W Project with Stations. 16 . Stationing in field minimum 500 ' beyond beginning and ending of project. 17 . Baseline (equate to intersecting State or County Jobs by Station and job number when available) as available . Page 15 of 16 G:\Admin\Marketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06 . doc M . Projects shall be in NAD83/99 (Or current Datum as per NGS) State plane coordinate system and bearings reference shall be shown and must be clearly stated. Values shall be place on key baseline monumentation. 19 . County/State lines 20. Section 21 . Township 22 . Range 23 . Government Lots, Grants, etc . 24. Sections and '/4 Sections (lines & corners) . Certified Corner reports of all Section/ l /4 corners used in the course of survey shall be completed and/or updated. 25 . City Limits by Name & Symbol; Name of City, if job entirely within city limits but does not cross- city limits. 26 . Land and Subdivision Ties (angles and/or, bearings & distances) 27 . Subdivision name and limits 28 . Plat Book and page (County) 29. Lots and Blocks (key map — blocks only) 30. Lot and Street dimensions (plat or document of record) . 31 . Show all original plat and R/W lines of record, if different from present time, with dashed lines 32 . Show/plot all Murphy Reservations and/or release lines (including document of record) via graphic or dimension which ever is obtainable. 33 . Show names of subdivision streets, plat book and page recording — also, show Lot and Block number and Dimensions, Exceptions, Easements, and Vacated portions. 34. When property lines break the Right of Way on curve, show tangent bearings or chord bearings. 35 . Show any replat of a subdivision — show old subdivision when necessary to clear up former acquisition or old title references — use system of dashed lines, dotted figures, etc . , with ties shown and name and plat book reference indicated 36 . Stations and Angle Ties to ALL Existing Major and Minor Side Streets (Public Road R/W) as surveyed and/or calculated. 37 . Show field located P . R. M. /major property corner or parcel ties by station/offset to baseline/control line. 38 . Current Street Names 39. Any buildings within 25 feet of proposed R/W line shall be dimensioned to R/W line. If proposed R/W line is unknown, obtain buildings within +/- 100 ' of existing R/W. Locations of buildings and large structures can be obtained from field and/or photographic / planimetric methods, note shall be placed on plan as to origin. 40. Show and identify all easements on Detail Maps by width, use and ownership (where applicable) . U:\ECD\Manpower\standard I.R.C. Right-of-Way checklist 04.doc Page 16 of 16 G:\Adrro\Marketing\Proposals\WPB\2006\43rd Avenue Arcadis Agrement 8- 11 -06.doc Board of County Commissioners 4 1840 25th Street Y Vero Beach, Florida 32960 * Telephone: (772) 567-8000 �LORI OQ' FAX. 772-778-9391 ADDENDUM TO: WORK ORDER NO. 1 FOR PROFESSIONAL SURVEYING SERVICES AGREEMENT FOR SURVEYING AND MAPPING SERVICES WITH ARCADIS G& M, Inc. Formally (LAWSON, NOBLE & WEBB , INC .) 43"d Avenue Right-of-Way project. Oslo Road to 81h Street. Additional Services - Aerial Photography and Planimetrics. This ADDENDUM to Work Order No . 1 is in accordance with the previous AGREEMENT dated April 16 , 2002 , between ARCADIS G & M , Inc . (SURVEYOR) and Indian River County (COUNTY) . This ADDENDUM Work Order No . 1 amends the agreement as follows : SECTION I — PROJECT LIMITS This addendum to Work Order No . 1 is for providing all related services for the preparation and delivery of AERIAL PHOTOGRAMITRY and PLANIMENTRICS for the length of the particular project corridor of 43rd Avenue from Oslo Road (91h Street SW) to 8th Street. SECTION II - SCOPE OF SERVICES/ TIME FOR COMPLETION The scope of services and time for completion shall be in it' s entirety as defined in the attached project understanding and scope of services Exhibit "A" . SECTION III — COMPENSATION The COUNTY agrees to pay , and the SURVEYOR agrees to accept , a lump sum fee for services rendered according to all the items as defined in Sections I , II , III of 1 this ADDENDUM to Work Order No . 1 , a Lump Sum of $ 11 , 690 . 