HomeMy WebLinkAbout2006-258 ' Page 1 of 2 /
Board of County Commissioners CQDO
1810 25th Street
Vero Beach, Florida 32960
Telephone : (772) 567-8000 FAX: (772)-778-9391
Field and Laboratory Quality Control ( QC)
for
CR512 , PHASE III , CR510
IRC Project No. 9611 & 0001
WORK ORDER NO . 1 ( Engineering Division )
FOR
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534
WITH
DUNKELBERGER ENGINEERING & TESTING , INC .
All services performed under this contract shall be supervised and certified by a licensed
Professional Engineer (PE ) registered with the State of Florida and staff employed directly with
your firm .
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Scope of
Services dated September 23 , 2005 and shall comply with Standards enumerated in the
RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO .
0534 WITH DUNKELBERGER EGINEERING & TESTING , INC. Effective Date: October 1 ,
2005 .
Minimum Specification Requirements as follows:
Roadway Construction
• In-place moisture density testing of embankment fill, pipe backfill , stabilized sub grade ,
base course , and curb pads .
• Laboratory testing of soils and aggregates including Proctors, Limerock Bearing Ratio
(LBR), soil classification , carbonate content ( base), and other such specified QC tests.
• Preparation and issuance of engineering reports presenting the test results and their
compliance with the project specifications .
All work shall also comply with the current Florida Minimum Technical Standards.
COMPENSATION .
The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for
services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A"
Fee Schedule and Man Hours.
Wo# 1
F:\Engineering\Capital Projects\9611 -CR512 Widening\9611 BCC Agenda WO# 1 Dunkelbergef 07- 10-06.doc
w
Page 2 of 2
CR512, PHASE III, CR510
IRC Project Nos. 9611 & 0001
A Not-to-Exceed Amount of: $90,680 . 00 to be paid on a unit price basis for actual work
performed in accordance with the schedule of services and fees set forth in Exhibit A of
RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT, IRC PROJECT NO .
0534 WITH DUNKELBERGER EGINEERING & TESTING . INC. Effective Date : October 1 ,
2005.
TIME FOR COMPLETION
This Work Order No. 1 shall run concurrently with the construction work for the
CR512 , PHASE III , CR510
IRC Bid No. 2006065
IRC Project Nos. 9611 & 0001
IN WITNESS HEREOF the parties hereto have executed these presents
This 18th day of Jul y , 2006 .
OWNER DUNKELBERGER ENGINEERING &
BOARD OF COUNTY COMMONERS TESTING, INC.
INDIAN RIVER COUNTY, FLORIDA
(Signature) _I 9 .. _i) un- kelbes- I--P-.,E .
Chairman
(Printed name and tit e) (Printed name an tit e
ApprovedbyBCC 07 - 18 - 2006
ATTEST �`',h
Jeffrey K Barton„CI Circuit Court Witnessed by:
Deputk Clerk L ' ,$ (Prtn d name)
Ap royetk11 ,
�§ to, Forman @j I'S ffciency:
William G. C Ilins II, County Attorney
� . t
31:1
seph A. akd, County Administrator
F:\Engineering\Capital Projects\9611 -CR 512 Widening\9611 BCC Agenda WO# 1 Dunkelberger 07-10-06.doc
ESTIMATED SCOPE AND BUDGET EXHIBIT
Construction. Observation and Matorlals Testing Services
CR 512 510 Corridor Improvements
Indian River County, Florida
Project Name: CR 512;510 Convict Improvements Dunkclbcrgu EnOinceting &'Testing, Inc..
Indian River Cot nty; Florida 523A NW Enterprise Drive
Client: ladian River County • Engineering Ann: Mike Nfxcin Port St. Ludo, Florida 34986
DET Proposal No: P06-10.3195 (772) 344-9787 FAX (772),343-0404
Date: July. 6, 2006 Contact: David T. Younosbom
ConsfinI7 SMvices VaU Anrount ProvioirVY efuvi .. elcd This lnvoico Comw eted fn Data Romuiiur cn ConVxl
ttamincd services Dry Und Price Amount City, . Amount Qty Amount :Dry Amount Dfy Amounl.
i• riold lospuclion &Testing
A Soil Inspections • Sr. Tectink an 70 tour $49,00 53.430.00 0 50.00 0 50.03 0 $0.00 701 S3.430:00
B: Density Tests
• Embankment. 300 test 520.00 $6,000. 00 0 $0.00 0 $0.00 0 S0.DO ::00 S6,900,0
- Strom Sewer 850 test $20.00 $ 17,000.00 0 SO.00 0 $0,00 0 S0.0 650 ;.$17,600,0
- Snowy SewtY 350 test $20.00 .$7,000.00 0 50.00 0 50:00 0 $0.00 350 $7,000,00
- Wwarrnain 1501 test I 520.00 53,000.00 . 0 Woo 0 50.00 0 - SO.O .150 S3;0O.0
- Curb Pad 200 test $20.00 34.000.001 0 SO.001 0 54:00 0 50.0 - 200 54.000.00
- Stabilized Subgmdc 200 test 520.0 54:000.00 0 $0.00 0 $0.00 0 SO-00 FOO 54:000.00
- Base Rock 20 test $20.00 $4.00.0 '0 SOOo ol SO.00 0 50.00 - 200 ` $4.000.00
- Sidewalk Subgnade 80 test 520.00 $1 .GDO.0 70 50.00 0 $0.00 0 $0.0 80 51;600.00
C. Canaete Testing
- CurD & Sidewa'ks 70 set $70.00 54,900.00 -0 S0.0 0 50:00 0 $0.00 70 54 :900.00
- Ke caps 8 86dge 80 set $70.00 $5,600.00 ' 0 50.00 0 50:00 0 $0,00 nb . WWI) 00
Subtotal S60,530.00 1 $0.00 $0,00 SO-DO $60;530:00
11: Laboratory TeSfing
- Modified Pro= (T- ISO or D=1557) . 30 test $70.0 .$2,1 DO-00 -0 50.00 0 $0.0 0 $0,0 30 52,100.0
- Standard Proctor (T,99.or D-698). 0 lest $70.00 $0.00 0 $0.0 0 $D.0 4 50.0 0 " $0:0
-.Sieve Anays:s (Percent Fines) 30 test $25.0 S750.0 0 50.0 0 $0.0 0 $0.00 30 $750.0
Limerock Bearing Ratio,(L6R) s0 .test 5250.0 - $12;500.00 0 $0.00 0 SO.OD 0 SD.00 50 $ 12,50.0
Florida Being vaue (F(3V) 0 test 520.00 50.00 0 SG.00 . 0 50.0 0 50.00 0 ''SOD0
Subtofai 515,350.0 30.00 .' $0,00 $0.00 $15,350.00
N1; Engineering d
RepoMng
Principal Engineer 40 hour 5120.00 54,800.00 0 $0,00 0 S0:0O 0 SO-001 40 54,800.0 '
Project EngineerrUuelogist 80 hour 585.00 $0,80.00 0 $0.00 0 soed 0 $0.00 1301 56.800.00
Acrd Prcceasot 80 rout S4D:00 53.20.00 50.00 0 $0.00 0 S0.0 n0 $3,200.00
Subtotal $140800.00 So.Uo $0.00 0.0 S14;800.00
TOTAL 590,680:00 SO.001 1 $0. 00 50.00 $90,690.00
umt txca�dcnrn