Loading...
HomeMy WebLinkAbout2007-054 Page 1 of OC 0/ � ' 117 � U Board of County Commissioners ZOOp - �isy 7 1810 25th Street Vero Beach, Florida 32960 APPROVED BY Telephone : (772) 567-8000 FAX: (772)-778-9391 FEB 1 3 2007 SUBSURFACE SOIL EXPLORATIONggpARD OF COUNTY AND GEOTECHNICAL ENGINEERING EVALUATIOACOMMISSION for 56th Place Bridge north of 53`d Street IRC Project No. 0703 WORK ORDER NO. 2 ( Engineering Division ) FOR FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534 WITH ARDAMAN & ASSOCIATES , INC . All services performed under this contract shall be supervised and certified by a licensed Professional Engineer ( PE) registered with the State of Florida and staff employed directly with your firm . Scope of Services All work shall be performed on a unit price basis in accordance with the attached Scope of Services dated January 16, 2007 and shall comply with Standards enumerated in the RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT IRC PROJECT NO. 0534 WITH ARDAMAN & ASSOCIATES , INC . Effective Date: October 1 , 2006. Minimum Specification Requirements as follows : Initial site visit, layout of boring locations and coordination of fieldwork. • Mobilization/demobilization of drilling equipment. • Standard penetration test borings . • Laboratory testing of subsurface soils . Preparation and issuance of engineering reports presenting the test results for the bridge design . All work shall also comply with the current Florida Minimum Technical Standards . COMPENSATION . The COUNTY agrees to pay , and the Geotechnical Professional agrees to accept , a fee for services rendered according to the "Scope of Services" identified in the attached EXHIBIT "A" Fee Schedule and Man Hours . FAEngineering\Capiral Prciects%0703 56th Place Bridge - Vero Lago10703 Arda m WO# 02 02-02-07.doc Page 2 of 2 Work Order #2 560h Place Bridge north of 531d Street A Not-to-Exceed Amount of: $7 ,226 .50 to be paid on a unit price basis for actual work performed in accordance with the schedule of services and fees set forth in Exhibit A of RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT IRC PROJECT NO. 0534 WITH ARDAMAN & ASSOCIATES . INC . Effective Date: October 1 , 2006. TIME FOR COMPLETION This Work Order No. 2 shall run concurrently with the construction work for the 56th Place Bridge north of 53 Id Street IRC Project No. 0703 IN WITNESS HEREOF the parties hereto have executed these presents This 13th day of February , 2007 . OWNER ARDAMAN & ASSOCIATES, INC. BOARD OF COUNTY COMMSIONERS INDIAN RIV, R COUNTY, FLORIDA (Si n e (Pr`yred name and title) (Pra ed na a and title) Approved LCC , 02 / 13 / 07 _ ATTEST: Jeffrey K. Barton, Clerk of Circuit Court Witnessed by: ja Deputy Clerk (Printed name) Approved as to F r ape I S i ency: / � t illiam G. Collins II, Mounty Attorney r , oseph A Baird, County Administrator F:\Engineering\Capital Projects\0703 56th Place Bridge - Vero Lago\0703 Ardaroan W0402 02-02-07.doc Ardaman & Associates , Inc . Geoteahnica,, . ir Fient- and January 16 , 2007 � = a[el'iale consUTa n<.anis Proposal File No . 07-64-3136 Indian River County , t Board of County Commissioners :fee Engineering Division - 1840 25" Street Vero Beach , Florida 32960-3365 Attention : Ms . Michelle A. Gentile Subject : Proposal for Subsurface Soil Exploration and Geotechnical Engineering Evaluation 56" Place Bridge north of 53rtl Street Indian River County, Florida Ladies and Gentlemen : As requested , we are pleased to present the following proposal for conducting a subsurface soil exploration and geotechnical engineering evaluation for the subject project . This proposal presents our approach to the project which was discussed with your project structural engineer, Bridge Design Associates , Inc. and includes an estimate of field exploration and laboratory testing quantities as well as geotechnical engineering services needed for the evaluation of the data obtained and preparation of a report. We understand that the project includes the design and construction of a bridge crossing over North Relief Canal , supported on prestressed concrete piles . The following summarizes our proposed scope of work and associated fees for conducting the subject exploration . FIELD EXPLORATION Our field program will include conducting four Standard Penetration Test (SPT) borings to depths of 60 and 75 feet. One boring will be completed to a depth of 60 feet and one boring will be completed to a depth of 75 feet at each end of the proposed bridge over North Relief Canal . The borings may be completed to shallower (or deeper) depths depending on the soil conditions encountered during the performance of the borings . The SPT borings will be drilled using a procedure similar to the Standard Penetration Test outlined in ASTM D- 1586 . The borings will be sampled at 18-inch or 24-inch intervals to 10 feet deep and at 5-foot intervals below 10 feet . Each sample will be removed from the sampler in the field and then examined and visually classified by our crew chief. Representative portions will be sealed and packaged for transportation to our laboratory for further analysis as required . Water level observations will be made in the boreholes during the drilling operation . 