WORK ORDER NUMBER 1 -EM
SUPPLEMENTAL VALUE ENGINEERING AND QUALITY CONTROL REVIEWS OF
THE EGRET MARSH REGIONAL STORMWATER PARK
This Work Order Number 1 -EM is entered into as of this ',19th day of
July 2005, pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of /i/Mec4 15 , 2005 ("Agreement"),
by and between Indian River County, a political subdivision of the State of Florida
("COUNTY") and Malcolm Pirnie, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional services
set forth on Attachment 1, attached to this Work Order and made part ereof by this
reference. The professional services will be performed by the CONSULTANT for the fee
schedule set forth in Attachment 2, attached to this Work Order and made apart hereof by
this reference. The CONSULTANT will perform the professional services within the
timeframe more particularly set forth in Attachment 3, attached to this Work Order and
made a part hereof by this reference, all in accordance with the terms and',provisions set
forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in
any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set
forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of
the date first written above.
CONSULTANT
MALCOLM PIRNIE, INC.
By:
Title: SEN 10P, ASSCX UA EE
BOARD OF COUNTY COMMISSIONERS
OF INDIAN RIVER COUNTY
By <
Thomas S. Lowther, Chairman
Attest: J.K. Barton';-Cle"&ol
By
Deputy Clerk
BCC Agpyr )val. Da.t4
Approved: .•
rt
July 19, 2005
(fJoseph A. BaiKd, County Administrator
/A r e a o form and legal sufficiency:
ria E. Keff,Assid u tt rney
1
CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Fi1es\OLKA9\Ma1co1m Pirnie Work Order i#1-EM.doc
ATTA
RK ORDER NI
SUPPLEMENTAL VALUE ENGINEERING AND QUALITY (
REVIEWS OF THE EGRET MARSH REGIONAL STORMWA
1. PROJECT UNDERSTANDING
The County is having final design documents prepared by Hydra
Environmental Consulting & Technology, Inc.; and G. K. Environmental, Inc
Marsh Regional Stormwater Park (Egret Marsh) in southwest Indian River
major components of the design includes at least two pumping stations, the
of two existing borrow pits for stormwater treatment processes (primary se
polishing), a proprietary algal turf scrubber system, and a small polishing wet
2. BACKGROUND
The County is interested in an independent analysis in the form of a value
constructibility review of the design contract documents. The scope of worl
value analysis and constructibility review activity that will be performed on t
50 percent and 90 percent complete contract documents (drawings
specifications). The value analysis activity will provide both potential consti
cycle cost savings by developing alternative approaches to constrl,
specifications, and material selection. The value analysis and constructibilit)
performed on the following specialty design disciplines:
Civil
Mechanical
Electrical
Instrumentation/Process Control
The value analysis and constructibility review will not be performed on the str
discipline.
The constructibility review will identify those areas in the documents,
potentially cause field problems and delays during the construction
constructibility review comments will potentially improve the quality of the co
on this project.
3. SCOPE OF WORK
TASK NO. 1 — Meeting with County and Design Team
Attend three meetings with the County and the Design Team. The pu
meetings will be to discuss review comments from the previous submittals.
12 hours for technical assistance outside the formal meeting format.
TASK NO. 2 — Letter Response for 20% Design Completion
Prepare and submit a letter report to provide comments concerning issues a
2
CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\OLKA9\Malcolm Pirnie Work Order
NTROL
R PARK
)mentia, Inc.;
for the Egret
County. The
rehabilitation
cling and final
land system.
analysis and
will include a
ie 20 percent,
and technical
uction and life
Iction details,
review will be
ctural design
which could
hase. The
tractors' bids
)ose of these
Also includes
;sociated with
-EM.doc
the value analysis and constructibility review of the 20 percent submittal
Activities
2.1 Review contract drawings to identify potential changes that
savings in both capital and life cycle costs through an eval
specified design discipline of the project.
2.2 Review technical specifications to identify potential changes that
savings in both capital and life cycle costs.
Prepare value analysis and constructibility review letter report identifying th
savings.
TASK NO. 3 — Letter Response for 50% Design Completion
Prepare and submit a letter report to provide comments concerning issues
the value analysis and constructibility review of the 50 percent submittal pa
Activities
3.1 Review contract drawings to identify potential changes that
savings in both capital and life cycle costs through an evalu
specified design discipline of the project.
