Loading...
HomeMy WebLinkAbout2007-003 � . Board of County Commissioners 1810 25th Street Vero Beach, Florida 32960 Telephone : (772) 567-8000 FAX: 772-778-9391 WORK ORDER NO . 10 (Engineering) FOR PROFESSIONAL SURVEYING SERVICES AGREEMENT FOR ANNUAL SURVEYING AND MAPPING SERVICES 2006 —2007 CONTRACT 0390 WITH Masteller, Moler, Reed & Taylor, Inc. In accordance with Contract No. 0390 2006-2007 Project: Right-of-Way Mapping Project Indian River Drive Phase 1 IRC Project 0634 This Work Order No. 10 is in accordance with the existing AGREEMENT dated September 19th, 2006 between Masteller, Molar, Reed & Taylor, Inc. (SURVEYOR) and Indian River County (COUNTY) . This Work Order No. 10 amends the agreement as follows: SECTION I — PROJECT LIMITS This Work Order No . 10 is for the SURVEYOR to perform a Right of Way Survey for the existing 66 foot wide Right of Way for Indian River Drive and prepare a Right of Way Map for Phase 1 of the project. The overall project limits range from the southern intersection of Indian River Drive with U . S. Highway No . 1 to the northern intersection of Indian River Drive with U .S . Highway No. 1 (approx. 3. 5 miles). Phase 1 of the project ranges from the northern overall project limits south to the northern City Limits of the City of Sebastian (approx. 1 . 5 miles) . All lying in Indian River County, Florida SECTION II - SCOPE OF SERVICES As agreed upon between Masteller, Moler, Reed & Taylor Inc. and Indian River County, the Surveyor shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No. 10 described as follows: • Right of Way Survey. 1 . Establish and field locate the centerline of the existing 66 foot Right of Way for Indian River Drive from US1 to USI as described in Deed Book 538, Page 541 . 2 . Find or establish sectional data as necessary for establishing the Indian River Drive centerline and certify as required. Locate and identify existing Right of Way monumentation along the overall project limits. Prepare and record Certified Corner Reports as applicable to Florida Statutes IRC Work Order # I OE I.R. Drive R/W Map 12/ 15/2006 Page 2 of 6 3 . Monument Permanent Control Points (PCP's) with referenced points along the centerline at all changes in direction, including all Points of Curvature and Tangency. Provide State Plane Coordinate values on all baseline control points and reference points. PCP's and reference points shall be a nail and tab stamped " PCP LB #4644" and shall be placed at a maximum of 1000 feet apart. 4. The product shall include underlying topographic information from prior work performed by Masteller, Moler, Reed & Taylor, Inc. and Indian River County. 5. Locate and depict all Indian River County G . P. S . control monuments. • Right of Way Mapping: 1 . Prepare Final Right of Way Map for Phase 1 as described above. Map shall depict limits of 66 foot Right of Way for Phase 1 and the centerline of right of way for overall project limits including ties to sectional data as necessary. 2 . Map shall also depict limits of existing Rights-of-Ways and/or Boundaries as per apparent physical evidence, deeds as provided by the County and the limits of Right of Way as shown on existing recorded plats along the route. 3. Right of Way Map shall meet or exceed all requirements as listed in the Indian River County Right of Way checklist as modified and attached hereto as Exhibit "A" . SECTION III — COUNTY RESPONSIBILITIES It is the COUNTY's responsibility to provide an abbreviated title search and all other information of record for properties along the proposed route for Phase 1 . SECTION IV — CONSULTANTS RESPONSIBILITIES It is the Consultants responsibility to obtain legal access to properties along the route prior to performing any work. Proper safety precautions and protocol shall be maintained at all times . SECTION V — TIME FOR COMPLETION Project shall be completed within one hundred twenty ( 120) business days from Notice to Proceed . Schedule shall include a 60-70% submittal within ninety (90) days for review and approvals by the COUNTY. Fina] submittal (Deliverables) shall be provided to the COUNTY upon completion . C1Documents and SertingslDTAYLOR11.ocal Scaings\Temporary Intemet Piles\Content.IE5\05ZROMFO\0390_IR_Drive_Ph_l_ROW_Map_Work_Order_10_I -9-07[1 ].doc IRC Work Order # I OE I .R. Drive R/W Map 12/ 15/2006 Page 3 of 6 SECTION VI — DELIVERABLESIWORK PRODUCT 1 . Survey shall be supplied as a right of way map in state plane coordinates and suitable for recording; in the form of a cover sheet, Control sheet, key sheet and detailed Right-of Way sheets as applicable. 