Loading...
HomeMy WebLinkAbout2007-020 INDIAN RIVER COUNTY, FLORIDA MEMORANDUM TO : Joseph A. Baird , County Administrator ; THROUGH : James W. Davis , P. E. , Public Works Direc AND Christopher J . Kafer, Jr. , P. E . , County Engine r FROM : Michael D. Nixon , P . E. , Design Professional Engineer InIV SUBJECT: Approval Work Order No. 1 (Engineering) with CTI-Construction Testing & Inspection , Inc. Providing Professional Geotechnical Services In Accordance with the Annual Geotechnical Services Contract No . 0534 4th Street/Cooch Ditch Bridge Replacement (Proj . No . 0209) 11th Street SW Paving and Drainage Project (Proj . No . 9321 ) DATE: January 8, 2007 DESCRIPTION AND CONDITIONS On October 4, 2005 the Board of County Commissioners approved an annual agreement for Professional Geotechnical Services , with CTI -Construction Testing & Inspection , Inc. for various services including but not limited to Field and Laboratory Construction Materials Testing in Indian River County under IRC Project No. 0534. The purpose of this Work Order is to provide testing services for the construction of the subject projects. CTI-Construction Testing & Inspection , Inc. submitted a proposal outlined in the attached Work Order No. 1 , (Engineering) and scope of work (Exhibit A) for these projects for a fee not to exceed $ 8 , 540 . 54. RECOMMENDATION Staff recommends approval of the attached Work Order No. 1 (Engineering) authorizing the above-mentioned project as outlined in the attached scope of services and requests the Board to authorize the Chairman to execute the attached Work Order on their behalf for fee not-to- exceed $ 83540. 54. FAEngineering\Capital Projects10209-0th Street Bridge Over Cooch Ditch10209 BCC Geotech Work Order 1 01 -03-07-mn.doc PAGE TWO BCC Agenda Item for Michael D. Nixon , P. E . January 8, 2007 FUNDING Funding is budgeted and available from Account Number 31521441 -066510-03029. ATTACHMENTS 1 . Work Order No. 1 to CTI-Construction Testing & Inspection , Inc. providing Professional Geotechnical Services for the 4th Street/Cooch Ditch Bridge Replacement and 111n Street SW Paving and Drainage Project. 2. Exhibit A — Scope of Services/Task Description 3. Proposal Project Acceptance DISTRIBUTION 1 . Christopher J . Kafer, Jr. , P. E . County Engineer 2. Michael Mezzina, Civil Engineer 3. Keith Slone, CTI , Branch Manager 4. William K. DeBraal, Assistant County Attorney APPROVED AGENDA ITEM : FOR: January 23, 2007 Indian River County Approved Date Administration BY: . % seph Baird, County Administrator legal ,. �7 I Budget I -7 Risk Management Public Works Engineering Division F:1Engineering%Capital Projects\02094th Street Bridge Over Cooch Ditch\0209 BCC Geotech Work Order 101 -03-07-mn.doc Page 1 of Board of County Commissioners 1810 25th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX: (772)-778-9391 Field and Laboratory Quality Control (QC) for 4th Street/Cooch Ditch Bridge Replacement 11th Street SW Paving & Drainage Project IRC Project No. 0209 & 9321 WORK ORDER NO. 1 ( Engineering Division ) FOR FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534 WITH CTI — CONSTRUCTION TESTING & INSPECTION , INC . All services performed under this contract shall be supervised and certified by a licensed Professional Engineer ( PE) registered with