Loading...
HomeMy WebLinkAbout2007-408 IRG Work OQer N l County Road 512 phase 3 - Wetland Mitigation As-built -y November 21 , 2007 ( - Page I of 2 pW4 ! Board of County Commissioners Administration - Building A (South) 1801 27th Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX : 772-778-9391 Project: County Road 512 Phase 3 Wetland Mitigation As-built Survey IRC Project 9611A WORK ORDER NO . 1 (Engineering/Surveying ) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Masteller, Moler, Reed & Taylor, Inc. In accordance with Contract No. 0725 2007-2009 This Work Order No. 1 is in accordance with the existing AGREEMENT dated November 6t" 2007 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County (COUNTY) . This Work Order No . 1 amends the agreement as follows : SECTION I — PROJECT LIMITS This Work Order No . 1 is for the SURVEYOR to perform additional services in connection with the design and construction of CR512 Phase 3 , in particular; the Wetland Mitigation within the St. Johns River Water Management District's Buffer Preserve. CR512 Phase 3 limits range from Roseland Road to County Road 510 , all lying in Indian River County, Florida . SECTION II - SCOPE OF SERVICES As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No . 1 described as follows : Wetland Mitigation/Ditch Plug As-built: 1 . Perform field location and obtain elevations of approximately (eight) 8 ditch plugs as constructed by the COUNTY. 2 . Prepare As-built Survey depicting an overall sketch of the mitigation site and a section view of each of the ditch plugs . 3 . Upon completion , provide five (5) hard copies and a digital file of the As-built Survey. SECTION III — TIME FOR COMPLETION , DELIVERABLEWWORK PRODUCT Project shall be completed within thirty (30) business days from Notice to Proceed . Survey shall be supplied as a topographic survey of the limits of County Road Phase 3 project. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for services rendered as identified in Sections I , 11 and III of this Work Order No . 1 , a lump sum fee of $ $7 , 500 . 00 . F.\Engineering\Capital Projects\0725- 2007 Annual Prof. Survey Contrac02007-2008 Projects\MMR&T\CR512 Phase 3 Wetland Mitigation Asbuilt\0725 WO 1 -CR512 Ph . 3 Wetland Mitigation Asbuilt 12-4-07 .doc IRC Work Order # 1 County Road 512 phase 3 — Wetland Mitigation Asbuilt November 21, 2007 Page 2 of 2 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein . 1 IN RVITNESS WHEREOF the parties hereto have executed these presents this "I � day of L14& 6 2007. OWNER Masteller, Moler, Reed &Taylor Inc. BOARD OF COUNTY COMMISSIONERS INDIAN RIVEJR COUNTY, FLORIDA � t N. ature) ( ature) Sapdral,$y4lenhairman �y �— (AlAteM•riame• gndlitle) (Printed name and title) Approved, by BCC ZA A • t ATTEST: Jeffrey K. Barton,�-- Clerk of Circuit Court Witnessed by: oe� t` cr Clerk t\.) i ko ) c. L j � lasSe P Y (Printed name) A plr a o Foma g Sufficiency: /p Collins , COUNTY Attorney (7 ph A. Balyd, CO N Adm, istrator