3.2 Review technical specifications to identify potential changes that
savings in both capital and life cycle costs.
3.3 Review the Design Consultant's opinion of probable construction
3.4 Prepare value analysis and constructibility review letter report
potential cost savings.
TASK NO. 4 — Letter Response for 90% Design Completion
Prepare and submit a letter report to provide comments concerning issues
the value analysis and constructibility review of the 90 percent submittal
activities associated with this Task will be similar to those for Task No. 3,
4. DELIVERABLES
Five copies of the value analysis and constructibility review letter report
to the County for the 20 percent, 50 percent, and 90 percent submittal pac
**END OF ATTACHMENT 1 **
e.
)uld provide
ion of each
could provide
potential cost
iated with
M
ould provide
tion of each
could provide
St.
dentifying the
ated with
ge. The
will be submitted
3
CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\OLKA9\Malcolm Pirnie Work Order
es.
I-EM.doc
ATTACHMENT 2 to WORK ORDER NO. 1 -EM
SUPPLEMENTAL VALUE ENGINEERING AND QUALITY CONTROL
REVIEWS OF THE EGRET MARSH REGIONAL STORMWA
1. COMPENSATION
The COUNTY agrees to pay and the CONSULTANT agrees to accept, a lum
$16,100 for services rendered according to Attachment 1 of this WORK ORC
2. PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the CONSULT/
authorized work pertaining directly to this project performed during the previo
month. The CONSULTANT shall submit invoices monthly for services perfor
expenses incurred pursuant to this Agreement during the prior month.
The CONSULTANT shall submit duly certified invoices in duplicate to
the Public Works Department. For lump sum line items, the amount submittE
prorated amount due for all work performed to date under this phase, determ
applying the percentage of the work completed as certified by the CONSULT
total due for this phase of the work. For time and material line items, the am(
submitted shall be based on the actual hours worked and expenses incurred
period.
The amount of the partial payment due the CONSULTANT for the wor
to date under these phases shall be an amount calculated in accordance wit[
paragraph, less ten percent (10%) of the invoice amount thus determined, w[
withheld by the COUNTY as retainage, and less previous payments. Per F..E
the COUNTY will pay approved invoices on or before the forty-fifth day after 1
receives the CONSULTANT's invoice.
Per F.S. 218.74(2), the ten percent (10%) retainage withheld shall be I
the CONSULTANT by the COUNTY, on or before the forty-fifth day after the
acceptance of the Work by the Public Works Director.
**END OF ATTACHMENT 2**
4
CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\OLKA9\Malcolm Pirnie Work Order
R PARK
sum fee of
R.
.NT for all
is calendar
ned and
ie Director of
I shall be the
ied by
kNT, to the
unt
or the billing
performed
the previous
ich shall be
218.74(2),
ie COUNTY
id in full to
to of final
-EM.doc
ATTACHMENT 1 to WORK ORDER NO. 1 -EM
SUPPLEMENTAL VALUE ENGINEERING AND QUALITY C NTROL
REVIEWS OF THE EGRET MARSH REGIONAL STORMWA
1. TIME FOR COMPLETION
The CONSULTANT will complete its review and provide comments of
progress package on or before the 14th day after it receives the progress pa
the COUNTY.
**END OF ATTACHMENT 3**
5
CADocuments and Settings\crawfordv\Local Settings\Temporary Internet Files\01-KA9\Malcolm Pirnie Work Order
R PARK
each
:kage from
I-EM.doc
June 30, 2005
Keith McCully, P.E.
Stonnwater Engineer
Stonnwater Section
Indian River County
184025 Ih Street
Vero Beach, FL 32960
INDEPENDENT ENVIRONMENTAL
Re: Indian River County
Value Analysis/Constructibility Review for Egret Marsh Regional Storm
Dear Mr. McCully:
This letter will serve as confirmation that Victor A. Hurlburt, Senior Associate
execute work authorizations, work orders and purchase orders for Malcolm Pirme,
not exceeding $100,000.00
Very truly yours,
c: Victor Hurlburt, MPI
F/Nespolini/Balchon/Indian River-Hurlburt Itr.doc