Loading...
HomeMy WebLinkAbout2005-195aWORK ORDER NUMBER NO. 1 This Work Order Number is entered into as of this 7th day of June 2005, pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of March 15, 2005 ("Agreement"), by and between Indian River County, a political subdivision of the State of Florida ("COUNTY") and Hydromentia, Inc. ("CONSULTANT"). The COUNTY has selected the CONSULTANT to perform the professional services set forth on Attachment 1, attached to this Work Order and made part hereof by this reference. The professional services will be performed by the CONSULTANT for the fee schedule set forth in Attachment 2, attached to this Work Order and made a part hereof by this reference. The CONSULTANT will perform the professional services within the timeframe more particularly set forth in Attachment 3, attached to this Work Order and made a part hereof by this reference, all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT Hydromentia, Inc. i By' �' v Q Title: BOARD OF COUNTY COMMISSIONERS OF INDIAN RIVER COUNTY Thomas 8, LowfheepChairman Attest: JI tartan, Clerk a;Court Bye Deputy Approved: I r\ Baird, County Administrator as to form and legal sufficiency: L Fell, AssistanW& BCC Approved: June 7, 2005 ey 1 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc ATTACHMENT 1 to WORK ORDER NO. 1 System Design and Monitoring Plan 1. GENERAL This Work Order shall be included as an Attachment to the "Continuing Contract Agreement for Professional Services" (" Agreement") dated March 15, 2005, between Indian River County, Florida ("COUNTY") and HydroMentia, Inc. ("Consultant"),and upon execution and delivery of a 66notice4o-proceed" shall become part of the Agreement. It is intended and required that all services described within this Work Order shall be completed and provided in accordance with applicable provisions within the Agreement. Services described within this Work Order shall include those associated with the development of engineering calculations, construction drawings, specifications, contract documents, and system monitoring and quality assurance plans for those components of the proposed Egret Marsh Regional Stormwater Park directly associated with the operations and monitoring of a proposed Managed Aquatic Plant System (MAPS), specifically the Algal Turf Scrubber® (ATSTM) or ("ATSTM Project") as contemplated by the COUNTY, and the general nature of which is described within the document entitled "Indian River Egret Marsh Regional Stormwater Management Facility Project" ("Egret Marsh Project'). Included as part of the Egret Marsh Project document, is a list of project objectives, which are summarized within this Work Order in the subsequent section. These project objectives shall apply to this Work Order In its performance of services as detailed within this Work Order, HydroMentia, Inc. will provide information, including engineering drawings and calculations, that is considered proprietary to Hydromentia. COUNTY agrees to use such information only to evaluate its interest in purchasing from HydroMentia, the installed process known as Algal Turf Scrubber® or ATSTM , for the specific site application, and only the specific site application, as contemplated within this Work Order, 2. PROJECT OBJECTIVES The objectives of the ATSTM Project are as follows: a. Reduce high levels of nitrogen, phosphorous, suspended solids, and other loads (as applicable and practical), from an agricultural basin to the Indian River Lagoon in the vicinity of Vero Beach, Florida. b. Evaluate the ATSTM Managed Aquatic Plant Systems (MAPS) technology for its ability to help meet the Countywide interim goal of 50% pollutant load reduction. 2 R\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc c. Demonstrate the efficacy of one MAPS technology known as an Algal Turf Scrubber® (ATSTM) as an effective structural BMP to citrus growers in the Indian River Farms Water Control District and the public. d. Use an ATSTM to treat the variable flows from a water control district, significantly reducing the land space needs for nutrient removal facilities in a basin that is rapidly changing to urban use with escalating land values. e. Assess the use of an ATSTM to reduce seagrass growth -inhibiting optical parameters, including suspended solids, turbidity, and color. f. Identify beneficial uses for the biomass produced within an ATSTM; to include but not be limited to soil additive, animal feed materials, and biogas production. g. Educate the public about the potential for pollutant load reduction to the IRL using ATSTM for stormwater treatment. 