HomeMy WebLinkAbout2007-050 Board of County Commissioners I 5 J
z 1840 251h Street
z Vero Beach, Florida 32960 APPROVED BY
* �t Telephone: (772) 567-8000
't1OR1�' FAX, 772- 778-9391 FEB 13 2007
WORK ORDER NO. 18 BOARD OF COUNTY
"County Road 512 Phase IV Utility Adjustments" COMMISSION
FOR
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR ANNUAL SURVEYING AND MAPPING SERVICES CONTRACT NO : 0390
WITH
Masteller, Moler, Reed & Taylor, Inc.
This Work Order No. 18 is in accordance with the existing AGREEMENT dated September 19th,
2006 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County
(COUNTY). This Work Order No. 18 amends the agreement as follows:
SECTION I — PROJECT LIMITS
Perform Specific Purpose Survey for property located in Indian River County and identified as
County Road 512 Phase IV, Indian River County, Florida.
SECTION H - SCOPE OF SERVICES
As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County,
Masteller, Moler, Reed & Taylor, Inc. will perform Professional Land Surveying services to
include the following :
a. Recover baseline and establish horizontal and vertical control.
b. Uncover, locate and obtain top of pipe elevations for 14 locations as depicted on plans
includedwith letter from Masteller & Moler, dated 1 /25/07. ( s e Exhibit A )
c. Intergrate information obtained into existing County Road 512 Phase IV Route Survey.
d. Provide five copies and one digital file of the topographic survey upon completion.
SECTION III — WORK PRODUCT
a) The SURVEYOR shall prepare its Work Product so that the COUNTY or other
consultants can readily use it for the design and analysis of the area, as defined. It shall
contain all information necessary for third-party surveyor to independently recreate
and/or utilize the survey work. It is acknowledged all final products become property of
Indian River County and will be available for use by the public at large.
SECTION IV — TIME FOR COMPLETION
Work Order No. 18 shall be completed within 30 business days from Notice to Proceed.
Attachment 1
IRC-Work Order No. 18
County Road 512 PH N Utility adjustments
2/1 /2007
Page 2 of 2
SECTION V — COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for services rendered
according to the "Scope of Services" identified in Section II of this Work Order No . 18 , a Lump
Sum (not to exceed) fee of $4,800.00.
The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein.
IN WITNES WHEREOF the partied hereto have executed these presents this 13th day of
February , 2007.
MASTELLER, MOLER, REED & INDIAN RIVER COUNTY, FLORIDA
TAYLOR . (SURVEYO BOARD OF COUNTY COMMIS §101,1E).L$ e,
BY: BY:
C01-
Gary Wh er, Chairpet'so"n x^
Title : VA
t ICII ,
Approved b the BCC: Fehr , IZ�77
� 1
ATTEST: 4 d
Jeffrey : Batton
Clerk of Circuit Court
BY : /
Deputy Clerk of Court
APPROVED :
u . _
unty Administrator
APP VED AS TO FORM AND LEGAL
SL�FFI 'IE�
arian Fell, Assistant ty Attorney
EXHIBIT A
MASTELLER & MOLER, INC.
M — CIVIL ENGINEERS
January 25, 2007
Revised: February 5, 2007
Mr. Gordon Sparks
Indian River County Utilities Department
1840 25s' Street
Vero Beach, FL 32960
RE: Utility Relocations
CR 512 Roadway Improvements — Phase IV
Indian River County, Florida
Dear Gordon:
In response to your letter regarding proposed utility relocations for Phase IV of the CR-512
Roadway Improvements Project, please find enclosed one copy of redlined Utility
Relocation Sheets from the Construction Plans.
We are willing to work with your Department to minimize costs related to the relocation of
existing water and sewer mains. However, in most areas the specific location of the water
and sewer mains is not known. As such, please refer to the attached redline plans and
provide top-of-main elevations at the following locations:
Station Water Sewer
STA 67+ 75 10' R 56' R
STA 115 +50 126' L 80' L
STA 119+00 - 80' L
STA 122+05 126' L - (revision)
STA 128+ 90 - 48' L
STA 131 + 04 78' L -
STA 132+ 95 - 0'
STA 133 +09 60' L -
STA 136+00 45' L 19' R
STA 140+03 40' L 21 ' R
Upon receipt of the above information, we will evaluate the proposed storm sewer design to
determine whether conflicts may be avoided.
Please feel free to contact me if you have any questions.
Sincerely,
MASTELL�RE & MOLER, INC.
John M. B6yer, P. E.
Project Engineer
PUC.
CC C ns KaFeq PP.
Enc Olson
Mike HouI]gss
�aaw,ka a�xwx-2..a«� 1655 27t' Street, Suite 2
Vero Beach, Florida 32960
Phone: (772) 567-5300
Far. (772) 7941106
Entail: mastmolr@bellsouth.net