00 This ADDENDUM includes approved sub-consultant Photogrammetry services with Southern Resource Mapping , Inc . These services and payments are the complete responsibility of ARCADIS . The COUNTY shall not incur any responsibility or liability for the Sub-Consultant services . I C:\Documents and Setongs\chess.ARCADIS-US\Lmal Settings\Temporary lntemet Fi1es\0LK2E\0138 WO No I ADDENDUM ARCADIS (LNW) 8-22-06 mob.doc PAGE TWO Addendum to Work Order No. 1 ARCADIS Survey Consultant — 43R0 AVE Oslo-8' Street, Aerial/Planimetrics Project August 22, 2006 All invoicing shall be supported with documentation (Man hours) of time and materials spent and the following information prior to payments: invoices shall include the work order, contract project number, invoice number related to this work order, original contract amount, current billing amount and retainage amounts. The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the previous AGREEMENT shall remain in full force and effect , and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 5th day of September 2006 . OWNER ARCADIS G &M , Inc . BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA ( ignature) (Signature) Ardw F011subanIler p Chairmari< Mt ctY#r.L & (Printed-ndme and title) (Printed name and title) Approved by ; BCC Sept egf3er_ 5 ,'' 2006 ATTEST: Witnessed by: ARCADIS . Jeffrey K. Barton, Clerk of Circuit Court Deputy Clerk rinted name) Approved as to Form and Legal S Sufficiency: t •. illiam G. Collins II, County Attorney Q LIl Jeph A. Baird, County Administrator ( ached Scope of services Exhibit Al 2 C VDocuments and etungs\mkolodziejczyk\Local ettings\Temporary Internet FilesV0LK7EV0138 WO No 1 ADDENDUM ARCADIS (LNW ) 8-22-06 mob.doc ARCADIS Infrastructure, environment, facilities ARCADIS G&M , Inc. 590 Northwest Peacock EXHIBIT "A" Boulevard Suite 9 Port St. Lucie Florida 34986 Mr. Michael O ' Brien, P.S .M . Tel 772 878 1700 Indian River County Surveyor Fax 772 878 1802 1840 25 " Street www.arcadis-us.com Vero Beach, FL 32960 Land Resources Subleor 43rd Avenue right of way maps Indian River County Work Order # 1 Project Specific No. 0138 Revision 1 Date' August 8, 2006 Dear Mr. O ' Brien : Contact. ARCADIS G&M, Inc. ("ARCADIS") is pleased to submit this revised proposal to Michael Kolodziejczyk Indian River County ("COUNTY") for professional surveying and mapping services. Phone: PROJECT UNDERSTANDING 772-878- 1700 It is our understanding that that the COUNTY wishes to add aerial planimetric Email mapping to the R-O-W maps. mtk@arcadis-us .com The COUNTY is requesting professional surveying and mapping services in support Ouf fef 9 g P Y g PP g PP B649 of Planning and Engineering Design. The primary corridor limits for 43", Avenue are from Oslo Road to 8°i Street, for an overall project length of approximately 10,680 feet. The width of the primary corridor for planimetric mapping is 200 feet. SCOPE Southern Resource Mapping, Inc . will provide the aerials and planimetric mapping as per their scope attached. ARCADIS will provide the horizontal and vertical control for the mapping . It is understood that the planimetric mapping can be, and may be, utilized for roadway design. DELIVERABLES ARCADIS will provide six (6) signed and sealed hard copy R-O-W maps and digital files in Auto Cad version 2005 or later electronic format based upon Florida state plane coordinates. P\600-698\B6 OCS\DO .OUTG0ING\IRC Surveyor Lr 7 25-Mdoc Imagine die resu`T ARCADIS TIME OF COMPLETION Arcadis will complete all field/office survey tasks and submit the project control survey to SRM within 30 days from notice to proceed. Final R-O-W maps will be delivered within 6 weeks of receipt of aerial mapping. Anticipated time for final completion and submittals to Indian River County is 120 days from notice to proceed. Indian River County will be notified when the control survey has been submitted to SRM and of any delays or un-foreseen events that may modify the anticipated schedule . FEESCHEDULE Aerial Mapping $9, 190.00 Horizontal & Vertical Control $2,500.00 We look forward to continue working with you Sincerely, ARCADIS G&M, Inc . Michael T. Kolodziejczyk, PLS Associate Vice President P-\600-699\D6 DOCS\DOCS\OUTGOING'dRC Surveyor Ur 7-25-06 do Page: 2/2 Southern Resource Mapping , Inc . EXHIBIT A August 3, 2006 Mr. Mike Kolodziejczyk, P . S . M . Arcadis 590 N .W . Peacock Road Suite 9 Port St . Lucie , FL 34986 Subject: Aerial Photography and Digital Mapping of 43rd Avenue from Oslo Road to Glendale Road , Vero Beach , FL SRM Estimate Number: 06-0087R1 Dear Mike , Southern Resource Mapping (SRM) is pleased to submit this proposal to Arcadis to provide new aerial photography and digital mapping of the above referenced project. The north-south corridor is centered on 43`d Avenue starting at Oslo Road on the south to Glendale Road on the north . Mapping will extend 80' north and south of these intersections . Mapping bandwidth will be 200' centered on 43'd Avenue . Total project length is 10,680 lineal feet. SCOPE OF WORK Aerial Photography SRM will obtain new color vertical photography of the project corridor with a precision calibrated aerial camera equipped with a 6" focal length lens cone , forward Motion Compensation ( FMC) and a gyro-stabilized suspension mount. The photography will be flown at 1500' AMT providing