3. SCOPE OF WORK Task 1 • Analysis of Existing Water Quality and Flow Data The Consultant shall collect and compile existing data related to (i) the rates and scheduling of stormwater flows targeted for treatment by the ATSTM Project and (ii) the water quality in terms of those parameters as identified within the Egret Marsh Project document, as listed below: • pH, • dissolved oxygen, • salinity, • temperature, • Total Kjeldahl Nitrogen, • ammonia, • nitrates and nitrites, • total phosphorus, • ortho-phosphorus, • total organic carbon (TOC), • color, • biochemical oxygen demand (BOD), • total suspended solids, • alkalinity, and • pesticide and heavy metal scans (limited). Based upon this information, the Consultant shall develop a family of parameter values to serve as the basis of design, to be detailed as average monthly conditions, and 3 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc general monthly ranges for (i) flow as MGD, (ii) air and water temperatures, (iii) total nitrogen and phosphorus, (iv) color, (v) pH, (vi) conductivity, (vii) TOC or BODS, (viii) total alkalinity, (ix) calcium, iron and magnesium and (x) total suspended solids or turbidity. The Consultant shall prepare and submit to the County, a document based upon this analysis entitled "Basis of Design for Proposed Egret Marsh Regional Stormwater Park Developed from Historical Data." Included in this review shall be reasonable statistical evaluations of existing data, and discussion of rationale for establishing selected values of critical design parameters. Also to be included shall be an assessment of potential agents, which could impair ATSTM performance. Task 2: Pre -Construction Water Quality Monitoring In an effort to validate, to the extent practical, the "Basis of Design" the Consultant shall develop and implement a pre -construction water quality assessment strategy, which shall include collection and subsequent evaluation of five independent 24 hour composite samples from the targeted stormwater source. The scheduling of these sampling events shall be such that the dynamics of water quality changes associated with a sufficiently large storm event can be evaluated. It is envisioned that sampling would include a period representative of a base flow, followed by sequential sampling over a period after the storm event that represents the influx of upgradient stormwater. In addition to the parameters listed as part of Task 1, other potentially relevant environmental features, such as water level and climatic conditions will be recorded, and for at least one sampling event, testing will be completed on those parameters identified within Task 1 as potentially deleterious to the proposed ATSTM facility. Such factors could include, but are not limited to herbicides, heavy metals, and mineral deficiencies. Sampling and testing shall be coordinated with a certified Analytical Laboratory, such as US BioSytsems of Boca Raton, Florida, which is acceptable to the COUNTY, and which has in-place sampling and testing protocols compliant with applicable standards. All sampling and testing will be conducted in full accordance with these protocols. After all pre -construction water quality data has been secured, the Consultant shall prepare an evaluation to be attached to the previously submitted "Basis of Design for Proposed Egret Marsh Regional Stormwater Park Developed from Historical Data" (hereinafter "Basis of Design"), and this document revised to reflect the influence of the pre -construction data. The revised document shall be renamed "Final Basis of Design for Proposed Egret Marsh Regional Stormwater Park", and shall be submitted to the COUNTY. Task 3: Monitoring and Quality Assurance Plan The Consultant shall prepare a comprehensive monitoring and quality assurance plan for the ATSTM influent and effluent streams and all other sources, such as algal biomass and compost, associated directly with the ATSTM operation, to include identification of sampling protocols; sampling targets (water, biomass, compost solids etc.) and parameters; sampling frequency; custody, holding times, and sample preparations and 4 F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc containers; flow and biomass measurement procedures; instrumentation maintenance and calibration; identification of procedures and limits of detection; procedures for reporting data; and assessment and management of apparently aberrant data; identification of involved laboratories with appropriate certifications; and other issues as required to assure compliance with applicable State and