460 Concourse Place NW, Un'.t 1 , Port Si. Lucie, Flonda 54986, Phone (772) 878-00'2 FAX (777_) 678-0097 Offices In: Bartow, Cocoa. Foo Myers, Miarni, Orlando, Port Chadotle, Por: St. Lucie, Sarasoc , -anahassee, Tames, Vv, Patin Leach R {b Indian River County 2- Proposal File No. 07-64-3136 „ f,*e We recommend that the project surveyor locate our borings horizontally and vertically (i . e . , determine the elevation of the ground surface at the boring locations) . This information will increase the accuracy of the data obtained . LABORATORY TESTING Routine laboratory visual classification will be performed along with specific classification tests deemed necessary (i .e . , sieve analysis , Atterberg limits and organic contents ) . ENGINEERING ANALYSIS AND REPORT Engineering analysis of all data obtained will be made to evaluate general subsurface conditions and to develop geotechnical engineering recommendations to guide site preparation and foundation design criteria for the bridge . For our analysis, we will require specific loading conditions for the bridge. Our recommendations as discussed above , together with all the data developed during the exploration will be submitted in a written report upon conclusion of the exploration . COST ESTIMATE The costs associated with the aforementioned tasks are presented below. Unit rates were obtained from the continuing services contract between Indian River County and Ardaman and Associates , Inc. If subsurface conditions are encountered during our field explorations that necessitate advancing the SPT borings to greater depths , the client understands and agrees to pay the additional drilling cost of $ 13 .25 per foot. 1 . Initial Site Visit, Layout of Boring Locations, Coordination of Field Work : Senior Project Engineer - 1 hour @ $ 98 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 98 .00 Project Engineer - 2 hours @ $ 85.00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 170 .00 Senior Field Technician - 4 hours @ $ 48 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 192 .00 2 . Mobilization/Demobilization of Drilling Equipment 1 Mobilization @ $ 175.00/Mob . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 175 . 00 3. Standard Penetration Test Borings : (2 borings to 60 feet) 100 feet of borehole at depths less than 25 feet @ $ 11 . 00lfoot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 100 . 00 100 feet of borehole at depths 26 to 50 feet @ $ 12 .00/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 ,200 .00 70 feet of borehole at depths 51 to 75 feet @ $ 13 .25/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 927 .50 Ardaman & Associates, Inc. Indian River County �$ Is -3- Proposal File No. 07-64-3136 om4 4 . Laboratory Testing Program : Percent Fines Analysis - 10 tests @ $ 30 . 00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300 .00 Atterberg Limits - 4 tests @ $ 80 . 00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 320 .00 Sieve Analysis - 10 tests @ $ 65 .00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 650 .00 Organic Content tests - 4 tests @ $ 30.00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 120 .00 Moisture Content tests - 14 tests @ $ 15 .00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 210 . 00 5 . Engineering Services : Senior Project Engineer - 3 hours @ $ 98 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 294 . 00 Project Engineer - 14 hours @ $ 85 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 190. 00 CAD/Draftsman Services - 4 hours @ $ 40 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 160. 00 Clerical/Secretarial Services - 3 hours @ $ 40 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . $ 120. 00 Total Project Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 7,226. 50 TERMS AND CONDITIONS This proposal is subject to the following terms and conditions : ( 1 ) access to boring locations is to be readily available to our truck-mounted drilling equipment, (2) the proposed number of borings and the boring depths will be adequate, (3) undisturbed samples and consolidation tests on fine grained soils are not budgeted into the total cost and (4) Ardaman & Associates can not take responsibility for damages to underground structures and/or services ; their locations are to be provided by the client prior to commencement of the field work. CLOSURE We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If this proposal meets with your approval , please indicate your acceptance by signing and returning the attached Proposal/Project Acceptance sheet or by issuing the purchase order that will be assigned to this project. Please call if you have any questions or require additional information. Best Regards , ARDAMAN & ASSOCIATES , INC . Will B . Cornelius II , E . I . an J . Zrall ck , P . E . Assistant Project Engineer nch ager WBC II/DJZ/dd cc: Mr. Brian C . Rheault, P . E . — Bridge Design Associates , Inc. IEW 11 Andaman & Associates, Inc.