HomeMy WebLinkAbout2007-427 IRC Work Order #2 ,
66'" Ave Roadway Improvements and Design - C '
South of SR60
Survey Horizontal and Vertical Control
December 11 '", 2007
Page 1 of 4
yprvCq
Board of County Commissioners
Administration - Building A (South)
1801 27th Street
Vero Beach, Florida 32960
Telephone : ( 772) 567-8000 FAX : 772-778-9391
Project:
IRC Project No. 9810 -A, Phase land 9810-B , Phase 2
66 1, Ave Roadway Improvements and Design
South of SR60
Survey Horizontal and Vertical Control
WORK ORDER NO . 2 ( Engineering/Surveying )
FOR
PROFESSIONAL SERVICES AGREEMENT
ANNUAL SURVEYING and MAPPING/GIS SERVICES
WITH
Carter Associates , Inc.
In accordance with Contract No. 0725
This Work Order No . 2 is in accordance with the existing AGREEMENT dated November 6 ,
2007 between Carter Associates , Inc. (SURVEYOR) and Indian River County (COUNTY) . This
Work Order No . 2 amends the agreement as follows:
SECTION I — PROJECT LIMITS
This Work Order No. 2 is for the SURVEYOR to perform a Horizontal/Vertical Control Survey for
the entire length of 66th Avenue , Phase 1 and Phase 2 design project from 4h Street to SR60,
Indian River County, Florida .
SECTION II - SCOPE OF SERVICES
As agreed upon between Carter Associates , Inc. and Indian River County , the SURVEYOR
shall provide Professional Land Surveying services to complete all tasks as outlined in this Work
Order No. 2 described within the attached "Exhibit A" :
SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT
1 . Project shall be completed within thirty (30) business days from Notice to Proceed .
2 . Deliverables to include five (5) signed and sealed 11 "x17" hard copies of the County
roadway improvement plans for 66th Avenue, prepared by Carter Associates , Inc. ,
Indian River County Project No. 9810-A, Phase 1 and 9810-13 , Phase 2 with new
Horizontal/Vertical Control Sheets incorporated therein and updated electronic
copies in AutoCAD 2007 and PDF formats .
K EngineeringlCapital Projects\0725- 2007 Annual Prof. Survey Contract12007-2008 ProjectslCarter166th Ave Survey Control10725
WO 2 Carter-66th Ave. Survey Control 12-11 -07. doc
4
IRC Work Order #2
66T' Ave Roadway Improvements and Design
South of SR60
Survey Horizontal and Vertical Control
December 11 ", 2007
Page 2 of 4
SECTION IV - COMPENSATION
The COUNTY agrees to pay, and the SURVEYOR agrees to accept , for services rendered as
identified in Sections I , II , and III of this Work Order No . 2 a lump sum fee of $ 107550. 00.
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein .
IN ITNESS WHEREOF the parties hereto have executed these presents this l 41k
day
of )cc . 2007 .
OWNER Carter Associates Inc.
BOARD OF COUNTY COMMISSIONERS an -_(I INDIAN RIVER COUD1W. FLQRIDA atuj - (Signtu
Sandra'. wAv 4 . IGhaitman J IDL T i j^�
(Printed name pnf} title) (Printed name and title)
Approved by BCC
ATTEST:
Jeffrey K. B rton , Clerk of Circuit Court W' ssed by :
4 &
epu Clerk / (Prin d name)
A r ve" to F m and u ciency: — -- ---
Illiam G. Ili
II , COUNTY Attorney
oseph . Baird4CUONTXYDAIdmin�istrator
F:1Engineering\Capital Projectsk0725- 2007 Annual Prof. Survey Contract12007-2008 Projects%carter166th Ave Survey Contro110725
WO 2 Carter-66th Ave. Survey Control 12-11 -07.doc
IRC Work Order #2
66Th Ave Roadway Improvements and Design
South of SR60
Survey Horizontal and Vertical Control
December 11 ", 2007
Page 3 of 4
PROPOSAL
EXHIBIT "A"
WORK ORDER NO. 2
FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPINGIGIS SERVICES
CONTRACT NO. 0725
CARTER ASSOCIATES, INC.