the State of Florida and staff employed directly with your firm . Scope of Services All work shall be performed on a unit price basis in accordance with the attached Scope of Services dated January 2 , 2007 and shall comply with Standards enumerated in the RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO. 0534 WITH CTI , INC . Effective Date : October 1 , 2006 . Minimum Specification Requirements as follows: Roadway Construction • In-place moisture density testing of embankment fill , pipe backfill , stabilized sub grade , base course, and curb pads by Nuclear Method (AASHTO-T238) . • Laboratory testing of soils and aggregates including Proctors , Limerock Bearing Ratio (LBR) , soil classification , carbonate content (base) , and other such specified QC tests . • Standard laboratory testing of SP 9 . 5, SP 12 . 5 asphalt • Standard laboratory testing of concrete flume , curbing , sidewalk and endwalls . • Preparation and issuance of engineering reports presenting the test results and their compliance with the project specifications . All work shall also comply with the current Florida Minimum Technical Standards. COMPENSATION . The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept , a fee for services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A" Fee Schedule and Man Hours. F:Tngineering\Capital Projects\0209-4th Street Bridge Over Conch Ditch\0201 BCC Agenda WO# I CTI-01 -04-07.doc Page 2 of 2 WO $ 1 4" StreeVCooch Ditch Bridge & 11th Street SW Paving & Drainage IRC Project Nos. 0209 & 9321 A Not-to-Exceed Amount of: $8 , 540 . 54 to be paid on a unit price basis for actual work performed in accordance with the schedule of services and fees set forth in Exhibit A of RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO. 0534 WITH CTI , INC . Effective Date : October 1 , 2006 . TIME FOR COMPLETION This Work Order No. 1 shall run concurrently with the construction work for the 4T" STREET(COOCH DITCH BRIDGE 11TH STREET SW PAVING & DRAINAGE IRC Bid No . 2006049 IRC Project Nos . 0209 & 9321 IN WITNESS HEREOF the parties hereto have executed these presents This 23rd day of January , 2007 . OWNER CTI - CONSTRUCTION, TESTING & BOARD OF COUNTYCQMMSIONERS INSPECTION, INC. INDIANRIVFR COUNTYJLORIDA (Sr ' a e) � (Signature) - = Keith Sloane; Branelf Iviaoager _._-. - (Printed naMe. and title) (Printed name and title) Approved by BCC 01 - 23 - 2007 ATTEST: Jeffrey K. Barton, Clerk of Circuit Court Witnessed by: Deputy Clerk ( rintelname) Il Va . t� l I � i � Approved as to FormWLealiency: j ; illiam G. Co linsll, County Attorney ) . Joseph A. Bllklrd, County Administra r F :Tngineering\Capital Projects\02094th Street Bridge Over Comb Ditch\0201 BCC Agenda WON I CTI-01 -04-07.doc SCOPE OF SERVICES 01-02-07 " A Materials Sampling And Testing Cost Estimate 4th Street / Coach Ditch County Project # 0209 Bridge Replacement I- EARTHWORK maim 030% MaRaw _ 120-6-1 Embankment 574 CY 1 per soil type 2 AASHTO T-99 $95.42 25 $39.50 $190.84 $987.50 2 AASHTO M-145 $234.00 $468.00 2 AASHTO T-87 $26.06 $52. 