2. Deliverables shall include a 60-70% submittal within ninety (90) days for review and approvals by the COUNTY prior to proceeding with the final product. 3. Deliverables for the final ( 100%) submittal to the COUNTY will consist of a digital file (disk). The digital file shall adhere to basic COUNTY AutoCAD layer structure as provided . 4. The SURVEYOR shall provide the COUNTY one ( 1 ) executed mylar in recordable format and a digital file in . pdf format of the survey and prepare its Work Product digital versions so that the COUNTY or other consultants can readily use it for the design and analysis of the area, as defined . It shall contain all information necessary for third-party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large. 5. The SURVEYOR'S work product shall meet or exceed the minimum standards as defined by Sections I , II , III , IV, V and VI or the COUNTY will not approve the SURVEYOR'S request for payment. 6 . Final product will be provided to the COUNTY in a recordable format. SECTION VII — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for services rendered as identified in Sections II , III and IV of this Work Order No. 10 a fee at the standard hourly rates as agreed to by the Consultant and the COUNTY, and not to exceed $ 39, 880. 00. All invoicing shall be supported with documentation (Man hours) of time and materials spent and following information prior to payments. Invoices shall include the work order, contract and project numbers. Invoice number related to this work order, original contract amount, current billing amount and retainage amounts. C:\Da ents and Set ings\DTAYLOR\Local Settings\Temporary Intemet Files\Content.IE5\05ZROMFO\0390_IR_Drive_Ph_1_ROW_Map_Work_Order_10_I -9-07f liAm IRC Work Order # I OE I.R. Drive R/W Map 12/15/2006 Page 4 of 6 The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein . IN WITNESS WHEREOF the parties hereto have executed these presents this 9th day of January2007 . OWNER Masteller, Moler, Reed &Taylor Inc. BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA az��44�L� A 2 — (�' CA.) AAA AM A � K (Signature) (Signature) Gwor Gary C. Wh ler - Chairman M . 07ztjk V, VP (Printed name and title) (Printed name and title) Approved by BCC 01 - 09 - 2007 ATTEST: Jeffrey K. I B.itton, Clerk of Circuit Court Witnessed by: Deputy 1r(erk (Printed name) Approved as o gn e� Sufficiency: it is G. o fins II, C UNTY Attorney Jo ph A. Baird , COUNTY Administrator C\Documents and Settings\DTAYLOR\Loeal Settings\Temporary Intemet Files\ContenLlE5\05ZROMFO\0390_IR_Drive_Ph_l_ROW_Map_W ork_Order_10_I -9-07[il.doe IRC Work Order 410E I.R. Drive R/W Map 12/ 15/2006 Page 5 of 6 EXHIBIT "A" INDIAN RIVER COUNTY RIGHT OF WAY MAP CHECKLIST All Right-of-way projects shall adhere to Chapter 177 & 472, F.S. and Chapter 61G17, F.A.C. as minimum and be certified as such. 1 . Cover sheet/Key sheet. 2. Survey notes and report sheet (As applicable) 3 . Survey Control sheet (As applicable and or necessary) 4 . Subsequent R/W map sheets. 5 . Supply a Box or area for COUNTY acceptance and/or certification. 6. Title Box of each sheet must contain: a. COUNTY b . State Road Number c. Designed, drawn and checked by (use names or initials) & date d. Scale e. Field Book References f. Sheet Numbers to be in numerical order (1 , 2, 3 , 4, etc .) NOT ( 1 , 1A, 1B, 2, etc.) 7 . Any notes necessary to set out the type and/or purpose of the map shall be shown. 