Consulting Engineers & Surveyors
1708 21 st Street
Vero Beach, FL 32960
772-562-4191
772-562-7180 Fax
CLIENT: CAI JOB NO. :
[BILLING
N RIVER COUNTY 07-504s
ADDRESS: PHONE # (772) 226- 1386
y DivisionFAx #
25th StreetCELL #
Beach , FLorida 32960ECT LIMITS DATE ORDERED:
Horizontal/Vertical Control Survey to support 11 -06-07
design and construction applications
66T" AVENUE
EST. COMPLETION DATE
30 DaYs from acceptance
ORDERED BY: TAKEN BY: EST. COST:
Michael O'Brien , PSM Roger A. Hagler, PLS $ 101550.00
LEGAL DESCRIPTION (Lot, Block, S/D/Sec-Twp-Rri
PROPERTY STREET ADDRESS
66th Avenue — Plan Stations 89+97 . 30 to 123+68, Phase 1 , County Project No . 9810-A
and 1 +47F61G176
77 to 89+97 . 30 , Phase 2 , Count Project No . 9810-B .
BE PERFORMED :
rtical Control Survey in accordance with the requirements of the
hnical Standards for Surveying and Mapping as set forth in Chapter
e Florida Administrative Code . pursuant to Chapter 472 . 026 of the
e State of Florida .
For the purpose of this survey, the final mapping will be incorporated into two sets of
existing design plans prepared by Carter Associates , Inc . , Indian River County Project
No . 9810-A, Phase 1 and No . 9810-13 , Phase 2 .
See Sheet 2 for Scope Completion Deliverables and Compensation
F:1Engineering\Capital Projectsl0725- 2007 Annual Prof. Survey Contract12007-2008 Projects\Carterl66th Ave Survey Contro110725
WO 2 Carter-66th Ave. Survey Control 12-11 -07.doc
IRC Work Order #2
66r" Ave Roadway Improvements and Design
South of SR60
Survey Horizontal and Vertical Control
December 11", 2007
Page 4 of 4
PROPOSAL
EXHIBIT "A"
Continued
WORK ORDER NO. 2
FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES
CAI Job. No. 07-504s CONTRACT NO. 0725
County Project No. 's 9810-A and 9810-B
SCOPE:
1 . Review existing plan information , previous County survey field notes , available published
horizontal and vertical control networks.
2. Computations, management and coordination of all information for field survey execution .
3. Field investigate and locate existing horizontal and vertical control within and adjacent to the
road right of way and set baseline construction control at minimum 700 foot intervals.
4. Establish elevations on set baseline control .
5 . Reduce field survey data for final mapping.
6 . Prepare Horizontal/Vertical Control Sheets for incorporation to existing design plans prepared
by Carter Associates, Inc. , Indian River County Project No. 9810-A, Phase 1 and No. 9810-B ,
Phase 2 .
Specific Notes
a) All control shall be mapped by station and offset to the Survey Baseline with
coordinates posted in 1990 National Adjusted Datum ( 1983 NAD, 1999 adjusted),
Florida East Coast State Plane Grid Network. And elevation datum based upon 1929
National Geodetic Vertical Datum ( 1929 NGVD) per existing plan design .
b) Right of way alignment to be per the existing County roadway improvement plans for
66 Avenue, prepared by Carter Associates, Inc. , Indian River County Project No.
9810-A, Phase 1 and No. 9810-B , Phase 2 .
c) Proposal does not include review of title work or any public records searches for
ownerships and/or right of way takings.
COMPLETION & DELIVERABLES/WORK PRODUCT :
1 . Project shall be completed within thirty (30) business days from Notice to Proceed .
2 . Deliverables to include five (5) signed and sealed 111'x17" hard copies of the County roadway
improvement plans for 66 th Avenue, prepared by Carter Associates, Inc. , Indian River County
Project No. 9810-A, Phase 1 and No. 9810-B, Phase 2 with new HorizontalA/ertical Control
Sheets incorporated therein and updated electronic copies in AutoCAD 2007 and PDF formats.
COMPENSATION :
TOTAL LUMP SUM PRICE $10,550.00
F:\FngineeringlCapital ProjeCts10725- 2007 Annual Prof. Survey Contractt2007-2008 Projects\Carter166th Ave Survey Contro1\0725
WO 2 Carter-66th Ave. Survey Control 12-11 -07.doc