12 285-714 Limerock Base 1174 SY 1 per soil type 1 AASHTO T-180 $95.42 10 $39.50 $95.42 $395.00 1 AASHTO M-145 $234.00 $234.00 1 AASHTO T-87 $26.06 $26.06 tal ToEstimated 1 066Cost - $ .44 $1 ,382.50 Working Hours Per Day - 8.00 hrs./day II- ASPHALT a .e 334-1 -113 SP 9.5 TL-C 61 1 per 1000 Tons 1 T 308 $105.47 3 $50.50 $105.47 $151 .50 1 FM 1-T 209 . $90.00 $90.00 334-1 -213 SP 12.5 TL-C 92 1 per 1000 Tons 1 T 308 $105.47 3 $50.50 $105.47 $151 .50 1 FM 1 -T 209 $90.00 $90.00 Total Estimated Cost - $390.94 $303.00 Working Hours Per Day - 8.00 hrs./day EXHIBIT "A " Materials Sampling And Testing Cost Estimate 4th Street / Cooch Ditch County Project # 0209 Bridge Replacement II- CONCRETE .. . . ,., , 1. _ ... . ow $39.50 G $14.00 i $118.50 522-1 Concrete Sidewalk 123 SY 1 ASTM C-39 $14.00 3 ASTM C-173 $28.67 1 $28.67 400-1 Class I concrete 6 CY 1 per 100 CY per 1 ASTM C-39 $14.00 3 $39.50 $14.00 $118.50 day per mix ASTM C-173 $28.67 1 $28.67 2 ASTM C-39 $14.00 8 $39.50 400-4-2 Class IV Concrete EW 52 CY ASTM C-173 $28.67 2 $57.34 Total Estimated Cost - $114.68 $28.00 $237.00 Working Hours Per Day - 8.00 hrs./day CTI - Construction Testing & Inspection, Inc. 3 Cone. Cylinders each test SUMMARY: Earthwork - $2,448.94 Asphalt - $693.94 Concrete - $379.68 Hours are estimated, actual site hours will be billed from field reports and are a portal to portal charge. Estimated Contract Cost- $3,522.56 SCOPE OF SERVICES 01-02-07 At Materials Sampling And TestingCost Estimate p 11th Street SW r� County Project # 9321 Between 17th Ave. SW $ 9th Ct. SW I- iEARTHWORK � f 120-6 Embankment LS 1 per soil type 2 AASHTO T-99 $95.42 25 $39.50 $190.84 $987.50 2 AASHTO M-145 $234.00 $468.00 2 AASHTO T-87 $26.06 $52.12 160-4 Type B Stabilization 14,020 SY 1 per soil type 1 FM 5-515 $275.47 12 $39.50 $275.47 $474.00 1 FM 1 -T 246 $43.44 $43.44 1 AASHTO T-87 $26.06 $26.06 1 285-7-06 Limerock Base 11 ,800 SY 1 per soil type 1 AASHTO T-180 $95.42 12 $39.50 $95.42 $474.00 1 FM1 -T 246 $43.44 $43.44 1 AASHTO T-87 $26.06 $26.06 Total Estimated Cost - $1 ,220.85 $1 ,935.50 Working Hours Per Day - 8.00 hrs./day II- ASPHALT afi 11 11 0a O ai 334-1 SP 9.5 654 1 per 1000 Tons 2 FM 5-563 $105.47 6 $50.50 $210.94 $303.00 2 FM 1-T209 $90.00 $180.00 Total Estimated Cost - $390.94 $303.00 * Working Hours Per Day - 8.00 hrs./day EXHIBIT "A Materials Sampling And Testing Cost Estimate 11 th Street SW County Project # 9321 Between 17th Ave. SW & 9th Ct. SW II- CONCRETE v t 520-1 -8 Concrete Flume 12 3 ASTM C-39 $14.00 10 $39.50 $42.00 $395.00 1 per 100 CY per ASTM C-173 $28.67 3 $86.01 520-1 -10 Concrete Curb & Cutter 7,730 LF day per mix 4 ASTM C-39 $14.00 12 $39.50 $56.00 $474.00 ASTM C173 $28.67 4 $39.50 $114.68 Total Estimated Cost - $200.69 $98.00 $869.00 Working Hours Per Day - 8.00 hrs./day CTI - Construction Testing & Inspection, Inc. 3 Cone. Cylinders each test SUMMARY: Earthwork - $3,156.35 Asphalt - $693.94 Concrete - $1p167.69 Hours are estimated, actual site hours will be billed from field reports and are a portal to portal charge. Estimated Contract Cost- $5,017.98 � gIVER Board of County Commissioners A z 1840 25th Street Z Vero Beach, Florida 32960 * Telephone: (772) 567-8000 FLORI�P FAX: 772-778-9391 RENEWAL OF PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES IRC PROJECT NO . 