WORK ORDER NUMBER 10
This Work Order Number 10 is entered into as of thisr- day of OyiDbi,�
2002 ("Effective Date") pursuant to that certain Continuing Contract Agreement for Professional
Services entered into as of April 6, 2004 ("Agreement'J, and amended effective April 7, 2007 (as so
amended, the "Agreement") , by and between Indian River County, a political subdivision of the State
of Florida ("COUNTY'S and Masteller & Moler, Inc. ("CONSULTANT") .
The COUNTY has selected the CONSULTANT to perform the professional services set
forth on Attachment 1 (Scope of Work), attached to this Work Order and made part hereof by this
reference. The professional services will be performed by the CONSULTANT for the fee schedule
set forth in Attachment 2 (Fee Schedule), attached to this Work Order and made a part hereof by
this reference. The CONSULTANT will perform the professional services within the timeframe more
particularly set forth in Attachment 3 (Time-Schedule
), attached to this Work Order and made a
part hereof by this reference all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1 .4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN A71TNESS WTIEREOF, the parties hereto have executed this Work Order as of the date
first written above.
CONSULTANT: BOARD OF COUNTY COMMISSIONERS
Masteller & Moler, Inc. OF INDIAN RIVER COUNTY
Bv: G Q By:
Earl H. I13asteller', PE\DEE Wheeler, Chairman
Title: President P I �Iq -7
BCC Ap�;�bed -Da
Date: 9 /21 / 2007
Attest: J. K. Baron, Clerk
of Court
By: _4u+..-
Deputy Clerk
Approved: 1
By: C,,Zlt
seph A. Baird, County Administrator
Approv d ast� f
and 7fic cy:
/` /
By:
arian E. Fe , Assistant Coun Attomey
Our File #0713
March 7, 2007
NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
ATTACHMENT 1
• Project Description
Work Order No. 10 provides for professional engineering services for the design, permitting, bidding
and services during construction of numerous potable water and wastewater force mains proposed to
cross the County Route 512 Phase IV Corridor. These mains are intended to be designed and permitted
to allow coordinated construction during the CR 512 Phase IV project so as to avoid the necessity of
future connection crossings of the corridor.
Work Order No. 10 is being implemented at this time to provide professional engineering services by
Masteller & Moler, Inc. associated with the project described above. The work to be performed as part
of this Work Order will generally include providing base plans; preparation of project design for the
proposed water and wastewater extensions, preparation of contract plans; preparation of specifications
and bid documents; preparation and submittal of permit applications, assistance during bidding and
contract administration/periodic inspection for the pipeline project.
The estimated project construction cost is $300,885 .00
A brief description of the scope of services for Work Order No. 10 is provided below:
• Scope of Services
Task A — Design & Permitting: Water & Sewer Force Main Extensions
1 — Base Plans
Base Plans will be developed from the existing CR 512 Phase IV Route Survey and Design Plans for
Phase IV of the proposed Roadway Improvements. The base plans shall include coordinate points with
reference to the State Plane Coordinate System to facilitate the incorporation of the plans into the
County' s GIS system.
2 — Construction Plans
Masteller & Moler, Inc. will utilize the previously completed route survey information and the CR 512
Phase IV roadway designs for preparation of construction plans for the utility extensions. Our plans will
show the necessary fittings, gate valves, fire hydrants, directional boring, and construction details to
support the construction of potable water and sewer force main "stub-out" extensions. The extensions
shall be constructed to accommodate future connections to the existing 20" potable water and 10" sewer
force mains in the Phase IV portion of the CR-512 Roadway Improvements project. We anticipate a
total of 13 water and 3 sewer forcemain extensions will be constructed.
Attachment I
3/7/07
Page 2
3 - Permittine
Masteller & Moler, Inc. shall prepare and submit applications for the following permits :
• Florida Department of Environmental Protection (FDEP) Water Construction (General Permit)
• FDEP Wastewater Construction (General Permit)
Permit application fees are not included in this Proposal.
Our File #0713
March 7, 2007
NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
ATTACHMENT
Method and Amount of Compensation
Masteller & Moler, Inc. proposes to provide the above Scope of Services based on the following
lump sum fees :
Task A — Design & Permitting: Water & Sewer Force Main Extensions
Provide for Base Plan Preparation; Engineering Design; Preparation & Submittal of
Permit Applications.
Fee for Task A: $ 700.00
ATTACHMENT #2
LUMP SUM FEE TABULATION
3/7/2007
INDIAN RIVER COUNTY
CR-512: Water and Sewer Force Main Stub Out Extensions
PROVIDE FOR ENGINEERING DESIGN / PREPARATION OF CONSTRUCTION PLANS AND
PERMITTING APPLICATIONS
Professional Engineer Designer CAD Administration
$ 155. 00 $ 80. 00 $ 45 . 00 Total Comments
Hours Amount Hours Amount Hours Amount Costs
Engineering Design 10 $ 11550. 00 9 $ 720. 00 1 $ 45. 00 $ 2, 315. 00
Preparation of 7 $ 1 ,085. 00 23 $ 1 , 840. 00 2 $ 90. 00 $ 37015. 00
Construction Plans
Preparation & Acquisition of 3 $ 465. 00 10 $ 800. 00 9 $ 405 . 00 $ 11670. 00 Permits needed from FDEP.
Permits
Total ( hrs/cost) 20 $ 3, 100. 00 42 $ 35360. 00 12 $ 540. 00 $ 71000. 00
Engineering Design/Permitting $ 7, 000. 00
File 0713LA Surveying Services n/a
Sched_manhours_rev_030707.xls
(Design_Services) Total $ 71000. 00
Our File #0713
March 7, 2007
NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT
CONTINUING CONSULTING SERVICES
ATTACHMENT #3
• Time of Performance
The estimated time frame for completion of services from the approval of this Work Order* is as
follows:
MILESTONE *COMPLETION DATE
Base Plans Preparation Completed
Engineering Design &
Preparation of Construction Plans Completed
Submittal of Permit Applications
And Receipt of Permits 30 — 60 days*
* Estimated time to completion from date of County Commission Approval.
* *Assumes construction starts immediately upon receipt of required permits.