COUNTY standards. The monitoring and quality assurance plan shall be prepared in a format typical of such plans for State and COUNTY projects, and shall be submitted for review, comment and subsequent approval by the COUNTY. The Consultant shall revise the initial submittal to incorporate acceptable responses to the various comments offered. This revised plan shall be submitted to the COUNTY as a final document. Task 4: System Design Sub -Task 4a: 20% Design The Consultant shall use the previously established "Basis of Design" and information collected from the bench scale operations (funded independent of this Agreement through County issued purchase orders) to complete model projections, applying the revised ATSTM design model, or ATSDEM, as developed by HydroMentia to project ATSTM sizing and dimensions, considering an average daily flow of approximately 10 MGD. The modeling will be done on a monthly basis, resulting in a collective projection of performance of the ATSTM in terms of annual nitrogen and phosphorus removal; an estimate of harvesting requirements and biomass management needs; and a review of expected changes in pH, temperature, color and suspended solids. In addition, the Consultant shall prepare a preliminary ATSTM layout, to include location and sizing of the unit processes, to include, if appropriate: • ATSTM processing area, initial layout • ATSTM associated hydraulic features, including receiving headworks, distribution piping, effluent flume, flow splitting structures and effluent piping connections. • Flex Rake Location • Equipment storage and operational support area • ATSTM Monitoring facilities As part of the 20% design, the Consultant shall complete necessary on-site soil borings and analyses for the proposed ATSTM site, and shall have this work completed by a geotechnical group deemed acceptable to the COUNTY. This work shall include soil borings up to 40 feet, soil classification and blow counts, groundwater levels, sieve analyses, modified Proctor evaluations, and a professional assessment of the suitability of the site for supporting various unit processes. The soils evaluation will allow the Consultant to determine the location and extent of usable area, which will influence the ATSTM site plan and unit sizing. Also to be included as part of the 20% design shall be a preliminary hydraulic profile with calculations, beginning with the introduction of flows to the ATSTM; development of 5 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc a composting plan and projection of composting performance; and a suggested rough grading plan for the ATSTM Project, based upon previous boundary and topographic surveys as provided by the COUNTY. Design elements not to be done by the Consultant, but which need to be considered in establishing the ATSTM design include: • Influent Pumping Station and Force Main • Intermediate Lift Station, and associated piping for delivering flows from a settling pond to the ATSTM • Earthwork associated with the ponds, and support areas exclusive of the ATSTM Project • Littoral Zone design associated with the two pond elements • Receiving wetland design, including effluent piping. • Effluent piping • Stormwater management for regions outside the ATSTM Project • Site roads, lighting, electrical distribution, communications, security, signage, fencing, grassing and landscaping. • ERP permitting These design elements need to be completed concurrent with the ATSTM Project design. Accordingly, the Consultant shall work closely with the selected designer(s) for these elements, and together with these designers, shall make every effort to ensure the composite effort remains on schedule. For purposes of this work order, the term ATSTM Project shall include all areas inside the toes of the peripheral berm around the ATSTM itself; the ATSTM receiving box and piping connections; flow surgers and distribution manifold; grading, HDPE geomembrane, and geogrid matrix associated with the ATSTM floway; the ATSTM effluent flume; ATSTM flow splitter structures, to include channel support for the Flex -Rake Harvesting unit; Flex - Rake with necessary controls and appurtenances; connection(s) for ATSTM effluent piping; ATSTM monitoring stations; composting areas, to include roadways connecting ATSTM floway to composting area; operational and equipment support facilities; and equipment as required to effectively support and operate the ATSTM Project, Sub -Task 4b: 50% Design The 50% design documents shall be as required for the ATSTM component for required environmental permits. Procurement of Permits