0534 This shall serve as mutual consent to extend the Agreement between Indian River County and CTI-Construction Testing . & Inspection, Inc. for Professional Geotechnical Services from October 1 , 2006 to September 30, 2007 . All provisions of the original agreement, approved November 2 , 2004 shall remain in full force and effect. The .fee schedule for October 1 , 2006 through September 30, 2007 shall remain in effect from October 1 , 2006 through September 30, 2007 as stated in "Exhibit A" (attached) . CTI- CONSTRUCTION TESTING & INDIAN RIVER COUNTY, FLORIDA INSPECTION, INC . Keith Sloane Ss.Ai: ` ;` Arthur R. Neuberger, Chair an, TITLE : ifiLGtYAi%,P - ApprovedbyBCC October 3 , 2006 " �l Attest: R� 4 ftv' Jeffrey K. Barton, Clerk of Circuit Court P William G. Collins,E, County Attorney Approved.as "to Form and Legal Sufficiency YnyJopthA. Bird Administrator FAEngineering\Capital Projects10534 Annual Geotechnical Service Contrac00534 Agreement Renewal-CTI Const&Testing 06-07.doc EV A111B11 I Constructi®n Testing - pec ®n, -'Inc . `7 `7a 1717 0 3 9 l-S; 0 17 Ak S- 100 PASNIO NIB � . Men, s e w V 13 7 Laboratory Services AUG I d 1000 ® _ Prices good through 9-30-07 Revised Price List - Indian River County Proposal No. 70tIg6IAN RIVER COUNTY ENGINEERING DIVISION Materials Testing 5011-5 Item # Test # Description Unit Price Notes 7 .1 ASTM C-109 Compressive Strength Cubes $ 14.00/ea 7.2 ASTM C-39 Compressive Strength C finders $14.00/ea ASPHALT 7.3 FM 1 -T 24 Testingdrilled cores $16.76 7.4 ASTM C-173 . Air Content of Concrete :$28.67 If additional test is required - ___ 7.6 AASHTO T-11 Amount .finer than #200 $26.06 7.7 FM 1 -T 19 Unit weight and voids $65. 16 CONCRETE 7.9 AASHTO T-27 Sieve analysis $2 80 7.11 . : -AASHTO T-85 S.G & abso coarse 1 $58.63 7.12 FM 1 -T 238 Soil DensityPer Hour FIELD . 7:13 FM 1 -T 246 Sample reduction $43.44 IA15PECTWN - 7.14 FM 1 -T 104 .Soundness of aggregate - $272.99 7 ,29 - FM 5-514 . . Carbonates - $78:18 _ - 7.3 . FM 5- 515 L.B.R. _ $275.47 . CQC SPECIALIST 7.32 AASHTO T-1 80 Modified proctor $95.42 : 7.33 AASHTO T-99 Standard proctor $95.42 - 7:34 AASHTO T,87 Dry prep of soils $26.06 _ - 7.36 AASHTO T-89 Liquid limit $41 .68 7.37 AASHTO T-90 Plasticity index - $36.47 7A . AASHTO T-255 Moisture content, oven .$58.89 _ 7.41 FM 1 -T 267 Organic content, ignition $26. D6 7.43 . . Fly 5-T 550 - pH of solutions . 531 .02 - 7.08 FM 1 -T 21 - Colorimetric (organic) $26.06 - 7.67 ' FM 5-563 Extraction , Oven. method $105.47 - 7DB FM 1-T 245 Marshall Pills min- 3 - $105.47 Includes Stability and Flow TAB ' FM 1 -T 209 . Max. Spec. Gr. rice $90.00 _ 7.66 AASHTO M-14_ Sails Clashcation $234.00- - CorrossiveSeries - ' ".Select _ Backfill $12D.00 Plant Roadway Inspection ( Hourly, including travel) _ 7.1 .1 Asphalt Plant Technician $50.50 7.1 .2 Soils/Concrete Technician - $39.50 I `' __ _ _ _ 7. 1 .3 Asphalt Roadway Technician $50.51) - - 7. 1 :4 Concrete ACI Field Level 11 $6500 Technical Services 7.5 Soils Q.C. Plan - $750.00 7.51 Concrete O.C. Plan - $750.01) Engineering Services (Hourly) 'Q,C . Mona er . $75.00 7.10.2 Professional Engineer $75.00 - 7.10.3 Project Manager $65.00 7 .10.4 - LIMS Data Entry - $45 .00 - ` Never a charge for overtime , mileage . Travel time billed from. portal to portal - Corporate Office : 14003 N .W. 786th Street, Hialeah , Florida 33018 • 305-829 -1820 • Fax: 305-829-8309 • ctilabs . r PERSONNEL CERTIFIED/QUALIFIED BY: CTQP FDOT CMEC ACI NICET LABORATORY ACCREDITATION BY: AASH- I I(1FNRPrI .RY• RTATF rlF Fl ()RIr)A o f I.0 ARMV r.rlRP nF ❑ nir-_ n:ICGcc vAi inercn