Loading...
HomeMy WebLinkAbout2007-050 Board of County Commissioners I 5 J z 1840 251h Street z Vero Beach, Florida 32960 APPROVED BY * �t Telephone: (772) 567-8000 't1OR1�' FAX, 772- 778-9391 FEB 13 2007 WORK ORDER NO. 18 BOARD OF COUNTY "County Road 512 Phase IV Utility Adjustments" COMMISSION FOR PROFESSIONAL SURVEYING SERVICES AGREEMENT FOR ANNUAL SURVEYING AND MAPPING SERVICES CONTRACT NO : 0390 WITH Masteller, Moler, Reed & Taylor, Inc. This Work Order No. 18 is in accordance with the existing AGREEMENT dated September 19th, 2006 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County (COUNTY). This Work Order No. 18 amends the agreement as follows: SECTION I — PROJECT LIMITS Perform Specific Purpose Survey for property located in Indian River County and identified as County Road 512 Phase IV, Indian River County, Florida. SECTION H - SCOPE OF SERVICES As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, Masteller, Moler, Reed & Taylor, Inc. will perform Professional Land Surveying services to include the following : a. Recover baseline and establish horizontal and vertical control. b. Uncover, locate and obtain top of pipe elevations for 14 locations as depicted on plans includedwith letter from Masteller & Moler, dated 1 /25/07. ( s e Exhibit A ) c. Intergrate information obtained into existing County Road 512 Phase IV Route Survey. d. Provide five copies and one digital file of the topographic survey upon completion. SECTION III — WORK PRODUCT a) The SURVEYOR shall prepare its Work Product so that the COUNTY or other consultants can readily use it for the design and analysis of the area, as defined. It shall contain all information necessary for third-party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of Indian River County and will be available for use by the public at large. SECTION IV — TIME FOR COMPLETION Work Order No. 18 shall be completed within 30 business days from Notice to Proceed. Attachment 1 IRC-Work Order No. 18 County Road 512 PH N Utility adjustments 2/1 /2007 Page 2 of 2 SECTION V — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for services rendered according to the "Scope of Services" identified in Section II of this Work Order No . 18 , a Lump Sum (not to exceed) fee of $4,800.00. The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNES WHEREOF the partied hereto have executed these presents this 13th day of February , 2007. MASTELLER, MOLER, REED & INDIAN RIVER COUNTY, FLORIDA TAYLOR . (SURVEYO BOARD OF COUNTY COMMIS §101,1E).L$ e, BY: BY: C01- Gary Wh er, Chairpet'so"n x^ Title : VA t ICII , Approved b the BCC: Fehr , IZ�77 � 1 ATTEST: 4 d Jeffrey : Batton Clerk of Circuit Court BY : / Deputy Clerk of Court APPROVED : u . _ unty Administrator APP VED AS TO FORM AND LEGAL SL�FFI 'IE� arian Fell, Assistant ty Attorney EXHIBIT A MASTELLER & MOLER, INC. M — CIVIL ENGINEERS January 25, 2007 Revised: February 5, 2007 Mr. Gordon Sparks Indian River County Utilities Department 1840 25s' Street Vero Beach, FL 32960 RE: Utility Relocations CR 512 Roadway Improvements — Phase IV Indian River County, Florida Dear Gordon: In response to your letter regarding proposed utility relocations for Phase IV of the CR-512 Roadway Improvements Project, please find enclosed one copy of redlined Utility Relocation Sheets from the Construction Plans. We are willing to work with your Department to minimize costs related to the relocation of existing water and sewer mains. However, in most areas the specific location of the water and sewer mains is not known. As such, please refer to the attached redline plans and provide top-of-main elevations at the following locations: Station Water Sewer STA 67+ 75 10' R 56' R STA 115 +50 126' L 80' L STA 119+00 - 80' L STA 122+05 126' L - (revision) STA 128+ 90 - 48' L STA 131 + 04 78' L - STA 132+ 95 - 0' STA 133 +09 60' L - STA 136+00 45' L 19' R STA 140+03 40' L 21 ' R Upon receipt of the above information, we will evaluate the proposed storm sewer design to determine whether conflicts may be avoided. Please feel free to contact me if you have any questions. Sincerely, MASTELL�RE & MOLER, INC. John M. B6yer, P. E. Project Engineer PUC. CC C ns KaFeq PP. Enc Olson Mike HouI]gss �aaw,ka a�xwx-2..a«� 1655 27t' Street, Suite 2 Vero Beach, Florida 32960 Phone: (772) 567-5300 Far. (772) 7941106 Entail: mastmolr@bellsouth.net