shall be by others. The Consultant shall make 50% design submittals to the COUNTY, which shall include all elements associated with the 20% design in addition to: • Final Grading and Site Plan • Typical details • Typical sections • Equipment, Materials and Construction Specifications • Structure sizing and layout 6 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc • Initial Engineering Cost Estimate Sub -Task 4c: 100% Design The Consultant shall make 100% design submittals to the COUNTY, which shall include all elements associated with the 50% design in addition to: • Structural Details • HDPE geomembrane design, specifications and QA/QC plan • Monitoring and Instrumentation Details • Construction Documents • Estimated Construction Schedule • Cost Information for ATSTM System Sub -Task 4d: Final Contract and Construction Documents The Consultant shall review the 100% design with the COUNTY, and other involved parties, as deemed appropriate, and receive comments and suggestions. The Consultant shall adjust the final documents in accordance with applicable comments and suggestions, and submit to the COUNTY as final documents. **END OF ATTACHMENT 1** 7 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc ATTACHMENT 2 to WORK ORDER NO. 1 COMPENSATION The COUNTY agrees to pay and the CONSULTANT agrees to accept, a fee for services rendered according to Attachment 1 of this WORK ORDER, with a maximum charge under this WORK ORDER of $95,435 as set forth below. 1. FEE SCHEDULE Payment for services for Tasks 1 through 4 shall be based upon the lump sum amounts and deliverables presented within Table 1, below. Estimated completion times and dates are also included. The total fee for these tasks is $95,435. Field work associated with on-site soils, geological and groundwater analyses will be conducted by a geotechnical group to be contracted by HydroMentia and as approved by the County. The cost of this work, including field collection and laboratory analyses is included in the cost proposal as a $9,000 allowance. HydroMentia will invoice the County only for the actual fee submitted to HydroMentia for this work, and will deduct the remainder from the lump sum amount for Work Order No, 1. 2. PARTIAL PAYMENTS The COUNTY shall make monthly partial payments to the CONSULTANT for all authorized work pertaining directly to this project that was performed during the previous calendar month. Each month, the CONSULTANT shall submit an invoice for services performed and expenses incurred pursuant to this Agreement during the previous calendar month. The CONSULTANT shall submit duly certified invoices in duplicate to the Director of the Public Works Department. For lump sum line items, the amount submitted shall be the prorated amount due for all work performed to date, determined by applying the percentage of the work completed to the total amount due. For time and material line items, the amount submitted shall be based on the actual hours worked and expenses incurred for the billing period. The amount of the partial payment due the CONSULTANT for the work performed to date shall be an amount calculated in accordance with the previous paragraph, less ten percent (10%) of the invoice amount thus determined, which shall be withheld by the COUNTY as retainage, and less previous payments. Per F.S. 218.74(2), the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY receives the CONSULTANT's invoice. Per F.S. 218.74(2), the ten percent (10%) retainage withheld shall be paid in full to the CONSULTANT by the COUNTY, on or before the forty-fifth day after the date of final acceptance of the Work by the Public Works Director. No payment shall be made unless the Public Works Director has received and approved the work products required under the "Scope of Services Provided by the CONSULTANT," herein. 8 FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc Table 1: Lump Sum Fee Schedule Tasks 1 through 4. a. Includes $500 rental fee for automatic sampler and $500 rental fee for generator. Work Order Fees would be reduced by this amount ($1,000) if these items provided by the County. b. Includes a $1,500 rental fee for a backhoe to be used for specific determination of C&D disposal limits. Work Order Fees would be reduced by this amount ($1,500) if this item provided by the County, or if an alternate site selected. **END OF ATTACHMENT 2** 9 F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc Lump Start- Completion Task Description Deliverables Sum Fee date Date Task 1 Analysis of Existing Water $29770 Initial Basis of 5/2/05 5/13/05 Qualityand