8 . Show pertinent dimensions and bearings in the following fashion as the case may be : a. Plat — (P) b. Computed — (C) c . Field — (F) d. Deed (D) 9. Table of Ownerships shall show: a. Parcel Number b. Owners Name c. Recording Data 10. Show stations and offsets to all Right of Way Breaks. 11 . Establish a baseline alignment for control and determine location of significant elements for future monumentation. 12. Verify that computed distances and bearings are supported by field measurements. 13 . Intentionally omitted — to be included in future contract. 14. Ensure that significant elements of all curves are shown and are correct. Also show curve data on all sheets where they appear. 15 . Begin and End R/W Project with Stations . 16. Stationing in field minimum 500' beyond beginning and ending of project. 17. Baseline (equate to intersecting STATE or COUNTY Jobs by Station and job number when available) as available . CADocuments and Settings\DTAYLOR\Local Settings\Temporary Internet Files\ContentlE5\05ZROMFO\0390_IR_Drive_Ph_1_ROW_Map_Work_Order_10_I -9-07[l ].doc IRC Work Order # I OE I.R. Drive R/W Map 12/15/2006 Page 6 of 6 18 . Projects shall be in NAD83/90 State plane coordinate system and bearings reference shall be shown and must be clearly stated. Values shall be place on key baseline monumentation. 19. COUNTY/State lines 20. Section 21 . Township 22. Range 23 . Government Lots, Grants, etc. 24. Sections and 1/A Sections (lines & comers). Certified Corner reports of all Section/l /4 corners used in the course of survey shall be completed and/or updated. 25 . City Limits by Name & Symbol; Name of City, if job entirely within city limits but does not cross-city limits . 26. Land and Subdivision Ties (angles and/or, bearings & distances) 27. Subdivision name and limits 28 . Plat Book and page (COUNTY) 29 . Lots and Blocks (key map — blocks only) 30 . Lot and Street dimensions (plat). 31 . Show all original plat and R/W lines of record, if different from present time, with dashed lines 32. Show names of subdivision streets, plat book and page recording — also, show Lot and Block number and Dimensions, Exceptions, Easements, and Vacated portions. 33 . When property lines break the Right of Way on curve, show tangent bearings or chord bearings. 34 . Show any replat of a subdivision — show old subdivision when necessary to clear up former acquisition or old title references — use system of dashed lines, dotted figures, etc. , with ties shown and name and plat book reference indicated 35 . Stations and Angle Ties to Existing Side Streets as surveyed and/or calculated (where applicable). 36. Show field located P. R. M. /major property corner or parcel ties by station/offset to baseline/control line (where applicable) . 37 . Current Street Names 38. Show and identify all easements on Detail Maps by width, use and ownership (where applicable). C:\Documents and Settings0TAYLORTocal SettingslTemporary Intemet Files\Content.IE5\05ZROMFO\0390_IR_Drive_Ph_I_RO W_Map_Work_Order_10_I -9-07[ 1].doc RIGHT OF WAY MAPPING PROJECT / PHASE 1 INDIAN RIVER DRIVE, SEBASTIAN FLORIDA SECTIONAL R/W DEED R/W SET QUALITY ESTIMATEDMANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P. C.P. S CONTROL SUB-TOTALS CLASSIFICATION RATE PROFESSIONAL SURVEYORP.SM. 110.00 8 8 8 8 8 $4, 400. 00 SURVEY PROJECT MANAGER P.S.M. 95. 00 8 24 29 5320. 00 FIELD CREW SUPERVISOR $90. 00 2 8 8 2 $1,800. 00 TWO MAN G.P.S. FIELD CREW $135.00 24 96 16 $18,360, 00 SURVEY C4DD OPERATOR $70. 00 120 $4400. 00 GEODETIC PROCESSSING 80. 00 10 10 $lz6OO. 00 TOTAL $39,880. 00 RIGHT OF WAY MAPPING PROJECT/ PHASE 2 INDIAN RIVER DRIVE, SEBASTIAN FLORIDA SECTIONAL R/W DEED R/W SET QUALITY ESTIMATED MANHOURS RECON CONTROL CONTROL ANALYSIS ANALYSIS DRAFTING P.C.P. S CONTROL SUB-TOTALS CLASSIFICATION RATE PROFESSIONAL SURVEYORP.S.M. 110. 00 4 4 4 4 1760. 00 SURVEY PROJECT MANAGERP.S.M. 95.00 12 12 2280. 00 FIELD CREW SUPERVISOR 90.00 8 8 2 1 620. 00 TWO MAN G.P.S. FIELD CREW $135. 00 40 16 7560. 00 SURVEY C4DD OPERATOR $70.00 90 6 300. 00 GEODETIC PROCES55ING $80. 00 10 10 1 600. 00 TOTAL $21tI20.00