a negative scale of V=250' . Forward overlap on all photography will be 60%. One set of 9 ' x 9" contact prints will be produced for SRM's internal production use . Ground Control Surveys The horizontal and vertical ground control locations required for the mapping are shown with blue dots on the 5 images 43- 1 thru 43-5 sent to you with this proposal . All points will be post identified on the new photography or if you prefer targets can be set. SRM requests the control survey data be accompanied by a signed and sealed report certified to Florida Minimum Technical Standards under Chapter 61G17-6. The control information and datum supplied will be the basis for controlling the photography for the digital mapping . It is our understanding that Arcadis will be responsible for supplying the control survey information to SRM at no charge. 701 N. Oceanshore Blvd . , Flagler Beach , FL 32136 voice 386.439.4848 fax 386.439 . 1553 web www.mapres .com Page 2 of 3 SRM Est. 06-0087R1 August 3, 2006 Analytical Triangulation SRM will density and supplement the ground control surveys by performing analytical triangulation of the new photography using our Wild BC-2 instrument , Wild PUG 4 point transfer device and JFK software . Digital Mapping Using our first order analytical stereo plotting stations , SRM will provide digital mapping of the project corridors at 1 "=40' . Visible planimetric features collected for the mapping corridor will include but not be limited to the following : Roof outlines of buildings and other major structures , edge of pavement for all paved surfaces including curbs, parking lots , drives and shoulders , dirt roads and drives , trails , sidewalks , concrete pads , tanks , railroads , fences and walls , athletic fields , signs , utility poles , manholes , CATV and telephone boxes , storm drainage structures , water valves , flagpoles , meters , fire hydrants , and visible indications of other utility systems , shorelines , ditches , streams, trees , bridges and other features . Only major paint striping such as stop bars and pedestrian crosswalks will be collected . A CAD Edit will be performed to verify and confirm the database contents and layering structure. To assure completeness a final quality control review will be performed by our Florida Registered Surveyor and Mapper. Translation and delivery of the database will be on CD ROM in AutoCAD version 2000 . Rectified Digital Images The color photography will be rectified to the planimetric features collected on the ground , the control points and the analytical triangulation points . These images will be mosaiced into one image providing coverage of the project corridor plus and an additional 100' on each side . For those portions rectified past the mapping limits , only the control and analytical triangulation points will be utilized in the rectification process . All will be delivered on CD ROM in .tif format. Scale will be 1 "=40' with a .2' pixel size . Accuracy The mapping will meet or exceed the requirements of the State of Florida Minimum Technical Standards set forth in Chapter 61G17-6. A final signed and sealed map report will be sent after the mapping has been completed . Professional Fees • New color aerial photography at 1 "=250' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2 ,275 .00 • Analytical Triangulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $845. 00 • Digital Planimetric Mapping at 1 "=40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3 , 700 . 00 • CAD Edit and Translation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $600 .00 • Rectified Digital Images . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 1 , 770. 00 $9, 190. 00 Page 3 of 3 SRM Est . 06-0087R1 August 3 , 2006 Delivery Schedule The digital mapping will be delivered 4 weeks after receipt of acceptable ground control surveys , or completion of the aerial photography , whichever is the later . SRM looks forward to working with the Arcadis on this project. If this proposal letter is acceptable , please have an authorized representative sign the acceptance block below. If it is not, please inform SRM of your desired revisions so that a revised proposal may be presented to you . Payment Terms SRM will invoice monthly in accordance with percent complete . Payment terms are 30 days . SRM reserves the right to charge 1 . 5% per month ( 18% per annum ) on all past due accounts . Authorization If this proposal letter is acceptable, please have an authorized representative sign the acceptance block below. If it is not , please inform SRM of your desired revisions so that a revised proposal may be presented to you . Sincerely, Southern Resource Mapping Joseph Ricke , PSM FIRM NAME AND TITLE SIGNATURE DATE