Flow Data Design Task 2 Pre -Construction Water $7,255a Final Basis of 5/2/05 6/8/05 QualityMonitoringDesign Task 3 Monitoring and Quality Assurance Plan $3,030 Monitoring Plan 5/2/05 5/31/05 1. Soils Analysis 2. ATSDEM-REV Model runs 3. Initial Hydraulic Task 4a 20% Design $271590° Profile 5/2/05 7/11/05 4. Compost Design Mix 5. Rough Grading Plan 1. Final Grading and Site Plan 2. Typical sections/details Task 4b 50% Design $23,020 3. Technical 7/5/05 8/10/05 Specification 4. Initial Cost Estimate 1. Structural details 2. HDPE Design 3. Electrical Design 4.Construction Task 4c 100% Design $23,370 Documents 7/15/05 9/8/05 5. Construction Schedule 6. Final Cost Estimate Task 4d Final Contract and $8,400 Final Construction 9/9/05 9/21/05 Construction Documents Documents TOTAL WORK ORDER 1 $95,435 5/2/05 9/21/05 a. Includes $500 rental fee for automatic sampler and $500 rental fee for generator. Work Order Fees would be reduced by this amount ($1,000) if these items provided by the County. b. Includes a $1,500 rental fee for a backhoe to be used for specific determination of C&D disposal limits. Work Order Fees would be reduced by this amount ($1,500) if this item provided by the County, or if an alternate site selected. **END OF ATTACHMENT 2** 9 F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order #1.doc e 4 ATTACHMENT 3 to WORK ORDER NO. 1 1s TIME FOR COMPLETION The proposed timeline for the first four tasks are noted in Figure A. The start time is shown as 5/2/05, and will be adjusted to coincide with actual date of the Notice -to - Proceed from the COUNTY, with final design completed within 103 work days, assuming delivery of County provided site topographical and boundary surveys, and identification of, and access to, the site is sufficiently timely to permit initiation of the work elements (sub -tasks) within the time allowances noted. Figure A: Projected timeline for Task 1 through 4 ID Task Name Duration Start Finish rid Quarter 3rd Quarter 4th Cu B M E B M E B M E B M E B M E B M E B M 1 MJ Analysis of Existing Water Quality and Flow Data Collection and Compilation of historical data Analysis of data, initial basis of design Pre -Construction Water Quality Monitoring Establish sampling program Complete sampling and analyses Submit Final Basis of Design Monitoring and Quality Assurance Plan Selection of Laboratories Preparation of Plan Initial Plan Submittal Final Plan Submittal System Design 20% Design Soils Testing and Analysis ATSDEM-REV modeling Conceptual She Layout Composting Design Mix Rough Grading Plan Initial Hydraulic Profile Submit 20% design 50% Design Final Grading and Site Plan Typical sections/detail Equipment, Construction and Materials Specifications Hydraulic Structures sizing and layout Initial Engineering Cost Estimate Submit 50% design 100% Design Structural Details HDPE Design Electrical and Instrumentation Construction Documents Estimated Construction Schedule Final Engineering Estimate Submit 100% design Final Contract and Construction Documents receive comments on 100% design submit final documents 10 days 5 days 10 days 28 days 3 days 20 days 0 days 22 days 7 days 14 days 0 days 0 days 103 days 51 days 15 days 5 days 14 days 10 days 5 days 15 days O days 32 days 8 days 15 days 10 days 8 days 20 days 0 days 40 days 10 days 20 days 14 days 20 days 14 days 10 days 0 days 9 days 8 days 0 days Mon 5/2105 Mon &2/0E Mon 5/2/0.. Mon 5/2105 Mon 5/2/0. Thu 5/5/0. Wed 818/0. Mon 512/05 Mon 51210E Thu 5/5/05 Tue 5/24/05 Tue 5/31/05 Mon SW05 Mon 5f2/05 Mon 5/2/0. Thu &2/05 Thu 5/26/05 Thu 6/2/05 Fri 6110/0. Tue 6/7/05 Mon 7/11/OE Tue 7/5/05 Tue 7/12/05 Tue 7/5/05 Tue 7/19/05 Fri 7/15/0E Wed 7/20/0. Wed 8/17/0. Fd 7/15/05 Fri 7/2910E Fri 7/15/0E Thu 8/11/05 Tue 7/26/05 Wed 8/17/05 Thu 8/25/05 Thu 9/8105 Fri 9/9/05 Fri 9/910. Wed 92110E Fd U13105 Fri 5/&0. Fri 5/13/0E Wed 618/05 Wed 5/4/0! Wed 6/1/CF Wed 81810E Tue 5/31/05 Tue 5/10/0E Tue 5/2410E Tue 5/24/0E Tue 5/31/01! Wed 9121/05 Mon 7/11/0$ Fri 5/20/01! Wed &8/OE Tue 6/14/OE Wed 811510E Thu 8/1610E Mon 6/27/OE Mon 7/11/01! Wed 8117/05 Thu 7/21/0. Mon 7/25/01! Mon 8/1/OE Tue 726/05 Tue &1&OE Wed 8/17/015 Thu 9/8/05 Thu 811110E Thu &11/0. Tue 8130/Of Mon 812210E Mon 91510f Wed 9/7/0. Thu 9/8/0E Wed 9/21/05 Tue 9/20/0! Wed 921/0. f f 6/8 5/24 5/31 7/11 8117 9/8 9/21 2 3 4 5 B 7 8 9.a 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 28 27 28 29 30 31 32 33 34 35 36 37 38 39 Note: Red Bars indicate critical path task *END OF ATTACHMENT 3** 10 F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Storriwater Park\Work Orders\Hydromenta - Work Order #1.doc